ML19211A648: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:-
{{#Wiki_filter:-
                .
     ,                                        AVERAGE DAILY UNIT POWER LEVEL Docket No.              10-280 Unit              1 Date        December 17, 1979 Completed By Telephone            (215) 921-6579 DA'?      AVERAGE DAILY POWER LE'<EL                DAY          AVERAGE DAILY POWER LEVEL OMe-Net)                                                      ONe-Net) 1                -5                              17
      -
     ,                                        AVERAGE DAILY UNIT POWER LEVEL
                                        -
Docket No.              10-280
                                                                                                                      .  .
Unit              1 Date        December 17, 1979
* Completed By Telephone            (215) 921-6579 DA'?      AVERAGE DAILY POWER LE'<EL                DAY          AVERAGE DAILY POWER LEVEL OMe-Net)                                                      ONe-Net)
  .
1                -5                              17
                                                                                                       -5
                                                                                                       -5
                                                                                                                           ./. .' .
                                                                                                                           ./. .' .
                                                                                                                              -
                                                                                                                                          . , -
2                -4                              18                              -5                    -
2                -4                              18                              -5                    -
3                ;- 3
3                ;- 3
Line 37: Line 26:
                                                                                                       -5                              . , ,
                                                                                                       -5                              . , ,
h                -5                              20                                -5 5                -5                ___
h                -5                              20                                -5 5                -5                ___
21                              -5 6                -5                              22                                -5
21                              -5 6                -5                              22                                -5 7                  -5                              23
_
                                                                                                       -5 8                  -5                              24                              -5 n                  -5                              gg                              -5 lo                    -5                              26
7                  -5                              23
                                                                                                       -5 8                  -5                              24                              -5
                                                                                  ,
n                  -5                              gg                              -5 lo                    -5                              26
                                                                                                       -5 n                    -5                              27
                                                                                                       -5 n                    -5                              27
                                                                                                       -5 12                    -5                              28
                                                                                                       -5 12                    -5                              28
                                                                                                       -5 13                    -5                              29
                                                                                                       -5 13                    -5                              29
                                                                                                       -5
                                                                                                       -5 14                    -5                              30
                                                                                                                                    .
14                    -5                              30
                                                                                                       -5 15                    -5                              31
                                                                                                       -5 15                    -5                              31
                                                                                                       -5 16                    -5
                                                                                                       -5 16                    -5 1634 014
                                .          ,.
1634 014
                                                                                                            .
                                                                                     ,. J      79122 00 3(o f                                ,
                                                                                     ,. J      79122 00 3(o f                                ,
                                                                                                                              .          .
o.a."Ow*        ,
o.a."Ow*        ,
                                                                                                               ~
                                                                                                               ~
         ' ~+ --~      .,
         ' ~+ --~      .,
                        -
                                                                          ,.                    _
                                                                                                                 - . .          .% .% . . . ~
                                                                                                                 - . .          .% .% . . . ~
   .Ja-    s- fe Q M gh*e? Y," .  % ,-        _, " " *?      c'' * ~ _' - Qf, ' hh,f h' .',.  ,h    ~Q7h$1 k              f.? '"k{-        3
   .Ja-    s- fe Q M gh*e? Y," .  % ,-        _, " " *?      c'' * ~ _' - Qf, ' hh,f h' .',.  ,h    ~Q7h$1 k              f.? '"k{-        3


        '
               ,                                    OPERATING DATA REPORT        Docxet ho.        50-289 Date December 17, 1979 Completed By    J. R. Stair OPEF.ATING STATUS                                                      Telephone    (215) 021_As70
            *
               ,                                    OPERATING DATA REPORT        Docxet ho.        50-289
      '
Date December 17, 1979 Completed By    J. R. Stair OPEF.ATING STATUS                                                      Telephone    (215) 021_As70
: 1.      Unit Name: Three Mile Island Nuclear Station
: 1.      Unit Name: Three Mile Island Nuclear Station
: 2.      F.eporting Period: November                                                        e
: 2.      F.eporting Period: November                                                        e
                                                                                                        -
: 3.      Licensed Thermal Power (MWt):            2535
: 3.      Licensed Thermal Power (MWt):            2535
: k.      Nameplate Rating (Gross MRe):            871 5      Design Electrical Rating (Net MWe):          819
: k.      Nameplate Rating (Gross MRe):            871 5      Design Electrical Rating (Net MWe):          819
Line 78: Line 50:
9      Power Level to which Restricted. If Any (Net MWe):
9      Power Level to which Restricted. If Any (Net MWe):
: 10.      Reasons for Restrictions, If Any:
: 10.      Reasons for Restrictions, If Any:
                                                                                                                      *
                                                                                                             ?            __
                                                                                                             ?            __
                                                                                                               .                    w.
                                                                                                               .                    w.
Line 96: Line 67:
85.4                      2,.        7" 2h.      Shutdowns Scheduled Over Next 6 Months (Type, Date, anu Duratica of Each):
85.4                      2,.        7" 2h.      Shutdowns Scheduled Over Next 6 Months (Type, Date, anu Duratica of Each):
i 25      If Shut Down at End of Report Period, Estimated Date of Startup;
i 25      If Shut Down at End of Report Period, Estimated Date of Startup;
: 26. Units In Test Status (Prior to Cc=mercial Operation):                  FORECAST        ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY
: 26. Units In Test Status (Prior to Cc=mercial Operation):                  FORECAST        ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMERCIAL OPERATION t
                                  -
COMERCIAL OPERATION t
                                                                                                                 .            $~
                                                                                                                 .            $~
                                                                                                                  -
_                                                                                1634:015                -
_                                                                                1634:015                -
                                                                                                          .
e    e  e. e                ee==ee%
e    e  e. e                ee==ee%
    .
a.em--mm e  *  -he  m e m-em e ,              e      .
a.em--mm e  *  -he  m e m-em e ,              e      .


                                               ;                      .
                                               ;                      .
                                                                                                                                        '
UNIT SHUTDOWNS AND POWER' REDUCTIONS              Docket No.      50-289 Unit Name      TMI-1
UNIT SHUTDOWNS AND POWER' REDUCTIONS              Docket No.      50-289
                                           '.            REPORT MONTH    November Date Dece'mber 17. 1979 Completed By      J,'R. Stair
* Unit Name      TMI-1
                                           '.            REPORT MONTH    November
                                              -
Date Dece'mber 17. 1979
                                          '.*'
Completed By      J,'R. Stair
* Telephone    (215) 921-6579 No.      Date      Type l        cu                      System        Component                Cause and Corrective                    -
* Telephone    (215) 921-6579 No.      Date      Type l        cu                      System        Component                Cause and Corrective                    -
gg    n        og  gg        Code 4        Code 5                          Action to Prevent Recurrence
gg    n        og  gg        Code 4        Code 5                          Action to Prevent Recurrence j
                                                                                                                          -
g        ggo g,g                                                                                    'j
j g        ggo g,g                                                                                    'j
                                       "        #$8 80j MM=
                                                                                                                                            ,
                                       "        #$8
                                                $$$
80j MM=
5 1
5 1
1      11 / 1 / 7 9  F      720      D        1                                            .Regelatory Restraint Order                  j 1
1      11 / 1 / 7 9  F      720      D        1                                            .Regelatory Restraint Order                  j 1
t
t 1
                                                                                                                                            ,
1
                                                                                                                                              .
                                                                                                                                       .j d
                                                                                                                                       .j d
u
u i1 n.
                                                                                                                                            ,
mn " - Ine E ' S,,5 i
i1
I:F Forced            2Reason:                                          3 Methods S: Scheduled          A-Equipment Failure (Explain)                      14fanu al
                                                                                                                                          ,,
                                                                                                                                              ,
n.
mn " - Ine E ' S,,5
                                                                                                                                    '
i I:F Forced            2Reason:                                          3 Methods S: Scheduled          A-Equipment Failure (Explain)                      14fanu al
                                                                                                       ##        P*    **      "~
                                                                                                       ##        P*    **      "~
B-Maintenance or Tc':t                                                    "        '
B-Maintenance or Tc':t                                                    "        '
                                                                                                                      '*                      '
-'
24fanual Scram.      Event . m t (LER, -                j C-Refueling 3-Automatic Scram.    "
24fanual Scram.      Event . m t (LER, -                j C-Refueling 3-Automatic Scram.    "
D-Regulatory Restriction                            h-Other (Explain)                  '
D-Regulatory Restriction                            h-Other (Explain)                  '
E-Operator Training & Licensee Examination                                                                        -
E-Operator Training & Licensee Examination                                                                        -
#
F-Administrative G-Operational Error (Explain)                                            5 Exhibit 1 - Srme Scurce            1 g
F-Administrative G-Operational Error (Explain)                                            5 Exhibit 1 - Srme Scurce            1 g
-                            H-Other (Explain}                                                                                          p<
-                            H-Other (Explain}                                                                                          p<
Ch                                                                                                                                    JI
Ch                                                                                                                                    JI
[j 4 .,
[j 4 .,
                                                                        .__                              ._
                                                                                            ,


  *
.
OPERATING  
OPERATING  


Line 163: Line 103:
Unit I remained in cold' shutdown with the "B" Decay Heat Removal System providing core cooling.
Unit I remained in cold' shutdown with the "B" Decay Heat Removal System providing core cooling.
MAJOR SAFETY RELATED MAINTENANCE Spent Fuel piping indications #13, 14, and 22 were repaired satisfactorily. The repair included removal of the indication, weld prep of the pipe and installation of a spool piece or dutchmen (included fit up, welding). The repairs were performed without adversely affecting the cooling of the spent fuel pools.
MAJOR SAFETY RELATED MAINTENANCE Spent Fuel piping indications #13, 14, and 22 were repaired satisfactorily. The repair included removal of the indication, weld prep of the pipe and installation of a spool piece or dutchmen (included fit up, welding). The repairs were performed without adversely affecting the cooling of the spent fuel pools.
                                                                    .
i634 017
i634 017
                                                                  .


                                                                                                                                .
            *
. . *
      *                                                                                                          .
  ..
      ,
        .,
REFUELING INF0FMATION REQUEST _
REFUELING INF0FMATION REQUEST _
: 1. Name of Facility:                                                                          .
: 1. Name of Facility:                                                                          .
Three Mile Island Nuclear Station, Unit 1
Three Mile Island Nuclear Station, Unit 1
                                                                                                                                  .
: 2. Scheduled date for next refueling shutdown:
: 2. Scheduled date for next refueling shutdown:
Unknown 3
Unknown 3
Scheduled F. ate for restart following refueling:
Scheduled F. ate for restart following refueling:
                                                                                                                                .
Unknown
Unknown
: 4. Will refueling or resu=ption of operation thereafter require a technical specification change or other license amendment?
: 4. Will refueling or resu=ption of operation thereafter require a technical specification change or other license amendment?
                                                                                                                                      .
If answer is yes, in general, what vill these'be?
If answer is yes, in general, what vill these'be?
If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Consittee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section 50.59)?
If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Consittee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section 50.59)?
Line 195: Line 123:
T.
T.
The nunber of fuel assemblies (a) in the core, and (b) in the spent fuel storage pool:
The nunber of fuel assemblies (a) in the core, and (b) in the spent fuel storage pool:
  .
(a) 177 1634 018 (b) 208
(a) 177 1634 018 (b) 208
: 8. The present licensed spent fuel pool storage capaci planned, in number of fuel assemblies:
: 8. The present licensed spent fuel pool storage capaci planned, in number of fuel assemblies:
Line 205: Line 132:
   "          '.            .n.__.      ' ' ~ " ~          -~      - - - ~  -
   "          '.            .n.__.      ' ' ~ " ~          -~      - - - ~  -
                                                                                           . . _ , . . _ : . y ,'
                                                                                           . . _ , . . _ : . y ,'
_
                                                                                                                 ;
                                                                                                                 ;
_
                                                                                                                         , ;y . - .}}
                                                                                                                         , ;y . - .}}

Revision as of 04:55, 2 February 2020

Monthly Operating Rept for Nov 1979
ML19211A648
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 12/17/1979
From: Stair J
METROPOLITAN EDISON CO.
To:
Shared Package
ML19211A647 List:
References
NUDOCS 7912200368
Download: ML19211A648 (5)


Text

-

, AVERAGE DAILY UNIT POWER LEVEL Docket No.10-280 Unit 1 Date December 17, 1979 Completed By Telephone (215) 921-6579 DA'? AVERAGE DAILY POWER LE'<EL DAY AVERAGE DAILY POWER LEVEL OMe-Net) ONe-Net) 1 -5 17

-5

./. .' .

2 -4 18 -5 -

3  ;- 3

, 19

-5 . , ,

h -5 20 -5 5 -5 ___

21 -5 6 -5 22 -5 7 -5 23

-5 8 -5 24 -5 n -5 gg -5 lo -5 26

-5 n -5 27

-5 12 -5 28

-5 13 -5 29

-5 14 -5 30

-5 15 -5 31

-5 16 -5 1634 014

,. J 79122 00 3(o f ,

o.a."Ow* ,

~

' ~+ --~ .,

- . . .% .% . . . ~

.Ja- s- fe Q M gh*e? Y," .  % ,- _, " " *? c * ~ _' - Qf, ' hh,f h' .',. ,h ~Q7h$1 k f.? '"k{- 3

, OPERATING DATA REPORT Docxet ho. 50-289 Date December 17, 1979 Completed By J. R. Stair OPEF.ATING STATUS Telephone (215) 021_As70

1. Unit Name: Three Mile Island Nuclear Station
2. F.eporting Period: November e
3. Licensed Thermal Power (MWt): 2535
k. Nameplate Rating (Gross MRe): 871 5 Design Electrical Rating (Net MWe): 819
6. Max. Dependable Capacity (Gross Mwe): 8h0 7 Max. Dependable Capacity (Net MWe): 776
8. If Changes Occur in Capacity Ratings (Items No. 3 through 7) Since Last Report, Give Reasons:

9 Power Level to which Restricted. If Any (Net MWe):

10. Reasons for Restrictions, If Any:

? __

. w.

Month Yr. to date Cumulative

11. Ecurs in Reporting Period 720. 8016. 46705,
12. No. of Hours Reactor was Critical 0.0 1128.0 31731.8
13. Reactor Reserve Shutdown Hours 0.0 0.0 838.5
14. Hours Generator On-Line 0.0 1128.0 31130.9 15 Unit Reserve Shutdevn Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated UGH) 0. 2828hh8. 76531071.

17 Gross Elect. Energ7 Generated (!GH) O. 94599o. 25h8h330.

18. Net Electrical Energy Generated (IGH) -3510. 848301. 23840316.

19 Unit Service Factor 0.0 14.1 66.8 .

20. Unit Availability Factor 0.0 14.1 66.8 _
21. Unit Capacity Factor (Using MDC Net) -0.6 13.6 64.7
22. Unit Capacity Factor (Using DER Net) -0.6 12.9 6'3
23. Unit Forced Outage Rate 100.0 ,

85.4 2,. 7" 2h. Shutdowns Scheduled Over Next 6 Months (Type, Date, anu Duratica of Each):

i 25 If Shut Down at End of Report Period, Estimated Date of Startup;

26. Units In Test Status (Prior to Cc=mercial Operation): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMERCIAL OPERATION t

. $~

_ 1634:015 -

e e e. e ee==ee%

a.em--mm e * -he m e m-em e , e .

.

UNIT SHUTDOWNS AND POWER' REDUCTIONS Docket No. 50-289 Unit Name TMI-1

'. REPORT MONTH November Date Dece'mber 17. 1979 Completed By J,'R. Stair

  • Telephone (215) 921-6579 No. Date Type l cu System Component Cause and Corrective -

gg n og gg Code 4 Code 5 Action to Prevent Recurrence j

g ggo g,g 'j

" #$8 80j MM=

5 1

1 11 / 1 / 7 9 F 720 D 1 .Regelatory Restraint Order j 1

t 1

.j d

u i1 n.

mn " - Ine E ' S,,5 i

I:F Forced 2Reason: 3 Methods S: Scheduled A-Equipment Failure (Explain) 14fanu al

    1. P* ** "~

B-Maintenance or Tc':t " '

24fanual Scram. Event . m t (LER, - j C-Refueling 3-Automatic Scram. "

D-Regulatory Restriction h-Other (Explain) '

E-Operator Training & Licensee Examination -

F-Administrative G-Operational Error (Explain) 5 Exhibit 1 - Srme Scurce 1 g

- H-Other (Explain} p<

Ch JI

[j 4 .,

OPERATING

SUMMARY

Unit I remained in cold' shutdown with the "B" Decay Heat Removal System providing core cooling.

MAJOR SAFETY RELATED MAINTENANCE Spent Fuel piping indications #13, 14, and 22 were repaired satisfactorily. The repair included removal of the indication, weld prep of the pipe and installation of a spool piece or dutchmen (included fit up, welding). The repairs were performed without adversely affecting the cooling of the spent fuel pools.

i634 017

REFUELING INF0FMATION REQUEST _

1. Name of Facility: .

Three Mile Island Nuclear Station, Unit 1

2. Scheduled date for next refueling shutdown:

Unknown 3

Scheduled F. ate for restart following refueling:

Unknown

4. Will refueling or resu=ption of operation thereafter require a technical specification change or other license amendment?

If answer is yes, in general, what vill these'be?

If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Consittee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section 50.59)?

If no such review has taken place, when is it scheduled?

A=endnent No. 50, Cycle 5 reload, was approved on 3-16-79 Scheduled date(s) for submitting proposed licensing action and suppcrting 5

infor=ation:

N/A

6. Important licensing considerations associated with refueling, e.g. new or different fuel design or supplier, unreviewed design or perfor=ance analysis methods, significant changes in fuel design, new operating procedures:

N/A ,

T.

The nunber of fuel assemblies (a) in the core, and (b) in the spent fuel storage pool:

(a) 177 1634 018 (b) 208

8. The present licensed spent fuel pool storage capaci planned, in number of fuel assemblies:

There are no planned increases The present licensed capacity is 752.

at this tine.

9 The Projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

1986 is the last refueling discharge which allovs full core off-load ,

capacity (177 fuel assemblies). . .. . ? - ...

" '. .n.__. ' ' ~ " ~ -~ - - - ~ -

. . _ , . . _ : . y ,'

, ;y . - .