Monthly Operating Rept for Aug 1997 for TMI-1
ML20217A876
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 08/31/1997
From: Heysek W, Langenbach J
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
6710-97-2406, NUDOCS 9709230055
Download: ML20217A876 (3)


Text

l

  • 0

{ GPU Nuclear. Inc.

( Route 441 South NUCLEAR PoOnc* Box **0 Middletow 1, PA 17057-0480 Tel717 944 7621 6710-97-2406 September 12, 1997 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

Three hiile Island Nuclear Station, Unit I (Thil-1)

Operating License No. DPR-50 Docket No. 50-289 Monthly Operating Report for August 1997 Enclosed are two copies of the August 1997 hionthly Operating Report for Three hiile Island Nuclear Station, Unit 1. The content and format ofinformation submitted in this report is in accordance with the guidance provided by Generic Letter 97-02.

}

Sincerely, /{j

>\ ~l \

hQ(A). n l . W. Langenbach Vice President and Director, Thil WGH cc: Administrator, Region i Thil Senior Resident inspector 97001 9709230055 970831' lilElEME!NRillll PDR ADOCK 03000289 R PDR

9 APPENDIX A OPERATING DATA REPORT DOCKET NO. 50 289 DATE September 12, 1997 COMPLETED BY W. HEYSEK TELEPHONE (717) 948-8191 REPORTING PERIOD: AUGUST 1997 YEAR TO MONTH DATE CUMULATIVE

1. DESIGN ELECTRICAL RATING (MWe 819.0 *
  • NET).

The nominal net electrical output of the unit specified by the utility and used for the pwpose of plant design.

2. MAXIMUM DEPENDABLE CAPACITY 786.0 * *

(MWeNE!).

De gross electrical output as measured at the output tenninals of the turbine generator during the most restrictise seasonal conditions minus the nonnal station service loads.

3. NUMBER OF HOURS REACTOR WAS 744.0 5,654.3 123,981.4 CRITICAL.

The utal number of hours durtng the gross hours of the reporting period that the reactor was entical.

4. HOURS GENERATOR ON LINE. 744.0 5,649.2 122,814.5 (Senice flours) The total number of hours during the gross hours of the reporting period that the unit opetated with the breakers closed to the station bus.

The sum of the hours that the generator uns on line plus the total outage hours in the reporting period.

5. UNIT RESERVE SHUTDOWN HOURS. 0.0 0.0 0.0 ne total number of hours during the gross hours of the reporting period that the unit vias removed from service for economic or similar reasons but w as available for operation.
6. NET ELECTRICAL ENERCY (MWH). 587,502.0 4,560,048.0 95,703.712.1 j The gross electrical output of the unit measured at the output terminals of the turbine generator minus h normal station senice loads during the gross l hows of the reporting period, expressed in megawatt  ;

hours. Negative quantities should not be used. l

  • Design values have no " Year to Date" or " Cumulative" significance.

i

APPENDIX B

  • UNIT SIIUTDO%%S DOCKET NO. 50-289 -
  • DATE September 12, 1997 COMPLETED BY W. llEYSEK TELEPl!ONE (717)948-8191 REPORTING PERIOD: AUGUST 1997 Method of Cmame & Corrective oe w - ,_m. = ,,,,,n,,,

650tal gs None i

1 2 3 )

A-Eqtsymers Fahne(Explum) 1 Man-d S Sdedidad B-Massamance or Test 2 MarmelScram C Renackng 1Ausemens Srsam D-Roridssory Restnetum 40ther Explem)

Eopientor Trarung & tscensmg Exaremneme F-r Coperutsanal Emr(Explem)

Hother (Er,gnmen)

SUMMARY

The plant entered the month operating at 100% power and remt.ined at that power lesel for the entire month. The plant maintrjned full power operation as the end of the operating cyc'e approached by reducing average temperature and withdrawing the axial power shaping control rc(ns. The plant is scheduled to shut down on September 5,1997 for refueling.