| | number = ML19225D315 | | | number = ML19225D315 |
| | issue date = 08/13/2019 | | | issue date = 08/13/2019 |
| | title = Request for Additional Information Regarding License Amendment Request to Relocate the MOV Thermal Overload Bypass Devices (L-2019-LLA-0106) | | | title = NRR E-mail Capture - St. Lucie Plant, Unit No. 2, Request for Additional Information Regarding License Amendment Request to Relocate the MOV Thermal Overload Bypass Devices (L-2019-LLA-0106) |
| | author name = Wentzel M | | | author name = Wentzel M |
| | author affiliation = NRC/NRR/DORL/LPLII-2 | | | author affiliation = NRC/NRR/DORL/LPLII-2 |
Line 25: |
Line 25: |
| ==Dear Mr. Godes:== | | ==Dear Mr. Godes:== |
|
| |
|
| By application dated May 20, 2019 (Agencywide Documents Access and Management System Accession No. | | By application dated May 20, 2019 (Agencywide Documents Access and Management System Accession No. ML19140A100), Florida Power & Light Company (FPL, the licensee) submitted a license amendment request (LAR) for St. Lucie Plant, Unit No. 2 (St. Lucie 2). The proposed amendments would modify Technical Specification (TS) to relocate the requirements pertaining to the Motor Operated Valve (MOV) Thermal Overload Protection Bypass Devices to licensee control, whereby future changes will be subject to regulatory controls of Section 50.59 of Title 10 of the Code of Federal Regulations (10 CFR). |
| ML19140A100), Florida Power & Light Company (FPL, the licensee) submitted a license amendment request (LAR) for St. Lucie Plant, Unit No. 2 (St. Lucie 2). The proposed amendments would modify Technical Specification (TS) to relocate the requirements pertaining to the Motor Operated Valve (MOV) Thermal Overload Protection Bypass Devices to licensee control, whereby future changes will be subject to regulatory controls of Section 50.59 of Title 10 of the Code of Federal Regulations (10 CFR). | |
| The NRCs Electrical Engineering Operating Reactors Branch (EEOB) staff is reviewing the application and has identified areas where it needs additional information to support its review. The NRC staffs request for additional information (RAI) is provided below. As discussed with the licensees staff on call on August 13, 2019, the NRC staff requests your response to the RAI within 30 days of the date of this email. | | The NRCs Electrical Engineering Operating Reactors Branch (EEOB) staff is reviewing the application and has identified areas where it needs additional information to support its review. The NRC staffs request for additional information (RAI) is provided below. As discussed with the licensees staff on call on August 13, 2019, the NRC staff requests your response to the RAI within 30 days of the date of this email. |
| If you have any questions, please contact me at (301) 415-6459 or michael.wentzel@nrc.gov. | | If you have any questions, please contact me at (301) 415-6459 or michael.wentzel@nrc.gov. |
|
---|
Category:E-Mail
MONTHYEARML24002A7272023-12-16016 December 2023 NRR E-mail Capture - (External_Sender) November 2023 FPL Marine Turtle Removal Monthly Report ML23332A0352023-11-27027 November 2023 Conversion to Improved Technical Specifications Change in Estimated Review Schedule ML23326A0252023-11-20020 November 2023 NRR E-mail Capture - (External_Sender) October 2023 FPL Marine Turtle Removal Monthly Report ML24008A1582023-11-14014 November 2023 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for October 2023 ML23254A2852023-09-11011 September 2023 NRR E-mail Capture - (External_Sender) August 2023 FPL Marine Turtle Removal Monthly Report ML23243A9182023-08-31031 August 2023 NRR E-mail Capture - Re Audit Plan - St. Lucie ITS Conversion LAR - Setpoints ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23228A1482023-08-16016 August 2023 NRR E-mail Capture - Acceptance Review Results - St. Lucie Nuclear Plant, Unit 2 Alternative PSL2-I5-RR-01 (L-2023-LLR-0038) ML23226A0762023-08-14014 August 2023 NRR E-mail Capture - Request for Additional Information - St. Lucie Plant, Units 1 and 2 - Adopt 10 CFR 50.69 (L-2022-LLA-0182) ML23226A0692023-08-12012 August 2023 NRR E-mail Capture - (External_Sender) July 2023 FPL Marine Turtle Removal Monthly Report ML23223A0152023-08-11011 August 2023 NRR E-mail Capture - Acceptance Review Results - St. Lucie Nuclear Plant, Unit 2 Alternative PR-10 (L-2023-LLR-0039) ML23191A1952023-07-10010 July 2023 NRR E-mail Capture - (External_Sender) June 2023 FPL Marine Turtle Removal Monthly Report ML23216A1412023-06-30030 June 2023 August 2023 RP Inspection Document Request ML23248A1292023-06-29029 June 2023 NRR E-mail Capture - St Lucie 50.69 - Additional Audit Questions ML23198A0662023-06-22022 June 2023 NRR E-mail Capture - (External_Sender) Green Turtle Nest on Canal Bank, June 2023 ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23198A0642023-06-12012 June 2023 NRR E-mail Capture - (External_Sender) Loggerhead Nest on Canal Bank, May 2023 ML23163A1732023-06-10010 June 2023 NRR E-mail Capture - (External_Sender) May 2023 FPL Marine Turtle Removal Monthly Report ML23163A1222023-05-30030 May 2023 NRR E-mail Capture - (External_Sender) Nest on Intake Canal Bank ML23137A0942023-05-17017 May 2023 NRR E-mail Capture - Audit Plan - St Lucie Plant, Units 1 and 2 - 10 CFR 50.69 LAR ML23138A0212023-05-17017 May 2023 Telephone Record, Call with Florida Power and Light Regarding Decommissioning Funding Plan Update Dated March 30, 2021 ML23135A0292023-05-12012 May 2023 NRR E-mail Capture - (External_Sender) April 2023 FPL Marine Turtle Removal Monthly Report ML23129A8312023-05-0808 May 2023 NRR E-mail Capture - Audit Plan - St. Lucie ITS Conversion LAR - Setpoints ML23109A1862023-04-19019 April 2023 and Turkey Point Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML23198A1592023-04-0707 April 2023 NRR E-mail Capture - (External_Sender) March 2023 FPL Marine Turtle Removal Monthly Report ML23074A2292023-03-15015 March 2023 NRR E-mail Capture - (External_Sender) February 2023 FPL Marine Turtle Removal Monthly Report ML23041A2262023-02-10010 February 2023 NRR E-mail Capture - (External_Sender) January 2023 FPL Marine Turtle Removal Monthly Report ML23065A1142023-02-0101 February 2023 NRR E-mail Capture - (External_Sender) FPL St. Lucie Plant Biological Opinion SERO-2019-03494 - Submittal ML23254A4022023-01-24024 January 2023 RP Inspection_2023-001_Document Request ML23019A0142023-01-18018 January 2023 NRR E-mail Capture - (External_Sender) Regarding St. Lucie Olive Ridley Capture 1/3/2023 ML23006A1882023-01-0606 January 2023 NRR E-mail Capture - (External_Sender) December 2022 FPL Marine Turtle Removal Monthly Report ML23006A1822023-01-0606 January 2023 NRR E-mail Capture - (External_Sender) Psl Smalltooth Sawfish Capture 1/5/23 ML23006A0242023-01-0505 January 2023 NRR E-mail Capture - (External_Sender) Psl Olive Ridley Capture 1323 ML23019A2052022-12-24024 December 2022 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors - Acceptance Review ML22348A1002022-12-14014 December 2022 NRR E-mail Capture - (External_Sender) November 2022 FPL Marine Turtle Removal Monthly Report ML22325A0682022-11-18018 November 2022 Email from Brian Harris (NRC) to Robert Coffey (FPL) - St. Lucie SLRA RAI Set 4 ML22319A0762022-11-15015 November 2022 NRR E-mail Capture - (External_Sender) October 2022 FPL Marine Turtle Removal Monthly Report ML22285A2222022-10-12012 October 2022 NRR E-mail Capture - (External_Sender) September 2022 FPL Marine Turtle Removal Monthly Report ML22270A1492022-09-26026 September 2022 Email from Brian Harris (NRC) to Robert Coffey (FPL) - St. Lucie SLRA Second Round RAI Letter 2 - Class 1 Fatigue ML22286A1612022-09-16016 September 2022 August 2022 FPL St. Lucie Marine Turtle Removal Report ML22234A1552022-08-22022 August 2022 NRR E-mail Capture - (External_Sender) July 2022 FPL Marine Turtle Removal Monthly Report ML22227A0522022-08-15015 August 2022 NMFS to NRC, Transmittal of Final Biological Opinion for Continued Operation of St. Lucie Nuclear Power Plant ML22217A0022022-08-0404 August 2022 Email from Brian Harris (NRC) to Robert Coffey (FPL) - St. Lucie SLRA Second Round RAI Letter 1) ML22210A0782022-07-22022 July 2022 Stl 2022003 Document Request ML22194A0482022-07-12012 July 2022 NRR E-mail Capture - (External_Sender) June 2022 FPL Marine Turtle Removal Monthly Report ML22193A0862022-07-11011 July 2022 Email - St. Lucie SLRA - Request for Additional Information Set 3 ML22165A2992022-06-14014 June 2022 NRR E-mail Capture - (External_Sender) May 2022 FPL Marine Turtle Removal Monthly Report ML22147A0862022-05-26026 May 2022 Email from Brian Harris (NRC) to Robert Coffey (FPL) - St. Lucie SLRA - RCI Set 1 2023-09-11
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23226A0762023-08-14014 August 2023 NRR E-mail Capture - Request for Additional Information - St. Lucie Plant, Units 1 and 2 - Adopt 10 CFR 50.69 (L-2022-LLA-0182) ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23254A4022023-01-24024 January 2023 RP Inspection_2023-001_Document Request ML22311A5582022-11-22022 November 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Cep ML22325A0692022-11-18018 November 2022 RAI Set 4 ML22270A1482022-09-26026 September 2022 SLRA Second Round RAI Letter 2 - Class 1 Fatigue (Final) ML22217A0022022-08-0404 August 2022 Email from Brian Harris (NRC) to Robert Coffey (FPL) - St. Lucie SLRA Second Round RAI Letter 1) ML22217A0032022-08-0404 August 2022 SLRA Second Round RAI Letter 1) ML22193A0872022-07-11011 July 2022 Letter RAI Set 3 (Final) ML22133A0032022-05-12012 May 2022 SLRA Rai'S Set 1 ML22101A2322022-05-0202 May 2022 Summary of the Environmental Remote Audit Related to the Review of the Subsequent License Renewal Application Enclosure RCIs and RAIs ML22094A1672022-04-0101 April 2022 2022 St. Lucie POV Inspection Information Request ML22075A1212022-03-16016 March 2022 Stl Problem Identification and Resolution (Pi&R) Information Request Final Report ML21350A4262021-12-21021 December 2021 Supplemental Information Needed for Acceptance of Licensing Amendment Request Concerning Technical Specification Conversion to NUREG-1432, Revision 5 ML21119A3142021-04-28028 April 2021 Requests for Additional Information Regarding License Amendment Requests to Apply Risk Informed Completion Times (RICT) for the 120-Volt AC (EPID L-2020-LLA-0283) (Email) ML21063A3192021-03-0404 March 2021 Request for Additional Information Regarding Relief Request RR 15 - Extension of RPV Welds from 10 to 20 Years ML20092G3442020-04-0101 April 2020 RAIs for LAR to Revise Technical Specifications 6.8.4.o, Reactor Coolant Pump Flywheel Inspection Program ML20094G2022020-03-30030 March 2020 Request for Additional Information Regarding License Amendment Request to Adopt EAL Schemes Pursuant to NEI 99-01 (L-2019-LLA-0210) ML19225D3152019-08-13013 August 2019 NRR E-mail Capture - St. Lucie Plant, Unit No. 2, Request for Additional Information Regarding License Amendment Request to Relocate the MOV Thermal Overload Bypass Devices (L-2019-LLA-0106) ML19218A2742019-08-0606 August 2019 Notification of Inspection and Request for Information ML19193A1982019-07-12012 July 2019 Emailed St. Lucie Heat Sink RFI ML19192A1372019-07-11011 July 2019 NRR E-mail Capture - Request for Additional Information - St. Lucie Plant, Unit No. 2, Fall 2018 Refueling Outage Steam Generator Tube Inspection Report ML19192A1352019-06-25025 June 2019 NRR E-mail Capture - Draft Request for Additional Information - St. Lucie Plant, Unit No. 2, Fall 2018 Refueling Outage Steam Generator Tube Inspection Report ML19151A8312019-05-31031 May 2019 NRR E-mail Capture - St. Lucie Plant, Unit Nos. 1 and 2, Request for Additional Information Regarding Emergency Diesel Generator Surveillance Requirement Amendment Request ML19151A5092019-05-21021 May 2019 NRR E-mail Capture - Draft Request for Additional Information - St. Lucie Plant, Unit Nos. 1 and 2 Emergency Diesel Generator Surveillance Requirement Amendment Request ML19109A1392019-04-18018 April 2019 NRR E-mail Capture - St. Lucie Plant, Unit No. 2, Request for Additional Information Regarding the License Amendment Request Pertaining to the Iodine Removal System ML19053A2242019-02-0101 February 2019 NRR E-mail Capture - St. Lucie Plant Unit No. 1 - Draft Request for Additional Information Related to Relief Request 6 Regarding the Refueling Water Tank Bottom Liner L-2018-018, St. Lucie Plant, Unit No. 2, Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element Assemblies (EPID L-2018-0181)2018-10-22022 October 2018 St. Lucie Plant, Unit No. 2, Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element Assemblies (EPID L-2018-0181) ML18296A2052018-10-22022 October 2018 NRR E-mail Capture - St. Lucie Plant, Unit No. 2, Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element Assemblies (EPID L-2018-0181) ML18197A4112018-08-0101 August 2018 Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request to Reduce the Number of Control Element Assemblies ML18019A0712018-01-18018 January 2018 NRR E-mail Capture - Request for Additional Information - St. Lucie Inop AFW Steam Supply LAR (L-2017-LLA-0296) ML17331B1532017-11-27027 November 2017 NRR E-mail Capture - Request for Additional Information - St. Lucie IST Relief Request #5 - PR-01 (L-2017-LLR-0113) ML17277A3692017-10-0404 October 2017 NRR E-mail Capture - Request for Additional Information - St. Lucie Rict LAR - MF5372/MF5373 ML17152A1842017-06-0101 June 2017 Request for Additional Information - RPS Rate of Change and LCO Change LAR (CACs MF9119 9120) ML16356A1432016-12-20020 December 2016 Notification of Inspection and Request for Information ML16326A0092016-11-18018 November 2016 NRR E-mail Capture - Request for Additional Information Re. Nextera/Fpl LAR to Adopt TSTF-545 - CACs MF8203, MF8204, MF8208, and MF8209 ML16308A3232016-11-0303 November 2016 NRR E-mail Capture - Request for Additional Information - St. Lucie EDG Day Tank LAR - MF8006 ML16292A8212016-10-14014 October 2016 Emergency Preparedness Inspection and Request for Information ML17003A0452016-10-11011 October 2016 NRR E-mail Capture - (External_Sender) FW: St. Lucie Response to RAI on SL2-22 SG Tube Inspection Report (MF7604) ML16244A2602016-08-26026 August 2016 Notification of Inspection and Request for Information ML16155A3502016-06-0303 June 2016 Notification of Inspection and Request for Information ML16089A0052016-03-28028 March 2016 NRR E-mail Capture - Request for Additional Information - St. Lucie Srxb Mtc Surv - MF7269 & MF7270 ML16077A1062016-03-17017 March 2016 NRR E-mail Capture - Request for Additional Information - St Lucie Vacuum Gothic LAR - MF6980/MF6981 ML16068A2612016-03-0808 March 2016 NRR E-mail Capture - Request for Additional Information - St Lucie TSTF-422 - MF6683/MF6684 ML16068A0412016-03-0808 March 2016 NRR E-mail Capture - Request for Additional Information - St Lucie Unit 1 Relief Request No. 10 - MF6685 ML16013A2152016-01-13013 January 2016 NRR E-mail Capture - St. Lucie RAIs (Rvi Aging Management Plan) MF6777 and MF6778 ML15336A8882015-12-16016 December 2015 Request for Additional Information Regarding License Amendment Request for Changes to the Snubber Surveillance Requirements ML15308A6152015-11-23023 November 2015 Request for Additional Information on License Amendment Request for Changes to the Required Actions for Inoperability of Auxiliary Feedwater Pumps ML15233A0362015-09-0404 September 2015 Redacted Request for Additional Information Regarding Proposed License Amendment Request and Exemption Request to Allow the Transition to Areva Fuel 2023-08-31
[Table view] |
Text
NRR-DRMAPEm Resource From: Wentzel, Michael Sent: Tuesday, August 13, 2019 3:39 PM To: Godes, Wyatt Cc: Mack, Jarrett; Catron, Steve; Frehafer, Ken
Subject:
St. Lucie Plant, Unit No. 2, Request for Additional Information Regarding License Amendment Request to Relocate the MOV Thermal Overload Bypass Devices (L-2019-LLA-0106)
Dear Mr. Godes:
By application dated May 20, 2019 (Agencywide Documents Access and Management System Accession No. ML19140A100), Florida Power & Light Company (FPL, the licensee) submitted a license amendment request (LAR) for St. Lucie Plant, Unit No. 2 (St. Lucie 2). The proposed amendments would modify Technical Specification (TS) to relocate the requirements pertaining to the Motor Operated Valve (MOV) Thermal Overload Protection Bypass Devices to licensee control, whereby future changes will be subject to regulatory controls of Section 50.59 of Title 10 of the Code of Federal Regulations (10 CFR).
The NRCs Electrical Engineering Operating Reactors Branch (EEOB) staff is reviewing the application and has identified areas where it needs additional information to support its review. The NRC staffs request for additional information (RAI) is provided below. As discussed with the licensees staff on call on August 13, 2019, the NRC staff requests your response to the RAI within 30 days of the date of this email.
If you have any questions, please contact me at (301) 415-6459 or michael.wentzel@nrc.gov.
Sincerely, Michael Wentzel, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST REGARDING MOTOR-OPERATED VALVE THERMAL OVERLOAD PROTECTION BYPASS DEVICES ST. LUCIE PLANT, UNIT NO. 2 EPID L-2019-LLA-0106 FLORIDA POWER & LIGHT COMPANY DOCKET NO. 50-389 Requirements:
1
The regulatory requirements related to limiting conditions for operation are contained in the regulations at 10 CFR 50.36, "Technical specifications." Section 50.36 (c)(2)(ii) of 10 CFR requires TSs to have a technical specification limiting condition for operation for each item meeting one or more of the following criteria:
(A) Criterion 1: Installed instrumentation that is used to detect, and indicate in the control room, a significant abnormal degradation of the reactor coolant pressure boundary.
(B) Criterion 2: A process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.
(C) Criterion 3: A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.
(D) Criterion 4: A structure, system, or component which operating experience or probabilistic risk assessment has shown to be significant to public health and safety.
RAI-EEOB-1 The license amendment request dated May 20, 2019, states, in part, that the proposed change deletes TS 3/4.8.4 and Table 3.8-1 in their entirety and relocates the MOV thermal overload protection bypass devices requirements to the stations Preventive Maintenance Program. However, the license amendment request does not contain a description of the Preventive Maintenance Program, nor does the program appear to be described in the Updated Final Safety Analysis Report. Further, it is not apparent why future changes to the relocated requirements would be subject to the controls of 10 CFR 50.59. Therefore:
- a. Provide a description of the St. Lucie Preventive Maintenance Program. Further, describe how future changes made to the relocated requirements would be subject to the controls of 10 CFR 50.59.
RAI-EEOB-2 The license amendment request dated May 20, 2019, states in Section 3.0 under Criterion 3 that the valves are not subject to repetitive cycling or prolonged periods of continuous operation that produce the elevated motor temperatures thermal overload protection is designed to prohibit.
- a. Provide the basis for this statement.
RAI-EEOB-3 The license amendment request dated May 20, 2019, states in Section 3.0 under Criterion 4 that MOV thermal overload protection and the need to bypass the protection during accident conditions are not SSCs that industry OE [operating experience] or the St. Lucie Unit 2 PRA [probabilistic risk assessment] have shown to be significant to public health and safety. Later in that section the LAR states, Moreover, MOV thermal overload protection is neither credited in the PRA nor is it subject to Maintenance Rule unavailability monitoring pursuant 10 CFR 50.65.
- a. Clarify what is meant by the statement that MOV thermal overload protection and/or their bypass devices are not specifically credited in the PRA for St. Lucie 2.
- b. Explain why MOV thermal overload protection is not subject to Maintenance Rule monitoring.
2
Hearing Identifier: NRR_DRMA Email Number: 170 Mail Envelope Properties (BL0PR0901MB3250349C9383C2E03518ED7FE7D20)
Subject:
St. Lucie Plant, Unit No. 2, Request for Additional Information Regarding License Amendment Request to Relocate the MOV Thermal Overload Bypass Devices (L-2019-LLA-0106)
Sent Date: 8/13/2019 3:39:02 PM Received Date: 8/13/2019 3:39:02 PM From: Wentzel, Michael Created By: Michael.Wentzel@nrc.gov Recipients:
"Mack, Jarrett" <Jarrett.Mack@fpl.com>
Tracking Status: None "Catron, Steve" <Steve.Catron@fpl.com>
Tracking Status: None "Frehafer, Ken" <Ken.Frehafer@fpl.com>
Tracking Status: None "Godes, Wyatt" <Wyatt.Godes@fpl.com>
Tracking Status: None Post Office: BL0PR0901MB3250.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 4843 8/13/2019 3:39:02 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: