==SUMMARY==
==SUMMARY==
Line 29: Line 26:
MAJOR SAFETY RELATED MAINTENANCE During this month, the Unit operated in the cold shutdown condition.
MAJOR SAFETY RELATED MAINTENANCE During this month, the Unit operated in the cold shutdown condition.
Restart modification activities were in progress. Major maintenance activities are as follows:
Restart modification activities were in progress. Major maintenance activities are as follows:
Decay Heat Loop "A" weld repair on the suction line to the "A" Decay Heat Pump (D-Il6) was performed. This repair was performed with Decay Heat Loop "B" in oper-
Decay Heat Loop "A" weld repair on the suction line to the "A" Decay Heat Pump (D-Il6) was performed. This repair was performed with Decay Heat Loop "B" in oper-ation.
* ation.
Work on D-116 included:
Work on D-116 included:
: 1. Weld indication was cut.
: 1. Weld indication was cut.
Line 41: Line 37:
: 8. Final x-ray of weed-out.
: 8. Final x-ray of weed-out.
This work was performed with satisfactory results.
This work was performed with satisfactory results.
            .
8006200yqg
8006200yqg


_.                            ..            .          -              _                          _ _ . .
          .  .
                                                                                                                                                            .
OPERATING DATA REPORT
OPERATING DATA REPORT
* DOCKET NO.          50-289 DATE    June D. 1980 COMPLETED BY                n. c. Mitchell TELEPHONE            (71 % 921-6579 -
* DOCKET NO.          50-289 DATE    June D. 1980 COMPLETED BY                n. c. Mitchell TELEPHONE            (71 % 921-6579 -
Line 57: Line 49:
, ,              3. Licensed Thermal Power (MWt):
, ,              3. Licensed Thermal Power (MWt):
871
871
    *
: 4. Nameplate Rating (Gross MWe):    .
: 4. Nameplate Rating (Gross MWe):    .
819
819
Line 68: Line 59:
: 9. Power LevelTo Wluch Restncted,if Any (Net MWe):
: 9. Power LevelTo Wluch Restncted,if Any (Net MWe):
1              10. Reasons For Restrictions.If Any:
1              10. Reasons For Restrictions.If Any:
i
i Dia Month                  Yr to Date                  Cumulative 79n_                        3623.                      50352.
,
Dia Month                  Yr to Date                  Cumulative 79n_                        3623.                      50352.
: 11. Hours la Reporting Period 0.0                            0.0                  31731,8
: 11. Hours la Reporting Period 0.0                            0.0                  31731,8
: 12. Number Of Hours Reactor Was Critical                            0.                            O.                        838.5
: 12. Number Of Hours Reactor Was Critical                            0.                            O.                        838.5
Line 88: Line 77:
100.0                        100.0
100.0                        100.0
: 23. Unit Forced Outage Rate
: 23. Unit Forced Outage Rate
                                                                                                                                                                  .
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each t:
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each t:
l
l
: 25. If Shut Down At End Of Report Period Estimated Date of Startup
: 25. If Shut Down At End Of Report Period Estimated Date of Startup
: 26. Units in Test Status (Prior io Commercial Operation):                                Forecast                    Actueved                      )
: 26. Units in Test Status (Prior io Commercial Operation):                                Forecast                    Actueved                      )
.
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION i                                                                                                                                                    (9/77)
            .
INITIAL CRITICALITY
      ,
INITIAL ELECTRICITY COMMERCIAL OPERATION
      !
i                                                                                                                                                    (9/77)
   .1 I
   .1 I
                                                                                                                                  -
i
i
                                   - -      .,-                -  - - - , .          .,  . , . . . .      , . -    --,...,n-        - - , , , - - .-.--. . ,,
                                   - -      .,-                -  - - - , .          .,  . , . . . .      , . -    --,...,n-        - - , , , - - .-.--. . ,,


   ?f
   ?f i
      . ..
AVERAGE DAILY UNITPOWER LEVEL DOCKET NO.            50-289 TMI-I UNIT l                                                                                                      June 15, 1980 DATE l
i AVERAGE DAILY UNITPOWER LEVEL
COMPLETED BY              D          C. Mitchell hl                                                                            TELEPHONE                (215) 921-6579 l
                                                                                                                              .
l MONTH    May 1980 DAY      AVERAGE DAILY POWER LEVEL          DAY        AVERAGE DAILY POWER LEVEL (MWe-Net)                                        IMWe-Net) 1                0                              17 ,,_
DOCKET NO.            50-289
0 2                0                              gg              a 3                0                              y,              o 4                0                                                0 3
,  ,                              ,
5                0                            21 0
TMI-I UNIT l                                                                                                      June 15, 1980 DATE l
COMPLETED BY              D          C. Mitchell
                                            ,
hl                                                                            TELEPHONE                (215) 921-6579
  !
l l
MONTH    May 1980 DAY      AVERAGE DAILY POWER LEVEL          DAY        AVERAGE DAILY POWER LEVEL (MWe-Net)                                        IMWe-Net) 1                0                              17 ,,_
0 2                0                              gg              a 3                0                              y,              o 4                0                                                0
_
3 5                0                            21 0
6                0                            22                0 7                0                            n                  0                                                )
6                0                            22                0 7                0                            n                  0                                                )
8                0                                                0                                                f 24
8                0                                                0                                                f 24
Line 129: Line 100:
13                                              29                  0
13                                              29                  0
           '14                  0                                                0
           '14                  0                                                0
                                               -            30 I3                                            31                    0 16                  0
                                               -            30 I3                                            31                    0 16                  0 A
                                                                                                                                .
,
A
     ,                                                                                    .                                        l
     ,                                                                                    .                                        l
                          .
                                                --      . _ _ .          . _
                                                                                          - _ . _ _ _ , _ _ - _ _ _ , _ _ _ _ .


DOCKET NO.
DOCKET NO.
50-289 UNITSHUTDOWNS AND POWER REDUCTIONS UNIT NAME TML-I DATE June IL 10A0 COMPLETED BY D C Mieche11 REPORTMONTH May 1980                        TELEPHONE (215) 921-6579 "t.                                                                                '
50-289 UNITSHUTDOWNS AND POWER REDUCTIONS UNIT NAME TML-I DATE June IL 10A0 COMPLETED BY D C Mieche11 REPORTMONTH May 1980                        TELEPHONE (215) 921-6579 "t.                                                                                '
c        es    3 se 3                  Ev          h              Cause & Corrective
c        es    3 se 3                  Ev          h              Cause & Corrective
                                -
                                           .2 _e      f                Licensee                  4
                                           .2 _e      f                Licensee                  4
           . No.          Date              M              } .s g M''      Event    Ei            3                Action to
           . No.          Date              M              } .s g M''      Event    Ei            3                Action to
                                   *{
                                   *{
          .
3
3
                                           $ ~g                        Report *  '50                        Prevent Recurrence cE  j (5 =                              [O                                        -
                                           $ ~g                        Report *  '50                        Prevent Recurrence cE  j (5 =                              [O                                        -
2
2 Reguistory Restraint Order 1          5/1/80    F        720        D      1
                                                                                                                                                .
Reguistory Restraint Order 1          5/1/80    F        720        D      1
                                                                                                                                .
.
;                              -
;                              -
'
!
,
,
i                    2                                                  3                          4 l            F: Forced            Reason:                                          Method:                      Exhibit G. Instructions J            S: Scheduled        A Equiprnent Failure (Explain)                    1-Manual                    for Preparation of Data B-Maintenance or Test                            2-Manual Scram.              Entry Sheets for Licensee Event Report (LER) File (NUREG-
i                    2                                                  3                          4 l            F: Forced            Reason:                                          Method:                      Exhibit G. Instructions J            S: Scheduled        A Equiprnent Failure (Explain)                    1-Manual                    for Preparation of Data B-Maintenance or Test                            2-Manual Scram.              Entry Sheets for Licensee Event Report (LER) File (NUREG-
,
,                                C Refueling                                      3 Automatic Scram.
,                                C Refueling                                      3 Automatic Scram.
l                                D Regulatory Restriction                        4 Other (Esplain)            0161)
l                                D Regulatory Restriction                        4 Other (Esplain)            0161)
E Operator Training & License Examination 1                                F Administrati.e                                                          5                                -
E Operator Training & License Examination 1                                F Administrati.e                                                          5                                -
G Operptional Errur (Esplain)                                                  Exhibit I Same Source l
G Operptional Errur (Esplain)                                                  Exhibit I Same Source l
,
ll Other (Esplain) j    .
ll Other (Esplain)
<
    .
j    .
_..
  --
__


                                                                          --            - - -    --    --      --
_                _ - . . _ . _ . . . . . _ . . _        -,
. . . .. -
REFUELING INFORMATION REOUEST
REFUELING INFORMATION REOUEST
: 1. Name of Facility:
: 1. Name of Facility:
                                                                                                          .
Three Mile Island Nuclear Station, Unit I
Three Mile Island Nuclear Station, Unit I
: 2. Scheduled date for next refueling shutdown:
: 2. Scheduled date for next refueling shutdown:
Line 195: Line 138:
: 7. The number of fuel assemblies (a) in the core, and (b) in the spent fuel storage pool:
: 7. The number of fuel assemblies (a) in the core, and (b) in the spent fuel storage pool:
(a) 177 (b) 208
(a) 177 (b) 208
                                                                                                            ''
: 8. The present licensed spent fuel pool storage capacity and the size of any increase in'11 censed storage capacity that has been requested or is planned, in number of fuel assemblies:
: 8. The present licensed spent fuel pool storage capacity and the size of any increase in'11 censed storage capacity that has been requested or is planned, in number of fuel assemblies:
The present licensed capacity is 752. There are no planned increases at this time.
The present licensed capacity is 752. There are no planned increases at this time.

Revision as of 07:30, 1 February 2020

Monthly Operating Rept for May 1980
ML19318A412
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 06/15/1980
From: Mitchell D
METROPOLITAN EDISON CO.
To:
Shared Package
ML19318A411 List:
References
NUDOCS 8006200496
Download: ML19318A412 (5)


Text

)

l

. 4 O OPERATING

SUMMARY

l Repairs of IGSCC indications in the "A" Decay Heat string were completed and following the appropriate testing, the system was declared operable. At the end of the month, with both Decay Heat strings operable, the Reactor Coolant System was drained down to a level that will permit the installation of a high pressure in-jection cross-connect. While the system is drained, a sampling of tube inspections will be performed on the "B" OTSG and the Reactor Coolant System check valves will be inspected and re-paired as necessary.

MAJOR SAFETY RELATED MAINTENANCE During this month, the Unit operated in the cold shutdown condition.

Restart modification activities were in progress. Major maintenance activities are as follows:

Decay Heat Loop "A" weld repair on the suction line to the "A" Decay Heat Pump (D-Il6) was performed. This repair was performed with Decay Heat Loop "B" in oper-ation.

Work on D-116 included:

1. Weld indication was cut.
2. Weld preps performed.
3. Dutchmen fitup to pipe.
4. Cleanliness and fitup inspections.
5. Root / Hot pass weld performed.
6. Information x-ray of hot /rcot pass.
7. Weed-out of welds.
8. Final x-ray of weed-out.

This work was performed with satisfactory results.

8006200yqg

OPERATING DATA REPORT

  • DOCKET NO. 50-289 DATE June D. 1980 COMPLETED BY n. c. Mitchell TELEPHONE (71 % 921-6579 -

OPERATING STATUS .

1. Unit Name:

Three Mile Island Nuclear Station Unit I

  • May 1980
2. Reporting Period:

2535 .

, , 3. Licensed Thermal Power (MWt):

871

4. Nameplate Rating (Gross MWe): .

819

5. Design Electrical Rating (Net MWe):

840

6. Maximum Dependable Capacity (Gross MWe):

776

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Iterns Number 3 Through 7) Since Last Report.Give Reasons:
9. Power LevelTo Wluch Restncted,if Any (Net MWe):

1 10. Reasons For Restrictions.If Any:

i Dia Month Yr to Date Cumulative 79n_ 3623. 50352.

11. Hours la Reporting Period 0.0 0.0 31731,8
12. Number Of Hours Reactor Was Critical 0. O. 838.5
13. Reactor Reserve Shutdown Hours 31180,9 0.0 0.0
14. Hours Generator On-Line 00 0.0 0.0
15. Unit Reserve Shutdown Hours 0.0 76531071.

0.0

16. Grom Thermal Eaergy Generated (MWH) U48433u.

U* 0.

17. Grom Electrical Energy Generated (MWH) u.
u. 4as4uusa.
18. Net Electrical Energy Generated (MWH) 0.0
19. Unit Service Factor 0.0 61 0.0 u.0 61.9
20. Unit Availability Facta, 0.0 0.0 60.1
21. Unit Capacity Factor (Using MDC Net) 57.8 0.0 0.0
22. Unit Capacity Factor (Using DER Net) 27.4 1

100.0 100.0

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each t:

l

25. If Shut Down At End Of Report Period Estimated Date of Startup
26. Units in Test Status (Prior io Commercial Operation): Forecast Actueved )

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION i (9/77)

.1 I

i

- - .,- - - - - , . ., . , . . . . , . - --,...,n- - - , , , - - .-.--. . ,,

?f i

AVERAGE DAILY UNITPOWER LEVEL DOCKET NO. 50-289 TMI-I UNIT l June 15, 1980 DATE l

COMPLETED BY D C. Mitchell hl TELEPHONE (215) 921-6579 l

l MONTH May 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) IMWe-Net) 1 0 17 ,,_

0 2 0 gg a 3 0 y, o 4 0 0 3

5 0 21 0

6 0 22 0 7 0 n 0 )

8 0 0 f 24

, 0 0 0 10 26 0

' 27 0

0 3 ~3 28 0 0

13 29 0

'14 0 0

- 30 I3 31 0 16 0 A

, . l

DOCKET NO.

50-289 UNITSHUTDOWNS AND POWER REDUCTIONS UNIT NAME TML-I DATE June IL 10A0 COMPLETED BY D C Mieche11 REPORTMONTH May 1980 TELEPHONE (215) 921-6579 "t. '

c es 3 se 3 Ev h Cause & Corrective

.2 _e f Licensee 4

. No. Date M } .s g M Event Ei 3 Action to

  • {

3

$ ~g Report * '50 Prevent Recurrence cE j (5 = [O -

2 Reguistory Restraint Order 1 5/1/80 F 720 D 1

-

i 2 3 4 l F: Forced Reason: Method: Exhibit G. Instructions J S: Scheduled A Equiprnent Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee Event Report (LER) File (NUREG-

, C Refueling 3 Automatic Scram.

l D Regulatory Restriction 4 Other (Esplain) 0161)

E Operator Training & License Examination 1 F Administrati.e 5 -

G Operptional Errur (Esplain) Exhibit I Same Source l

ll Other (Esplain) j .

REFUELING INFORMATION REOUEST

1. Name of Facility:

Three Mile Island Nuclear Station, Unit I

2. Scheduled date for next refueling shutdown:

Unknown

3. Scheduled date for restart following refueling:

Unknown

4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If answer is yes, in general, what will these be?

If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section 50.59)?

If no such review has taken place, when is it scheduled?

Amendment No. 50, Cycle 5 reload, was approved on 3-16-79.

5. Scheduled date (s) for submitting proposed licensing action and supporting information:

N/A

6. Important licensing considerations associated with refueling, e.g. new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

N/A

7. The number of fuel assemblies (a) in the core, and (b) in the spent fuel storage pool:

(a) 177 (b) 208

8. The present licensed spent fuel pool storage capacity and the size of any increase in'11 censed storage capacity that has been requested or is planned, in number of fuel assemblies:

The present licensed capacity is 752. There are no planned increases at this time.

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

1986 is the last refueling discharge which allows full core off-load capacity (177 fuel assemblies).