ML090771222: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML090771222
| number = ML090771222
| issue date = 03/18/2009
| issue date = 03/18/2009
| title = 03/31/2009 Notice of Public Meeting with Firstenergy Nuclear Operating Company (FENOC) to Discuss Nrc'S Assessment of Safety Performance of Beaver Valley Power Station for Calendar Year 2008 & Role of NRC in Ensuring Safe Plant Operations
| title = Notice of Public Meeting with Firstenergy Nuclear Operating Company (FENOC) to Discuss Nrc'S Assessment of Safety Performance of Beaver Valley Power Station for Calendar Year 2008 & Role of NRC in Ensuring Safe Plant Operations
| author name = Bellamy R
| author name = Bellamy R
| author affiliation = NRC/RGN-I/DRP/PB6
| author affiliation = NRC/RGN-I/DRP/PB6
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:No. 09-004 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING March 18, 2009  
{{#Wiki_filter:No. 09-004 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING March 18, 2009 Licensee:            FirstEnergy Nuclear Operating Company (FENOC)
Facility:            Beaver Valley Power Station, Units 1 & 2 Docket No.            50-334 and 50-412 Date and Time:        March 31, 2009 from 6:30 p.m. to 8:00 p.m.
Location:            Shippingport Community and Municipal Building 164 State Road 3016 Shippingport, PA. 15077


Licensee: FirstEnergy Nuclear Operating Company (FENOC)
==Purpose:==
Facility:  Beaver Valley Power Station, Units 1 & 2 Docket No. 50-334 and 50-412
To discuss the NRCs assessment of the safety performance of the Beaver Valley Power Station for calendar year 2008 and the role of the NRC in ensuring safe plant operations.
NRC Attendees:        R. Bellamy, Chief, Projects Branch 6, Region I D. Werkheiser, Senior Resident Inspector, Beaver Valley D. Spindler, Resident Inspector, Beaver Valley Licensee Attendees: K. Ostrowski - Director of Site Operations R. Brosi - Director of Performance Improvement and other members of Beaver Valley staff Public Participation: This is a Category 1 Meeting. The NRC staff will hold an open house to discuss FENOCs safety performance at Beaver Valley Power Station during calendar year 2008 and the role of the agency in ensuring safe plant operations. During the session the public will have the opportunity to talk with the NRC staff on an informal basis Meeting


Date and Time: March 31, 2009 from 6:30 p.m. to 8:00 p.m.
==Contact:==
Location:  Shippingport Community and Municipal Building    164 State Road 3016 Shippingport, PA. 15077 Purpose: To discuss the NRC's assessment of the safety performance of the Beaver Valley Power Station for calendar year 2008 and the role of the NRC in ensuring safe plant operations.
Dr. Ronald R. Bellamy, Chief, Projects Branch 6 610-337-5200 E-mail: ronald.bellamy@nrc.gov.
NRC Attendees: R. Bellamy, Chief, Projects Branch 6, Region I D. Werkheiser, Senior Resident Inspector, Beaver Valley D. Spindler, Resident Inspector, Beaver Valley Licensee Attendees: K. Ostrowski - Director of Site Operations    R. Brosi - Director of Performance Improvement and other members of Beaver Valley staff Public Participation: This is a Category 1 Meeting. The NRC staff will hold an open house to discuss FENOC's safety performance at Beaver Valley Power Station during calendar year 2008 and the role of the agency in ensuring safe plant operations. During the session the public will have the opportunity to talk with the NRC staff on an informal basis Meeting Contact: Dr. Ronald R. Bellamy, Chief, Projects Branch 6 610-337-5200 E-mail: ronald.bellamy@nrc.gov.
The NRCs Annual Assessment Letter for the Beaver Valley Power Station can be located in ADAMS with Accession Number ML090620768. This meeting notice can be located in ADAMS with the Accession Number ML090771222. ADAMS is accessible from the NRC Web Site at:
The NRC's Annual Assessment Letter for the Beaver Valley Power Station can be located in ADAMS with Accession Number ML090620768. This meeting notice can be located in ADAMS with the Accession Number ML090771222. ADAMS is accessible from the NRC Web Site at:
http://www.nrc.gov/reading-rm/adams.html.
http://www.nrc.gov/reading-rm/adams.html.
2  Additional information relative to the NRC's Annual Assessment process and the safety performance of the Beaver Valley Power Station can be found on the NRC's web site at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. The NRC
=s Policy Statement, AEnhancing Public Participation in NRC Meetings,@ effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html and contains information regarding visitors and security.
Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting, to provide the NRC staff adequate notice to determine whether the request can be accommodated. Attendance by NRC personnel at this meeting should be made known by March 24, 2009, via telephone to the NRC meeting contact.


Approved by: _____/RA/     ____________
2 Additional information relative to the NRCs Annual Assessment process and the safety performance of the Beaver Valley Power Station can be found on the NRCs web site at:
Dr. Ronald R. Bellamy, Chief Projects Branch 6 Division of Reactor Projects cc w/encl: J. Hagan, President and Chief Nuclear Officer             J. Lash, Senior Vice President of Operations and Chief Operating Officer D. Pace, Senior Vice President, Fleet Engineering K. Fili, Vice President, Fleet Oversight             P. Harden, Vice President, Nuclear Support       G. Halnon, Director, Fleet Regulatory Affairs Manager, Fleet Licensing Company K. Ostrowski, Director, Site Operations C. McFeaters, Director, Maintenance M. Manoleras, Director, Engineering R. Brosi, Director, Site Performance Improvement C. Keller, Manager, Site Regulatory Compliance D. Jenkins, Attorney, FirstEnergy Corporation M. Clancy, Mayor, Shippingport, PA D. Allard, Director, PADEP C. O'Claire, State Liaison to the NRC, State of Ohio Z. Clayton, EPA-DERR, State of Ohio Director, Utilities Department, Public Utilities Commission, State of Ohio D. Hill, Chief, Radiological Health Program, State of West Virginia J. Lewis, Commissioner, Division of Labor, State of West Virginia W. Hill, Beaver County Emergency Management Agency J. Johnsrud, National Energy Committee, Sierra Club J. Powers, Director, PA Office of Homeland Security R. French, Director, PA Emergency Management Agency  
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. The NRC=s Policy Statement, AEnhancing Public Participation in NRC Meetings,@ effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html and contains information regarding visitors and security.
Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting, to provide the NRC staff adequate notice to determine whether the request can be accommodated. Attendance by NRC personnel at this meeting should be made known by March 24, 2009, via telephone to the NRC meeting contact.
Approved by: _____/RA/ ____________
Dr. Ronald R. Bellamy, Chief Projects Branch 6 Division of Reactor Projects cc w/encl:
J. Hagan, President and Chief Nuclear Officer J. Lash, Senior Vice President of Operations and Chief Operating Officer D. Pace, Senior Vice President, Fleet Engineering K. Fili, Vice President, Fleet Oversight P. Harden, Vice President, Nuclear Support G. Halnon, Director, Fleet Regulatory Affairs Manager, Fleet Licensing Company K. Ostrowski, Director, Site Operations C. McFeaters, Director, Maintenance M. Manoleras, Director, Engineering R. Brosi, Director, Site Performance Improvement C. Keller, Manager, Site Regulatory Compliance D. Jenkins, Attorney, FirstEnergy Corporation M. Clancy, Mayor, Shippingport, PA D. Allard, Director, PADEP C. OClaire, State Liaison to the NRC, State of Ohio Z. Clayton, EPA-DERR, State of Ohio Director, Utilities Department, Public Utilities Commission, State of Ohio D. Hill, Chief, Radiological Health Program, State of West Virginia J. Lewis, Commissioner, Division of Labor, State of West Virginia W. Hill, Beaver County Emergency Management Agency J. Johnsrud, National Energy Committee, Sierra Club J. Powers, Director, PA Office of Homeland Security R. French, Director, PA Emergency Management Agency


3 Additional information relative to the NRC's Annual Assessment process and the safety performance of the Beaver Valley Power Station can be found on the NRC's web site at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. The NRC
3 Additional information relative to the NRCs Annual Assessment process and the safety performance of the Beaver Valley Power Station can be found on the NRCs web site at:
=s Policy Statement, AEnhancing Public Participation in NRC Meetings,@ effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html and contains information regarding visitors and security.
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. The NRC=s Policy Statement, AEnhancing Public Participation in NRC Meetings,@ effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html and contains information regarding visitors and security.
Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting, to provide the NRC staff adequate notice to determine whether the request can be accommodated. Attendance by NRC personnel at this meeting should be made known by March 24, 2009, via telephone to the NRC meeting contact.
Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting, to provide the NRC staff adequate notice to determine whether the request can be accommodated. Attendance by NRC personnel at this meeting should be made known by March 24, 2009, via telephone to the NRC meeting contact.
Approved by: ____/RA/_     ____________
Approved by: ____/RA/_ ____________
Dr. Ronald R. Bellamy, Chief Projects Branch 6 Division of Reactor Projects Distribution: (Via E-Mail): Executive Director for Operations, OEDO                                                                             (RIDSEDOMAILCENTER) Deputy Executive Director for Reactor Programs, OEDO                                                     (RIDSEDOMAILCENTER) Director, Office of Nuclear Reactor Regulation, NRR                                                           (RIDSNRROD) Deputy Director, Office of Nuclear Reactor Regulation, NRR                                               (RIDSNRROD)
Dr. Ronald R. Bellamy, Chief Projects Branch 6 Division of Reactor Projects Distribution: (Via E-Mail):
Associate Director, Office of Operating Reactor Oversight and Licensing, NRR/ADRO       (RIDSNRRADRO) Director, Division of Inspection and Regional Supprt, NRR/DIRS                                         (RIDSNRRDIRS) Director, Division of Operating Reactor Licensing, NRR/DORL                                             (RIDSNRRDORL) Project Directorate I-1 (PD1-2), NRR                                                                                     (RIDSNRRDORILpl 1-2) Asst. General Counsel Materials Litigation and Enforcement, OGC                                     (RIDSOGCMAILCENTER)
Executive Director for Operations, OEDO                                                                             (RIDSEDOMAILCENTER)
S. Collins, RA M. Dapas, DRA D. Lew, DRP J. Clifford, DRP R. Bellamy, DRP S. Barber, DRP C. Newport, DRP S. Campbell, RI OEDO R. Nelson, NRR N. Morgan, NRR, PM R. Guzman, NRR Backup D. Werkheiser, DRP, SRI D. Spindler, DRP, RI P. Garrett, DRP, OA D. Roberts, DRS E. Cobey, DRS D. Screnci, PAO N. Sheehan, PAO R. Barkley, ORA N. McNamara, SLO J. Thompson, NRR G. Matakas, ORA DRS Division Secretary, RI DRP Division Secretary, RI  RI Receptionist PMNS ROPreportsResource@nrc.gov Region I Docket Room SUNSI REVIEW COMPLETE: ___RRR______ (Reviewer's Initials)                                               ML090771222 DOCUMENT NAME: G:\DRP\BRANCH6\ROP ASSESSMENT FOLDERS\ROP 9\BEAVER VALLEY\END-OF-CYCLE\BV AA OPENHOUSE MTG NOTICE ROP 9.DOC  
Deputy Executive Director for Reactor Programs, OEDO                                                                 (RIDSEDOMAILCENTER)
 
Director, Office of Nuclear Reactor Regulation, NRR                                                                   (RIDSNRROD)
After declaring this document AAn Official Agency Record
Deputy Director, Office of Nuclear Reactor Regulation, NRR                                                           (RIDSNRROD)
@ it will be released to the Public.
Associate Director, Office of Operating Reactor Oversight and Licensing, NRR/ADRO                                     (RIDSNRRADRO)
To receive a copy of this document, indicate in the box:
Director, Division of Inspection and Regional Supprt, NRR/DIRS                                                         (RIDSNRRDIRS)
" C" = Copy without attachment/enclosure " E" = Copy with attachment/enclosure   " N" = No copy OFFICE:   RI/DRP   RI/DRP     NAME:   SBarber/ SB             RBellamy/ RRR           DATE:   03/ 18 /09   03/18/09       OFFICIAL RECORD COPY}}
Director, Division of Operating Reactor Licensing, NRR/DORL                                                           (RIDSNRRDORL)
Project Directorate I-1 (PD1-2), NRR                                                                                 (RIDSNRRDORILpl 1-2)
Asst. General Counsel Materials Litigation and Enforcement, OGC                                                       (RIDSOGCMAILCENTER)
S. Collins, RA                                         R. Guzman, NRR Backup                                  J. Thompson, NRR M. Dapas, DRA                                         D. Werkheiser, DRP, SRI                                G. Matakas, ORA D. Lew, DRP                                           D. Spindler, DRP, RI                                   DRS Division Secretary, RI J. Clifford, DRP                                      P. Garrett, DRP, OA                                    DRP Division Secretary, RI R. Bellamy, DRP                                       D. Roberts, DRS                                       RI Receptionist S. Barber, DRP                                        E. Cobey, DRS                                         PMNS C. Newport, DRP                                        D. Screnci, PAO                                       ROPreportsResource@nrc.gov S. Campbell, RI OEDO                                  N. Sheehan, PAO                                       Region I Docket Room R. Nelson, NRR                                        R. Barkley, ORA N. Morgan, NRR, PM                                    N. McNamara, SLO SUNSI REVIEW COMPLETE: ___RRR______ (Reviewers Initials)                                                                   ML090771222 DOCUMENT NAME: G:\DRP\BRANCH6\ROP ASSESSMENT FOLDERS\ROP 9\BEAVER VALLEY\END-OF-CYCLE\BV AA OPENHOUSE MTG NOTICE ROP 9.DOC After declaring this document AAn Official Agency Record@ it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE:         RI/DRP                     RI/DRP NAME:           SBarber/ SB                 RBellamy/ RRR DATE:           03/ 18 /09                 03/18/09 OFFICIAL RECORD COPY}}

Latest revision as of 03:05, 7 December 2019

Notice of Public Meeting with Firstenergy Nuclear Operating Company (FENOC) to Discuss Nrc'S Assessment of Safety Performance of Beaver Valley Power Station for Calendar Year 2008 & Role of NRC in Ensuring Safe Plant Operations
ML090771222
Person / Time
Site: Beaver Valley
Issue date: 03/18/2009
From: Bellamy R
NRC/RGN-I/DRP/PB6
To:
BELLAMY RR
References
09-004
Download: ML090771222 (2)


Text

No.09-004 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING March 18, 2009 Licensee: FirstEnergy Nuclear Operating Company (FENOC)

Facility: Beaver Valley Power Station, Units 1 & 2 Docket No. 50-334 and 50-412 Date and Time: March 31, 2009 from 6:30 p.m. to 8:00 p.m.

Location: Shippingport Community and Municipal Building 164 State Road 3016 Shippingport, PA. 15077

Purpose:

To discuss the NRCs assessment of the safety performance of the Beaver Valley Power Station for calendar year 2008 and the role of the NRC in ensuring safe plant operations.

NRC Attendees: R. Bellamy, Chief, Projects Branch 6, Region I D. Werkheiser, Senior Resident Inspector, Beaver Valley D. Spindler, Resident Inspector, Beaver Valley Licensee Attendees: K. Ostrowski - Director of Site Operations R. Brosi - Director of Performance Improvement and other members of Beaver Valley staff Public Participation: This is a Category 1 Meeting. The NRC staff will hold an open house to discuss FENOCs safety performance at Beaver Valley Power Station during calendar year 2008 and the role of the agency in ensuring safe plant operations. During the session the public will have the opportunity to talk with the NRC staff on an informal basis Meeting

Contact:

Dr. Ronald R. Bellamy, Chief, Projects Branch 6 610-337-5200 E-mail: ronald.bellamy@nrc.gov.

The NRCs Annual Assessment Letter for the Beaver Valley Power Station can be located in ADAMS with Accession Number ML090620768. This meeting notice can be located in ADAMS with the Accession Number ML090771222. ADAMS is accessible from the NRC Web Site at:

http://www.nrc.gov/reading-rm/adams.html.

2 Additional information relative to the NRCs Annual Assessment process and the safety performance of the Beaver Valley Power Station can be found on the NRCs web site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. The NRC=s Policy Statement, AEnhancing Public Participation in NRC Meetings,@ effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html and contains information regarding visitors and security.

Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting, to provide the NRC staff adequate notice to determine whether the request can be accommodated. Attendance by NRC personnel at this meeting should be made known by March 24, 2009, via telephone to the NRC meeting contact.

Approved by: _____/RA/ ____________

Dr. Ronald R. Bellamy, Chief Projects Branch 6 Division of Reactor Projects cc w/encl:

J. Hagan, President and Chief Nuclear Officer J. Lash, Senior Vice President of Operations and Chief Operating Officer D. Pace, Senior Vice President, Fleet Engineering K. Fili, Vice President, Fleet Oversight P. Harden, Vice President, Nuclear Support G. Halnon, Director, Fleet Regulatory Affairs Manager, Fleet Licensing Company K. Ostrowski, Director, Site Operations C. McFeaters, Director, Maintenance M. Manoleras, Director, Engineering R. Brosi, Director, Site Performance Improvement C. Keller, Manager, Site Regulatory Compliance D. Jenkins, Attorney, FirstEnergy Corporation M. Clancy, Mayor, Shippingport, PA D. Allard, Director, PADEP C. OClaire, State Liaison to the NRC, State of Ohio Z. Clayton, EPA-DERR, State of Ohio Director, Utilities Department, Public Utilities Commission, State of Ohio D. Hill, Chief, Radiological Health Program, State of West Virginia J. Lewis, Commissioner, Division of Labor, State of West Virginia W. Hill, Beaver County Emergency Management Agency J. Johnsrud, National Energy Committee, Sierra Club J. Powers, Director, PA Office of Homeland Security R. French, Director, PA Emergency Management Agency

3 Additional information relative to the NRCs Annual Assessment process and the safety performance of the Beaver Valley Power Station can be found on the NRCs web site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. The NRC=s Policy Statement, AEnhancing Public Participation in NRC Meetings,@ effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html and contains information regarding visitors and security.

Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting, to provide the NRC staff adequate notice to determine whether the request can be accommodated. Attendance by NRC personnel at this meeting should be made known by March 24, 2009, via telephone to the NRC meeting contact.

Approved by: ____/RA/_ ____________

Dr. Ronald R. Bellamy, Chief Projects Branch 6 Division of Reactor Projects Distribution: (Via E-Mail):

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Associate Director, Office of Operating Reactor Oversight and Licensing, NRR/ADRO (RIDSNRRADRO)

Director, Division of Inspection and Regional Supprt, NRR/DIRS (RIDSNRRDIRS)

Director, Division of Operating Reactor Licensing, NRR/DORL (RIDSNRRDORL)

Project Directorate I-1 (PD1-2), NRR (RIDSNRRDORILpl 1-2)

Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

S. Collins, RA R. Guzman, NRR Backup J. Thompson, NRR M. Dapas, DRA D. Werkheiser, DRP, SRI G. Matakas, ORA D. Lew, DRP D. Spindler, DRP, RI DRS Division Secretary, RI J. Clifford, DRP P. Garrett, DRP, OA DRP Division Secretary, RI R. Bellamy, DRP D. Roberts, DRS RI Receptionist S. Barber, DRP E. Cobey, DRS PMNS C. Newport, DRP D. Screnci, PAO ROPreportsResource@nrc.gov S. Campbell, RI OEDO N. Sheehan, PAO Region I Docket Room R. Nelson, NRR R. Barkley, ORA N. Morgan, NRR, PM N. McNamara, SLO SUNSI REVIEW COMPLETE: ___RRR______ (Reviewers Initials) ML090771222 DOCUMENT NAME: G:\DRP\BRANCH6\ROP ASSESSMENT FOLDERS\ROP 9\BEAVER VALLEY\END-OF-CYCLE\BV AA OPENHOUSE MTG NOTICE ROP 9.DOC After declaring this document AAn Official Agency Record@ it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE: RI/DRP RI/DRP NAME: SBarber/ SB RBellamy/ RRR DATE: 03/ 18 /09 03/18/09 OFFICIAL RECORD COPY