IR 05000335/2009006: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML100351155
| number = ML100351155
| issue date = 02/04/2010
| issue date = 02/04/2010
| title = 02/19/2010 Notice of Category 1 Public Meeting with Florida Power and Light Company to Discuss Risk Significance of the Two Preliminary Greater than Green Inspection Report 05000335-09-006 and 05000389-09-006
| title = Notice of Category 1 Public Meeting with Florida Power and Light Company to Discuss Risk Significance of the Two Preliminary Greater than Green Inspection Report 05000335-09-006 and 05000389-09-006
| author name = Desai B B
| author name = Desai B
| author affiliation = NRC/RGN-II/DRS/EB1
| author affiliation = NRC/RGN-II/DRS/EB1
| addressee name = Nazar M
| addressee name = Nazar M
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 February 4, 2010 Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power and Light Company P.O.Box 14000 Juno Beach, FL 33408-0420
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION ary 4, 2010


SUBJECT: MEETING ANNOUNCEMENT - PUBLIC MEETING CATEGORY 1 REGULATORY CONFERENCE - ST. LUCIE NUCLEAR PLANT DOCKET NOS. 50-335 AND 50-389
==SUBJECT:==
MEETING ANNOUNCEMENT - PUBLIC MEETING CATEGORY 1 REGULATORY CONFERENCE - ST. LUCIE NUCLEAR PLANT DOCKET NOS. 50-335 AND 50-389


==Dear Mr. Nazar:==
==Dear Mr. Nazar:==
This letter confirms the telephone conversation between Mr. Eric Katzman of your staff and Mr. Binoy Desai of the NRC, on February 1, 2010, concerning a Regulatory Conference, being conducted at your request, which has been scheduled for February 19, 2010, from 2 p.m. to 4:00 p.m. (EST). The meeting notice, which provides additional details, is enclosed. The purpose of the Regulatory Conference is to discuss the risk significance of the two preliminary greater than green inspection findings documented in NRC Inspection Report 05000335, 389/2009006. These findings concern apparent failures to identify and correct design issues associated with an October 8, 2008, air intrusion event from the Unit 1 containment instrument air system into the component cooling water system.
This letter confirms the telephone conversation between Mr. Eric Katzman of your staff and Mr. Binoy Desai of the NRC, on February 1, 2010, concerning a Regulatory Conference, being conducted at your request, which has been scheduled for February 19, 2010, from 2 p.m. to 4:00 p.m. (EST). The meeting notice, which provides additional details, is enclosed. The purpose of the Regulatory Conference is to discuss the risk significance of the two preliminary greater than green inspection findings documented in NRC Inspection Report 05000335, 389/2009006. These findings concern apparent failures to identify and correct design issues associated with an October 8, 2008, air intrusion event from the Unit 1 containment instrument air system into the component cooling water system.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public ins pection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Should you have any questions concerning this meeting, please contact me at (404) 562-4519.
Should you have any questions concerning this meeting, please contact me at (404) 562-4519.


Sincerely,/RA: Original signed by Mark Franke for/
Sincerely,
Binoy B. Desai, Chief Engineering Branch 1 Division of Reactor Safety  
/RA: Original signed by Mark Franke for/
Binoy B. Desai, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos.: 50-335, 50-389 License Nos.: DPR-67, NPF-16 Enclosure: As stated cc w/encl: (See page 2)


Docket Nos.: 50-335, 50-389 License Nos.: DPR-67, NPF-16
FP&L  2 cc w/encl:  Marjan Mashhadi Richard L. Anderson  Senior Attorney Site Vice President  Florida Power & Light Company St. Lucie Nuclear Plant  Electronic Mail Distribution Electronic Mail Distribution William A. Passetti Robert J. Hughes  Chief Plant General Manager  Florida Bureau of Radiation Control St. Lucie Nuclear Plant  Department of Health Electronic Mail Distribution Electronic Mail Distribution Gene St. Pierre  Ruben D. Almaguer Vice President - Fleet Organizational Director Support  Division of Emergency Preparedness Florida Power & Light Company Department of Community Affairs Electronic Mail Distribution Electronic Mail Distribution Mark Hicks  J. Kammel Operations Manager  Radiological Emergency Planning St. Lucie Nuclear Plant  Administrator Electronic Mail Distribution Department of Public Safety Electronic Mail Distribution Eric Katzman Licensing Manager  Mano Nazar St. Lucie Nuclear Plant  Executive Vice President and Chief Nuclear Electronic Mail Distribution Officer Florida Power & Light Company Abdy Khanpour  Electronic Mail Distribution Vice President Engineering Support  Senior Resident Inspector Florida Power and Light Company St. Lucie Nuclear Plant P.O. Box 14000  U.S. Nuclear Regulatory Commission Juno Beach, FL 33408-0420 P.O. Box 6090 Jensen Beach, FL 34957-2010 McHenry Cornell Director  (Vacant)
Licensing and Performance Improvement Vice President Florida Power & Light Company Nuclear Plant Support Electronic Mail Distribution Florida Power & Light Company Electronic Mail Distribution Alison Brown Nuclear Licensing  Faye Outlaw Florida Power & Light Company County Administrator Electronic Mail Distribution St. Lucie County Electronic Mail Distribution Mitch S. Ross Vice President and Associate General Jack Southard Counsel  Director Florida Power & Light Company Public Safety Department Electronic Mail Distribution St. Lucie County Electronic Mail Distribution


===Enclosure:===
_  xG SUNSI REVIEW COMPLETE /RA M. Thomas/
As stated
OFFICE RII:DRS RII:DRP RII:DRS SIGNATURE RA RA RA NAME JHAMMON MSYKES BDESAI DATE  2/4/2010 2/4/2010 2/4/2010 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO


cc w/encl: (See page 2)
SUBJECT: PUBLIC MEETING WITH FLORIDA POWER & LIGHT FACILITY: ST. LUCIE NUCLEAR PLANT DOCKETS: 05000335 and 05000389 DATE & TIME: Friday, February 19, 2010 - 2:00 p.m. to 4:00 p.m.
FP&L 2 cc w/encl: Richard L. Anderson Site Vice President St. Lucie Nuclear Plant Electronic Mail Distribution


Robert J. Hughes Plant General Manager St. Lucie Nuclear Plant Electronic Mail Distribution
LOCATION: Suite 24T25 Region II Office, Sam Nunn Atlanta Federal Center, 61 Forsyth Street, S.W., Atlanta, GA PURPOSE: The purpose of the meeting is to discuss the risk significance of the two preliminary greater than green inspection findings documented in NRC Inspection Report 05000335, 389/2009006. These findings concern apparent failures to identify and correct design issues associated with an October 8, 2008, air intrusion event from the Unit 1 containment instrument air system into the component cooling water system. The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov and contains information regarding conduct of NRC meetings.


Gene St. Pierre Vice President - Fleet Organizational Support Florida Power & Light Company Electronic Mail Distribution
CATEGORY: This is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned. The NRC provides reasonable accommodation to individuals with disabilities, where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRC=s meeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.


Mark Hicks Operations Manager St. Lucie Nuclear Plant Electronic Mail Distribution
NRC OFFICE Region II PARTICIPATING:
OTHER None ORGANIZATIONS PARTICIPATING:
PARTICIPANTS: NRC (partial list)
L. Reyes, Regional Administrator, Region II (RII)
V. McCree, Deputy Regional Administrator for Operations, RII K. Kennedy, Director, Division of Reactor Safety (DRS), RII L. Wert, Director, Division of Reactor Projects (DRP), RII B. Desai, Chief, Engineering Branch 1, DRS, RII W. Rogers, Senior Reactor Analyst LICENSEE (partial list)
Richard Anderson, Site Vice President Bob Hughes, Plant General Manager Eric Katzman, Licensing Manager Tom Cosgrove, Engineering Manager Abdy Khanpour, Engineering Support Jim Porter, Engineering Design Manager Cheng Guey, Risk Assessment George Tullidge, Risk Assessment Enclosure


Eric Katzman Licensing Manager St. Lucie Nuclear Plant Electronic Mail Distribution
MEETING Binoy Desai CONTACT: 404-562-4519 Binoy.Desai@nrc.gov AUDIO TELE- Interested members of the public may participate in this meeting via a toll-free CONFERENCING audio teleconference. Please contact the NRC meeting contact in advance of the meeting, indicating your intent to attend and to obtain teleconferencing information no later than 4:30 p.m. Wednesday, February 17, 2010.


Abdy Khanpour Vice President Engineering Support Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
VIDEO TELE- Not Available CONFERENCING Enclosure
 
McHenry Cornell Director Licensing and Performance Improvement Florida Power & Light Company Electronic Mail Distribution
 
Alison Brown Nuclear Licensing Florida Power & Light Company Electronic Mail Distribution
 
Mitch S. Ross Vice President and Associate General Counsel Florida Power & Light Company Electronic Mail Distribution
 
Marjan Mashhadi Senior Attorney Florida Power & Light Company Electronic Mail Distribution
 
William A. Passetti Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution
 
Ruben D. Almaguer Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution
 
J. Kammel Radiological Emergency Planning Administrator Department of Public Safety Electronic Mail Distribution
 
Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power & Light Company Electronic Mail Distribution
 
Senior Resident Inspector St. Lucie Nuclear Plant U.S. Nuclear Regulatory Commission P.O. Box 6090 Jensen Beach, FL 34957-2010
 
(Vacant)
Vice President Nuclear Plant Support Florida Power & Light Company Electronic Mail Distribution
 
Faye Outlaw County Administrator St. Lucie County Electronic Mail Distribution
 
Jack Southard Director Public Safety Department St. Lucie County Electronic Mail Distribution
 
_
x G SUNSI REVIEW COMPLETE /RA M. Thomas/ OFFICE RII:DRS RII:DRP RII:DRS SIGNATURE RA RA RA NAME JHAMMON MSYKES BDESAI DATE 2/4/2010 2/4/2010 2/4/2010 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Enclosure
 
SUBJECT: PUBLIC MEETING WITH FLORIDA POWER & LIGHT FACILITY:
ST. LUCIE NUCLEAR PLANT DOCKETS: 05000335 and 05000389 DATE & TIME:
Friday, February 19, 2010 - 2:00 p.m. to 4:00 p.m.
 
LOCATION:
Suite 24T25 Region II Office, Sam Nunn Atlanta Federal Center, 61 Forsyth Street, S.W., Atlanta, GA PURPOSE: The purpose of the meeting is to discuss the risk significance of the two preliminary greater than green inspection findings documented in NRC Inspection Report 05000335, 389/2009006. These findings concern apparent failures to identify and correct design issues associated with an October 8, 2008, air intrusion event from the Unit 1 containment instrument air system into the component cooling water system. The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov and contains information regarding conduct of NRC meetings.
 
CATEGORY:
This is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opport unities to communicate with the NRC after the business portion, but before the meeting is adjourned. The NRC provides
 
reasonable accommodation to individuals with disabilities, where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRC
=s meeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
 
NRC OFFICE PARTICIPATING:
Region II OTHER ORGANIZATIONS PARTICIPATING:
None PARTICIPANTS:
NRC (partial list) L. Reyes, Regional Administrator, Region II (RII)
V. McCree, Deputy Regional Administrator for Operations, RII K. Kennedy, Director, Division of Reactor Safety (DRS), RII L. Wert, Director, Division of Reactor Projects (DRP), RII B. Desai, Chief, Engineering Branch 1, DRS, RII W. Rogers, Senior Reactor Analyst
 
LICENSEE (partial list) Richard Anderson, Site Vice President Bob Hughes, Plant General Manager Eric Katzman, Licensing Manager Tom Cosgrove, Engineering Manager Abdy Khanpour, Engineering Support Jim Porter, Engineering Design Manager Cheng Guey, Risk Assessment George Tullidge, Risk Assessment 2 Enclosure MEETING CONTACT:
Binoy Desai 404-562-4519 Binoy.Desai@nrc.gov AUDIO TELE-CONFERENCING Interested members of the public may participate in this meeting via a toll-free audio teleconference. Please contact the NRC meeting contact in advance of the meeting, indicating your intent to attend and to obtain teleconferencing information no later than 4:30 p.m. Wednesday, February 17, 2010.
 
VIDEO TELE-CONFERENCING Not Available
}}
}}

Latest revision as of 22:09, 6 December 2019

Notice of Category 1 Public Meeting with Florida Power and Light Company to Discuss Risk Significance of the Two Preliminary Greater than Green Inspection Report 05000335-09-006 and 05000389-09-006
ML100351155
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 02/04/2010
From: Binoy Desai
NRC/RGN-II/DRS/EB1
To: Nazar M
Florida Power & Light Co
References
IR-09-006
Download: ML100351155 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION ary 4, 2010

SUBJECT:

MEETING ANNOUNCEMENT - PUBLIC MEETING CATEGORY 1 REGULATORY CONFERENCE - ST. LUCIE NUCLEAR PLANT DOCKET NOS. 50-335 AND 50-389

Dear Mr. Nazar:

This letter confirms the telephone conversation between Mr. Eric Katzman of your staff and Mr. Binoy Desai of the NRC, on February 1, 2010, concerning a Regulatory Conference, being conducted at your request, which has been scheduled for February 19, 2010, from 2 p.m. to 4:00 p.m. (EST). The meeting notice, which provides additional details, is enclosed. The purpose of the Regulatory Conference is to discuss the risk significance of the two preliminary greater than green inspection findings documented in NRC Inspection Report 05000335, 389/2009006. These findings concern apparent failures to identify and correct design issues associated with an October 8, 2008, air intrusion event from the Unit 1 containment instrument air system into the component cooling water system.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact me at (404) 562-4519.

Sincerely,

/RA: Original signed by Mark Franke for/

Binoy B. Desai, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos.: 50-335, 50-389 License Nos.: DPR-67, NPF-16 Enclosure: As stated cc w/encl: (See page 2)

FP&L 2 cc w/encl: Marjan Mashhadi Richard L. Anderson Senior Attorney Site Vice President Florida Power & Light Company St. Lucie Nuclear Plant Electronic Mail Distribution Electronic Mail Distribution William A. Passetti Robert J. Hughes Chief Plant General Manager Florida Bureau of Radiation Control St. Lucie Nuclear Plant Department of Health Electronic Mail Distribution Electronic Mail Distribution Gene St. Pierre Ruben D. Almaguer Vice President - Fleet Organizational Director Support Division of Emergency Preparedness Florida Power & Light Company Department of Community Affairs Electronic Mail Distribution Electronic Mail Distribution Mark Hicks J. Kammel Operations Manager Radiological Emergency Planning St. Lucie Nuclear Plant Administrator Electronic Mail Distribution Department of Public Safety Electronic Mail Distribution Eric Katzman Licensing Manager Mano Nazar St. Lucie Nuclear Plant Executive Vice President and Chief Nuclear Electronic Mail Distribution Officer Florida Power & Light Company Abdy Khanpour Electronic Mail Distribution Vice President Engineering Support Senior Resident Inspector Florida Power and Light Company St. Lucie Nuclear Plant P.O. Box 14000 U.S. Nuclear Regulatory Commission Juno Beach, FL 33408-0420 P.O. Box 6090 Jensen Beach, FL 34957-2010 McHenry Cornell Director (Vacant)

Licensing and Performance Improvement Vice President Florida Power & Light Company Nuclear Plant Support Electronic Mail Distribution Florida Power & Light Company Electronic Mail Distribution Alison Brown Nuclear Licensing Faye Outlaw Florida Power & Light Company County Administrator Electronic Mail Distribution St. Lucie County Electronic Mail Distribution Mitch S. Ross Vice President and Associate General Jack Southard Counsel Director Florida Power & Light Company Public Safety Department Electronic Mail Distribution St. Lucie County Electronic Mail Distribution

_ xG SUNSI REVIEW COMPLETE /RA M. Thomas/

OFFICE RII:DRS RII:DRP RII:DRS SIGNATURE RA RA RA NAME JHAMMON MSYKES BDESAI DATE 2/4/2010 2/4/2010 2/4/2010 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

SUBJECT: PUBLIC MEETING WITH FLORIDA POWER & LIGHT FACILITY: ST. LUCIE NUCLEAR PLANT DOCKETS: 05000335 and 05000389 DATE & TIME: Friday, February 19, 2010 - 2:00 p.m. to 4:00 p.m.

LOCATION: Suite 24T25 Region II Office, Sam Nunn Atlanta Federal Center, 61 Forsyth Street, S.W., Atlanta, GA PURPOSE: The purpose of the meeting is to discuss the risk significance of the two preliminary greater than green inspection findings documented in NRC Inspection Report 05000335, 389/2009006. These findings concern apparent failures to identify and correct design issues associated with an October 8, 2008, air intrusion event from the Unit 1 containment instrument air system into the component cooling water system. The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov and contains information regarding conduct of NRC meetings.

CATEGORY: This is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned. The NRC provides reasonable accommodation to individuals with disabilities, where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRC=s meeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

NRC OFFICE Region II PARTICIPATING:

OTHER None ORGANIZATIONS PARTICIPATING:

PARTICIPANTS: NRC (partial list)

L. Reyes, Regional Administrator, Region II (RII)

V. McCree, Deputy Regional Administrator for Operations, RII K. Kennedy, Director, Division of Reactor Safety (DRS), RII L. Wert, Director, Division of Reactor Projects (DRP), RII B. Desai, Chief, Engineering Branch 1, DRS, RII W. Rogers, Senior Reactor Analyst LICENSEE (partial list)

Richard Anderson, Site Vice President Bob Hughes, Plant General Manager Eric Katzman, Licensing Manager Tom Cosgrove, Engineering Manager Abdy Khanpour, Engineering Support Jim Porter, Engineering Design Manager Cheng Guey, Risk Assessment George Tullidge, Risk Assessment Enclosure

MEETING Binoy Desai CONTACT: 404-562-4519 Binoy.Desai@nrc.gov AUDIO TELE- Interested members of the public may participate in this meeting via a toll-free CONFERENCING audio teleconference. Please contact the NRC meeting contact in advance of the meeting, indicating your intent to attend and to obtain teleconferencing information no later than 4:30 p.m. Wednesday, February 17, 2010.

VIDEO TELE- Not Available CONFERENCING Enclosure