|
|
(3 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML12107A066 | | | number = ML12107A066 |
| | issue date = 04/12/2012 | | | issue date = 04/12/2012 |
| | title = 2012/04/12 NRR E-mail Capture - Acceptance Review for TACs ME8135/6, Addition of Analytical Methodology TR to TS 5.6.5 and Revision to TS 2.1.1.2 | | | title = NRR E-mail Capture - Acceptance Review for TACs ME8135/6, Addition of Analytical Methodology TR to TS 5.6.5 and Revision to TS 2.1.1.2 |
| | author name = Saba F E | | | author name = Saba F |
| | author affiliation = NRC/NRR/DORL | | | author affiliation = NRC/NRR/DORL |
| | addressee name = Murray W R | | | addressee name = Murray W |
| | addressee affiliation = Progress Energy Co | | | addressee affiliation = Progress Energy Co |
| | docket = 05000324, 05000325 | | | docket = 05000324, 05000325 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:1 NRR-PMDAPEm Resource From: Saba, Farideh Sent: Thursday, April 12, 2012 12:00 PM To: Murray, William R. (Bill) | | {{#Wiki_filter:NRR-PMDAPEm Resource From: Saba, Farideh Sent: Thursday, April 12, 2012 12:00 PM To: Murray, William R. (Bill) |
| Cc: Billoch, Araceli; Lingam, Siva | | Cc: Billoch, Araceli; Lingam, Siva |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Acceptance review for TACs ME8135/6, Addition of Analytical Methodology TR to TS 5.6.5 and Revision to TS 2.1.1.2 Bill, Per LIC-109, the NRC staff completed acceptance review of Carolina Power & Light Company request dated March 6, 2012, for review and approval of "Addition of Analytical Methodology Topical Report to Te chnical Specification 5.6.5, "CORE OPERATING LIMITS REPORT (COLR)" and Revision to Te chnical Specification 2.1.1.2 Minimum Critical Power Ratio Safety Limit," for Brunswick Units 1 and 2. The NRC staff finds this amendment request to be acceptable for review in that the submittal reasonably appears to contain sufficient technical information, both in scope and depth, for the NRC staff to perform the detailed technical review and render, in an appropriate time frame, an assessment of the requested action. | | Acceptance review for TACs ME8135/6, Addition of Analytical Methodology TR to TS 5.6.5 and Revision to TS 2.1.1.2 |
| | | : Bill, Per LIC-109, the NRC staff completed acceptance review of Carolina Power & Light Company request dated March 6, 2012, for review and approval of Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, "CORE OPERATING LIMITS REPORT (COLR)" and Revision to Technical Specification 2.1.1.2 Minimum Critical Power Ratio Safety Limit," for Brunswick Units 1 and 2. The NRC staff finds this amendment request to be acceptable for review in that the submittal reasonably appears to contain sufficient technical information, both in scope and depth, for the NRC staff to perform the detailed technical review and render, in an appropriate time frame, an assessment of the requested action. |
| The detailed review may result in some questions that will n eed to be addressed informally or formally prior to the completion of the staff's final review of the amendment request. | | The detailed review may result in some questions that will need to be addressed informally or formally prior to the completion of the staff's final review of the amendment request. |
| Thanks, | | : Thanks, Farideh E. Saba, P.E. |
| | Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV Tracking: |
| | 1 |
|
| |
|
| Farideh E. Saba, P.E.
| | Recipient Read Murray, William R. (Bill) |
| Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV Tracking:
| | Billoch, Araceli Read: 4/12/2012 12:50 PM Lingam, Siva 2 |
| 2RecipientRead Murray, William R. (Bill)Billoch, AraceliRead: 4/12/2012 12:50 PM
| |
|
| |
|
| Lingam, Siva Hearing Identifier: NRR_PMDA Email Number: 326 Mail Envelope Properties (Farideh.Saba@nrc.gov20120412115900)
| | Hearing Identifier: NRR_PMDA Email Number: 326 Mail Envelope Properties (Farideh.Saba@nrc.gov20120412115900) |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Acceptance review for TACs ME8135/6, Addition of Analytical Methodology TR to TS 5.6.5 and Revision to TS 2.1.1.2 Sent Date: 4/12/2012 11:59:30 AM Received Date: 4/12/2012 11:59:00 AM From: Saba, Farideh Created By: Farideh.Saba@nrc.gov Recipients: "Billoch, Araceli" <Araceli.Billoch@nrc.gov> Tracking Status:: Response: Read : 4/12/2012 12:50:00 PM "Lingam, Siva" <Siva.Lingam@nrc.gov> Tracking Status: None "Murray, William R. (Bill)" <Bill.Murray2@pgnmail.com> Tracking Status: None Post Office: Files Size Date & Time MESSAGE 1112 4/12/2012 11:59:00 AM | | Acceptance review for TACs ME8135/6, Addition of Analytical Methodology TR to TS 5.6.5 and Revision to TS 2.1.1.2 Sent Date: 4/12/2012 11:59:30 AM Received Date: 4/12/2012 11:59:00 AM From: Saba, Farideh Created By: Farideh.Saba@nrc.gov Recipients: |
| | | "Billoch, Araceli" <Araceli.Billoch@nrc.gov> |
| Options Priority: Standard Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date: Recipients Received:}} | | Tracking Status:: Response: Read : 4/12/2012 12:50:00 PM "Lingam, Siva" <Siva.Lingam@nrc.gov> |
| | Tracking Status: None "Murray, William R. (Bill)" <Bill.Murray2@pgnmail.com> |
| | Tracking Status: None Post Office: |
| | Files Size Date & Time MESSAGE 1112 4/12/2012 11:59:00 AM Options Priority: Standard Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date: |
| | Recipients Received:}} |
Letter Sequence Acceptance Review |
---|
TAC:ME8135, Control Room Habitability (Approved, Closed) TAC:ME8136, Control Room Habitability (Approved, Closed) |
|
MONTHYEARML12076A0622012-03-0606 March 2012 Request for License Amendments - Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report (Colr) and Revision to Technical Specification 2.1.1.2 Project stage: Request ML12107A0662012-04-12012 April 2012 NRR E-mail Capture - Acceptance Review for TACs ME8135/6, Addition of Analytical Methodology TR to TS 5.6.5 and Revision to TS 2.1.1.2 Project stage: Acceptance Review ML12223A1962012-08-0909 August 2012 NRR E-mail Capture - Brunswick Units 1 and 2- RAIs Regarding TSs 2.1.1.2 and 5.6.5 and Revising a License Condition (ME8135 and ME8136) Project stage: RAI ML12251A1422012-08-29029 August 2012 Response to Request for Additional Information Re License Amendment Request for Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report, & Rev. to Tech Spec 2.1.1.2.. Project stage: Response to RAI BSEP 12-0104, Response to Request for Additional Information Regarding License Amendment Request for Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report (Colr), and Rev. To..2012-09-21021 September 2012 Response to Request for Additional Information Regarding License Amendment Request for Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report (Colr), and Rev. To.. Project stage: Response to RAI ML12348A0152012-11-29029 November 2012 Response to Request for Additional Information Re License Amendment Request for Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report, and Revision to Technical. Project stage: Response to RAI ML12300A3812012-12-0505 December 2012 Request for Withholding Information from Public Disclosure (TAC TAC ME8135 and ME8136) Project stage: Withholding Request Acceptance ML12305A2082012-12-20020 December 2012 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML12305A1982012-12-20020 December 2012 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML13031A0102013-01-22022 January 2013 Supplement to License Amendment Request for Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report (Colr), and Revision to Tech Spec 2.1.1.2 Minimum Critical Power.. Project stage: Supplement ML13023A2242013-02-0404 February 2013 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML13039A2102013-02-11011 February 2013 Letter - Draft SE for Amendments Regarding Addition of Analytical Methodology Topic Reports to TS 5.6.5 and Revision to Minimum Critical Power Ratio Safety Limit Project stage: Draft Approval ML13037A5512013-03-0101 March 2013 Issuance of Amendments Regarding Addition of Analytical Methodology TR to TS 5.6.5 and Revision to TS 2.1.1.2 Project stage: Approval 2012-08-29
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML23248A2612023-09-0505 September 2023 NRR E-mail Capture - Brunswick Steam Electric Plant, Units 1 and 2 - Acceptance of License Amendment Request to Revise the 10 CFR 50.69 Categorization Process ML23202A0652023-07-19019 July 2023 NRR E-mail Capture - Request for Additional Information - Brunswick Steam Electric Plant, Units 1 and 2, Torus Liner Inspection Alternative Request (L-2022-LLR-0089) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23073A2282023-03-13013 March 2023 Duke Fleet- Adoption of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements - Acceptance Review ML23032A2472023-01-26026 January 2023 Document Request Letter for Brunswick Upcoming RP Inspection 2023002 ML23018A1892023-01-17017 January 2023 Document Request for RP Inspection at Brunswick Inspection Report 2023-01 ML23006A0642023-01-0606 January 2023 NRR E-mail Capture - Acceptance Review Results for Brunswick, Unit Nos. 1 and 2 - Proposed Alternative Request RA-22-0308 ML23006A1892023-01-0606 January 2023 NRR E-mail Capture - Corrected - Acceptance Review Results for Brunswick, Unit Nos. 1 and 2 - Proposed Alternative Request RA-22-0308 NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004)2022-09-12012 September 2022 EN 55999 Valcor Coil Shell Assemblies Final Notification (004) NRC 2110-2022, EN 55999 - Valcor Engineering Corporation (009)2022-07-18018 July 2022 EN 55999 - Valcor Engineering Corporation (009) ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML22038A1572022-02-0707 February 2022 NRR E-mail Capture - Duke Energy Fleet - Acceptance of License Amendment Request Regarding Adoption of TSTF-541, Revision 2 ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21357A0472021-12-23023 December 2021 NRR E-mail Capture - Brunswick Steam Electric Plant, Units 1 and 2 - Acceptance of License Amendment Request Regarding Adoption of TSTF-580 ML21361A0122021-12-23023 December 2021 NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Relocate Emergency Operations Facility ML21354A8612021-12-15015 December 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet Request RA-19-0352 - Alternative for RPV Closure Stud Exams (L-2020-LLR-0156) ML21277A0952021-10-0101 October 2021 NRR E-mail Capture - Request for Additional Information - Brunswick Exemption Request from 10CFR 55.47 License Operator Exam Two-year Waiver Limit ML21200A1582021-07-16016 July 2021 NRR E-mail Capture - Accepted for Review - Brunswick License Amendment Request to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery ML21168A0042021-06-17017 June 2021 Notification of Inspection and Request for Information ML21137A1622021-04-26026 April 2021 NRR E-mail Capture - Accepted for Review - Brunswick License Amendment Request to Adopt TSTF-505 Risk-Informed Completion Time (L-2021-LLA-0060) ML21082A0162021-03-22022 March 2021 Accepted for Review - Brunswick License Amendment Request to Change Tech Spec Limit for Standby Liquid Control System Boron Solution Storage Tank Volume L-2021-LLA-0022 ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 ML21049A2632021-02-0404 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan ML21019A3772021-01-13013 January 2021 002 Radiation Safety Baseline Inspection Information Request ML21007A3722021-01-0707 January 2021 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-19-0352 - Proposed Alternative for Reactor Vessel Close Stud Examinations (L-2020-LLR-0156) ML20323A4072020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180) ML20309A5212020-10-29029 October 2020 Request for Additional Information - Brunswick License Amendment Request to Modify Its Approved 10 CFR 50.69, Risk-Informed Categorization and Treatment of SSC Categorization Process ML20294A0642020-10-20020 October 2020 NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Adopt TSTF-582 RPV Water Inventory Control Enhancements(L-2020-LLA-0218) ML20297A3102020-10-13013 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0191 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-5120, IWA-5213, IWA-5241, IWA-5242, and IWA-5250 (L-2020-LLR-0126) ML20297A3082020-10-0707 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0263 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI for Repair/Replacement (L-2020-LLR-0124) ML20297A3092020-10-0606 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0262 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-4540(b) (L-2020-LLR-0125) ML20275A2972020-10-0101 October 2020 NRR E-mail Capture - Request for Additional Information - Brunswick Request for Alternate Examination of Reactor Vessel Nozzles ML21033A8562020-08-0505 August 2020 NRR E-mail Capture - Accepted for Review - Brunswick Relief Request for RPV Nozzle-to-Vessel Weld and Inner Radii Examination Requirements EPID-L-2020-LLR-0091 ML20121A1262020-04-29029 April 2020 Radiation Safety Baseline Inspection Information Request ML20111A1212020-04-20020 April 2020 NRR E-mail Capture - Accepted for Review - Brunswick Request for Alternative to Examination Category B-N-1 (VT-3) Visual Examination of Accessible Areas of the Reactor Vessel Interior - EPID: L-2020-LLR-0048 ML20017A1602020-01-17017 January 2020 E-mail Notification of Inspection and Request for Additional Information ML19283D0852019-10-0909 October 2019 Request for Additional Information - Brunswick Atrium 11 LAR ML19252A4572019-09-0808 September 2019 (FEMA Email 09-08-19) Tentative Notification of Brunswick Preliminary Capability Assessment Results ML19252A4092019-09-0606 September 2019 (E-mail to FEMA 09-06-19) FEMA Notification for Planned Restart of Brunswick Units 1 and 2 ML19219A2132019-08-0707 August 2019 NRR E-mail Capture - Duke Energy Fleet - Acceptance of Requested Licensing Action Amendment Requests to Relocate the TSs Staff Qualification Requirements to the Duke Energy Corporation QAPD ML19179A1312019-06-27027 June 2019 NRR E-mail Capture - Brunswick RAIs - LAR to Revise TS 5.5.12, Primary Containment Leakage Rate Testing Program for Permanent Extension of Maximum Appendix J Test Intervals (L 2019-LLA-0031) ML19177A0122019-06-25025 June 2019 NRR E-mail Capture - Draft Brunswick RAIs - LAR to Revise TS 5.5.12, Primary Containment Leakage Rate Testing Program for Permanent Extension of Maximum Appendix J Test Intervals (L 2019-LLA-0031) ML19162A3902019-06-11011 June 2019 NRR E-mail Capture - Brunswick Steam Electric Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Fourth 10-Year Inservice Inspection Interval ISI-12 ML19162A3912019-06-11011 June 2019 NRR E-mail Capture - Duke Energy Fleet - Acceptance of Requested Licensing Action Relief Request (19-GO-001) Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination in Lieu of Radiography ML19092A1152019-04-0101 April 2019 NRR E-mail Capture - Brunswick Steam Electric Plant, Unit Nos. 1 and 2 - Acceptance of Requested Licensing Action Amendment Request to Modify Surveillance Requirements for Safety Relief Valves (L-2019-LLA-0043) ML19092A1142019-04-0101 April 2019 NRR E-mail Capture - Brunswick Plant, Unit 1 and 2 - Acceptance of Requested Licensing Action Amendment Request to Modify TS 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (L-2019-LLA-0031) ML19067A2712019-03-0707 March 2019 NRR E-mail Capture - Brunswick 3rd Round RAI - LAR to Allow Implementation of the Provisions 10 CFR 50.69 ML19065A0962019-03-0606 March 2019 NRR E-mail Capture - Brunswick RAIs - LAR to Revise Allowable Value for TS 3.3.8.1 Time Delay on Loss of Voltage ML19058A0742019-02-26026 February 2019 NRR E-mail Capture - Draft Brunswick RAIs - LAR to Revise Allowable Value for TS 3.3.8.1 Time Delay on Loss of Voltage ML19056A2212019-02-25025 February 2019 NRR E-mail Capture - Brunswick Draft 3rd Round RAI - LAR to Allow Implementation of the Provisions 10 CFR 50.69 2023-09-05
[Table view] |
Text
NRR-PMDAPEm Resource From: Saba, Farideh Sent: Thursday, April 12, 2012 12:00 PM To: Murray, William R. (Bill)
Cc: Billoch, Araceli; Lingam, Siva
Subject:
Acceptance review for TACs ME8135/6, Addition of Analytical Methodology TR to TS 5.6.5 and Revision to TS 2.1.1.2
- Bill, Per LIC-109, the NRC staff completed acceptance review of Carolina Power & Light Company request dated March 6, 2012, for review and approval of Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, "CORE OPERATING LIMITS REPORT (COLR)" and Revision to Technical Specification 2.1.1.2 Minimum Critical Power Ratio Safety Limit," for Brunswick Units 1 and 2. The NRC staff finds this amendment request to be acceptable for review in that the submittal reasonably appears to contain sufficient technical information, both in scope and depth, for the NRC staff to perform the detailed technical review and render, in an appropriate time frame, an assessment of the requested action.
The detailed review may result in some questions that will need to be addressed informally or formally prior to the completion of the staff's final review of the amendment request.
- Thanks, Farideh E. Saba, P.E.
Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV Tracking:
1
Recipient Read Murray, William R. (Bill)
Billoch, Araceli Read: 4/12/2012 12:50 PM Lingam, Siva 2
Hearing Identifier: NRR_PMDA Email Number: 326 Mail Envelope Properties (Farideh.Saba@nrc.gov20120412115900)
Subject:
Acceptance review for TACs ME8135/6, Addition of Analytical Methodology TR to TS 5.6.5 and Revision to TS 2.1.1.2 Sent Date: 4/12/2012 11:59:30 AM Received Date: 4/12/2012 11:59:00 AM From: Saba, Farideh Created By: Farideh.Saba@nrc.gov Recipients:
"Billoch, Araceli" <Araceli.Billoch@nrc.gov>
Tracking Status:: Response: Read : 4/12/2012 12:50:00 PM "Lingam, Siva" <Siva.Lingam@nrc.gov>
Tracking Status: None "Murray, William R. (Bill)" <Bill.Murray2@pgnmail.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 1112 4/12/2012 11:59:00 AM Options Priority: Standard Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date:
Recipients Received: