ML13039A210

From kanterella
Jump to navigation Jump to search

Letter - Draft SE for Amendments Regarding Addition of Analytical Methodology Topic Reports to TS 5.6.5 and Revision to Minimum Critical Power Ratio Safety Limit
ML13039A210
Person / Time
Site: Brunswick  
Issue date: 02/11/2013
From: Gratton C
Plant Licensing Branch II
To: Annacone M
Carolina Power & Light Co
Gratton, Chris
References
TAC ME8135, TAC ME8136
Download: ML13039A210 (3)


Text

GFFrGtAI::-lJSE--9Ht¥--6EN6tnve--PRGRPfE-T-AR¥-mFORM-AfleN UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 11, 2013 Mr. Michael J. Annacone, Vice President Brunswick Steam Electric Plant Carolina Power & Light Company Post Office Box 10429 Southport, NC 28461

SUBJECT:

BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 - DRAFT SAFETY EVALUATION FOR AMENDMENTS REGARDING ADDITION OF ANALYTICAL METHODOLOGY TOPICAL REPORTS TO TECHNICAL SPECIFICATION 5.6.5 AND REVISION TO MINIMUM CRITICAL POWER RATIO SAFETY LIMIT (TAC NOS. ME8135 AND ME8136)

Dear Mr. Annacone:

By letter dated March 6, 2012, as supplemented by letters dated August 29, 2012, September 21, 2012, November 29, 2012, and January 22. 2013, Carolina Power & Light Company submitted a license amendment request to the U.S. Nuclear Regulatory Commission (NRC) staff for review. Enclosed for Carolina Power & Light Company review and comment is a copy of the NRC staffs Draft Safety Evaluation (SE) for the license amendment regarding Brunswick Steam Electric Plant, Units 1 and 2. Your review and comment should be limited to the proprietary nature of the safety evaluation.

PUrsuant to Section 2.390 of Title 10 of the Code of Federal Regulations (10 CFR), we have determined that the enclosed draft SE does not contain proprietary information. However, we will delay placing the draft SE in the public document room for a period of 10 working days from the date of this letter to provide you with the opportunity to comment on any proprietary aspects.

If you believe that any information in the enclosure is proprietary, please identify such information line-by-line and define the basis pursuant to the criteria of 10 CFR 2.390. After 10 working days, the draft SE will be made publicly available. The final SE will be issued after making any necessary changes and will be made publicly available. The NRC staffs disposition of your comments on the draft SE will be discussed in the final SE.

To facilitate the NRC staffs review of your comments, please provide a marked-up copy of the SE showing proposed changes and provide a summary table of the proposed changes.

The enclosure transmitted herewith contains Sensitive Unclassified Non-Safeguards Information. When separated from the enclosure, this transmittal document is decontrolled.

-eFF~GtAl:-USE-()Nl;¥---SENSl-T-IYE-PRGR.pfET-AR-¥-JNFGRMA:r~()N

OFFJGfAl-tJSE-ONl:.¥-&ENSHNSPRORPfE-T-AR¥tNFeRM-AffGN M. Annacone

-2 If you have any questions, please contact me at 301-415-1055.

Sincerely, Christopher Gratton, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-325 and 50-324

Enclosure:

As stated cc w/enclosure: Distribution via ListServ

-eFf'fCtAl;-(JSE-ON1:¥---SENSf'ffYE-PRORflIEfAR:¥-fNFORMA-T-taN

Letter ML13039A210 Draft SE ML13039A211 OFFICE DORUlPL2-2IPM DORLlLPL2*2ILA

! DORLILPL2.2I8C DORUlPL2*2IPM NAME CGratton BClayton IJQulc:hoc:ho CGratton DATE 2/11113 2/8113 12111/13 2111113