TAC:ME8135, Control Room Habitability (Approved, Closed) TAC:ME8136, Control Room Habitability (Approved, Closed) |
|
MONTHYEARML12076A0622012-03-0606 March 2012 Request for License Amendments - Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report (COLR) and Revision to Technical Specification 2.1.1.2 Project stage: Request ML12107A0662012-04-12012 April 2012 NRR E-mail Capture - Acceptance Review for TACs ME8135/6, Addition of Analytical Methodology TR to TS 5.6.5 and Revision to TS 2.1.1.2 Project stage: Acceptance Review ML12223A1962012-08-0909 August 2012 NRR E-mail Capture - Brunswick Units 1 and 2- RAIs Regarding TSs 2.1.1.2 and 5.6.5 and Revising a License Condition (ME8135 and ME8136) Project stage: RAI ML12251A1422012-08-29029 August 2012 Response to Request for Additional Information Re License Amendment Request for Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report, & Rev. to Tech Spec 2.1.1.2 Project stage: Response to RAI BSEP 12-0103, NRC Correspondence Distribution List Update2012-09-21021 September 2012 NRC Correspondence Distribution List Update Project stage: Request BSEP 12-0104, Response to Request for Additional Information Regarding License Amendment Request for Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report (Colr), and Rev. to2012-09-21021 September 2012 Response to Request for Additional Information Regarding License Amendment Request for Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report (Colr), and Rev. to Project stage: Response to RAI ML12348A0152012-11-29029 November 2012 Response to Request for Additional Information Re License Amendment Request for Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report, and Revision to Technical Project stage: Response to RAI ML12300A3812012-12-0505 December 2012 Request for Withholding Information from Public Disclosure (TAC TAC ME8135 and ME8136) Project stage: Withholding Request Acceptance ML12305A2082012-12-20020 December 2012 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML12305A1982012-12-20020 December 2012 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML13031A0102013-01-22022 January 2013 Supplement to License Amendment Request for Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report (Colr), and Revision to Tech Spec 2.1.1.2 Minimum Critical Power Project stage: Supplement ML13023A2242013-02-0404 February 2013 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML13039A2102013-02-11011 February 2013 Letter - Draft SE for Amendments Regarding Addition of Analytical Methodology Topic Reports to TS 5.6.5 and Revision to Minimum Critical Power Ratio Safety Limit Project stage: Draft Approval ML13037A5512013-03-0101 March 2013 Issuance of Amendments Regarding Addition of Analytical Methodology TR to TS 5.6.5 and Revision to TS 2.1.1.2 Project stage: Approval 2012-08-29
[Table View] |
Text
1 NRR-PMDAPEm Resource From:
Saba, Farideh Sent:
Thursday, April 12, 2012 12:00 PM To:
Murray, William R. (Bill)
Cc:
Billoch, Araceli; Lingam, Siva
Subject:
Acceptance review for TACs ME8135/6, Addition of Analytical Methodology TR to TS 5.6.5 and Revision to TS 2.1.1.2
- Bill, Per LIC-109, the NRC staff completed acceptance review of Carolina Power & Light Company request dated March 6, 2012, for review and approval of Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, "CORE OPERATING LIMITS REPORT (COLR)" and Revision to Technical Specification 2.1.1.2 Minimum Critical Power Ratio Safety Limit," for Brunswick Units 1 and 2. The NRC staff finds this amendment request to be acceptable for review in that the submittal reasonably appears to contain sufficient technical information, both in scope and depth, for the NRC staff to perform the detailed technical review and render, in an appropriate time frame, an assessment of the requested action.
The detailed review may result in some questions that will need to be addressed informally or formally prior to the completion of the staff's final review of the amendment request.
- Thanks, Farideh E. Saba, P.E.
Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV Tracking:
2 Recipient Read Murray, William R. (Bill)
Billoch, Araceli Read: 4/12/2012 12:50 PM Lingam, Siva
Hearing Identifier:
NRR_PMDA Email Number:
326 Mail Envelope Properties (Farideh.Saba@nrc.gov20120412115900)
Subject:
Acceptance review for TACs ME8135/6, Addition of Analytical Methodology TR to TS 5.6.5 and Revision to TS 2.1.1.2 Sent Date:
4/12/2012 11:59:30 AM Received Date:
4/12/2012 11:59:00 AM From:
Saba, Farideh Created By:
Farideh.Saba@nrc.gov Recipients:
"Billoch, Araceli" <Araceli.Billoch@nrc.gov>
Tracking Status:: Response: Read : 4/12/2012 12:50:00 PM "Lingam, Siva" <Siva.Lingam@nrc.gov>
Tracking Status: None "Murray, William R. (Bill)" <Bill.Murray2@pgnmail.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 1112 4/12/2012 11:59:00 AM Options Priority:
Standard Return Notification:
No Reply Requested:
Yes Sensitivity:
Normal Expiration Date:
Recipients Received: