ML12107A066: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML12107A066
| number = ML12107A066
| issue date = 04/12/2012
| issue date = 04/12/2012
| title = Acceptance Review for TACs ME8135/6, Addition of Analytical Methodology TR to TS 5.6.5 and Revision to TS 2.1.1.2
| title = NRR E-mail Capture - Acceptance Review for TACs ME8135/6, Addition of Analytical Methodology TR to TS 5.6.5 and Revision to TS 2.1.1.2
| author name = Saba F
| author name = Saba F
| author affiliation = NRC/NRR/DORL
| author affiliation = NRC/NRR/DORL
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:1 NRR-PMDAPEm Resource From: Saba, Farideh Sent: Thursday, April 12, 2012 12:00 PM To: Murray, William R. (Bill)
{{#Wiki_filter:NRR-PMDAPEm Resource From:                       Saba, Farideh Sent:                       Thursday, April 12, 2012 12:00 PM To:                         Murray, William R. (Bill)
Cc: Billoch, Araceli; Lingam, Siva
Cc:                         Billoch, Araceli; Lingam, Siva


==Subject:==
==Subject:==
Acceptance review for TACs ME8135/6, Addition of Analytical Methodology TR to TS 5.6.5 and Revision to TS 2.1.1.2 Bill, Per LIC-109, the NRC staff completed acceptance review of Carolina Power & Light Company request dated March 6, 2012, for review and approval of "Addition of Analytical Methodology Topical Report to Te chnical Specification 5.6.5, "CORE OPERATING LIMITS REPORT (COLR)" and Revision to Te chnical Specification 2.1.1.2 Minimum Critical Power Ratio Safety Limit," for Brunswick Units 1 and 2. The NRC staff finds this amendment request to be acceptable for review in that the submittal reasonably appears to contain sufficient technical information, both in scope and depth, for the NRC staff to perform the detailed technical review and render, in an appropriate time frame, an assessment of the requested action.  
Acceptance review for TACs ME8135/6, Addition of Analytical Methodology TR to TS 5.6.5 and Revision to TS 2.1.1.2
 
: Bill, Per LIC-109, the NRC staff completed acceptance review of Carolina Power & Light Company request dated March 6, 2012, for review and approval of Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, "CORE OPERATING LIMITS REPORT (COLR)" and Revision to Technical Specification 2.1.1.2 Minimum Critical Power Ratio Safety Limit," for Brunswick Units 1 and 2. The NRC staff finds this amendment request to be acceptable for review in that the submittal reasonably appears to contain sufficient technical information, both in scope and depth, for the NRC staff to perform the detailed technical review and render, in an appropriate time frame, an assessment of the requested action.
The detailed review may result in some questions that will n eed to be addressed informally or formally prior to the completion of the staff's final review of the amendment request.
The detailed review may result in some questions that will need to be addressed informally or formally prior to the completion of the staff's final review of the amendment request.
Thanks,  
: Thanks, Farideh E. Saba, P.E.
Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV Tracking:
1


Farideh E. Saba, P.E.
Recipient                  Read Murray, William R. (Bill)
Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV Tracking:
Billoch, Araceli            Read: 4/12/2012 12:50 PM Lingam, Siva 2
2RecipientRead Murray, William R. (Bill)Billoch, AraceliRead: 4/12/2012 12:50 PM


Lingam, Siva Hearing Identifier: NRR_PMDA Email Number: 326   Mail Envelope Properties   (Farideh.Saba@nrc.gov20120412115900)
Hearing Identifier:       NRR_PMDA Email Number:             326 Mail Envelope Properties         (Farideh.Saba@nrc.gov20120412115900)


==Subject:==
==Subject:==
Acceptance review for TACs ME8135/6, Addition of Analytical Methodology TR to TS 5.6.5 and Revision to TS 2.1.1.2   Sent Date:   4/12/2012 11:59:30 AM Received Date: 4/12/2012 11:59:00 AM From:   Saba, Farideh Created By:   Farideh.Saba@nrc.gov Recipients:     "Billoch, Araceli" <Araceli.Billoch@nrc.gov> Tracking Status:: Response: Read : 4/12/2012 12:50:00 PM "Lingam, Siva" <Siva.Lingam@nrc.gov> Tracking Status: None "Murray, William R. (Bill)" <Bill.Murray2@pgnmail.com> Tracking Status: None Post Office:     Files     Size     Date & Time MESSAGE   1112     4/12/2012 11:59:00 AM
Acceptance review for TACs ME8135/6, Addition of Analytical Methodology TR to TS 5.6.5 and Revision to TS 2.1.1.2 Sent Date:               4/12/2012 11:59:30 AM Received Date:           4/12/2012 11:59:00 AM From:                     Saba, Farideh Created By:               Farideh.Saba@nrc.gov Recipients:
 
"Billoch, Araceli" <Araceli.Billoch@nrc.gov>
Options Priority:     Standard   Return Notification:   No   Reply Requested:   Yes   Sensitivity:     Normal Expiration Date:     Recipients Received:}}
Tracking Status:: Response: Read : 4/12/2012 12:50:00 PM "Lingam, Siva" <Siva.Lingam@nrc.gov>
Tracking Status: None "Murray, William R. (Bill)" <Bill.Murray2@pgnmail.com>
Tracking Status: None Post Office:
Files                             Size                   Date & Time MESSAGE                           1112                   4/12/2012 11:59:00 AM Options Priority:                         Standard Return Notification:               No Reply Requested:                   Yes Sensitivity:                       Normal Expiration Date:
Recipients Received:}}

Latest revision as of 22:25, 5 December 2019

NRR E-mail Capture - Acceptance Review for TACs ME8135/6, Addition of Analytical Methodology TR to TS 5.6.5 and Revision to TS 2.1.1.2
ML12107A066
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 04/12/2012
From: Farideh Saba
Division of Operating Reactor Licensing
To: Murray W
Progress Energy Co
References
TAC ME8135, TAC ME8136
Download: ML12107A066 (3)


Text

NRR-PMDAPEm Resource From: Saba, Farideh Sent: Thursday, April 12, 2012 12:00 PM To: Murray, William R. (Bill)

Cc: Billoch, Araceli; Lingam, Siva

Subject:

Acceptance review for TACs ME8135/6, Addition of Analytical Methodology TR to TS 5.6.5 and Revision to TS 2.1.1.2

Bill, Per LIC-109, the NRC staff completed acceptance review of Carolina Power & Light Company request dated March 6, 2012, for review and approval of Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, "CORE OPERATING LIMITS REPORT (COLR)" and Revision to Technical Specification 2.1.1.2 Minimum Critical Power Ratio Safety Limit," for Brunswick Units 1 and 2. The NRC staff finds this amendment request to be acceptable for review in that the submittal reasonably appears to contain sufficient technical information, both in scope and depth, for the NRC staff to perform the detailed technical review and render, in an appropriate time frame, an assessment of the requested action.

The detailed review may result in some questions that will need to be addressed informally or formally prior to the completion of the staff's final review of the amendment request.

Thanks, Farideh E. Saba, P.E.

Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV Tracking:

1

Recipient Read Murray, William R. (Bill)

Billoch, Araceli Read: 4/12/2012 12:50 PM Lingam, Siva 2

Hearing Identifier: NRR_PMDA Email Number: 326 Mail Envelope Properties (Farideh.Saba@nrc.gov20120412115900)

Subject:

Acceptance review for TACs ME8135/6, Addition of Analytical Methodology TR to TS 5.6.5 and Revision to TS 2.1.1.2 Sent Date: 4/12/2012 11:59:30 AM Received Date: 4/12/2012 11:59:00 AM From: Saba, Farideh Created By: Farideh.Saba@nrc.gov Recipients:

"Billoch, Araceli" <Araceli.Billoch@nrc.gov>

Tracking Status:: Response: Read : 4/12/2012 12:50:00 PM "Lingam, Siva" <Siva.Lingam@nrc.gov>

Tracking Status: None "Murray, William R. (Bill)" <Bill.Murray2@pgnmail.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 1112 4/12/2012 11:59:00 AM Options Priority: Standard Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date:

Recipients Received: