|
|
(2 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML14198A391 | | | number = ML14198A391 |
| | issue date = 07/15/2014 | | | issue date = 07/15/2014 |
| | title = RAIs - Developmental Tech Specs Rev I | | | title = NRR E-mail Capture - Watts Bar 2 - RAIs - Developmental Tech Specs Rev I |
| | author name = Miernicki M J | | | author name = Miernicki M |
| | author affiliation = NRC/NRR/DORL/LPWB | | | author affiliation = NRC/NRR/DORL/LPWB |
| | addressee name = Arent G P, Bryan R H | | | addressee name = Arent G, Bryan R |
| | addressee affiliation = Tennessee Valley Authority | | | addressee affiliation = Tennessee Valley Authority |
| | docket = 05000391 | | | docket = 05000391 |
Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:1 NRR-PMDAPEm Resource From: Miernicki, Michael Sent: Tuesday, July 15, 2014 10:03 AM To: garent@tva.gov; rhbryan@tva.gov Cc: Quichocho, Jessie; Poole, Justin; T horp, John; Rahn, David; Lingam, Siva | | {{#Wiki_filter:NRR-PMDAPEm Resource From: Miernicki, Michael Sent: Tuesday, July 15, 2014 10:03 AM To: garent@tva.gov; rhbryan@tva.gov Cc: Quichocho, Jessie; Poole, Justin; Thorp, John; Rahn, David; Lingam, Siva |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Watts Bar 2 - RAIs - Developmental Tech Specs Rev I Attachments:RAI WBN2 T.S, Rev I - EICB.docxAttached please find RAIs from the Instrument and Controls Branch regarding Watts Bar 2 Developmental Technical Specifications Revision I. Please acknowledge receipt of these questions, and that they contain no proprietary information. Please provide your responses within 30 days. | | Watts Bar 2 - RAIs - Developmental Tech Specs Rev I Attachments: RAI WBN2 T.S, Rev I - EICB.docx Attached please find RAIs from the Instrument and Controls Branch regarding Watts Bar 2 Developmental Technical Specifications Revision I. Please acknowledge receipt of these questions, and that they contain no proprietary information. Please provide your responses within 30 days. |
| Mike Michael J. Miernicki Sr. Project Manager NRC/NRR/DORL/LP-WB 301-415-2304 | | Mike Michael J. Miernicki Sr. Project Manager NRC/NRR/DORL/LP-WB 301-415-2304 1 |
|
| |
|
| Hearing Identifier: NRR_PMDA Email Number: 1431 Mail Envelope Properties (Michael.Miernicki@nrc.gov20140715100200) | | Hearing Identifier: NRR_PMDA Email Number: 1431 Mail Envelope Properties (Michael.Miernicki@nrc.gov20140715100200) |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Watts Bar 2 - RAIs - Developmental Tech Specs Rev I Sent Date: 7/15/2014 10:02:31 AM Received Date: 7/15/2014 10:02:00 AM From: Miernicki, Michael Created By: Michael.Miernicki@nrc.gov Recipients: "Quichocho, Jessie" <Jessie.Quichocho@nrc.gov> Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov> | | Watts Bar 2 - RAIs - Developmental Tech Specs Rev I Sent Date: 7/15/2014 10:02:31 AM Received Date: 7/15/2014 10:02:00 AM From: Miernicki, Michael Created By: Michael.Miernicki@nrc.gov Recipients: |
| Tracking Status: None "Thorp, John" <John.Thorp@nrc.gov> Tracking Status: None "Rahn, David" <David.Rahn@nrc.gov> Tracking Status: None "Lingam, Siva" <Siva.Lingam@nrc.gov> | | "Quichocho, Jessie" <Jessie.Quichocho@nrc.gov> |
| Tracking Status: None "garent@tva.gov" <garent@tva.gov> Tracking Status: None "rhbryan@tva.gov" <rhbryan@tva.gov> Tracking Status: None Post Office: Files Size Date & Time MESSAGE 395 7/15/2014 10:02:00 AM RAI WBN2 T.S, Rev I - EICB.docx 59568 | | Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov> |
| | Tracking Status: None "Thorp, John" <John.Thorp@nrc.gov> |
| | Tracking Status: None "Rahn, David" <David.Rahn@nrc.gov> |
| | Tracking Status: None "Lingam, Siva" <Siva.Lingam@nrc.gov> |
| | Tracking Status: None "garent@tva.gov" <garent@tva.gov> |
| | Tracking Status: None "rhbryan@tva.gov" <rhbryan@tva.gov> |
| | Tracking Status: None Post Office: |
| | Files Size Date & Time MESSAGE 395 7/15/2014 10:02:00 AM RAI WBN2 T.S, Rev I - EICB.docx 59568 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: |
| | Recipients Received: |
|
| |
|
| Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:
| | REQUEST FOR ADDITIONAL INFORMATION REVIEW OF DEVELOPMENTAL TECHNICAL SPECIFICATIONS REV. I WATTS BAR NUCLEAR PLANT UNIT 2 DOCKET NUMBER 50-391 BACKGROUND By letter dated June 16, 2014 (Agencywide Documents Access and Management System Accession No. ML14169A525), Tennessee Valley Authority (the applicant) submitted developmental Revision I of the Watts Bar Unit 2 Technical Specifications, for review and licensing by the U.S. Nuclear Regulatory Commission (NRC). |
| REQUEST FOR ADDITIONAL INFORMATION REVIEW OF DEVELOPMENTAL TECHNICAL SPECIFICATIONS REV. I WATTS BAR NUCLEAR PLANT UNIT 2 DOCKET NUMBER 50-391 BACKGROUND By letter dated June 16, 2014 (Agencywide Documents Access and Management System Accession No. ML14169A525), Tennessee Valley Authority (the applicant) submitted developmental Revision I of the Watts Bar Unit 2 Technical Specifications, for review and licensing by the U.S. Nuclear Regulatory Commission (NRC). | | The NRC staff has reviewed Technical Specification Sections 3.3, 3.9.3, and 5.7 which the applicant provided, and determined that additional information is required in order to complete the review. In order for the NRC staff to complete its review of the document listed above, please respond to the following questions and provide associated additional information: |
| The NRC staff has reviewed Technical Specification Sections 3.3, 3.9.3, and 5.7 which the applicant provided, and determined that additional information is required in order to complete the review. In order for the NRC staff to complete its review of the document listed above, please respond to the following questions and provide associated additional information: | | QUESTION 1 On Table 3.3.1-1 (TS page 3.3-22), Note 2, Overpower T equation, the sign before K6 was changed from - to +. The staff needs clarification from the applicant as to the reasons for the change. |
| | Watts Bar 2 TS, Rev I: |
| | Watts Bar 2 TS, Rev A: |
|
| |
|
| QUESTION 1 On Table 3.3.1-1 (TS page 3.3-22), Note 2, Overpower T equation, the sign before K6 was changed from "-" to "+". The staff needs clarification from the applicant as to the reasons for the change. Watts Bar 2 TS, Rev I:
| | QUESTION 2 On Table 3.3.2-1 (page 3.3-39), Function 8 (ESFAS Interlocks), b (Pressurizer Pressure P-11), |
| Watts Bar 2 TS, Rev A:
| | (2) (Enable Manual Block of SI), the allowable value was changed from 1956.8 psig to 1956.8 psig. The staff needs clarification from the applicant as to the reasons for the change. |
| | | QUESTION 3 TS 3.3.8, Auxiliary Building Gas Treatment System (ABGTS) Actuation Instrumentation, has several changes related to the elimination (from Table 3.3.8-1) of the Fuel Pool Area Monitors during movement of irradiated fuel assemblies in the spent fuel pool area. Condition C in TS revision A has been removed (Condition D in TS revision A is now Condition C in TS revision H) and SR 3.3.8.1, SR 3.3.8.2 and SR 3.3.8.4 in TS revision A have been removed (SR 3.3.8.3 in TS revision A is now SR 3.3.8.1 in TS revision H). EICB staff is not aware of the reasons for this change. Please provide an explanation of the reason for this change QUESTION 4 On Table 3.3.1-1 (page 3.3-18), Function 14 (Turbine Trip), a (Low Fluid Oil Pressure), SR 3.3.1.10(b)(c) was added in revision G (as a correction of a typo). However, it was removed in revision I, even though the page remains marked as revision G. This SR is for the performance of a channel calibration. The staff needs clarification from the applicant as to the reasons for the change.}} |
| QUESTION 2 On Table 3.3.2-1 (page 3.3-39), Function 8 (ESFAS Interlocks), b (Pressurizer Pressure P-11), (2) (Enable Manual Block of SI), the allowable value was changed from | |
| " 1956.8 psig" to "1956.8 psig". The staff needs clarification from the applicant as to the reasons for the change. | |
| QUESTION 3 TS 3.3.8, "Auxiliary Building Gas Treatment System (ABGTS) Actuation Instrumentation," has several changes related to the elimination (from Table 3.3.8-1) of the Fuel Pool Area Monitors during movement of irradiated fuel assemblies in the spent fuel pool area. Condition C in TS revision A has been removed (Condition D in TS revision A is now Condition C in TS revision H) and SR 3.3.8.1, SR 3.3.8.2 and SR 3.3.8.4 in TS revision A have been removed (SR 3.3.8.3 in TS revision A is now SR 3.3.8.1 in TS revision H). EICB staff is not aware of the reasons for this change. Please provide an explanation of the reason for this change QUESTION 4 | |
| | |
| On Table 3.3.1-1 (page 3.3-18), Function 14 (Turbine Trip), a (Low Fluid Oil Pressure), SR 3.3.1.10(b)(c) was added in revision G (as a correction of a typo). However, it was removed in revision I, even though the page remains marked as revision G. This SR is for the performance of a channel calibration. The staff needs clarification from the applicant as to the reasons for the change.}} | |
|
---|
Category:E-Mail
MONTHYEARML24274A2762024-09-24024 September 2024 Email from K.Green to S.Hughes, Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, Hydrologic LAR to Revise the UFSAR ML24260A0322024-09-10010 September 2024 NRR E-mail Capture - Request for Additional Information Regarding the Watts Bar Unit 2 Steam Generator Tube Inspection Report for U2R5 ML24215A3152024-07-24024 July 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-276-A, Revision 2 TS 3.8.1, AC Sources ML24177A1412024-06-11011 June 2024 NRR E-mail Capture - Audit Plan Related to Review of the Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, LAR to Revise Technical Specification Table 3.3.2-1 Function 5 ML24157A3152024-06-0303 June 2024 2024 Sequoyah Commercial Grade Dedication Inspection Information Request ML24155A1372024-05-29029 May 2024 Email from K. Green to S. Hughes Request for Additional Information Related to License Amendment Request to Revise Residual Heat Removal Flow Rate ML24156A0062024-05-22022 May 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Recapture Low-Power Testing Time ML24130A0132024-05-0707 May 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.7.11 for MCR Chiller Completion Time ML24123A0882024-05-0202 May 2024 NRR E-mail Capture - Correction Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24122B4872024-04-30030 April 2024 NRR E-mail Capture - Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24082A0662024-04-17017 April 2024 Email to Stuart Rymer on Exemption Decision for Watts Bar ML24116A2012024-04-17017 April 2024 Nrctva ISFSI CBS (RFI) ML24082A0682024-04-10010 April 2024 Email to Stuart Rymer Re_ Availability of EA-FONSI for Watts Bar ML24100A8392024-04-0909 April 2024 Response from State of Tn Regarding Review of Environmental Assessment for Watts Bar Exemption Request ML24100A8402024-04-0808 April 2024 Email to State of Tn Requesting Review of Environmental Assessment for Watts Bar Exemption Request ML24071A0982024-03-0707 March 2024 NRR E-mail Capture - Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce RHR Flow Rate ML24058A0962024-02-26026 February 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant License Amendment Request to Revise UFSAR for Hydrologic Analysis ML24047A2792024-02-15015 February 2024 RAI Related to the Exemption Request for 10 CFR 37.11 ML24045A0312024-02-14014 February 2024 NRR E-mail Capture - Request for Additional Information Related to the Exemption Request for the 10 CFR Part 73 Enhanced Weapons Rule ML24033A0562024-02-0101 February 2024 NRR E-mail Capture - Correction Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-427-A, Revision 2 Regarding Degraded Barriers ML24036A0132024-01-23023 January 2024 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar Nuclear Plants, License Amendment Request to Revise TS Table 3.3.2-1, Function 5, Turbine Trip and Feedwater Isolation ML24022A2592024-01-22022 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Revise TS LCO 3.8.2 to Remove Note C-S Diesel Generator ML24016A0762024-01-16016 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2 - License Amendment Request to Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications ML23347A0642023-12-13013 December 2023 12-13-23 Email from Kimberly Green to Wells, Russell, Subject: Results of NRC SUNSI Review of Watts Bar Nuclear Plant Dual-Unit UFSAR, Amendment 5 ML23334A0932023-11-28028 November 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Surveillance Requirement 3.9.5.1 to Reduce RHR Flow Rate During Mode 6 ML23319A1662023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant, Exemption Request Related to 10 CFR 37.11(c)(2) ML23254A2872023-09-11011 September 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Table 1.1-1 Re Number of Required Rvh Closure Bolts ML23236A2562023-08-24024 August 2023 NRR E-mail Capture - Acceptance Review Results for the Sequoyah and Watts Bar License Amendment Request to Adopt TSTF-567 (L-2023-LLA-0106) ML23191A8672023-07-10010 July 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML23166A1142023-06-15015 June 2023 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2023-03 ML23150A2472023-05-25025 May 2023 NRR E-mail Capture - Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23116A1492023-04-21021 April 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23075A0032023-03-13013 March 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1, 2, and 3, License Amendment Request to Revise TS 3.7.11, Required Actions A.1 and E.1 Footnotes Re Date for the Modification ML23072A0722023-03-10010 March 2023 NRR E-mail Capture - (External_Sender) State Consultation - Sequoyah Nuclear Plant, Units 1 and 2; and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML23067A2372023-03-0808 March 2023 WB_2023-02_RP_inspection_doc_request ML23013A0382023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML23013A0362023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML22356A2982022-12-22022 December 2022 Email Response to Letter, Dated November 22, 2022 Regarding Watts Bar Integrated Inspection Report ML22353A0812022-12-15015 December 2022 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Unit 2, Alternative Request WBN-2-ISI-01 Regarding Examination of Upper Head Injection Nozzle Dissimilar Metal Piping Butt Welds ML22348A0972022-12-14014 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML22348A0442022-12-13013 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML22343A0692022-12-0808 December 2022 NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML22227A0712022-08-15015 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 (EPID L-2022-LLA-0103) - Corrected ML22227A0262022-08-12012 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 ML22227A0272022-08-11011 August 2022 NRR E-mail Capture - Request for Additional Information Related to Alternative Requests RP-11 for Sequoyah Nuclear Plant, Units 1 and 2, and IST-RR-9 for Watts Bar Nuclear Plant, Units 1 and 2 ML22215A2752022-08-0303 August 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-554 ML22194A8762022-07-13013 July 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-529 ML22166A4292022-06-0606 June 2022 NRR E-mail Capture - LAR to Adopt TSTF-577 ML22146A3342022-05-25025 May 2022 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Units 1, 2, and 3, Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Relief Requests (EPID L-2022-LLR-0045 - 0047) ML22136A0182022-05-16016 May 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah Nuclear Plant, Units 1 and 2, Alternative Request RP-11 and Watts Bar Nuclear Plant, Units 1 and 2, Alternative Request IST-RR-9 2024-09-24
[Table view] |
Text
NRR-PMDAPEm Resource From: Miernicki, Michael Sent: Tuesday, July 15, 2014 10:03 AM To: garent@tva.gov; rhbryan@tva.gov Cc: Quichocho, Jessie; Poole, Justin; Thorp, John; Rahn, David; Lingam, Siva
Subject:
Watts Bar 2 - RAIs - Developmental Tech Specs Rev I Attachments: RAI WBN2 T.S, Rev I - EICB.docx Attached please find RAIs from the Instrument and Controls Branch regarding Watts Bar 2 Developmental Technical Specifications Revision I. Please acknowledge receipt of these questions, and that they contain no proprietary information. Please provide your responses within 30 days.
Mike Michael J. Miernicki Sr. Project Manager NRC/NRR/DORL/LP-WB 301-415-2304 1
Hearing Identifier: NRR_PMDA Email Number: 1431 Mail Envelope Properties (Michael.Miernicki@nrc.gov20140715100200)
Subject:
Watts Bar 2 - RAIs - Developmental Tech Specs Rev I Sent Date: 7/15/2014 10:02:31 AM Received Date: 7/15/2014 10:02:00 AM From: Miernicki, Michael Created By: Michael.Miernicki@nrc.gov Recipients:
"Quichocho, Jessie" <Jessie.Quichocho@nrc.gov>
Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>
Tracking Status: None "Thorp, John" <John.Thorp@nrc.gov>
Tracking Status: None "Rahn, David" <David.Rahn@nrc.gov>
Tracking Status: None "Lingam, Siva" <Siva.Lingam@nrc.gov>
Tracking Status: None "garent@tva.gov" <garent@tva.gov>
Tracking Status: None "rhbryan@tva.gov" <rhbryan@tva.gov>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 395 7/15/2014 10:02:00 AM RAI WBN2 T.S, Rev I - EICB.docx 59568 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
REQUEST FOR ADDITIONAL INFORMATION REVIEW OF DEVELOPMENTAL TECHNICAL SPECIFICATIONS REV. I WATTS BAR NUCLEAR PLANT UNIT 2 DOCKET NUMBER 50-391 BACKGROUND By letter dated June 16, 2014 (Agencywide Documents Access and Management System Accession No. ML14169A525), Tennessee Valley Authority (the applicant) submitted developmental Revision I of the Watts Bar Unit 2 Technical Specifications, for review and licensing by the U.S. Nuclear Regulatory Commission (NRC).
The NRC staff has reviewed Technical Specification Sections 3.3, 3.9.3, and 5.7 which the applicant provided, and determined that additional information is required in order to complete the review. In order for the NRC staff to complete its review of the document listed above, please respond to the following questions and provide associated additional information:
QUESTION 1 On Table 3.3.1-1 (TS page 3.3-22), Note 2, Overpower T equation, the sign before K6 was changed from - to +. The staff needs clarification from the applicant as to the reasons for the change.
Watts Bar 2 TS, Rev I:
Watts Bar 2 TS, Rev A:
QUESTION 2 On Table 3.3.2-1 (page 3.3-39), Function 8 (ESFAS Interlocks), b (Pressurizer Pressure P-11),
(2) (Enable Manual Block of SI), the allowable value was changed from 1956.8 psig to 1956.8 psig. The staff needs clarification from the applicant as to the reasons for the change.
QUESTION 3 TS 3.3.8, Auxiliary Building Gas Treatment System (ABGTS) Actuation Instrumentation, has several changes related to the elimination (from Table 3.3.8-1) of the Fuel Pool Area Monitors during movement of irradiated fuel assemblies in the spent fuel pool area. Condition C in TS revision A has been removed (Condition D in TS revision A is now Condition C in TS revision H) and SR 3.3.8.1, SR 3.3.8.2 and SR 3.3.8.4 in TS revision A have been removed (SR 3.3.8.3 in TS revision A is now SR 3.3.8.1 in TS revision H). EICB staff is not aware of the reasons for this change. Please provide an explanation of the reason for this change QUESTION 4 On Table 3.3.1-1 (page 3.3-18), Function 14 (Turbine Trip), a (Low Fluid Oil Pressure), SR 3.3.1.10(b)(c) was added in revision G (as a correction of a typo). However, it was removed in revision I, even though the page remains marked as revision G. This SR is for the performance of a channel calibration. The staff needs clarification from the applicant as to the reasons for the change.