ML14169A525

From kanterella
Jump to navigation Jump to search
Submittal of Developmental Revision I of the Unit 2 Technical Specification (TS) and TS Bases and Developmental Revision D of the Unit 2 Technical Requirements Manual and Technical Requirements Manual Bases
ML14169A525
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 06/16/2014
From: Hruby R
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML14170A054 List:
References
Download: ML14169A525 (33)


Text

Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 June 16, 2014 10 CFR 50.36 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 2 NRC Docket No. 50-391

Subject:

Watts Bar Nuclear Plant Unit 2 - Submittal of Developmental Revision I of the Unit 2 Technical Specification & Technical Specification Bases and Developmental Revision D of the Unit 2 Technical Requirements Manual and Technical Requirements Manual Bases

References:

1. TVA Letter to NRC dated December 12, 2013, "Watts Bar Nuclear Plant Unit 2 - Submittal of Developmental Revision H of the Unit 2 Technical Specification and Technical Specification Bases"
2. TVA Letter to NRC dated September 26, 2013, "Watts Bar Nuclear Plant (WBN) Unit 2 - Submittal of Revised Section 4.3.1, "Criticality" Developmental Revision G of the Unit 2 Technical Specification (TS)"
3. TVA Letter to NRC dated June 13, 2013, "Watts Bar Nuclear Plant (WBN) Unit 2 - Submittal of Three Revised Specifications from Developmental Revision G of the Unit 2 Technical Specifications (TS)"
4. TVA Letter to NRC dated August 27, 2012, "Watts Bar Nuclear Plant (WBN) Unit 2 - Update to Technical Specification (TS) Table 3.3.3-1 and Technical Specification Bases (TSBs) 3.3.3" This letter provides a complete version of Developmental Revision I of the Watts Bar Nuclear Plant (WBN) Unit 2 Technical Specifications (TS) and Technical Specification Bases (TSB), and Developmental Revision D of the WBN Unit 2 Technical Requirements Manual (TRM) and Technical Requirements Manual Bases (TRMB).

U.S. Nuclear Regulatory Commission Page 2 June 16, 2014 Included in the TS and TSB Developmental Revision I and TRM and TRMB Developmental Revision D, respectively are changes that have been submitted by the referenced correspondence, changes to incorporate recently approved WBN Unit 1 Amendments, and recently docketed WBN Unit 1 Amendment requests.

The enclosure provides a description of each of the changes, and changes that have not been previously submitted including the rationale for making the change. It should be noted that due to the size of the attachments, each is provided on the enclosed optical media as attachments 1 - 5. The changes support two unit operation, are necessary to provide consistency and/or identify specific differences between the WBN Unit 1 and WBN Unit 2 TS, TS Bases, TRM, and TRM Bases. to the enclosure provides the original WBN Unit 2 TS pages marked-up to show the TS specific Developmental Revision I changes. to the enclosure provides the original WBN Unit 2 TS Bases pages marked-up to show the TS Bases specific Developmental Revision I changes. to the enclosure provides the original WBN Unit 2 TRM pages marked-up to show the TRM specific Developmental Revision D changes. to the enclosure provides the original WBN Unit 2 TRM Bases pages marked-up to show the TRM Bases specific Developmental Revision D changes. to the enclosure provides a complete copy of the WBN Unit 2 TS and TS Bases through Developmental Revision I, and the TRM and TRM Bases through Developmental Revision D.

There are no new commitments in this letter. If you have any questions, please contact Gordon Arent at (423) 365-2004.

I declare under penalty of perjury that the foregoing is true and correct. Executed on the 1 6 th day of June, 2014.

Respectfully, Raymond A. Hruby, Jr.

General Manager, Technical Services Watts Bar Unit 2

U.S. Nuclear Regulatory Commission Page 3 June 16, 2014

Enclosure:

Synopsis of Revisions Included in Watts Bar Nuclear Plant Unit 2 Developmental Revision I of the Technical Specifications and Technical Specification Bases, and Developmental Revision D of the Technical Requirements Manual and Technical Requirements Manual Bases Attachments:

1. TS Developmental Revision I Changes (Mark-Up) for WBN Unit 2
2. TS Bases Developmental Revision I Changes (Mark-Up) for WBN Unit 2
3. TRM Developmental Revision D Changes (Mark-Up) for WBN Unit 2
4. TRM Bases Developmental Revision D Changes (Mark-Up) for WBN Unit 2
5. WBN Unit 2 TS and TSB through Developmental Revision I, and TRM and TRMB through Developmental Revision D cc (Enclosure):

U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 NRC Resident Inspector Unit 2 Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381

Enclosure SYNOPSIS OF REVISIONS INCLUDED IN WATTS BAR NUCLEAR PLANT UNIT 2 DEVELOPMENTAL REVISION I OF THE TECHNICAL SPECIFICATIONS, TECHNICAL SPECIFICATION BASES, TECHNICAL REQUIREMENTS MANUAL, AND TECHNICAL REQUIREMENTS MANUAL BASES 1.0

SUMMARY

This letter provides the Watts Bar Nuclear Plant (WBN) Unit 2 Developmental Revision I Technical Specifications (TS) and TS Bases, and Developmental Revision D Technical Requirements Manual (TRM), and TRM Bases. This is a complete copy of the entire TS, TS Bases, TRM, and TRM Bases.

The revisions include changes previously submitted by letter for WBN Unit 2 since the submittal of the TS and TS Bases Developmental Revision H, and TRM and TRM Bases Developmental Revision C. Developmental Revisions I and D also incorporate recently approved WBN Unit 1 amendments and amendments submitted and currently under review by the Nuclear Regulatory Commission (NRC).

For the WBN Unit 2 revisions previously submitted (References 1 - 4), a justification for these changes is not provided in this document as it was included in the referenced submittal. A discussion of the applicability of the WBN Unit 1 TS changes to WBN Unit 2 is summarized in Section 2.1 of this enclosure. The current changes to the TS, TS Bases, TRM, and TRM Bases are primarily minor enhancements, grammatical corrections, nomenclature consistency, and format revisions. For those specific cases where there is a technical change to the TS and TS Bases not previously provided, a technical basis or reference is provided in this enclosure. The proposed changes to the TS, TS Bases, TRM, and TRM Bases are discussed in Sections 2.2, 2.3, 2.4, and 2.5, respectively.

For WBN Unit 2, TS 3.3.3, "Post Accident Monitoring (PAM) Instrumentation" and TS Bases 3.3.3, "Post Accident Monitoring (PAM) Instrumentation" have been relocated and renumbered as TS 3.3.9, "Post Accident Monitoring (PAM) Instrumentation" and TS Bases 3.3.9, "Post Accident Monitoring (PAM) Instrumentation," respectively. This was done as an enhancement and to achieve consistency with the WBN Unit 1 TS and TS Bases section identification and numbering.

Proposed WBN Unit 1 License Amendment Request (LAR) for Technical Specification (TS) 3.8.4, "DC Sources Operating," submitted to the NRC and applicable to WBN Unit 2, has been withdrawn per discussion with the staff (Note: Formal request per forthcoming TVA Letter CNL-14-083, 'Withdrawal of Application to Modify Watts Bar Nuclear Plant, Unit 1 Technical Specifications (TS) 3.8.4, 3.8.5, and 3.8.6 (WBN-TS 07)). WBN Unit 2 had previously included the proposed WBN Unit 1 LAR content for TS 3.8.4 and TS Bases 3.8.4 as part of TS and TS Bases Developmental Revision H (Reference 1). Due to the pending withdrawal of the subject WBN Unit 1 LAR, both WBN Unit 2 TS 3.8.4 and TS Bases 3.8.4 have been revised accordingly to reflect their content prior to the submittal of Developmental Revision H. The revised content for TS 3.8.4 and TS Bases 3.8.4 are included in Developmental Revision I.

E-1

Enclosure 2.0 CHANGES 2.1 WBN Unit 2 Changes Previously Submitted Submitted by Reference 1 Approved WBN Unit 1 Amendments Applicable to WBN Unit 2 o WBN Unit 1 Amendment 92 Associated with Alternate Source Term

" Added new WBN Unit 2 TS 3.9.10, "Decay Time" and associated TS Bases

" Modified WBN Unit 2 TS 3.3.6, "Containment Vent Isolation Instrumentation" in addition to the associated TS Bases

" Modified WBN Unit 2 TS 3.3.8, Auxiliary Building Gas Treatment System (ABGTS) Actuation Instrumentation" in addition to the associated TS Bases

" Modified WBN Unit 2 TS 3.7.12, "Auxiliary Building Gas Treatment System (ABGTS)" in addition to the associated TS Bases

  • Eliminated WBN Unit 2 TS 3.9.4, "Containment Penetrations"
  • Eliminated WBN Unit 2 TS 3.9.8, "Reactor Building Purge Air Cleanup Units"
  • Modified WBN Unit 2 TS 5.7.2.14, "Ventilation Filter Testing Program (VFTP)"
  • Modified Section 3.9.1 of the Technical Requirements Manual

" WBN Unit 1 Amendments Under NRC Review Applicable to WBN Unit 2 NOTE: This License Amendment Request (LAR) is being withdrawn per discussion with the staff.

o TS 3.8.4, "DC Sources Operating"

  • Revised 3.8.4, "DC Sources - Operating"
  • Added TS 5.7.2.21, "Battery Monitoring and Maintenance Program"

" WBN Unit 2 TS or TSB Changes Not Previously Submitted to the NRC o Technical Specification Bases 3.6.8 HMS

  • Deleted from WBN Unit 2 TS and TS Bases
  • Submitted by Reference 2

Enclosure

" Submitted by Reference 3

  • TS Table 3.3.7-1 CREVS Actuation Instrumentation

" TS 5.9.2 Annual Radiological Environmental Operating Report

  • Submitted by Reference 4
  • Sub-Section 1.1 Definition - Added definition for pressure control operator (PCO).

2.2.2 TS Section 3.1

  • Sub-Section 3.1.1 - Incorporated minor symbol enhancement for LCO 3.1.1.
  • Sub-Section 3.1.2 - Incorporated minor symbol enhancement for 3.1.2 SHUTDOWN MARGIN (SDM) - Tavg < 200 0 F.

" Sub-Section 3.1.4 - Incorporated minor symbol enhancement for SR 3.1.4.3 NOTE 2.

  • Sub-Section 3.1.5 - Incorporated minor symbol enhancement for CONDITION B and SR 3.1.5.3.

2.2.3 TS Section 3.2

  • Sub-Section 3.2.1 - Incorporated minor symbol enhancement for REQUIRED ACTION A.2.
  • Sub-Section 3.2.3 - Incorporated minor symbol enhancement for APPLICABILITY.

2.2.4 TS Section 3.3

  • Sub-Section 3.3.1 - SR 3.3.1.14 FREQUENCY 'Mode' revised to 'MODE' and Table 3.3.1-1 -'T' added to 'able'.
  • Sub-Section 3.3.3 - Deleted section in its entirety. Relocated and renumbered 3.3.9 to be consistent with WBN Unit 1.
  • Sub-Section 3.3.2 - (1) 'mode' revised to 'MODE' for multiple ACTIONS, (2)

Incorporated minor symbol enhancements for SR 3.3.2.10 and Table 3.3.2-1, and (3) added 'Main' to note k of Table 3.3.2-1 on page 6 of 8.

  • Sub-Section 3.3.6 - Incorporated minor symbol enhancement for Table 3.3.6-1.

E-3

Enclosure 2.2.5 TS Section 3.4

  • Sub-Section 3.4.6 - LCO 3.4.6 NOTE, added standard statement 'less than or equal to the COMS arming temperature specified in the PTLR.'
  • Sub-Section 3.4.7 - LCO 3.4.7 NOTE 2, revised to use text, 'less than or equal to' in lieu of symbol since no numerical value is provided.
  • Sub-Section 3.4.10 - (1) APPLICABILITY MODE 4, revised to use text,

'greater than' in lieu of symbol since no numerical value is provided, (2) deleted APPLICABILITY NOTE since NOTE is not appropriate for WBN 2, and (3) REQUIRED ACTION B.2, revised to use text, 'less than or equal to' in lieu of symbol since no numerical value is provided.

  • Sub-Section 3.4.12 - (1) APPLICABILITY MODE 4, revised to use text, 'less than or equal to' in lieu of symbol since no numerical value is provided, (2)

REQUIRED ACTION D.2, revised to use text, 'greater than' in lieu of symbol since no numerical value is provided, (3) SR 3.4.12.1 and SR 3.4.12.2 FREQUENCY revised the stated value to the standard statement 'the COMS arming temperature specified in the PTLR,' and (4) SR 3.4.12.17 revised NOTE to use text, 'less than or equal to' in lieu of symbol since no numerical value is provided.

" Sub-Section 3.4.16 - Incorporated minor symbol enhancement for SR 3.4.16.1.

" Sub-Section 3.4.17 - Deleted use of 'or repair' or 'or repaired' since 'repair' is not currently applicable to WBN Unit 2.

2.2.6 TS Section 3.5

  • Sub-Section 3.5.2 - Added hyphen to valve identification for stated valves to ensure nomenclature consistency in SR 3.5.2.1 and SR 3.5.2.7.

2.2.7 TS Section 3.6

  • Sub-Section 3.6.5 - Incorporated minor symbol enhancement for LCO 3.6.5.

" Sub-Section 3.6.8 - Revised multiple use of 'ignitor' to 'igniter' to be consistent with WBN Unit 2 FSAR.

2.2.8 TS Section 3.7

  • Sub-Section 3.7.1 - (1) Revised '59' to '58' for REQUIRED ACTION A.1 based on calculation EPMRKK121294, Revision 2, "Reduced Power Level Determination With Reduced Number Of Operable MSSVS," (2) added '36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />' to COMPLETION TIME for REQUIRED ACTION B.2 as it was inadvertently missed in the previous developmental revision, (3) revised '42' to '41' and '26' to '25' for the stated values in Table 3.7.1-1 based on calculation EPMRKK121294, Revision 2, "Reduced Power Level Determination With Reduced Number Of Operable MSSVS," and (4) revised unit valve designation to proper unit (i.e., '1' to '2') for Table 3.7.1-2.
  • Sub-Section 3.7.3 - Revised CONDITION F, REQUIRED ACTION designated incorrectly as 'E' to 'F.'

E-4

Enclosure 2.2.9 TS Section 3.8

" Sub-Section 3.8.1 - (1) Revised SR 3.8.1.2 DG frequency to 60.0 Hz nominal, (2) revised SR 3.8.1.7 DG frequency to '> 59.8 Hz and <60.1 Hz' from the currently stated range, (3) revised SR 3.8.1.11 DG frequency range to '> 59.8 Hz and < 60.1 Hz' from the currently stated range, (4) revised SR 3.8.1.12 DG frequency range to '> 59.8 Hz and <60.1 Hz' from the currently stated range, (5) revised SR 3.8.1.15 DG frequency range to '> 59.8 Hz and

< 60.1 Hz' from the currently stated range, (6) revised SR 3.8.1.19 DG frequency range to 'a 59.8 Hz and < 60.1 Hz' from the currently stated range, and (7) revised SR 3.8.1.21 DG frequency range to '> 59.8 Hz and <60.1 Hz' from the currently stated range.

  • Sub-Section 3.8.4 - Completely revised to reflect the withdrawal of proposed WBN Unit 1 TS 3.8.4 LAR. Revised TS 3.8.4 content reflects status prior to submittal of Developmental Revision H.

" Sub-Section 3.8.6 - TS 3.8.4 was also affected by the withdrawal of proposed WBN Unit 1 TS 3.8.4 LAR. TS 3.8.6 was completely revised and reflects content status prior to submittal of Developmental Revision H.

2.2.10 TS Section 3.9

  • Sub-Section 3.9.10 - Incorporated minor symbol enhancement for LCO 3.9.10.

2.2.11 TS Section 4.0

  • Sub-Section 4.3 - Incorporated minor symbol enhancement for 4.3.1 Criticality.

2.2.12 TS Section 5.0

  • Sub-Section 5.7.2.7 - Incorporated minor symbol enhancement for 5.7.2.7 Radioactive Effluent Controls Program.
  • Sub-Section 5.7.2.12 - (1) Deleted use of any term referring to 'repair' since

'repair' is not currently applicable to WBN Unit 2 and (2) incorporated minor grammatical revisions to the text as appropriate.

" Sub-Section 5.7.2.13 - Deleted stray 'section header' from text.

  • Sub-Section 5.7.2.14 - Incorporated minor spelling symbol enhancement for 5.7.2.14 Ventilation Filter Testing Program (VFTP).

" Sub-Section 5.9.9 - Deleted use of term 'repair' for the Steam Generator Tube Inspection Report, since 'repair' is not currently applicable for WBN Unit 2.

2.3 WBN Unit 2 Technical Specification Bases (TSB) Developmental Revision I -

Proposed Changes Synopsis 2.3.1 TSB Section B 3.0

  • LCO 3.0.6 - Added clarification regarding non-TS support systems.
  • SR 3.0.2 - Added clarification that provisions of SR 3.0.2 are not to be utilized repeatedly as an operational convenience.

E-5

Enclosure 2.3.2 TSB Section B 3.1.1

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.3 TSB Section B 3.1.2

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.4 TSB Section B 3.1.3

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.5 TSB Section B 3.1.4

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.6 TSB Section B 3.1.5

" BACKGROUND - Incorporated minor symbol enhancement.

" APPLICABLE SAFETY ANALYES - (1) Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document and (2) corrected grammatical errors.

" APPLICABILITY - Incorporated minor symbol enhancement.

  • SURVEILLANCE REQUIREMENTS - Incorporated minor symbol enhancement.

2.3.7 TSB Section B 3.1.6

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.8 TSB Section B 3.1.7

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.9 TSB Section B 3.1.8

  • BACKGROUND - Incorporated minor symbol enhancement.

" APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

E-6

Enclosure 2.3.10 TSB Section B 3.1.9

  • APPLICABLE SAFETY ANALYES - (1) Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document, (2) incorporated minor symbol enhancement, and (3) clarified references for the section.

" LCO - Incorporated minor symbol enhancement.

  • APPLICABILITY - Incorporated minor symbol enhancement.
  • ACTIONS - Incorporated minor symbol enhancement.

" SR 3.1.9.1 - Incorporated minor symbol enhancement.

  • REFERENCES - Clarified references 7 and 8, and added references 9 and 10.

2.3.11 TSB Section B 3.1.10

  • APPLICABLE SAFETY ANALYES - (1) Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document, (2) incorporated minor symbol enhancement, and (3) clarified references for the section.
  • LCO - Incorporated minor symbol enhancement.

" SR 3.1.10.2 - Incorporated minor symbol enhancement.

" REFERENCES - Clarified reference 7 and added reference 8.

2.3.12 TSB Section B 3.2.1

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.
  • ACTIONS - Incorporated minor symbol enhancement.

" SR 3.2.1.2 - Incorporated minor symbol enhancement.

2.3.13 TSB Section B 3.2.2

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.14 TSB Section B 3.2.3

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.15 TSB Section B 3.2.4

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

E-7

Enclosure 2.3.16 TSB Section B 3.3.1

  • BACKGROUND - (1) Corrected grammatical error and (2) incorporated minor symbol enhancement.
  • APPLICABLE SAFETY ANALYES, LCO, AND APPLICABILITY - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

" ACTIONS - Corrected capitalization of 'mode'.

  • SR 3.3.1.2 - Incorporated minor symbol enhancement.
  • REFERENCES - Clarified reference 16 and added reference 18.

2.3.17 TSB Section B 3.3.2

  • BACKGROUND - (1) Corrected grammatical error and (2) incorporated minor symbol enhancement.
  • APPLICABLE SAFETY ANALYES, LCO, AND APPLICABILITY - (1) Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document, (2) corrected capitalization of 'mode', (3) corrected grammatical errors, and (4) incorporated minor symbol enhancements.

2.3.18 TSB Section B 3.3.3

  • Deleted section in its entirety. Relocated and renumbered as B 3.3.9 to be consistent with WBN Unit 1.

2.3.19 TSB Section B 3.3.4

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

" LCO - Revised 'service water' to correct term, ERCW.

2.3.20 TSB Section B 3.3.5

  • APPLICABLE SAFETY ANALYES - (1) Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document and (2) corrected grammatical error.

2.3.21 TSB Section B 3.3.6

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.23 TSB Section B 3.3.7

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.24 TSB Section B 3.3.8

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

E-8

Enclosure 2.3.25 TSB Section B 3.3.9

  • This was previously TSB Section B 3.3.3. It was deleted in its entirety as B 3.3.3, and added in its entirety as B 3.3.9. The change was made in order to be consistent with WBN Unit 1.

2.3.26 TSB Section B 3.4.1

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.27 TSB Section B 3.4.2

  • APPLICABLE SAFETY ANALYES - (1) Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document, and (2) corrected proper use of symbol.

2.3.28 TSB Section B 3.4.3

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.29 TSB Section B 3.4.4

  • APPLICABLE SAFETY ANALYES - (1) Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document, and (2) grammatical correction.

2.3.30 TSB Section B 3.4.5

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.31 TSB Section B 3.4.6

  • APPLICABLE SAFETY ANALYES - (1) Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document, and (2) corrected proper use of symbol.

2.3.32 TSB Section B 3.4.7

  • APPLICABLE SAFETY ANALYES - (1) Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document, and (2) corrected proper use of symbol.

2.3.33 TSB Section B 3.4.8

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

E-9

Enclosure 2.3.34 TSB Section B 3.4.9

" APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

" APPLICABILITY - Added a word to correct grammar.

2.3.35 TSB Section B 3.4.10

" BACKGROUND - Corrected proper use of symbol.

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.
  • APPLICABILITY - Clarified LCO with regard to entering MODES 3 and 4.
  • ACTIONS - Corrected proper use of symbol.

2.3.36 TSB Section B 3.4.11

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.37 TSB Section B 3.4.12

" APPLICABLE SAFETY ANALYES - (1) Corrected proper use of symbol, and (2) added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

" APPLICABILITY - Corrected proper use of symbol.

  • ACTIONS - (1) Corrected proper use of symbol, and (2) clarified Reference 8.
  • REFERENCES - Provided new document for Reference 8.

2.3.38 TSB Section B 3.4.13

" APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

" REFERENCES - Clarified title of Reference 5.

2.3.39 TSB Section B 3.4.14

  • BACKGROUND - Provided specific clarification of Reference 6.

" APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

" REFERENCES - Clarified title of Reference 6.

2.3.40 TSB Section B 3.4.15

  • BACKGROUND - Deleted dew point sensitivity statement.

" APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

E-10

Enclosure 2.3.41 TSB Section B 3.4.16

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.42 TSB Section B 3.4.17

" APPLICABLE SAFETY ANALYES - (1) Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document, and (2) clarified SGTR fluid leakage.

  • LCO - Deleted use of 'or repair' or 'or repaired' since 'repair' is not currently applicable to WBN Unit 2.

" ACTIONS - (1) Deleted use of 'or repair' or 'or repaired' since 'repair' is not currently applicable to WBN Unit 2, and (2) added '(Ref. 7)' to differentiate between the Steam Generator (SG) Program and the Steam Generator Program Guidelines.

  • SURVEILLANCE REQUIREMENTS - (1) Deleted use of 'or repair' or 'or repaired' since 'repair' is not currently applicable to WBN Unit 2, and (2) added '(Ref. 7)' to differentiate between the Steam Generator (SG) Program and the Steam Generator Program Guidelines.

2.3.43 TSB Section B 3.5.1

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.44 TSB Section B 3.5.2

'diesel generators (DGs)' to agree with WBN Unit 2 terminology.

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

" LCO - Added statement that COMS arming temperature is 'specified in the PTLR.'

" SR 3.5.2.7 - Clarified the SR purpose with regard to throttle valve position.

2.3.45 TSB Section B 3.5.3

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

" SR 3.5.3.1 - Clarified SR applicability.

  • REFERENCES - Added specific B 3.5.3 references.

2.3.46 TSB Section B 3.5.4

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

E-1 1

Enclosure 2.3.47 TSB Section B 3.5.5

  • APPLICABLE SAFETY ANALYES- Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.48 TSB Section B 3.6.1

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.49 TSB Section B 3.6.2

  • BACKGROUND - Corrected grammar.
  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.50 TSB Section B 3.6.3

  • BACKGROUND - Corrected grammar.
  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.
  • ACTIONS - Corrected WBN operations titles.

" SR 3.6.3.2 - Corrected grammar.

2.3.51 TSB Section B 3.6.4

" APPLICABLE SAFETY ANALYES - (1) Revised and clarified the maximum peak containment pressure based on Westinghouse analysis, and (2) added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

" REFERENCES - Revised Reference 1.

2.3.52 TSB Section B 3.6.5

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

" REFERENCES - Revised Reference 3.

2.3.53 TSB Section B 3.6.6

" BACKGROUND - Revised Containment Spray System design basis.

" APPLICABLE SAFETY ANALYES - (1) Revised maximum peak containment pressure based on new Westinghouse analysis, and (2) added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

" SR 3.6.6.3 and SR 3.6.6.4 - Clarified applicability of surveillance for valve and pump requirements.

  • REFERENCES - Revised Reference 2.

E-12

Enclosure 2.3.54 TSB Section B 3.6.8

" BACKGROUND - Revised spelling of term 'ignitor' to 'igniter' to agree with WBN Unit 2 FSAR.

" APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.55 TSB Section B 3.6.9

  • APPLICABLE SAFETY ANALYES - (1) Defined PCO - pressure control operators, and (2) added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.56 TSB Section B 3.6.10

  • APPLICABLE SAFETY ANALYES - (1) Revised symbol application, and (2) added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.57 TSB Section B 3.6.11

  • BACKGROUND - Revised format and bulleting for alpha statements.
  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.
  • REFERENCES - Revised Reference 1.

2.3.58 TSB Section B 3.6.12

  • APPLICABLE SAFETY ANALYES - (1) Revised symbol application, and (2) added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

" ACTION C.1 - Clarified the ACTION.

  • REFERENCES - Revised Reference 1.

2.3.59 TSB Section B 3.6.13

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.60 TSB Section B 3.6.14

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.61 TSB Section B 3.6.15

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

E-13

Enclosure 2.3.62 TSB Section B 3.7.1

" APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

" ACTIONS - Revised Reference from '6' to '5.'

2.3.63 TSB Section B 3.7.2

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.64 TSB Section B 3.7.3

" BACKGROUND - Provided definition of FWLBs - feedwater line breaks.

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.65 TSB Section B 3.7.4

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.66 TSB Section B 3.7.5

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.67 TSB Section B 3.7.6

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.68 TSB Section B 3.7.7

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.69 TSB Section B 3.7.8

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.70 TSB Section B 3.7.9

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.71 TSB Section B 3.7.10

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

E-14

Enclosure 2.3.72 TSB Section B 3.7.11

  • APPLICABLE SAFETY ANALYES -Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.73 TSB Section B 3.7.12

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.74 TSB Section B 3.7.13

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.75 TSB Section B 3.7.14

  • BACKGROUND - Redefined secondary coolant specific activity.
  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.76 TSB Section B 3.7.15

" BACKGROUND - Redefined the 'double contingency principle' and reference basis for same.

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

" REFERENCES - Added Reference 2.

2.3.77 TSB Section B 3.8.1

" APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

" SURVEILLANCE REQUIREMENTS - Revised the DG Frequency based on new WBN Unit 2 analysis.

  • SR 3.8.1.2 and SR 3.8.1.7 - Provided clarification of operational mode for DG testing in addition to noting that operator controls frequency and voltage during the test rather than use of the DG governor.
  • REFERENCES - Revised title of Reference 10.

2.3.78 TSB Section B 3.8.2

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

E-15

Enclosure 2.3.79 TSB Section B 3.8.3

" BACKGROUND - Clarified the description of the soak-back subsystem.

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.80 TSB Section B 3.8.4

  • BACKGROUND - (1) Clarification of cell and battery voltage, (2) deletion of battery and battery cell discussion, and (3) deletion of battery charger discussion.

" APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

  • LCO - Revised NOTE discussion.

" ACTIONS - Completely revised to reflect withdrawal of WBN Unit 1 LAR (Reference 1).

  • SURVEILLANCE REQUIREMENTS - Completely revised to reflect withdrawal of WBN Unit 1 LAR (Reference 1).

2.3.81 TSB Section B 3.8.5

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.82 TSB Section B 3.8.6

  • BACKGROUND - Deleted reference to Specification 5.7.2.21, "Battery Monitoring and Maintenance Program" to reflect withdrawal of WBN Unit 1 LAR.

" LCO - Deleted reference to Specification 5.7.2.21, "Battery Monitoring and Maintenance Program" to reflect withdrawal of WBN Unit 1 LAR.

" ACTIONS - Completely revised to reflect withdrawal of WBN Unit 1 LAR (Reference 1).

" SURVEILLANCE REQUIREMENTS - Completely revised to reflect withdrawal of WBN Unit 1 LAR.

  • REFERENCES - Clarified REFERENCES based on withdrawal of WBN Unit 1 LAR (Reference 1).

2.3.83 TSB Section B 3.8.7

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.84 TSB Section B 3.8.8

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

E-16

Enclosure 2.3.85 TSB Section B 3.8.9

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.86 TSB Section B 3.8.10

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.87 TSB Section B 3.9.1

  • APPLICABLE SAFETY ANALYES -Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.88 TSB Section B 3.9.2

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.89 TSB Section B 3.9.3

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.90 TSB Section B 3.9.4

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.91 TSB Section B 3.9.5

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.92 TSB Section B 3.9.6

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.3.93 TSB Section B 3.9.7

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

E-17

Enclosure 2.3.94 TSB Section B 3.9.8

" BACKGROUND -Added Reference 1.

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

" REFERENCES - Revised Reference 1 by adding FSAR Section 9.1.2, "Spent Fuel Storage."

2.3.95 TSB Section B 3.9.10

  • APPLICABLE SAFETY ANALYES - Added clarification regarding NRC Commission Interim Policy Statement and accompanying reference document.

2.4 WBN Unit 2 Technical Requirements Manual (TRM) Developmental Revision D -

Proposed Changes Synopsis 2.4.1 TRM Section 1.0

  • 1.1 Definitions - Added sub-headers to subsequent page.
  • 1.3 Completion Times - Added missing 'T' to Example 1.3-6, REQUIRED ACTION A.1.

2.4.2 TR 3.1.1

  • TSR 3.1.1.1 - Corrected symbol configuration.

2.4.3 TR 3.1.2

" REQUIRED ACTION A.2.2 - Corrected symbol configuration.

" TSR 3.1.2.1 - Corrected symbol configuration.

" TSR 3.1.2.4 - Corrected symbol configuration.

2.4.3 TR 3.1.3

  • TSR 3.1.3.1 - Deleted symbol and replaced with text due to fact that no numerical value is provided.

2.4.4 TR 3.1.4

  • REQUIRED ACTION A.2.2 - Corrected symbol configuration.
  • TSR 3.1.4.1 - Deleted symbol and replaced with text due to fact that no numerical value is provided.

2.4.5 TR 3.1.5

  • TSR 3.1.5.1 - Corrected symbol configuration.

" TSR 3.1.5.2 - Corrected symbol configuration.

  • TSR 3.1.5.3 - Corrected symbol configuration.
  • TSR 3.1.5.4 - Corrected symbol configuration.

" TSR 3.1.5.5 - Corrected symbol configuration.

  • TSR 3.1.5.6 - (1) Corrected symbol configuration, and (2) revised BAT volume quantity from 5,300 gal to 5,100 gal.

E-18

Enclosure 2.4.6 TR 3.1.6

" REQUIRED ACTION E.2 - Corrected symbol configuration.

  • TSR 3.1.6.5 - Deleted Figures 3.1.6B and 3.1.6C in order to be consistent with WBN Unit 1.

" TSR 3.1.6.6 - Deleted Figures 3.11.6B and 3.1.6C in order to be consistent with WBN Unit 1.

2.4.7 TR 3.3.2

" Table 3.3.2-1 (Page 3 of 6) - Deleted item 9 and specified as 'NOT USED.'

" Table 3.3.2-1 (Page 6 of 6) - Revised valve designation in Note (13) to follow TVA convention.

2.4.8 TR 3.3.3

  • Renumbered entire section as 3.3.9 to be consistent with WBN Unit 1.

" TR 3.3.9 - Corrected symbol configuration.

  • TSR 3.3.3.3 (i.e., 3.3.3.9) - Deleted in its entirety, since self-powered detector elements do not require calibration.

2.4.9 TR 3.3.5

  • Turbine Overspeed Protection was deleted in its entirety.

2.4.10 TR 3.3.8

2.4.11 TR 3.4.3

  • TR was renamed 'Reactor Vessel Vent System' from 'RCS Vents' for consistency with the WBN Unit 2 FSAR. Similar name change was made throughout the TR.

2.4.12 TR 3.4.4

  • Corrected symbol configuration throughout the TR.

2.4.13 TR 3.4.5

  • Clarified that TR is applicable to all systems having ASME Code Class 1, 2 and 3 components.

2.4.14 TR 3.6.1

  • Revised to differentiate WBN Unit 2 specific Ice Bed Temperature Monitoring System instrumentation/hardware and monitoring methods/capabilities from those of WBN Unit 1.
  • Corrected symbol configuration throughout the TR.

2.4.15 TR 3.6.3 0 Corrected symbol configuration throughout the TR.

2.4.16 TR 3.7.1

" Clarified the nomenclature of the steam generator fluids.

" Combined REQUIRED ACTION A.2 and A.3 for CONDITION A, which resulted in deletion of REQUIRED ACTION A.3.

  • Corrected symbol configuration throughout the TR.

E-19

Enclosure 2.4.17 TR 3.7.3

  • WBN Unit 2 TR was revised in order to be consistent with the WBN Unit 1 TR.

2.4.18 TR 3.8.1

" TSR 3.8.1.1 - Note 3 grammar correction.

  • TSR 3.8.1.2 - Note 3 grammar correction.

" TSR 3.8.1.4 - Note grammar correction.

  • TSR 3.8.1.5 - Grammar correction.

2.4.19 TR 3.8.2

  • TSR 3.8.2.3 - Note 3 grammar correction.

" TSR 3.8.2.4 - Note 3 grammar correction.

2.4.20 TR 3.8.3

" Table 3.8.3-1 (Page 3 of 5) - Valve 2-FCV-67-146 system designation function was revised.

" Table 3.8.3-1 (Page 5 of 5) - Deletions and additions were made to the list of valves in order to correctly reflect the WBN Unit 2 configuration and design basis.

2.4.21 TR 3.9.1

  • Decay Time was deleted in its entirety.

2.4.22 TR 3.9.3 0 TSR 3.9.3.2 - Revised to clarify Auxiliary Hoist load test FREQUENCY.

2.5 WBN Unit 2 Technical Requirements Manual (TRM) Bases Developmental Revision D - Proposed Changes Synopsis 2.5.1 TRMB Section B 3.0

  • TSR 3.0.2 - Operational convenience provisions to extend surveillance intervals was clarified.
  • APPLICABLE SAFETY ANALYSES - Added Reference 2.
  • TECHNICAL SURVEILLANCE REQUIREMENTS -TSR 3.1.1.1 -Added Reference 3 and corrected symbol configuration.

" REFERENCES - Clarified Reference 2 and added References 3 and 4.

2.5.2 TRMB Section B 3.1.2

" APPLICABLE SAFETY ANALYSES - Added Reference 3.

  • TSR 3.1.2.1 - Clarified instrument error and added Reference 2.

" TSR 3.1.2.4 - Added Reference 2.

  • REFERENCES - Clarified Reference 1 and added References 2 and 3.

2.5.3 TRMB Section B 3.1.3

" TSR 3.1.3.1 - Added Reference 2.

  • REFERENCES - Clarified Reference 1 and added References 2 and 3.

E-20

Enclosure 2.5.4 TRMB Section B 3.1.4

  • APPLICABLE SAFETY ANALYSES - Added Reference 2.

" REFERENCES - Clarified Reference 1 and added Reference 2.

2.5.5 TRMB Section B 3.1.5

  • APPLICABLE SAFETY ANALYSES - Added Reference 4.
  • TSR 3.1.5.4 - Clarified instrument error.
  • TSR 3.1.5.6 - Revised BAT required volume.

" REFERENCES - Clarified Reference 1 and added References 3 and 4.

2.5.6 TRMB Section B 3.1.6

" APPLICABLE SAFETY ANALYSES - Clarified that operator response is required for CVCS malfunction resulting in boron dilution event.

" ACTIONS Al, A.2.1, A.2.2, and A.2.3 - Added that BASS is required.

  • TSR 3.1.6.4 -Added References 2 and 3.

" TSR 3.1.6.5 - (1) Deleted Figures 3.1.6B and 3.1.6C to be consistent with WBN Unit 1, and (2) added References 2 and 3.

  • TSR 3.1.6.6 - (1) Deleted Figures 3.1.6B and 3.1.6C to be consistent with WBN Unit 1, and (2) revised RWST required water volume.

" REFERENCES - Clarified Reference 1 and added References 3 and 4.

2.5.7 TRMB Section B 3.3.2

" APPLICABILITY - Deleted Reference 5 from section and added Reference 6.

" ACTIONS - A.1, Deleted Reference 5 from section and added Reference 6.

  • REFERENCES - Added Reference 6.

2.5.8 TRMB Section B 3.3.9

" BACKGROUND - Clarified OPERABLE PDMS functions.

  • TR - (1) Added Reference 3, and (2) deleted Core Exit Thermo-Couples and replaced with Self-Powered Detector (SPD) elements to differentiate between specific components for WBN Unit1 and Unit 2.

" TSR 3.3.9.2 - (1) Revised number of instruments from 4 to 8 based on WBN Unit 2 requirements, (2) revised Notes 1 - 4, and (3) added Notes 5 - 8 specifically for WBN Unit 2.

  • REFERENCES - Revised References 1 - 3, and added Reference 4.

2.5.9 TRMB Section B 3.3.4

  • BACKGROUND - Clarified that seismic instrumentation is common to both units.
  • APPLICABLE SAFETY ANALYSES - Added Reference 8.

" REFERENCES - Clarified Reference 2 and added Reference 8.

2.5.10 TRMB Section B 3.3.5

  • Deleted Turbine Overspeed section in its entirety.

E-21

Enclosure 2.5.11 TRMB Section B 3.3.6

" APPLICABLE SAFETY ANALYSES - (1) Grammar correction and addition of Reference 4.

" TSR 3.3.6.3 - Added discussion regarding Reference 1 to CHANNEL CALIBRATION.

  • REFERENCES - Revised Reference 1 and added Reference 4.

2.5.12 TRMB Section B 3.3.8

  • TECHNICAL SURVEILLANCE REQUIREMENTS - Corrected SR 3.3.3-1 to SR 3.3.8-1.

2.5.13 TRMB Section B 3.4.1

  • BACKGROUND - Corrected symbol configuration.

" APPLICABLE SAFETY ANALYSES - Added Reference 5.

  • REFERENCES - Clarified Reference 3 and added Reference 5.

2.5.14 TRMB Section B 3.4.2

  • REFERENCES - Clarified Reference 3 and added Reference 5.

2.5.15 TRMB Section B 3.4.3

  • TRMB was renamed 'Reactor Vessel Vent System' from 'RCS Vents' for consistency with the WBN Unit 2 FSAR. Similar name change was made throughout the TRMB.

" APPLICABLE SAFETY ANALYSES - Added Reference 2.

  • ACTIONS A.1 and A.2 - Clarified text for easier comprehension.

" TSR 3.4.3.1, TSR 3.4.3.2 and TSR 3.4.3.3 - Clarified text to better reflect valve function, operation, and position.

" REFERENCES - Revised Reference 1 and added Reference 3.

2.5.16 TRMB Section B 3.4.4

  • BACKGROUND - Added Reference 3.
  • REFERENCES - Clarified Reference 3 and added Reference 4.

2.5.17 TRMB Section B 3.4.5

" APPLICABLE SAFETY ANALYSES - Added Reference 5.

" TR - Clarified that TR is applicable to all systems having ASME Code Class 1, 2 and 3 components.

" REFERENCES - Clarified References 1 and 4, revised title of Reference 2, and added Reference 5.

2.5.18 TRMB Section B 3.6.1

" BACKGROUND - Revised to differentiate WBN Unit 2 specific'Ice Bed Temperature Monitoring System instrumentation/hardware and monitoring methods/capabilities from those of WBN Unit 1.

  • TR - Revised location of recording/monitoring equipment.

" ACTIONS A.1 - Revised alternate location for monitoring equipment.

" ACTIONS B.1.1, B.1.2, and B.1.3 - Revised alternate location and equipment for recording temperature.

E-22

Enclosure

  • ACTIONS B.2.1 and B.2.2 - Revised alternate equipment and location for recording temperature.
  • ACTIONS C.1.1 and C.1.2 - Revised alternate equipment and location for recording temperature.
  • ACTIONS C.2.1, C.2.2, and C.2.3 - Revised alternate location and equipment for recording temperature.
  • REFERENCES - Clarified Reference 2 and added Reference 3.

2.5.19 TRMB Section B 3.6.2

" APPLICABLE SAFETY ANALYSES - Added Reference 3.

  • REFERENCES - Clarified Reference 2 and added Reference.

2.5.20 TRMB Section B 3.6.3

  • APPLICABLE SAFETY ANALYSES - Clarified use of LCC System for long term cooling following a MSLB.

2.5.21 TRMB Section B 3.7.1

" BACKGROUND - Clarified that RTNDT is 10 OF for all WBN Unit 2 steam generators.

  • APPLICABLE SAFETY ANALYSES - Added Reference 6.

" ACTIONS - Deleted ACTION A.3.

  • REFERENCES - Clarified Reference 5 and added Reference 6.

2.5.22 TRMB Section B 3.7.2

  • BACKGROUND - Revised flood levels based on revised hydrology analyses.
  • APPLICABLE SAFETY ANALYSES - Added Reference 4.

" ACTIONS - Deleted ACTION A.3.

  • REFERENCES - Clarified Reference 3 and added Reference 4.

2.5.23 TRMB Section B 3.7.3

  • WBN Unit 2 TRMB was revised in order to be consistent with the WBN Unit 1 TRMB.

2.5.24 TRMB Section B 3.7.4

" BACKGROUND - Added Reference 4.

" APPLICABLE SAFETY ANALYSES - Added Reference 4.

" REFERENCES - Clarified References 1 and 3 and added Reference 4.

2.5.25 TRMB Section B 3.7.5

" APPLICABLE SAFETY ANALYSES - Added Reference 4.

  • REFERENCES - Clarified Reference 3 and added Reference 4.

2.5.26 TRMB Section B 3.8.1

" APPLICABLE SAFETY ANALYSES - Added Reference 2.

  • TSR 3.8.1.1 -Grammar correction.
  • REFERENCES - Added Reference 2.

E-23

Enclosure 2.5.27 TRMB Section B 3.8.2

" APPLICABLE SAFETY ANALYSES - Added Reference 5.

  • REFERENCES - Clarified Reference 2 and added Reference 5.

2.5.28 TRMB Section B 3.8.3

  • APPLICABLE SAFETY ANALYSES - Added Reference 4.

" REFERENCES - Clarified Reference 3 and added Reference 4.

2.5.29 TRMB Section B 3.8.4

" APPLICABLE SAFETY ANALYSES - Added Reference 6.

" REFERENCES - Clarified Reference 4 and added Reference 6.

2.5.30 TRMB Section B 3.9.1

  • Decay Time was deleted in its entirety.

2.5.31 TRMB Section B 3.9.3

  • APPLICABLE SAFETY ANALYSES - Added Reference 3.
  • REFERENCES - Clarified Reference 3 and added Reference 4.

2.5.32 TRMB Section B 3.9.4

  • APPLICABLE SAFETY ANALYSES - Added Reference 4.
  • REFERENCES - Clarified Reference 3 and added Reference 4.

E-24

TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT, UNIT 2 Revisions to Developmental Technical Specification (TS), Technical Specification Bases (TSB), Technical Requirements Manual (TRM), and Technical Requirements Manual Bases (TRMB), Revision I ATTACHMENTS

1. TS Changes (Mark-Up) for WBN Unit 2
2. TS Bases Changes (Mark-Up) for WBN Unit 2
3. TRM Changes (Mark-Up) for WBN Unit 2
4. TRM Bases Changes (Mark-Up) for WBN Unit 2
5. WBN Unit 2 TS, TSB, TRM, and TRMB Developmental Revision I (Optical Media Storage)

ATTACHMENT 1 Technical Specification Changes (TS) (Mark-Up) for WBN Unit 2

ATTACHMENT 2 Technical Specification Bases (TSB) Changes (Mark-Up) for WBN Unit 2

ATTACHMENT 3 Technical Requirements Manual (TRM) Changes (Mark-Up) for WBN Unit 2

ATTACHMENT 4 Technical Requirements Manual Bases (TRMB) Changes (Mark-Up) for WBN Unit 2

ATTACHMENT 5 WBN Unit 2 TS and TSB Developmental Revision H (Optical Media Storage)