| title = 2015/07/07 NRR E-mail Capture - Edwin I. Hatch Nuclear Plant Units 1 and 2 - Technical Review Checklist Related to Interim ESEP Supporting Implementation of NTTF R2.1, Seismic (TAC No. MF5243 and MF5244)
| title = NRR E-mail Capture - Edwin I. Hatch Nuclear Plant Units 1 and 2 - Technical Review Checklist Related to Interim ESEP Supporting Implementation of NTTF R2.1, Seismic (TAC No. MF5243 and MF5244)
| author name = Jackson D
| author name = Jackson D
| author affiliation = NRC/NRO
| author affiliation = NRC/NRO
| addressee name = Shams M K
| addressee name = Shams M
| addressee affiliation = NRC/NRR/JLD
| addressee affiliation = NRC/NRR/JLD
| docket = 05000321, 05000366
| docket = 05000321, 05000366
Line 14: Line 14:
| page count = 12
| page count = 12
| project = TAC:MF5243, TAC:MF5244
| project = TAC:MF5243, TAC:MF5244
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:1NRR-PMDAPEm ResourceFrom:Jackson, DianeSent:Tuesday, July 07, 2015 12:52 PMTo:Shams, MohamedCc:DiFrancesco, Nicholas; Wyman, Stephen; Spence, Jane; Devlin-Gill, Stephanie; Roche, Kevin; Yee, On; Heeszel, David; Rodriguez, Ricardo; Ng, Ching; Park, Sunwoo; 50.54f_Seismic Resource; RidsNroDsea Resource; Hsu, KaihwaSubject:EDWIN I. HATCH NUCLEAR PLANT UNITS 1 AND 2 - TECHNICAL REVIEW CHECKLIST RELATED TO INTERIM ESEP SUPPORTING IMPLEMENTATION OF NTTF R2.1, SEISMIC (TAC NO. MF5243 AND MF5244)Attachments:Hatch R2.1 seismic ESEP NRC review.docxJuly 7, 2015  MEMORANDUM TO: Mohamed K. Shams, Chief Hazards Management Branch (JHMB) Japan Lessons-Learned Division Office of Nuclear Reactor Regulation  FROM: Diane T. Jackson, Chief  Geosciences and Geotechnical Engineering Branch 2 (RGS2) Division of Site Safety and Environmental Analysis  Office of New Reactors  SUBJECT: EDWIN I. HATCH NUCLEAR PLANT UNITS 1 AND 2 - TECHNICAL REVIEW CHECKLIST RELATED TO INTERIM EXPEDITED SEISMIC EVALUATION PROCESS SUPPORTING IMPLEMENTATION OF NTTF RECOMMENDATION 2.1, SEISMIC, RELATED TO THE FUKUSHIMA DAI-ICHI NUCLEAR POWER PLANT ACCIDENT (TAC NO. MF5243 and MF5244)  The NRC technical staff working through the Geosciences and Geotechnical Engineering Branches 1 and 2 (RGS1 and RGS2) completed the Technical Review Checklist of the Edwin I. Hatch Nuclear Power Plant response to Enclosure 1, Item (6) of the March 12, 2012, request for information letter issued per Title 10 of the Code of Federal Regulations, Subpart 50.54(f), to power reactor licensees and holders of construction permits requesting addressees to provide further information to support the NRC staff's evaluation of regulatory actions to be taken in response to Fukushima Near-Term Task Force (NTTF) Recommendation 2.1: Seismic which implements lessons learned from Japan's March 11, 2011, Great Thoku Earthquake and subsequent tsunami. This addresses the staff review of the interim Expedited Seismic Evaluation Process (ESEP) report in response to Requested Item (6) of Enclosure 1, "Recommendation 2.1: Seismic," of the 50.54(f) letter. Attached is a file containing the technical review checklist to prepare a response letter to the licensee. The NRC staff reviewed the information provided and, as documented in the enclosed staff checklist, determined that sufficient information was provided to be responsive to this portion of the Enclosure 1 of the 50.54(f) letter. The application of this staff review is limited to the interim ESEP as part of NTTF Recommendation 2.1: Seismic activities. This electronic memo constitutes the DSEA concurrence provided that only editorial changes are made that would not affect the technical conclusions or technical context of the assessment. This concludes the NRC's efforts associated with TAC NO. MF5243 AND MF5233 for the review of the interim ESEP report for the EDWIN I. HATCH NUCLEAR PLANT UNITS 1 AND 2. Docket No: 50-321 and 50-366 2 CONTACT: Stephanie Devlin-Gill Office of New Reactors 301-415-5301  Copy: Nicholas DiFrancesco, Steve Wyman, Jane Spence, Stephanie Devlin-Gill, Kevin Roche, On Yee, David Heeszel, Ricardo Rodriguez, Ching Ng, Sunwoo Park, Robert Hsu Hearing Identifier:  NRR_PMDA  Email Number:  2207  Mail Envelope Properties  (933495689F8EB5409FE4267845E41B8816D46733DF) 
{{#Wiki_filter:NRR-PMDAPEm Resource From:                       Jackson, Diane Sent:                       Tuesday, July 07, 2015 12:52 PM To:                         Shams, Mohamed Cc:                         DiFrancesco, Nicholas; Wyman, Stephen; Spence, Jane; Devlin-Gill, Stephanie; Roche, Kevin; Yee, On; Heeszel, David; Rodriguez, Ricardo; Ng, Ching; Park, Sunwoo; 50.54f_Seismic Resource; RidsNroDsea Resource; Hsu, Kaihwa


==Subject:==
==Subject:==
EDWIN I. HATCH NUCLEAR PLANT UNITS 1 AND 2 - TECHNICAL REVIEW CHECKLIST RELATED TO INTERIM ESEP SUPPORTING IMPLEMENTATION OF NTTF R2.1, SEISMIC (TAC NO. MF5243 AND MF5244)
EDWIN I. HATCH NUCLEAR PLANT UNITS 1 AND 2 - TECHNICAL REVIEW CHECKLIST RELATED TO INTERIM ESEP SUPPORTING IMPLEMENTATION OF NTTF R2.1, SEISMIC (TAC NO. MF5243 AND MF5244)
Sent Date:   7/7/2015 12:52:26 PM  Received Date:  7/7/2015 12:52:30 PM  From:    Jackson, Diane  Created By:  Diane.Jackson@nrc.gov Recipients:    "DiFrancesco, Nicholas" <Nicholas.DiFrancesco@nrc.gov>  Tracking Status: None  "Wyman, Stephen" <Stephen.Wyman@nrc.gov>  Tracking Status: None "Spence, Jane" <Jane.Spence@nrc.gov>  Tracking Status: None  "Devlin-Gill, Stephanie" <Stephanie.Devlin-Gill@nrc.gov>  Tracking Status: None  "Roche, Kevin" <Kevin.Roche@nrc.gov>  Tracking Status: None "Yee, On" <On.Yee@nrc.gov>  Tracking Status: None  "Heeszel, David" <David.Heeszel@nrc.gov>
Attachments:               Hatch R2.1 seismic ESEP NRC review.docx July 7, 2015 MEMORANDUM TO: Mohamed K. Shams, Chief Hazards Management Branch (JHMB)
Tracking Status: None  "Rodriguez, Ricardo" <Ricardo.Rodriguez@nrc.gov>  Tracking Status: None  "Ng, Ching" <Ching.Ng@nrc.gov>  Tracking Status: None "Park, Sunwoo" <Sunwoo.Park@nrc.gov>  Tracking Status: None  "50.54f_Seismic Resource" <50.54f_Seismic.Resource@nrc.gov>  Tracking Status: None  "RidsNroDsea Resource" <RidsNroDsea.Resource@nrc.gov>  Tracking Status: None "Hsu, Kaihwa" <Kaihwa.Hsu@nrc.gov>  Tracking Status: None  "Shams, Mohamed" <Mohamed.Shams@nrc.gov>
Japan Lessons-Learned Division Office of Nuclear Reactor Regulation FROM: Diane T. Jackson, Chief Geosciences and Geotechnical Engineering Branch 2 (RGS2)
Tracking Status: None  Post Office:  HQCLSTR01.nrc.gov Files    Size      Date & Time  MESSAGE    3021      7/7/2015 12:52:30 PM  Hatch R2.1 seismic ESEP NRC review.docx   51372  Options  Priority:     Standard  Return Notification:    No  Reply Requested:    No Sensitivity:    Normal  Expiration Date:      Recipients Received:
Division of Site Safety and Environmental Analysis Office of New Reactors
TECHNICAL REVIEW CHECKLIST BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO EXPEDITED SEISMIC EVALUATION PROCESS INTERIM EVALUATION IMPLEMENTING NTTF RECOMMENDATION 2.1 SEISMIC EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2  DOCKET NOS. 50-321 AND 50-366 By letter dated March 12, 2012 (USNRC, 2012a), the U.S. Nuclear Regulatory Commission (NRC) issued a request for information to all power reactor licensees and holders of construction permits in active or deferred status, pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Section 50.54(f) "Conditions of License" (hereafter referred to as the "50.54(f) letter"). Enclosure 1 of the 50.54(f) letter requests addressees to reevaluate the seismic hazard at their site using present-day methods and guidance for licensing new nuclear power plants, and identify actions to address or modify, as necessary, plant components affected with the reevaluated seismic hazards. Requested Information Item (6) in Enclosure 1 to the 50.54(f) letter requests addressees to provide an interim evaluation and actions taken or planned to address a higher seismic hazard relative to the design basis, as appropriate, prior to completion and submission of the seismic risk evaluation. Additionally, by letter dated April 12, 20131, the Electric Power Research Institute (EPRI) staff submitted EPRI TR 3002000704 "Seismic Evaluation Guidance; Augmented Approach for the Resolution of Fukushima Near-Term Task Force (NTTF) Recommendation 2.1: Seismic" (hereafter referred to as the guidance). The Augmented Approach proposed that licensees would use an Expedited Seismic Evaluation Process (ESEP) to address the interim actions as requested by Information Item (6) in the 50.54(f) letter. The ESEP is a simplified seismic capacity evaluation with a focused scope of certain key installed Mitigating Strategies equipment that is used for core cooling and containment functions to cope with scenarios that involve a loss of all AC power and loss of access to the ultimate heat sink to withstand the Review Level Ground Motion, which is up to two times the safe shutdown earthquake (SSE).
Due to the expedited and interim nature of the ESEP, the assessment does not include many considerations that are part of a normal risk evaluation. These deferred items, include but are not limited to, structures, piping, non-seismic failures, and operator actions, as well scenarios such as addressing loss of coolant accidents. By letter dated May 7, 20132, the NRC staff endorsed the guidance. Central and eastern United States licensees with a reevaluated seismic hazard exceeding the SSE submitted an ESEP interim evaluation in December 2014.


Consistent with the interim nature of this activity, the staff performed the review of the licensee's submittal to assess whether the intent of the guidance was implemented. A multi-disciplined team checked whether the identified methods were consistent with the guidance. A senior expert panel reviewed team questions and checklists for consistency and scope. New or updated parameters (e.g., In-Structure Response Spectra, High Confidence of Low Probability of Failure calculations) presented by the licensees were assessed for acceptability only for the Item (6) response. The application of this staff review is limited to the ESEP interim evaluation as part of NTTF Recommendation 2.1: Seismic activities.                                                             1 ADAMS Accession No. ML13102A142 2 ADAMS Accession No. ML13106A331 NTTF Recommendation 2.1 Expedited Seismic Evaluation Process Technical Review Checklist for Edwin I. Hatch Nuclear Plant, Units 1 & 2    Page 2 By letter dated December 30, 20143, Southern Nuclear Operating Company, Inc. (the licensee) provided an Expedited Seismic Evaluation Process (ESEP) report in a response to Enclosure 1, Requested Information Item (6) of the 50.54(f) letter, for the Edwin I. Hatch Nuclear Plant, Units 1 and 2 (Hatch). I. Review Level Ground Motion The licensee:
==SUBJECT:==
* described the determination of the review level ground motion (RLGM) using one of the means acceptable by the guidance.
EDWIN I. HATCH NUCLEAR PLANT UNITS 1 AND 2 - TECHNICAL REVIEW CHECKLIST RELATED TO INTERIM EXPEDITED SEISMIC EVALUATION PROCESS SUPPORTING IMPLEMENTATION OF NTTF RECOMMENDATION 2.1, SEISMIC, RELATED TO THE FUKUSHIMA DAI-ICHI NUCLEAR POWER PLANT ACCIDENT (TAC NO. MF5243 and MF5244)
* identified location of the control point and is consistent with March submittal
The NRC technical staff working through the Geosciences and Geotechnical Engineering Branches 1 and 2 (RGS1 and RGS2) completed the Technical Review Checklist of the Edwin I. Hatch Nuclear Power Plant response to Enclosure 1, Item (6) of the March 12, 2012, request for information letter issued per Title 10 of the Code of Federal Regulations, Subpart 50.54(f), to power reactor licensees and holders of construction permits requesting addressees to provide further information to support the NRC staffs evaluation of regulatory actions to be taken in response to Fukushima Near-Term Task Force (NTTF) Recommendation 2.1: Seismic which implements lessons learned from Japans March 11, 2011, Great Thoku Earthquake and subsequent tsunami. This addresses the staff review of the interim Expedited Seismic Evaluation Process (ESEP) report in response to Requested Item (6) of Enclosure 1, Recommendation 2.1: Seismic, of the 50.54(f) letter.
* compared the site ground motion response spectra used to select the ESEP RLGM to the SSE. No  Yes  Yes HATCH used IPEEE Spectrum anchored at 0.3 g Notes from the Reviewer:
Attached is a file containing the technical review checklist to prepare a response letter to the licensee.
* The licensee used the Individual Plant Examination of External Events (IPEEE) review level earthquake (RLE) anchored to the plant level capacity as the RLGM at the site. Deviation(s) or Deficiency(ies), and Resolution:
The NRC staff reviewed the information provided and, as documented in the enclosed staff checklist, determined that sufficient information was provided to be responsive to this portion of the Enclosure 1 of the 50.54(f) letter. The application of this staff review is limited to the interim ESEP as part of NTTF Recommendation 2.1: Seismic activities.
This electronic memo constitutes the DSEA concurrence provided that only editorial changes are made that would not affect the technical conclusions or technical context of the assessment.
This concludes the NRCs efforts associated with TAC NO. MF5243 AND MF5233 for the review of the interim ESEP report for the EDWIN I. HATCH NUCLEAR PLANT UNITS 1 AND 2.
Docket No: 50-321 and 50-366 1
 
CONTACT: Stephanie Devlin-Gill Office of New Reactors 301-415-5301 Copy: Nicholas DiFrancesco, Steve Wyman, Jane Spence, Stephanie Devlin-Gill, Kevin Roche, On Yee, David Heeszel, Ricardo Rodriguez, Ching Ng, Sunwoo Park, Robert Hsu 2
 
Hearing Identifier:      NRR_PMDA Email Number:            2207 Mail Envelope Properties      (933495689F8EB5409FE4267845E41B8816D46733DF)
 
==Subject:==
EDWIN I. HATCH NUCLEAR PLANT UNITS 1 AND 2 - TECHNICAL REVIEW CHECKLIST RELATED TO INTERIM ESEP SUPPORTING IMPLEMENTATION OF NTTF R2.1, SEISMIC (TAC NO. MF5243 AND MF5244)
Sent Date:              7/7/2015 12:52:26 PM Received Date:          7/7/2015 12:52:30 PM From:                    Jackson, Diane Created By:              Diane.Jackson@nrc.gov Recipients:
"DiFrancesco, Nicholas" <Nicholas.DiFrancesco@nrc.gov>
Tracking Status: None "Wyman, Stephen" <Stephen.Wyman@nrc.gov>
Tracking Status: None "Spence, Jane" <Jane.Spence@nrc.gov>
Tracking Status: None "Devlin-Gill, Stephanie" <Stephanie.Devlin-Gill@nrc.gov>
Tracking Status: None "Roche, Kevin" <Kevin.Roche@nrc.gov>
Tracking Status: None "Yee, On" <On.Yee@nrc.gov>
Tracking Status: None "Heeszel, David" <David.Heeszel@nrc.gov>
Tracking Status: None "Rodriguez, Ricardo" <Ricardo.Rodriguez@nrc.gov>
Tracking Status: None "Ng, Ching" <Ching.Ng@nrc.gov>
Tracking Status: None "Park, Sunwoo" <Sunwoo.Park@nrc.gov>
Tracking Status: None "50.54f_Seismic Resource" <50.54f_Seismic.Resource@nrc.gov>
Tracking Status: None "RidsNroDsea Resource" <RidsNroDsea.Resource@nrc.gov>
Tracking Status: None "Hsu, Kaihwa" <Kaihwa.Hsu@nrc.gov>
Tracking Status: None "Shams, Mohamed" <Mohamed.Shams@nrc.gov>
Tracking Status: None Post Office:            HQCLSTR01.nrc.gov Files                          Size                    Date & Time MESSAGE                        3021                    7/7/2015 12:52:30 PM Hatch R2.1 seismic ESEP NRC review.docx                        51372 Options Priority:                      Standard Return Notification:            No Reply Requested:                No
 
Sensitivity:        Normal Expiration Date:
Recipients Received:
 
TECHNICAL REVIEW CHECKLIST BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO EXPEDITED SEISMIC EVALUATION PROCESS INTERIM EVALUATION IMPLEMENTING NTTF RECOMMENDATION 2.1 SEISMIC EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2 DOCKET NOS. 50-321 AND 50-366 By letter dated March 12, 2012 (USNRC, 2012a), the U.S. Nuclear Regulatory Commission (NRC) issued a request for information to all power reactor licensees and holders of construction permits in active or deferred status, pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Section 50.54(f) Conditions of License (hereafter referred to as the 50.54(f) letter). Enclosure 1 of the 50.54(f) letter requests addressees to reevaluate the seismic hazard at their site using present-day methods and guidance for licensing new nuclear power plants, and identify actions to address or modify, as necessary, plant components affected with the reevaluated seismic hazards. Requested Information Item (6) in Enclosure 1 to the 50.54(f) letter requests addressees to provide an interim evaluation and actions taken or planned to address a higher seismic hazard relative to the design basis, as appropriate, prior to completion and submission of the seismic risk evaluation.
Additionally, by letter dated April 12, 20131, the Electric Power Research Institute (EPRI) staff submitted EPRI TR 3002000704 Seismic Evaluation Guidance; Augmented Approach for the Resolution of Fukushima Near-Term Task Force (NTTF) Recommendation 2.1: Seismic (hereafter referred to as the guidance). The Augmented Approach proposed that licensees would use an Expedited Seismic Evaluation Process (ESEP) to address the interim actions as requested by Information Item (6) in the 50.54(f) letter. The ESEP is a simplified seismic capacity evaluation with a focused scope of certain key installed Mitigating Strategies equipment that is used for core cooling and containment functions to cope with scenarios that involve a loss of all AC power and loss of access to the ultimate heat sink to withstand the Review Level Ground Motion, which is up to two times the safe shutdown earthquake (SSE).
Due to the expedited and interim nature of the ESEP, the assessment does not include many considerations that are part of a normal risk evaluation. These deferred items, include but are not limited to, structures, piping, non-seismic failures, and operator actions, as well scenarios such as addressing loss of coolant accidents. By letter dated May 7, 20132, the NRC staff endorsed the guidance. Central and eastern United States licensees with a reevaluated seismic hazard exceeding the SSE submitted an ESEP interim evaluation in December 2014.
Consistent with the interim nature of this activity, the staff performed the review of the licensees submittal to assess whether the intent of the guidance was implemented. A multi-disciplined team checked whether the identified methods were consistent with the guidance. A senior expert panel reviewed team questions and checklists for consistency and scope. New or updated parameters (e.g., In-Structure Response Spectra, High Confidence of Low Probability of Failure calculations) presented by the licensees were assessed for acceptability only for the Item (6) response. The application of this staff review is limited to the ESEP interim evaluation as part of NTTF Recommendation 2.1: Seismic activities.
1 ADAMS Accession No. ML13102A142 2 ADAMS Accession No. ML13106A331
 
NTTF Recommendation 2.1 Expedited Seismic Evaluation Process Technical Review Checklist for Edwin I. Hatch Nuclear Plant, Units 1 & 2 By letter dated December 30, 20143, Southern Nuclear Operating Company, Inc. (the licensee) provided an Expedited Seismic Evaluation Process (ESEP) report in a response to Enclosure 1, Requested Information Item (6) of the 50.54(f) letter, for the Edwin I. Hatch Nuclear Plant, Units 1 and 2 (Hatch).
I.       Review Level Ground Motion The licensee:
* described the determination of the review level ground motion                     No (RLGM) using one of the means acceptable by the guidance.
* identified location of the control point and is consistent with March             Yes submittal
* compared the site ground motion response spectra used to select                   Yes the ESEP RLGM to the SSE.
HATCH used IPEEE Spectrum anchored at 0.3 g Notes from the Reviewer:
* The licensee used the Individual Plant Examination of External Events (IPEEE) review level earthquake (RLE) anchored to the plant level capacity as the RLGM at the site.
Deviation(s) or Deficiency(ies), and Resolution:
* The licensee used the IPEEE RLE spectrum as the RLGM. Because the IPEEE RLGM is greater than both the GMRS and the ratio between the IPEEE RLGM and the SSE is greater than the ratio between the GMRS and the SSE between 1 and 10 Hz, this approach is acceptable for this interim evaluation.
* The licensee used the IPEEE RLE spectrum as the RLGM. Because the IPEEE RLGM is greater than both the GMRS and the ratio between the IPEEE RLGM and the SSE is greater than the ratio between the GMRS and the SSE between 1 and 10 Hz, this approach is acceptable for this interim evaluation.
The NRC staff concludes:
The NRC staff concludes:
* the licensee's RLGM meets the intent of the guidance
* the licensees RLGM meets the intent of the guidance                             Yes
* the RLGM is reasonable for use in the interim evaluation. Yes Yes  II. Selection of the Success Path The licensee:
* the RLGM is reasonable for use in the interim evaluation.                       Yes II.     Selection of the Success Path The licensee:
* described the success path
* described the success path                                                       Yes
* described normal and desired state of the equipment for the success path
* described normal and desired state of the equipment for the success               Yes path
* ensured that the success path is consistent with the plant's overall mitigating strategies approach or provided a justification for an alternate path
* ensured that the success path is consistent with the plants overall             Yes mitigating strategies approach or provided a justification for an alternate path
* stated that the selection process was in accordance with the guidance or meets the intent of the guidance
* stated that the selection process was in accordance with the                     Yes guidance or meets the intent of the guidance
* used installed FLEX Phase 1 equipment as part of the success path
* used installed FLEX Phase 1 equipment as part of the success path                 Yes
* included FLEX Phase 2 and/or 3connections
* included FLEX Phase 2 and/or 3connections                                         Yes
* considered installed FLEX Phase 2 and/or 3equipment Yes Yes  Yes  Yes  Yes Yes Yes Notes from the Reviewer:None Deviation(s) or Deficiency(ies), and Resolution:
* considered installed FLEX Phase 2 and/or 3equipment                               Yes Notes from the Reviewer:None Deviation(s) or Deficiency(ies), and Resolution:
* No deviations or deficiencies were identified.                                                             3 ADAMS Accession No. ML15049A502 NTTF Recommendation 2.1 Expedited Seismic Evaluation Process Technical Review Checklist for Edwin I. Hatch Nuclear Plant, Units 1 & 2   Page 3 The NRC staff concludes that:
* No deviations or deficiencies were identified.
* the selected success path is reasonable for use in the interim evaluation
3 ADAMS Accession No. ML15049A502 Page 2
* the licensee considered installed Phase 2 and 3 connections or equipment in the interim evaluation. Yes  Yes  III. Selection of the Equipment List The licensee:
 
* developed and provided the ESEL by applying the ESEP
NTTF Recommendation 2.1 Expedited Seismic Evaluation Process Technical Review Checklist for Edwin I. Hatch Nuclear Plant, Units 1 & 2 The NRC staff concludes that:
* identified equipment considering the following functions: o Core cooling (with focus on Mode 1) function o Available, sustainable water source o Containment function and integrity   Yes Yes Yes Yes  For PWR Plants ONLY The licenseeincluded indicators / instrumentation for the following functions:
* the selected success path is reasonable for use in the interim                     Yes evaluation
level, pressure, temperature, that would be indicative of (but not explicitly identified to specific instruments): water level of the SG, pressure of SG, containment, and RCS; and temperature of the RCS. N/A For BWR Plants ONLY The licenseeconsidered indicators for the following functions:
* the licensee considered installed Phase 2 and 3 connections or                     Yes equipment in the interim evaluation.
level, pressure, temperature that would be indicative of (but not explicitly identified to specific instruments): Temperature of suppression pool, RCS, containment); Pressure of suppression pool, RCS, and drywell; water level of the suppression pool. Yes Notes from the Reviewer:
III. Selection of the Equipment List The licensee:
* developed and provided the ESEL by applying the ESEP                             Yes
* identified equipment considering the following functions:
o Core cooling (with focus on Mode 1) function                           Yes o Available, sustainable water source                                   Yes o Containment function and integrity                                     Yes For PWR Plants ONLY The licenseeincluded indicators / instrumentation for the following functions:
level, pressure, temperature, that would be indicative of (but not explicitly           N/A identified to specific instruments): water level of the SG, pressure of SG, containment, and RCS; and temperature of the RCS.
For BWR Plants ONLY The licenseeconsidered indicators for the following functions:
level, pressure, temperature that would be indicative of (but not explicitly Yes identified to specific instruments): Temperature of suppression pool, RCS, containment); Pressure of suppression pool, RCS, and drywell; water level of the suppression pool.
Notes from the Reviewer:
* The staff requested the licensee to explain why certain components are not included in the ESEL for Units 1 & 2. The licensee explained that these components either can be excluded per discussion in EPRI Report 3002000704 as not part of the credited mitigating strategies. The staff finds that the licensee responses (ML15106A549) adequately addressed the concern for this interim evaluation and met the intent of the guidance.
* The staff requested the licensee to explain why certain components are not included in the ESEL for Units 1 & 2. The licensee explained that these components either can be excluded per discussion in EPRI Report 3002000704 as not part of the credited mitigating strategies. The staff finds that the licensee responses (ML15106A549) adequately addressed the concern for this interim evaluation and met the intent of the guidance.
* The staff requested the licensee to clarify whether plant procedures provide instructions for manual operation for certain interlocks that are excluded. The licensee explained that the questioned exclusion was not applied to any components in the ESEL. The staff finds that the licensee responses (ML15106A549) adequately addressed the concern for this interim evaluation and met the intent of the guidance. Deviation(s) or Deficiency(ies), and Resolution:
* The staff requested the licensee to clarify whether plant procedures provide instructions for manual operation for certain interlocks that are excluded. The licensee explained that the questioned exclusion was not applied to any components in the ESEL. The staff finds that the licensee responses (ML15106A549) adequately addressed the concern for this interim evaluation and met the intent of the guidance.
Deviation(s) or Deficiency(ies), and Resolution:
* No deviations or deficiencies were identified.
* No deviations or deficiencies were identified.
NTTF Recommendation 2.1 Expedited Seismic Evaluation Process Technical Review Checklist for Edwin I. Hatch Nuclear Plant, Units 1 & 2   Page 4 Through a sampling of the ESEP key components, the NRC staff concludes that:
Page 3
* the licensee's process to develop the ESEL meets the intent of the guidance for the interim evaluation
 
* the desired equipment state for the success path were identified
NTTF Recommendation 2.1 Expedited Seismic Evaluation Process Technical Review Checklist for Edwin I. Hatch Nuclear Plant, Units 1 & 2 Through a sampling of the ESEP key components, the NRC staff concludes that:
* the licensee considered the support equipment for the ESEL
* the licensees process to develop the ESEL meets the intent of the           Yes guidance for the interim evaluation
* both front-line and support systems appeared to be included in the ESEL as evidenced by inclusion of SSCs on the success path and of support systems (e.g., batteries, motor control center (MCC),
* the desired equipment state for the success path were identified             Yes
inverters). Yes  Yes Yes Yes  IV. Walkdown Approach The licensee:
* the licensee considered the support equipment for the ESEL                   Yes
* described the walkdown screening approach, including walkbys and walkdowns performed exclusively for the ESEP, in accordance with the guidance
* both front-line and support systems appeared to be included in the           Yes ESEL as evidenced by inclusion of SSCs on the success path and of support systems (e.g., batteries, motor control center (MCC),
* credited previous walkdown results, including a description of current action(s) to verify the present equipment condition and/or configuration (e.g., walk-bys), in accordance with the guidance
inverters).
* stated that the walkdown was performed by seismically trained personnel Yes Yes Yes Notes from the Reviewer:None Deviation(s) or Deficiency(ies), and Resolution:
IV. Walkdown Approach The licensee:
* No deviations or deficiencies were identified. The licensee:
* described the walkdown screening approach, including walkbys and             Yes walkdowns performed exclusively for the ESEP, in accordance with the guidance
* Described, if needed, adverse material condition of the equipment (e.g. material degradation)
* credited previous walkdown results, including a description of current       Yes action(s) to verify the present equipment condition and/or configuration (e.g., walk-bys), in accordance with the guidance
* credited previous walkdown results, included a description of current action(s) to verify the present equipment condition (e.g., walk-bys), meeting the intent of the guidance Yes  Yes The licensee:
* stated that the walkdown was performed by seismically trained               Yes personnel Notes from the Reviewer:None Deviation(s) or Deficiency(ies), and Resolution:
* described the conditions of structural items considered for the interim evaluation, including: o spatial interactions (i.e., interaction between block walls and other items/components) o anchorage o piping connected to tanks (i.e., differential movement between pipes and tanks at connections)
* No deviations or deficiencies were identified.
Yes  Yes Yes  Notes from the Reviewer:
The licensee:
* The licensee identified some issues related to equipment anchorage, which were then resolved and re-evaluated to confirm that their HCLPF values exceed the RLGM. Deviation(s) or Deficiency(ies), and Resolution:
* Described, if needed, adverse material condition of the equipment           Yes (e.g. material degradation)
* credited previous walkdown results, included a description of current       Yes action(s) to verify the present equipment condition (e.g., walk-bys),
meeting the intent of the guidance The licensee:
* described the conditions of structural items considered for the interim evaluation, including:
o spatial interactions (i.e., interaction between block walls and     Yes other items/components) o anchorage                                                           Yes o piping connected to tanks (i.e., differential movement               Yes between pipes and tanks at connections)
Notes from the Reviewer:
* The licensee identified some issues related to equipment anchorage, which were then resolved and re-evaluated to confirm that their HCLPF values exceed the RLGM.
Deviation(s) or Deficiency(ies), and Resolution:
* No deviations or deficiencies were identified.
* No deviations or deficiencies were identified.
NTTF Recommendation 2.1 Expedited Seismic Evaluation Process Technical Review Checklist for Edwin I. Hatch Nuclear Plant, Units 1 & 2   Page 5 The licensee reported deviations for Hatch (related to walkdowns). If deviations were identified, there is a discussion of how the deficiencies were or will be addressed in the ESEP submittal report. No  N/A The NRC staff concludes that:
Page 4
* the licensee described the performed walkdown approach, including any credited previous efforts (e.g. IPEEE) consistent with the guidance
 
* the licensee addressed identified deviations consistent with the guidance, if any Yes Yes  V. Capacity Screening Approach and HCLPF Calculation Results The licensee:
NTTF Recommendation 2.1 Expedited Seismic Evaluation Process Technical Review Checklist for Edwin I. Hatch Nuclear Plant, Units 1 & 2 The licensee reported deviations for Hatch (related to walkdowns).                     No If deviations were identified, there is a discussion of how the deficiencies           N/A were or will be addressed in the ESEP submittal report.
* described the capacity screening process for the ESEL items, consistent with the guidance (e.g., use of EPRI NP-6041 screening table)(1).
The NRC staff concludes that:
* presented the results of the screened-out ESEL items in the ESEP report
* the licensee described the performed walkdown approach, including               Yes any credited previous efforts (e.g. IPEEE) consistent with the guidance
* described the development of ISRS based on scaling(2)
* the licensee addressed identified deviations consistent with the                 Yes guidance, if any V.       Capacity Screening Approach and HCLPF Calculation Results The licensee:
* described the development of ISRS based on new analysis consistent with the guidance
* described the capacity screening process for the ESEL items,                     Yes consistent with the guidance (e.g., use of EPRI NP-6041 screening table)(1).
* described the method for estimating HCLPF capacity of screened-in ESEL items, including both structural and functional failure modes consistent with the guidance: o use of CDFM o use of FA o use of experience data or generic information
* presented the results of the screened-out ESEL items in the ESEP                 Yes report
* credited IPEEE spectral shape for HCLPF capacity estimates is similar to or envelopes the RLGM, and anchored at the same control point
* described the development of ISRS based on scaling(2)                           Yes
* presented the results of HCLPF capacities including associated failure modes for screened-in ESEL items
* described the development of ISRS based on new analysis                         N/A consistent with the guidance
* reviewed the ESEL items with the lowest HCLPF values to ensure that their capacities are equal or greater than the RLGM Yes    Yes  Yes  N/A  Yes    Yes N/A Yes Yes Yes  Yes Notes from the Reviewer: 1. The staff asked questions to the licensee regarding failure modes and anchorage evaluations. In its response (ML15106A549), the licensee stated that it performed anchorage evaluations for each ESEL item anchored to structural elements and that all ESEL items were shown to have seismic capacity greater than or equal to the RLGM for all applicable failure modes, which is acceptable for this interim evaluation. 2. Because the submittal did not mention specific treatment of equipment above 40 feet, the staff also asked a question to the licensee regarding the method used for screening items located at elevations beyond 40 ft above grade. In its response (ML15106A549), the licensee stated that all the items located beyond 40 ft above grade were screened by following guidance put forth in EPRI 1019200, which is acceptable for this interim evaluation.
* described the method for estimating HCLPF capacity of screened-in               Yes ESEL items, including both structural and functional failure modes consistent with the guidance:
o use of CDFM                                                             Yes o use of FA                                                               N/A o use of experience data or generic information                           Yes
* credited IPEEE spectral shape for HCLPF capacity estimates is                   Yes similar to or envelopes the RLGM, and anchored at the same control point
* presented the results of HCLPF capacities including associated                   Yes failure modes for screened-in ESEL items Yes
* reviewed the ESEL items with the lowest HCLPF values to ensure that their capacities are equal or greater than the RLGM Notes from the Reviewer:
: 1. The staff asked questions to the licensee regarding failure modes and anchorage evaluations. In its response (ML15106A549), the licensee stated that it performed anchorage evaluations for each ESEL item anchored to structural elements and that all ESEL items were shown to have seismic capacity greater than or equal to the RLGM for all applicable failure modes, which is acceptable for this interim evaluation.
: 2. Because the submittal did not mention specific treatment of equipment above 40 feet, the staff also asked a question to the licensee regarding the method used for screening items located at elevations beyond 40 ft above grade. In its response (ML15106A549),
the licensee stated that all the items located beyond 40 ft above grade were screened by following guidance put forth in EPRI 1019200, which is acceptable for this interim evaluation.
Deviation(s) or Deficiency(ies), and Resolution:
Deviation(s) or Deficiency(ies), and Resolution:
* No deviations or deficiencies were identified.
* No deviations or deficiencies were identified.
NTTF Recommendation 2.1 Expedited Seismic Evaluation Process Technical Review Checklist for Edwin I. Hatch Nuclear Plant, Units 1 & 2   Page 6 The NRC staff concludes that:
Page 5
* the licensee described the implementation of the capacity screening process consistent with the intent of the guidance
 
* the licensee presented capacity screening and calculation results, as appropriate, in the ESEP report
NTTF Recommendation 2.1 Expedited Seismic Evaluation Process Technical Review Checklist for Edwin I. Hatch Nuclear Plant, Units 1 & 2 The NRC staff concludes that:
* the method used to develop the ISRS is consistent with guidance for use in the ESEP
* the licensee described the implementation of the capacity screening               Yes process consistent with the intent of the guidance
* for HCLPF calculations, the licensee used HCLPF calculation methods as endorsed in the guidance
* the licensee presented capacity screening and calculation results, as             Yes appropriate, in the ESEP report
* no anomalies were noted in the reported HCLPF   Yes  Yes  Yes Yes  Yes  VI. Inaccessible Items The licensee:
* the method used to develop the ISRS is consistent with guidance for               Yes use in the ESEP
* provided a list of inaccessible items
* for HCLPF calculations, the licensee used HCLPF calculation                       Yes methods as endorsed in the guidance
* provided a schedule of the planned walkdown and evaluation for all inaccessible items
* no anomalies were noted in the reported HCLPF                                     Yes VI.     Inaccessible Items The licensee:
* provided Regulatory Commitment to complete walkdowns. Yes Yes  Yes The licensee will provide results or complete walkdown by:
* provided a list of inaccessible items                                             Yes
* Hatch1: o December 2016 (2 years after ESEP report issuance) for items currently not installed and do not require an outage. o Spring outage 2018 (2 outages after December 2014) for items that were currently not installed and require outage. o Letter to NRC no later than 90 days after Spring 2018 outage.
* provided a schedule of the planned walkdown and evaluation for all               Yes inaccessible items
* Hatch 2: o December 2016 (2 years after ESEP report issuance) for items that were currently not installed and do not require outage. o Spring outage 2017 (2 outages after December 2014) for items that were currently not installed and require outage. o Letter to NRC no later than 90 days after Spring 2017 outage. Notes from the Reviewer:
* provided Regulatory Commitment to complete walkdowns.                             Yes The licensee will provide results or complete walkdown by:
* Hatch1:
o December 2016 (2 years after ESEP report issuance) for items currently not installed and do not require an outage.
o Spring outage 2018 (2 outages after December 2014) for items that were currently not installed and require outage.
o Letter to NRC no later than 90 days after Spring 2018 outage.
* Hatch 2:
o December 2016 (2 years after ESEP report issuance) for items that were currently not installed and do not require outage.
o Spring outage 2017 (2 outages after December 2014) for items that were currently not installed and require outage.
o Letter to NRC no later than 90 days after Spring 2017 outage.
Notes from the Reviewer:
* Hatch 1 & 2 ESEL contain about 70 items, in total, that are located in either drywells or locked high radiation areas. The licensee dispositioned of these items by sampling of other/similar equipment, referring to recent previous walkdowns performed and other applicable methods. The staff finds this approach reasonable for this interim evaluation.
* Hatch 1 & 2 ESEL contain about 70 items, in total, that are located in either drywells or locked high radiation areas. The licensee dispositioned of these items by sampling of other/similar equipment, referring to recent previous walkdowns performed and other applicable methods. The staff finds this approach reasonable for this interim evaluation.
* The licensee stated that items that have not been installed or for which FLEX modifications have not been completed, as of the time of the ESEP report, will be evaluated after installation or modification per the SMA methodology. The staff finds the licensee Regulatory Commitment described above to be a reasonable approach for the interim evaluation. Deviation(s) or Deficiency(ies), and Resolution:
* The licensee stated that items that have not been installed or for which FLEX modifications have not been completed, as of the time of the ESEP report, will be evaluated after installation or modification per the SMA methodology. The staff finds the licensee Regulatory Commitment described above to be a reasonable approach for the interim evaluation.
Deviation(s) or Deficiency(ies), and Resolution:
* No deviations or deficiencies were identified.
* No deviations or deficiencies were identified.
NTTF Recommendation 2.1 Expedited Seismic Evaluation Process Technical Review Checklist for Edwin I. Hatch Nuclear Plant, Units 1 & 2    Page 7 The NRC staff concludes that the licensee:
Page 6
* listed inaccessible items
* committed to provide the results (e.g. walkdowns, walkbys, etc) of the remaining inaccessible items consistent with the guidance
* substitutions, if needed, were appropriately justified  Yes Yes  N/A  VII. Modifications to Plant Equipment  The licensee:
* identified modifications for ESEL items necessary to achieve HCLPF values that bound the RLGM (excluding mitigative strategies equipment (FLEX)), as specified in the guidance
* provided a schedule to implement such modifications (if any), consistent with the intent of the guidance
* provided Regulatory Commitment to complete modifications
* provided Regulatory Commitment to report completion of modifications  No Yes  Yes Yes The licenseewill provide a report for each unit based on the results of items yet to be installed which may or may not require modifications as follows:
* Hatch 1: o December 2016 (2 years after ESEP report issuance) for items currently not installed and do not require an outage. o Spring outage 2018 (2 outages after December 2014) for items that were currently not installed and require outage. o Letter to NRC no later than 90 days after Spring 2018 outage
* Hatch 2: o December 2016 (2 years after ESEP report issuance) for items that were currently not installed and do not require outage. o Spring outage 2017 (2 outages after December 2014) for items that were currently not installed and require outage. o Letter to NRC no later than 90 days after Spring 2017 outage  Notes from the Reviewer:
* The licensee stated that items that have not been installed or for which FLEX modifications have not been completed, as of the time of the ESEP report, will be evaluated after installation or modification per the SMA methodology. The staff finds the licensee Regulatory Commitment described above to be a reasonable approach for this interim evaluation. Deviation(s) or Deficiency(ies), and Resolution:
* No deviations or deficiencies were identified. The NRC staff concludes that the licensee:
* identified plant modifications necessary to achieve the target seismic capacity
* provided a schedule to implement the modifications (if any) consistent with the guidance  N/A  Yes NTTF Recommendation 2.1 Expedited Seismic Evaluation Process Technical Review Checklist for Edwin I. Hatch Nuclear Plant, Units 1 & 2    Page 8 VIII. General Conclusions:
The NRC staff assessed the licensee's implementation of the ESEP guidance. Due to the interim applicability of the ESEP evaluations, use of the information for another application would require a separate NRC review and approval. Based on its review, the NRC staff concludes that the licensee's implementation of the interim evaluation meets the intent of the guidance. The staff concludes that, through the implementation of the ESEP guidance, the licensee identified and evaluated the seismic capacity of certain key installed Mitigating Strategies equipment that is used for core cooling and containment functions to cope with scenarios that involve a loss of all AC power and loss of access to the ultimate heat sink to withstand a seismic event up to the Review Level Ground Motion. Hatch used their IPEEE RLE spectrum anchored at 0.3g as the RLGM for the ESEP. This approach deviates from guidance, but is acceptable for the interim evaluation, as noted in the checklist. The application of this NRC staff review is limited to the ESEP interim evaluation as part of NTTF Recommendation 2.1: Seismic activities. The licensee is performing safety enhancing modifications of the FLEX equipment and committed to complete actions not requiring an outage by December 2016, modifications requiring an outage no later than the Spring 2018 outage for Unit 1 and Spring 2017 outage for Unit 2, and provide a letter to NRC no later than 90 days after each unit's outage.
In summary, the licensee, by implementing the ESEP interim evaluation, has demonstrated additional assurance which supports continued plant safety while the longer-term seismic evaluation is completed to support regulatory decision making. The NRC staff concludes that the licensee responded appropriately to Enclosure 1, Item (6) of the 50.54(f) letter, dated March 12, 2012, for Edwin I Hatch Nuclear Plant, Units 1 and 2.


Technical Reviewers: David Heezel, On Yee, Ching Ng, Robert Hsu, Sunwoo Park, Ricardo Rodriguez, Joseph Braverman(NRC Consultant)  
NTTF Recommendation 2.1 Expedited Seismic Evaluation Process Technical Review Checklist for Edwin I. Hatch Nuclear Plant, Units 1 & 2 The NRC staff concludes that the licensee:
* listed inaccessible items                                                        Yes
* committed to provide the results (e.g. walkdowns, walkbys, etc) of              Yes the remaining inaccessible items consistent with the guidance
* substitutions, if needed, were appropriately justified                          N/A VII. Modifications to Plant Equipment The licensee:
* identified modifications for ESEL items necessary to achieve HCLPF                No values that bound the RLGM (excluding mitigative strategies equipment (FLEX)), as specified in the guidance
* provided a schedule to implement such modifications (if any),                    Yes consistent with the intent of the guidance
* provided Regulatory Commitment to complete modifications                        Yes
* provided Regulatory Commitment to report completion of                          Yes modifications The licenseewill provide a report for each unit based on the results of items yet to be installed which may or may not require modifications as follows:
* Hatch 1:
o December 2016 (2 years after ESEP report issuance) for items currently not installed and do not require an outage.
o Spring outage 2018 (2 outages after December 2014) for items that were currently not installed and require outage.
o Letter to NRC no later than 90 days after Spring 2018 outage
* Hatch 2:
o December 2016 (2 years after ESEP report issuance) for items that were currently not installed and do not require outage.
o Spring outage 2017 (2 outages after December 2014) for items that were currently not installed and require outage.
o Letter to NRC no later than 90 days after Spring 2017 outage Notes from the Reviewer:
* The licensee stated that items that have not been installed or for which FLEX modifications have not been completed, as of the time of the ESEP report, will be evaluated after installation or modification per the SMA methodology. The staff finds the licensee Regulatory Commitment described above to be a reasonable approach for this interim evaluation.
Deviation(s) or Deficiency(ies), and Resolution:
* No deviations or deficiencies were identified.
The NRC staff concludes that the licensee:
* identified plant modifications necessary to achieve the target seismic          N/A capacity
* provided a schedule to implement the modifications (if any)                     Yes consistent with the guidance Page 7


}}
NTTF Recommendation 2.1 Expedited Seismic Evaluation Process Technical Review Checklist for Edwin I. Hatch Nuclear Plant, Units 1 & 2 VIII. General
 
== Conclusions:==
 
The NRC staff assessed the licensees implementation of the ESEP guidance. Due to the interim applicability of the ESEP evaluations, use of the information for another application would require a separate NRC review and approval. Based on its review, the NRC staff concludes that the licensees implementation of the interim evaluation meets the intent of the guidance. The staff concludes that, through the implementation of the ESEP guidance, the licensee identified and evaluated the seismic capacity of certain key installed Mitigating Strategies equipment that is used for core cooling and containment functions to cope with scenarios that involve a loss of all AC power and loss of access to the ultimate heat sink to withstand a seismic event up to the Review Level Ground Motion. Hatch used their IPEEE RLE spectrum anchored at 0.3g as the RLGM for the ESEP. This approach deviates from guidance, but is acceptable for the interim evaluation, as noted in the checklist. The application of this NRC staff review is limited to the ESEP interim evaluation as part of NTTF Recommendation 2.1: Seismic activities. The licensee is performing safety enhancing modifications of the FLEX equipment and committed to complete actions not requiring an outage by December 2016, modifications requiring an outage no later than the Spring 2018 outage for Unit 1 and Spring 2017 outage for Unit 2, and provide a letter to NRC no later than 90 days after each units outage.
In summary, the licensee, by implementing the ESEP interim evaluation, has demonstrated additional assurance which supports continued plant safety while the longer-term seismic evaluation is completed to support regulatory decision making. The NRC staff concludes that the licensee responded appropriately to Enclosure 1, Item (6) of the 50.54(f) letter, dated March 12, 2012, for Edwin I Hatch Nuclear Plant, Units 1 and 2.
Technical Reviewers: David Heezel, On Yee, Ching Ng, Robert Hsu, Sunwoo Park, Ricardo Rodriguez, Joseph Braverman(NRC Consultant)
Page 8}}

Latest revision as of 23:39, 4 December 2019

NRR E-mail Capture - Edwin I. Hatch Nuclear Plant Units 1 and 2 - Technical Review Checklist Related to Interim ESEP Supporting Implementation of NTTF R2.1, Seismic (TAC No. MF5243 and MF5244)
ML15190A131
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 07/07/2015
From: Diane Jackson
Office of New Reactors
To: Mohamed Shams
Japan Lessons-Learned Division
References
TAC MF5243, TAC MF5244
Download: ML15190A131 (12)


Text

NRR-PMDAPEm Resource From: Jackson, Diane Sent: Tuesday, July 07, 2015 12:52 PM To: Shams, Mohamed Cc: DiFrancesco, Nicholas; Wyman, Stephen; Spence, Jane; Devlin-Gill, Stephanie; Roche, Kevin; Yee, On; Heeszel, David; Rodriguez, Ricardo; Ng, Ching; Park, Sunwoo; 50.54f_Seismic Resource; RidsNroDsea Resource; Hsu, Kaihwa

Subject:

EDWIN I. HATCH NUCLEAR PLANT UNITS 1 AND 2 - TECHNICAL REVIEW CHECKLIST RELATED TO INTERIM ESEP SUPPORTING IMPLEMENTATION OF NTTF R2.1, SEISMIC (TAC NO. MF5243 AND MF5244)

Attachments: Hatch R2.1 seismic ESEP NRC review.docx July 7, 2015 MEMORANDUM TO: Mohamed K. Shams, Chief Hazards Management Branch (JHMB)

Japan Lessons-Learned Division Office of Nuclear Reactor Regulation FROM: Diane T. Jackson, Chief Geosciences and Geotechnical Engineering Branch 2 (RGS2)

Division of Site Safety and Environmental Analysis Office of New Reactors

SUBJECT:

EDWIN I. HATCH NUCLEAR PLANT UNITS 1 AND 2 - TECHNICAL REVIEW CHECKLIST RELATED TO INTERIM EXPEDITED SEISMIC EVALUATION PROCESS SUPPORTING IMPLEMENTATION OF NTTF RECOMMENDATION 2.1, SEISMIC, RELATED TO THE FUKUSHIMA DAI-ICHI NUCLEAR POWER PLANT ACCIDENT (TAC NO. MF5243 and MF5244)

The NRC technical staff working through the Geosciences and Geotechnical Engineering Branches 1 and 2 (RGS1 and RGS2) completed the Technical Review Checklist of the Edwin I. Hatch Nuclear Power Plant response to Enclosure 1, Item (6) of the March 12, 2012, request for information letter issued per Title 10 of the Code of Federal Regulations, Subpart 50.54(f), to power reactor licensees and holders of construction permits requesting addressees to provide further information to support the NRC staffs evaluation of regulatory actions to be taken in response to Fukushima Near-Term Task Force (NTTF) Recommendation 2.1: Seismic which implements lessons learned from Japans March 11, 2011, Great Thoku Earthquake and subsequent tsunami. This addresses the staff review of the interim Expedited Seismic Evaluation Process (ESEP) report in response to Requested Item (6) of Enclosure 1, Recommendation 2.1: Seismic, of the 50.54(f) letter.

Attached is a file containing the technical review checklist to prepare a response letter to the licensee.

The NRC staff reviewed the information provided and, as documented in the enclosed staff checklist, determined that sufficient information was provided to be responsive to this portion of the Enclosure 1 of the 50.54(f) letter. The application of this staff review is limited to the interim ESEP as part of NTTF Recommendation 2.1: Seismic activities.

This electronic memo constitutes the DSEA concurrence provided that only editorial changes are made that would not affect the technical conclusions or technical context of the assessment.

This concludes the NRCs efforts associated with TAC NO. MF5243 AND MF5233 for the review of the interim ESEP report for the EDWIN I. HATCH NUCLEAR PLANT UNITS 1 AND 2.

Docket No: 50-321 and 50-366 1

CONTACT: Stephanie Devlin-Gill Office of New Reactors 301-415-5301 Copy: Nicholas DiFrancesco, Steve Wyman, Jane Spence, Stephanie Devlin-Gill, Kevin Roche, On Yee, David Heeszel, Ricardo Rodriguez, Ching Ng, Sunwoo Park, Robert Hsu 2

Hearing Identifier: NRR_PMDA Email Number: 2207 Mail Envelope Properties (933495689F8EB5409FE4267845E41B8816D46733DF)

Subject:

EDWIN I. HATCH NUCLEAR PLANT UNITS 1 AND 2 - TECHNICAL REVIEW CHECKLIST RELATED TO INTERIM ESEP SUPPORTING IMPLEMENTATION OF NTTF R2.1, SEISMIC (TAC NO. MF5243 AND MF5244)

Sent Date: 7/7/2015 12:52:26 PM Received Date: 7/7/2015 12:52:30 PM From: Jackson, Diane Created By: Diane.Jackson@nrc.gov Recipients:

"DiFrancesco, Nicholas" <Nicholas.DiFrancesco@nrc.gov>

Tracking Status: None "Wyman, Stephen" <Stephen.Wyman@nrc.gov>

Tracking Status: None "Spence, Jane" <Jane.Spence@nrc.gov>

Tracking Status: None "Devlin-Gill, Stephanie" <Stephanie.Devlin-Gill@nrc.gov>

Tracking Status: None "Roche, Kevin" <Kevin.Roche@nrc.gov>

Tracking Status: None "Yee, On" <On.Yee@nrc.gov>

Tracking Status: None "Heeszel, David" <David.Heeszel@nrc.gov>

Tracking Status: None "Rodriguez, Ricardo" <Ricardo.Rodriguez@nrc.gov>

Tracking Status: None "Ng, Ching" <Ching.Ng@nrc.gov>

Tracking Status: None "Park, Sunwoo" <Sunwoo.Park@nrc.gov>

Tracking Status: None "50.54f_Seismic Resource" <50.54f_Seismic.Resource@nrc.gov>

Tracking Status: None "RidsNroDsea Resource" <RidsNroDsea.Resource@nrc.gov>

Tracking Status: None "Hsu, Kaihwa" <Kaihwa.Hsu@nrc.gov>

Tracking Status: None "Shams, Mohamed" <Mohamed.Shams@nrc.gov>

Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 3021 7/7/2015 12:52:30 PM Hatch R2.1 seismic ESEP NRC review.docx 51372 Options Priority: Standard Return Notification: No Reply Requested: No

Sensitivity: Normal Expiration Date:

Recipients Received:

TECHNICAL REVIEW CHECKLIST BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO EXPEDITED SEISMIC EVALUATION PROCESS INTERIM EVALUATION IMPLEMENTING NTTF RECOMMENDATION 2.1 SEISMIC EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2 DOCKET NOS. 50-321 AND 50-366 By letter dated March 12, 2012 (USNRC, 2012a), the U.S. Nuclear Regulatory Commission (NRC) issued a request for information to all power reactor licensees and holders of construction permits in active or deferred status, pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Section 50.54(f) Conditions of License (hereafter referred to as the 50.54(f) letter). Enclosure 1 of the 50.54(f) letter requests addressees to reevaluate the seismic hazard at their site using present-day methods and guidance for licensing new nuclear power plants, and identify actions to address or modify, as necessary, plant components affected with the reevaluated seismic hazards. Requested Information Item (6) in Enclosure 1 to the 50.54(f) letter requests addressees to provide an interim evaluation and actions taken or planned to address a higher seismic hazard relative to the design basis, as appropriate, prior to completion and submission of the seismic risk evaluation.

Additionally, by letter dated April 12, 20131, the Electric Power Research Institute (EPRI) staff submitted EPRI TR 3002000704 Seismic Evaluation Guidance; Augmented Approach for the Resolution of Fukushima Near-Term Task Force (NTTF) Recommendation 2.1: Seismic (hereafter referred to as the guidance). The Augmented Approach proposed that licensees would use an Expedited Seismic Evaluation Process (ESEP) to address the interim actions as requested by Information Item (6) in the 50.54(f) letter. The ESEP is a simplified seismic capacity evaluation with a focused scope of certain key installed Mitigating Strategies equipment that is used for core cooling and containment functions to cope with scenarios that involve a loss of all AC power and loss of access to the ultimate heat sink to withstand the Review Level Ground Motion, which is up to two times the safe shutdown earthquake (SSE).

Due to the expedited and interim nature of the ESEP, the assessment does not include many considerations that are part of a normal risk evaluation. These deferred items, include but are not limited to, structures, piping, non-seismic failures, and operator actions, as well scenarios such as addressing loss of coolant accidents. By letter dated May 7, 20132, the NRC staff endorsed the guidance. Central and eastern United States licensees with a reevaluated seismic hazard exceeding the SSE submitted an ESEP interim evaluation in December 2014.

Consistent with the interim nature of this activity, the staff performed the review of the licensees submittal to assess whether the intent of the guidance was implemented. A multi-disciplined team checked whether the identified methods were consistent with the guidance. A senior expert panel reviewed team questions and checklists for consistency and scope. New or updated parameters (e.g., In-Structure Response Spectra, High Confidence of Low Probability of Failure calculations) presented by the licensees were assessed for acceptability only for the Item (6) response. The application of this staff review is limited to the ESEP interim evaluation as part of NTTF Recommendation 2.1: Seismic activities.

1 ADAMS Accession No. ML13102A142 2 ADAMS Accession No. ML13106A331

NTTF Recommendation 2.1 Expedited Seismic Evaluation Process Technical Review Checklist for Edwin I. Hatch Nuclear Plant, Units 1 & 2 By letter dated December 30, 20143, Southern Nuclear Operating Company, Inc. (the licensee) provided an Expedited Seismic Evaluation Process (ESEP) report in a response to Enclosure 1, Requested Information Item (6) of the 50.54(f) letter, for the Edwin I. Hatch Nuclear Plant, Units 1 and 2 (Hatch).

I. Review Level Ground Motion The licensee:

  • described the determination of the review level ground motion No (RLGM) using one of the means acceptable by the guidance.
  • identified location of the control point and is consistent with March Yes submittal
  • compared the site ground motion response spectra used to select Yes the ESEP RLGM to the SSE.

HATCH used IPEEE Spectrum anchored at 0.3 g Notes from the Reviewer:

  • The licensee used the Individual Plant Examination of External Events (IPEEE) review level earthquake (RLE) anchored to the plant level capacity as the RLGM at the site.

Deviation(s) or Deficiency(ies), and Resolution:

  • The licensee used the IPEEE RLE spectrum as the RLGM. Because the IPEEE RLGM is greater than both the GMRS and the ratio between the IPEEE RLGM and the SSE is greater than the ratio between the GMRS and the SSE between 1 and 10 Hz, this approach is acceptable for this interim evaluation.

The NRC staff concludes:

  • the licensees RLGM meets the intent of the guidance Yes
  • the RLGM is reasonable for use in the interim evaluation. Yes II. Selection of the Success Path The licensee:
  • described the success path Yes
  • described normal and desired state of the equipment for the success Yes path
  • ensured that the success path is consistent with the plants overall Yes mitigating strategies approach or provided a justification for an alternate path
  • stated that the selection process was in accordance with the Yes guidance or meets the intent of the guidance
  • used installed FLEX Phase 1 equipment as part of the success path Yes
  • included FLEX Phase 2 and/or 3connections Yes
  • considered installed FLEX Phase 2 and/or 3equipment Yes Notes from the Reviewer:None Deviation(s) or Deficiency(ies), and Resolution:
  • No deviations or deficiencies were identified.

3 ADAMS Accession No. ML15049A502 Page 2

NTTF Recommendation 2.1 Expedited Seismic Evaluation Process Technical Review Checklist for Edwin I. Hatch Nuclear Plant, Units 1 & 2 The NRC staff concludes that:

  • the selected success path is reasonable for use in the interim Yes evaluation
  • the licensee considered installed Phase 2 and 3 connections or Yes equipment in the interim evaluation.

III. Selection of the Equipment List The licensee:

  • developed and provided the ESEL by applying the ESEP Yes
  • identified equipment considering the following functions:

o Core cooling (with focus on Mode 1) function Yes o Available, sustainable water source Yes o Containment function and integrity Yes For PWR Plants ONLY The licenseeincluded indicators / instrumentation for the following functions:

level, pressure, temperature, that would be indicative of (but not explicitly N/A identified to specific instruments): water level of the SG, pressure of SG, containment, and RCS; and temperature of the RCS.

For BWR Plants ONLY The licenseeconsidered indicators for the following functions:

level, pressure, temperature that would be indicative of (but not explicitly Yes identified to specific instruments): Temperature of suppression pool, RCS, containment); Pressure of suppression pool, RCS, and drywell; water level of the suppression pool.

Notes from the Reviewer:

  • The staff requested the licensee to explain why certain components are not included in the ESEL for Units 1 & 2. The licensee explained that these components either can be excluded per discussion in EPRI Report 3002000704 as not part of the credited mitigating strategies. The staff finds that the licensee responses (ML15106A549) adequately addressed the concern for this interim evaluation and met the intent of the guidance.
  • The staff requested the licensee to clarify whether plant procedures provide instructions for manual operation for certain interlocks that are excluded. The licensee explained that the questioned exclusion was not applied to any components in the ESEL. The staff finds that the licensee responses (ML15106A549) adequately addressed the concern for this interim evaluation and met the intent of the guidance.

Deviation(s) or Deficiency(ies), and Resolution:

  • No deviations or deficiencies were identified.

Page 3

NTTF Recommendation 2.1 Expedited Seismic Evaluation Process Technical Review Checklist for Edwin I. Hatch Nuclear Plant, Units 1 & 2 Through a sampling of the ESEP key components, the NRC staff concludes that:

  • the licensees process to develop the ESEL meets the intent of the Yes guidance for the interim evaluation
  • the desired equipment state for the success path were identified Yes
  • the licensee considered the support equipment for the ESEL Yes
  • both front-line and support systems appeared to be included in the Yes ESEL as evidenced by inclusion of SSCs on the success path and of support systems (e.g., batteries, motor control center (MCC),

inverters).

IV. Walkdown Approach The licensee:

  • described the walkdown screening approach, including walkbys and Yes walkdowns performed exclusively for the ESEP, in accordance with the guidance
  • credited previous walkdown results, including a description of current Yes action(s) to verify the present equipment condition and/or configuration (e.g., walk-bys), in accordance with the guidance
  • stated that the walkdown was performed by seismically trained Yes personnel Notes from the Reviewer:None Deviation(s) or Deficiency(ies), and Resolution:
  • No deviations or deficiencies were identified.

The licensee:

  • Described, if needed, adverse material condition of the equipment Yes (e.g. material degradation)
  • credited previous walkdown results, included a description of current Yes action(s) to verify the present equipment condition (e.g., walk-bys),

meeting the intent of the guidance The licensee:

  • described the conditions of structural items considered for the interim evaluation, including:

o spatial interactions (i.e., interaction between block walls and Yes other items/components) o anchorage Yes o piping connected to tanks (i.e., differential movement Yes between pipes and tanks at connections)

Notes from the Reviewer:

  • The licensee identified some issues related to equipment anchorage, which were then resolved and re-evaluated to confirm that their HCLPF values exceed the RLGM.

Deviation(s) or Deficiency(ies), and Resolution:

  • No deviations or deficiencies were identified.

Page 4

NTTF Recommendation 2.1 Expedited Seismic Evaluation Process Technical Review Checklist for Edwin I. Hatch Nuclear Plant, Units 1 & 2 The licensee reported deviations for Hatch (related to walkdowns). No If deviations were identified, there is a discussion of how the deficiencies N/A were or will be addressed in the ESEP submittal report.

The NRC staff concludes that:

  • the licensee described the performed walkdown approach, including Yes any credited previous efforts (e.g. IPEEE) consistent with the guidance
  • the licensee addressed identified deviations consistent with the Yes guidance, if any V. Capacity Screening Approach and HCLPF Calculation Results The licensee:
  • described the capacity screening process for the ESEL items, Yes consistent with the guidance (e.g., use of EPRI NP-6041 screening table)(1).
  • presented the results of the screened-out ESEL items in the ESEP Yes report
  • described the development of ISRS based on scaling(2) Yes
  • described the development of ISRS based on new analysis N/A consistent with the guidance
  • described the method for estimating HCLPF capacity of screened-in Yes ESEL items, including both structural and functional failure modes consistent with the guidance:

o use of CDFM Yes o use of FA N/A o use of experience data or generic information Yes

  • credited IPEEE spectral shape for HCLPF capacity estimates is Yes similar to or envelopes the RLGM, and anchored at the same control point
  • presented the results of HCLPF capacities including associated Yes failure modes for screened-in ESEL items Yes
  • reviewed the ESEL items with the lowest HCLPF values to ensure that their capacities are equal or greater than the RLGM Notes from the Reviewer:
1. The staff asked questions to the licensee regarding failure modes and anchorage evaluations. In its response (ML15106A549), the licensee stated that it performed anchorage evaluations for each ESEL item anchored to structural elements and that all ESEL items were shown to have seismic capacity greater than or equal to the RLGM for all applicable failure modes, which is acceptable for this interim evaluation.
2. Because the submittal did not mention specific treatment of equipment above 40 feet, the staff also asked a question to the licensee regarding the method used for screening items located at elevations beyond 40 ft above grade. In its response (ML15106A549),

the licensee stated that all the items located beyond 40 ft above grade were screened by following guidance put forth in EPRI 1019200, which is acceptable for this interim evaluation.

Deviation(s) or Deficiency(ies), and Resolution:

  • No deviations or deficiencies were identified.

Page 5

NTTF Recommendation 2.1 Expedited Seismic Evaluation Process Technical Review Checklist for Edwin I. Hatch Nuclear Plant, Units 1 & 2 The NRC staff concludes that:

  • the licensee described the implementation of the capacity screening Yes process consistent with the intent of the guidance
  • the licensee presented capacity screening and calculation results, as Yes appropriate, in the ESEP report
  • the method used to develop the ISRS is consistent with guidance for Yes use in the ESEP
  • for HCLPF calculations, the licensee used HCLPF calculation Yes methods as endorsed in the guidance
  • no anomalies were noted in the reported HCLPF Yes VI. Inaccessible Items The licensee:
  • provided a list of inaccessible items Yes
  • provided a schedule of the planned walkdown and evaluation for all Yes inaccessible items
  • provided Regulatory Commitment to complete walkdowns. Yes The licensee will provide results or complete walkdown by:
  • Hatch1:

o December 2016 (2 years after ESEP report issuance) for items currently not installed and do not require an outage.

o Spring outage 2018 (2 outages after December 2014) for items that were currently not installed and require outage.

o Letter to NRC no later than 90 days after Spring 2018 outage.

  • Hatch 2:

o December 2016 (2 years after ESEP report issuance) for items that were currently not installed and do not require outage.

o Spring outage 2017 (2 outages after December 2014) for items that were currently not installed and require outage.

o Letter to NRC no later than 90 days after Spring 2017 outage.

Notes from the Reviewer:

  • Hatch 1 & 2 ESEL contain about 70 items, in total, that are located in either drywells or locked high radiation areas. The licensee dispositioned of these items by sampling of other/similar equipment, referring to recent previous walkdowns performed and other applicable methods. The staff finds this approach reasonable for this interim evaluation.
  • The licensee stated that items that have not been installed or for which FLEX modifications have not been completed, as of the time of the ESEP report, will be evaluated after installation or modification per the SMA methodology. The staff finds the licensee Regulatory Commitment described above to be a reasonable approach for the interim evaluation.

Deviation(s) or Deficiency(ies), and Resolution:

  • No deviations or deficiencies were identified.

Page 6

NTTF Recommendation 2.1 Expedited Seismic Evaluation Process Technical Review Checklist for Edwin I. Hatch Nuclear Plant, Units 1 & 2 The NRC staff concludes that the licensee:

  • listed inaccessible items Yes
  • committed to provide the results (e.g. walkdowns, walkbys, etc) of Yes the remaining inaccessible items consistent with the guidance
  • substitutions, if needed, were appropriately justified N/A VII. Modifications to Plant Equipment The licensee:
  • identified modifications for ESEL items necessary to achieve HCLPF No values that bound the RLGM (excluding mitigative strategies equipment (FLEX)), as specified in the guidance
  • provided a schedule to implement such modifications (if any), Yes consistent with the intent of the guidance
  • provided Regulatory Commitment to complete modifications Yes
  • provided Regulatory Commitment to report completion of Yes modifications The licenseewill provide a report for each unit based on the results of items yet to be installed which may or may not require modifications as follows:
  • Hatch 1:

o December 2016 (2 years after ESEP report issuance) for items currently not installed and do not require an outage.

o Spring outage 2018 (2 outages after December 2014) for items that were currently not installed and require outage.

o Letter to NRC no later than 90 days after Spring 2018 outage

  • Hatch 2:

o December 2016 (2 years after ESEP report issuance) for items that were currently not installed and do not require outage.

o Spring outage 2017 (2 outages after December 2014) for items that were currently not installed and require outage.

o Letter to NRC no later than 90 days after Spring 2017 outage Notes from the Reviewer:

  • The licensee stated that items that have not been installed or for which FLEX modifications have not been completed, as of the time of the ESEP report, will be evaluated after installation or modification per the SMA methodology. The staff finds the licensee Regulatory Commitment described above to be a reasonable approach for this interim evaluation.

Deviation(s) or Deficiency(ies), and Resolution:

  • No deviations or deficiencies were identified.

The NRC staff concludes that the licensee:

  • identified plant modifications necessary to achieve the target seismic N/A capacity
  • provided a schedule to implement the modifications (if any) Yes consistent with the guidance Page 7

NTTF Recommendation 2.1 Expedited Seismic Evaluation Process Technical Review Checklist for Edwin I. Hatch Nuclear Plant, Units 1 & 2 VIII. General

Conclusions:

The NRC staff assessed the licensees implementation of the ESEP guidance. Due to the interim applicability of the ESEP evaluations, use of the information for another application would require a separate NRC review and approval. Based on its review, the NRC staff concludes that the licensees implementation of the interim evaluation meets the intent of the guidance. The staff concludes that, through the implementation of the ESEP guidance, the licensee identified and evaluated the seismic capacity of certain key installed Mitigating Strategies equipment that is used for core cooling and containment functions to cope with scenarios that involve a loss of all AC power and loss of access to the ultimate heat sink to withstand a seismic event up to the Review Level Ground Motion. Hatch used their IPEEE RLE spectrum anchored at 0.3g as the RLGM for the ESEP. This approach deviates from guidance, but is acceptable for the interim evaluation, as noted in the checklist. The application of this NRC staff review is limited to the ESEP interim evaluation as part of NTTF Recommendation 2.1: Seismic activities. The licensee is performing safety enhancing modifications of the FLEX equipment and committed to complete actions not requiring an outage by December 2016, modifications requiring an outage no later than the Spring 2018 outage for Unit 1 and Spring 2017 outage for Unit 2, and provide a letter to NRC no later than 90 days after each units outage.

In summary, the licensee, by implementing the ESEP interim evaluation, has demonstrated additional assurance which supports continued plant safety while the longer-term seismic evaluation is completed to support regulatory decision making. The NRC staff concludes that the licensee responded appropriately to Enclosure 1, Item (6) of the 50.54(f) letter, dated March 12, 2012, for Edwin I Hatch Nuclear Plant, Units 1 and 2.

Technical Reviewers: David Heezel, On Yee, Ching Ng, Robert Hsu, Sunwoo Park, Ricardo Rodriguez, Joseph Braverman(NRC Consultant)