{{#Wiki_filter:Catawba Nuclear Station JPM A May 201 5 NRC Exam PAGE 1 OF 9  
{{#Wiki_filter:Catawba Nuclear Station JPM A May 2015 NRC Exam JPM A PAGE 1 OF 9


JPM A     
Catawba Nuclear Station JPM A May 2015 NRC Exam EVALUATION SHEET Task:                Emergency Borate the Reactor Coolant System Alternate Path:      Yes Facility JPM #:      NV-017 Safety Function:     1


Catawba Nuclear Station JPM A May 201 5 NRC Exam PAGE 2 OF 9 EVALUATION SHEET Task: Emergency Borate the Reactor Coolant System Alternate Path:
==Title:==
Yes  Facility JPM #:
Reactivity Control K/A         004 A2.14     Ability to (a) predict the impacts of the following malfunctions or operations on the CVCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Emergency Boration Rating(s):   3.8 / 3.9     CFR:       41.5 / 43/5 / 45/3 / 45/5 Preferred Evaluation Location:                         Preferred Evaluation Method:
NV-017  Safety Function: 1 Title: Reactivity Control K/A 00 4 A 2.14 Ability to (a) predict the impacts of the following malfunctions or operations on the CVCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Emergency Boration Rating(s):
Simulator       X     In-Plant                         Perform               X     Simulate
3.8 / 3.9 CFR: 41.5 / 43/5 / 45/3 / 45/5   Preferred Evaluation Location:
 
Preferred Evaluation Method:
==References:==
Simulator X In-Plant   Perform X Simulate   References
EP/1/A/5000/FR-S.1 (Nuclear Power Generation/ATWS) rev. 22 Task Standard:       One NV pump running with its suction aligned to the FWST and isolated from the VCT.
: EP/1/A/5000/FR
Validation Time: 5 minutes                             Time Critical:           Yes         No     X
-S.1 (Nuclear Power Generation/ATW S) rev. 22   Task Standard:
===========================================================================
One NV pump running with its suction aligned to the FWST and isolated from the VCT. Validation Time:
Applicant:                                                                     Time Start: __________
5 minutes   Time Critical:
NAME___________________________ Docket #_______________ Time Finish: __________
Yes No X ===========================================================================
Performance Rating:                                                             Performance Time _____
Applicant:
SAT ____ UNSAT ____
Time Start:   ______
Examiner: _____________________________                 _____________________________/________
____ NAME___________________________
NAME                                       SIGNATURE                 DATE
Docket #_______________
===========================================================================
Time Finish: ________
COMMENTS PAGE 2 OF 9
__    Performance Rating:
 
SAT ____ UNSAT ____
Catawba Nuclear Station JPM A May 2015 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:
Performance Time ___
: 1.       ENSURE NRC Examination Security has been established.
__    Examiner: _____________________________
: 2.       Reset to IC #163
_____________________________/________
: 3.       Enter the password.
NAME SIGNATURE DATE ===========================================================================
: 4.       Select Yes on the INITIAL CONDITION RESET pop-up window.
COMMENTS Catawba Nuclear Station JPM A May 201 5 NRC Exam PAGE 3 OF 9  SIMULATOR OPERATOR INSTRUCTIONS:
: 5.       Ensure simulator setup per table below.
: 1. ENSURE NRC Examination Security has been established.
: 6.       Place simulator in RUN and acknowledge any alarms.
: 2. Reset to IC
: 7.       ENSURE Extra Operator is present in the simulator.
#163 3. Enter the password.
: 8.       Place simulator in FREEZE until Examiner cue is given.
: 4. Select "Yes" on the INITIAL CONDITION RESET pop
Instructor Action                 Final   Delay Ramp   Delete In Event MAL-IPX003A(REACTOR TRIP BKR A ACTIVE FAILURE)
-up window.
MAL-IPX003B (REACTOR TRIP BKR B ACTIVE FAILURE)
: 5. Ensure simulator setup per table below.
VLV-NV043F (NV236B BORIC ACID TO CHG 0
: 6. Place simulator in RUN and acknowledge any alarms.
PMP VLV FAIL TO POSITION)
: 7. ENSURE "Extra Operator" is present in the simulator.
MAL-MT-007 (LOSS OF TURBINE LUBE OIL ACTIVE PRESSURE)
: 8. Place simulator in FREEZE until Examiner cue is given
Instructor will act as the OATC and be manually inserting control rods when the simulator is placed in RUN.
. Instructor Action Final Delay Ramp Delete In Event MAL-IPX0 0 3A(REACTOR TRIP BKR A FAILURE) ACTIVE    MAL-IPX0 0 3B (REACTOR TRIP BKR B FAILURE) ACTIVE    VLV-NV043F (NV236B BORIC ACID TO CHG PMP VLV FAIL TO POSITION) 0    MAL-MT-007 (LOSS OF TURBINE LUBE OIL PRESSURE) ACTIVE    Instructor will act as the OATC and be manually inserting control rods when the simulator is placed in RUN.
PAGE 3 OF 9


REV. 0 PAGE 4 0F 9 Catawba Nuclear Station JPM A May 201 5 NRC Exam PAGE 4 OF 9  READ TO APPLICANT DIRECTION TO APPLICANT:
REV. 0                                                                   PAGE 4 0F 9 Catawba Nuclear Station JPM A May 2015 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
A valid reactor trip signal has been received
* A valid reactor trip signal has been received.
. The reactor will NOT trip automatically or manually
* The reactor will NOT trip automatically or manually.
. A Red Path for Subcriticality is in effect
* A Red Path for Subcriticality is in effect.
. The OATC is inserting rods manually
* The OATC is inserting rods manually.
. INITIATING CUES:
INITIATING CUES:
 
The Control Room Supervisor instructs you to initiate emergency boration, per EP/1/A/5000/FR-S.1, (Nuclear Power Generation/ATWS), step 4.
The Control Room Supervisor instructs you to initiate emergency boration, per EP/1/A/5000/FR
EXAMINER NOTE: After reading cue, provide the applicant with a copy of EP/1/A/5000/FR-S.1 pages 3-5.
-S.1, (Nuclear Power Generation/ATWS), step 4. EXAMINER NOTE
PAGE 4 OF 9
:   After reading cue, provide the applicant with a copy of EP/1/A/5000/FR
-S.1 pages 3-5.
Catawba Nuclear Station JPM A May 201 5 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 5 0F 9   START TIME: _______
STEP 1:  4. Initiate emergency boration of NC System as follows:
: a. Ensure at least one NV pump
- ON. STANDARD:  Applicant verifies red "ON" light lit for "NV PMP 1A" or "1B" (1MC
-10). COMMENTS: 


Catawba Nuclear Station JPM A May 2015 NRC Exam STEP/STANDARD                                SAT/UNSAT START TIME: _______
STEP 1: 4. Initiate emergency boration of NC System as follows:
___ SAT
___ SAT
___ UNSAT STEP 2   4. b. OPEN 1NV
: a. Ensure at least one NV pump - ON.
-236B (Boric Acid To NV Pumps Suct).
___ UNSAT STANDARD:
STANDARD:   Applicant depresses the red "OPEN" pushbutton for 1NV
Applicant verifies red ON light lit for NV PMP 1A or 1B (1MC-10).
-236B and verifies the red "OPEN" light remains dark and the green "CLSD" light remains lit on 1M C-10. 1NV-236B remains closed.
COMMENTS:
STEP 2 4. b. OPEN 1NV-236B (Boric Acid To NV Pumps Suct).
___ SAT STANDARD:
___UNSAT Applicant depresses the red OPEN pushbutton for 1NV-236B and verifies the red OPEN light remains dark and the green CLSD light remains lit on 1MC-10. 1NV-236B remains closed.
COMMENTS:
STEP 3 4. c. Ensure both boric acid transfer pump switches - IN THE "ON" POSITION.                                            ___ SAT STANDARD:                                                                ___ UNSAT Applicant rotates the switches for B/A XFER PMP 1A and B/A XFER PMP 1B to the ON position.
COMMENTS:
COMMENTS:
___ SAT
PAGE 5 0F 9
___UNSAT STEP 3  4. c. Ensure both boric acid transfer pump switches - IN THE "ON" POSITION.
 
STANDARD:  Applicant rotates the switches for "B/A XFER PMP 1A" and "B/A XFER PMP 1B" to the "ON" position.
 
COMMENTS: 
 
___ SAT  ___ UNSAT 
 
Catawba Nuclear Station JPM A May 201 5 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 6 0F 9   STEP 4  4. d. Verify emergency boration flow
- GREATER THAN OR EQUAL TO 30 GPM.
 
STANDARD:  Applicant verifies "EMER BORATE FLOW" (1NVP5440) indicates 0 gpm (1MC-5) and transitions to the RNO.
 
EXAMINER NOTE:
This begins the alternate path of this JPM.


Catawba Nuclear Station JPM A May 2015 NRC Exam STEP/STANDARD                        SAT/UNSAT STEP 4 4. d. Verify emergency boration flow - GREATER THAN OR      ___ SAT EQUAL TO 30 GPM.
___ UNSAT STANDARD:
Applicant verifies EMER BORATE FLOW (1NVP5440) indicates 0 gpm (1MC-5) and transitions to the RNO.
EXAMINER NOTE: This begins the alternate path of this JPM.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT STEP 5    4. d. RNO d. Align NV pump suction to FWST as follows: 1) OPEN the following valves:
STEP 5    4. d. RNO d. Align NV pump suction to FWST as follows:   CRITICAL STEP
1NV-252A (NV Pumps Suct From FWST)   1NV-253B (NV Pumps Suct From FWST).
: 1) OPEN the following valves:
STANDARD: Applicant depresses the red OPEN pushbuttons for 1NV
___ SAT
-252A and 1NV-253B This step is critical to align borated water to the suction of the charging pumps. Only ONE of the valves open ed meets the Critical Step criteria.
* 1NV-252A (NV Pumps Suct From FWST)
___ UNSAT
* 1NV-253B (NV Pumps Suct From FWST).
STANDARD:
Applicant depresses the red OPEN pushbuttons for 1NV-252A and 1NV-253B This step is critical to align borated water to the suction of the charging pumps. Only ONE of the valves opened meets the Critical Step criteria.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT 
PAGE 6 0F 9
 
Catawba Nuclear Station JPM A May 201 5 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 7 0F 9   STEP 6  4. d. RNO d. 2) CLOSE the following valves:
1NV-188A (VCT Otlt Isol) 1NV-189B (VCT Otlt Isol).
STANDARD:  Applicant depresses the green CLSD pushbutton fo r 1NV-188A and 1NV-189B.
This step is critical to prevent borated water from going to the VCT instead of the suction of the charging pumps
. Closing only ONE of the valves meets the intent of the Critical Step criteria.


Catawba Nuclear Station JPM A May 2015 NRC Exam STEP/STANDARD                                  SAT/UNSAT STEP 6 4. d. RNO d. 2) CLOSE the following valves:                          CRITICAL STEP
* 1NV-188A (VCT Otlt Isol)
___ SAT
* 1NV-189B (VCT Otlt Isol).
___ UNSAT STANDARD:
Applicant depresses the green CLSD pushbutton for 1NV-188A and 1NV-189B.
This step is critical to prevent borated water from going to the VCT instead of the suction of the charging pumps. Closing only ONE of the valves meets the intent of the Critical Step criteria.
COMMENTS:
STEP 7 4. e. Verify the following charging line isolation valves - OPEN:
___ SAT
* 1NV-312A (Chrg Line Cont Isol) follows:
___ UNSAT
* 1NV-314B (Chrg Line Cont Isol).
STANDARD:
Applicant verifies the red OPEN lights lit and green CLSD lights dark on 1NV-312A and 1NV-314B.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT STEP 7   4. e. Verify the following charging line isolation valves
PAGE 7 0F 9
- OPEN:  1NV-312A (Chrg Line Cont Isol) follows:
1NV-314B (Chrg Line Cont Isol).


STANDARD: Applicant verifies the red OPEN lights lit and green CLSD lights dark on 1NV-312A and 1NV
Catawba Nuclear Station JPM A May 2015 NRC Exam STEP/STANDARD                        SAT/UNSAT STEP 8 4. f. Verify Pzr pressure - LESS THAN 2335 PSIG.
-314B.
___ SAT STANDARD:
___ UNSAT Applicant verifies PZR pressure instruments (1NCP5161, 1NCP5150, 1NCP5170 and 1NCP5171) indicate less than 2335 psig (1MC-10)
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT 
END OF TASK STOP TIME ________
PAGE 8 0F 9


Catawba Nuclear Station JPM A May 201 5 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 8 0F 9  STEP 8  4. f. Verify Pzr pressure
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
- LESS THAN 2335 PSIG.
May 2015 NRC Initial License Exam JPM A INITIAL CONDITIONS:
STANDARD: Applicant verifies PZR pressure instruments (1NCP5161, 1NCP5150, 1NCP5170 and 1NCP5171) indicate less than 2335 psig (1MC
* A valid reactor trip signal has been received.
-10) COMMENTS:
* The reactor will NOT trip automatically or manually.
END OF TASK
* A Red Path for Subcriticality is in effect.
___ SAT  ___ UNSAT 
* The OATC is inserting rods manually.
INITIATING CUES:
The Control Room Supervisor instructs you to initiate emergency boration, per EP/1/A/5000/FR-S.1, (Nuclear Power Generation/ATWS), step 4.


STOP TIME ________
Catawba Nuclear Station JPM B May 2015 NRC Exam JPM B PAGE 1 OF 14
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
May 2015 NRC Initial License Exam JPM A       


INITIAL CONDITIONS:
Catawba Nuclear Station JPM B May 2015 NRC Exam EVALUATION SHEET Task:               Transfer the Emergency Core Coolant System to the Cold Leg Recirculation Alternate Path:     Yes Facility JPM #:      NI-088 Safety Function:    2
A valid reactor trip signal has been received
. The reactor will NOT trip automatically or manually
. A Red Path for Subcriticality is in effect
. The OATC is inserting rods manually
. INITIATING CUES:


The Control Room Supervisor instructs you to initiate emergency boration, per EP/1/A/5000/FR
==Title:==
-S.1, (Nuclear Power Generation/ATWS),  step 4.
Emergency Core Cooling System (ECCS)
Catawba Nuclear Station JPM B May 201 5 NRC Exam PAGE 1 OF 14 
K/A         006 A4.07      Ability to manually operate and/or monitor in the control room: ECCS pumps and valves.
Rating(s):  4.4 / 4.4      CFR:      41.7 / 45.5 to 45.8 Preferred Evaluation Location:                        Preferred Evaluation Method:
Simulator      X      In-Plant                        Perform            X      Simulate


JPM B 
==References:==
EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) rev. 29 Task Standard:      EP/1/A/5000/ES-1.3 Transfer to Cold Leg Recirculation) step 6 is performed and the 1A and 1B NV (Chemical Volume and Control System) and NI (Safety Injection System) pumps are secured.
Validation Time: 15 minutes                            Time Critical:        Yes        No    X
===========================================================================
Applicant:                                                                  Time Start: __________
NAME___________________________ Docket #_______________ Time Finish: __________
Performance Rating:                                                          Performance Time _____
SAT ____ UNSAT ____
Examiner: _____________________________                _____________________________/________
NAME                                    SIGNATURE                DATE
===========================================================================
COMMENTS PAGE 2 OF 14


Catawba Nuclear Station JPM B May 201 5 NRC Exam PAGE 2 OF 14  EVALUATION SHEET Task: Transfer the Emergency Core Coolant System to the Cold Leg Recirculation Alternate Path:
Catawba Nuclear Station JPM B May 2015 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:
Yes    Facility JPM #:
NI-088  Safety Function:
2 Title: Emergency Core Cooling System (ECCS)
K/A  006 A4.07 Ability to manually operate and/or monitor in the control room:  ECCS pumps and valves.
Rating(s):
4.4 / 4.4 CFR: 41.7 / 45.5 to 45.8 Preferred Evaluation Location:
Preferred Evaluation  Method:
Simulator X In-Plant  Perform X Simulate  References
: EP/1/A/5000/ES
-1.3 (Transfer to Cold Leg Recirculation) rev. 29  Task Standard:
EP/1/A/5000/ES
-1.3 Transfer to Cold Leg Recirculation) step 6 is performed and the 1A and 1B NV (Chemical Volume and Control System) and NI (Safety Injection System) pumps are secured. Validation Time:
15 minutes Time Critical:
Yes  No X ===========================================================================
Applicant:
Time Start:    ______
____ NAME___________________________
Docket #_______________
Time Finish:  ________
__    Performance Rating:
SAT ____  UNSAT ____
Performance Time ___
__    Examiner: _____________________________
_____________________________/________
NAME  SIGNATURE DATE ===========================================================================
COMMENTS Catawba Nuclear Station JPM B May 201 5 NRC Exam PAGE 3 OF 14  SIMULATOR OPERATOR INSTRUCTIONS:
: 1. ENSURE NRC Examination Security has been established.
: 1. ENSURE NRC Examination Security has been established.
: 2. Reset to IC
: 2. Reset to IC #164
#16 4 3. Enter the password.
: 3. Enter the password.
: 4. Select "Yes" on the INITIAL CONDITION RESET pop
: 4. Select Yes on the INITIAL CONDITION RESET pop-up window.
-up window.
: 5. Ensure simulator setup per table below.
: 5. Ensure simulator setup per table below.
: 6. Place simulator in RUN and acknowledge any alarms.
: 6. Place simulator in RUN and acknowledge any alarms.
: 7. ENSURE "Extra Operator" is present in the simulator.
: 7. ENSURE Extra Operator is present in the simulator.
: 8. Place simulator in FREEZE until Examiner cue is given
: 8. Place simulator in FREEZE until Examiner cue is given.
. Instructor Action Final Delay Ramp Delete In Event VLV-NI037F (NI184B CNMT SUMP LINE 1B ISOL (STEM) FAIL TO POSITION) 0    MAL-NC013A (NC COLD LEG A LEAK) 27.5     VLV-ND005F (ND28A ND HX A OUTLET TO CHARG A B FAIL TO POSITION.
Instructor Action               Final   Delay Ramp Delete In Event VLV-NI037F (NI184B CNMT SUMP LINE 1B 0
0 PAGE 4 0F 14 Catawba Nuclear Station JPM B May 201 5 NRC Initial License Exam PAGE 4 OF 14  READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
ISOL (STEM) FAIL TO POSITION)
MAL-NC013A (NC COLD LEG A LEAK)               27.5 VLV-ND005F (ND28A ND HX A OUTLET TO 0
CHARG AB FAIL TO POSITION.
PAGE 3 OF 14
 
PAGE 4 0F 14 Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
A LOCA has occurred on Unit 1
* A LOCA has occurred on Unit 1.
.
INITIATING CUES:
INITIATING CUES:
1AD-9, E/8 'FWST LO
* 1AD-9, E/8 FWST LO-LO LEVEL annunciator is lit and the Control Room Supervisor instructs you, as the BOP, to transfer to Cold Leg Recirculation using EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) step 6.
-LO LEVEL' annunciator is lit and the Control Room Supervisor instructs you, as the BOP, to transfer to Cold Leg Recirculation using EP/1/A/5000/ES
EXAMINER NOTE: After reading the cue, provide the applicant with a copy of EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) complete through step 8 with step 6 flagged.
-1.3 (Transfer to Cold Leg Recirculation) step 6.
PAGE 4 OF 14
EXAMINER NOTE
:   After reading the cue, provide the applicant with a copy of EP/1/A/5000/ES
-1.3 (Transfer to Cold Leg Recirculation
) complete through step 8 with step 6 flagged.


Catawba Nuclear Station JPM B May 201 5 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 14  START TIME: _______
Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD                               SAT/UNSAT START TIME: _______
STEP 1:   6. WHEN FWST level decreases to 5%
STEP 1: 6. WHEN FWST level decreases to 5% (1AD-9, E/8 "FWST LO-LO LEVEL"), THEN align NV and NI Systems for recirc     ___ SAT as follows:
(1AD-9, E/8 "FWST LO-LO LEVEL"), THEN align NV and NI Systems for recirc as follows:
___ UNSAT
: a. Ensure Enclosure 1 (Foldout Page) is monitored.
: a. Ensure Enclosure 1 (Foldout Page) is monitored.
STANDARD: Applicant reads the step.
STANDARD:
Examiner Cue:
Applicant reads the step.
"The OATC will monitor Enclosure 1
Examiner Cue: The OATC will monitor Enclosure 1 COMMENTS:
COMMENTS:       ___ SAT
NOTE CSF should not be implemented until directed by this procedure.
___ UNSAT    NOTE CSF should not be implemented until directed by this procedure.
STEP 2     b. Verify at least one of the following annunciators - LIT: ___ SAT
STEP 2         b. Verify at least one of the following annunciators  
* 1AD-20, B/2 "CONT. SUMP LEVEL >2.5 ft"               ___UNSAT OR
- LIT:   1AD-20, B/2 "CONT. SUMP LEVEL >2.5 ft"   OR   1AD-21, B/2 "CONT. SUMP LEVEL >2.5 ft".
* 1AD-21, B/2 "CONT. SUMP LEVEL >2.5 ft".
STANDARD:   Applicant determines that one or both annunciators are lit.
STANDARD:
Applicant determines that one or both annunciators are lit.
COMMENTS:
COMMENTS:
___ SAT    ___UNSAT 
PAGE 5 0F 14
 
Catawba Nuclear Station JPM B May 201 5 NRC Initial License Exam STEP/STANDARD SAT/UNSAT  PAGE 6 0F 14   STEP 3        c. Verify both ND pumps
- ON. STANDARD:  Applicant determines that only 1 ND pump is running and transitions to the RNO


Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD                          SAT/UNSAT STEP 3          c. Verify both ND pumps - ON.
___ SAT STANDARD:
___ UNSAT Applicant determines that only 1 ND pump is running and transitions to the RNO COMMENTS:
STEP 4 6.c. RNO c. Perform the following:                                ___ SAT
: 1) IF 1NI-185A (ND Pump 1A Cont Sump Suct) is  ___ UNSAT open, THEN start ND pump 1A.
STANDARD:
Applicant determines that ND PUMP 1A is on by verifying the red ON light is lit on 1MC-11.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT STEP 4  6.c. RNO c. Perform the following:
STEP 5                    2) IF 1NI-184B (ND Pump 1B Cont Sump Suct) is open, THEN start ND pump 1B.               ___ SAT STANDARD:                                                               ___ UNSAT Applicant determines that 1NI-184B is not open by verifying the green CLSD light is lit on 1MC-11 and determines that the step is not applicable.
: 1) IF 1NI-185A (ND Pump 1A Cont Sump Suct) is open, THEN start ND pump 1A. STANDARD: Applicant determines that ND PUMP 1A is on by verifying the red ON light is lit on 1MC-11.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT    STEP 5                      2) IF 1NI-184B (ND Pump 1B Cont Sump Suct) is open, THEN start ND pump 1B. STANDARD:  Applicant determines that 1NI-184B is not open by verifying the green CLSD light is lit on 1MC-11 and determines that the step is not applicable.
PAGE 6 0F 14


Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD                              SAT/UNSAT STEP 6                3) IF any ND pump running with suction aligned to sump, THEN GO TO Step 6.d.                    ___ SAT STANDARD:                                                                ___ UNSAT Applicant determines that ND Pump 1A is running with suction aligned to the sump and proceeds to step 6.d.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT Catawba Nuclear Station JPM B May 201 5 NRC Initial License Exam STEP/STANDARD SAT/UNSAT  PAGE 7 0F 14  STEP 6                      3) IF any ND pump running with suction aligned to sump, THEN GO TO Step 6.d. STANDARD:  Applicant determines that ND Pump 1A is running with suction aligned to the sump and proceeds to step 6.d.
STEP 7 6. d. Ensure the following valves - CLOSED:                       CRITICAL STEP
 
* 1ND-32A (ND Train 1A Hot Leg Inj Isol)
COMMENTS:        ___ SAT  ___ UNSAT STEP 7  6. d. Ensure the following valves  
* 1ND-65B (ND Train 1B Hot Leg Inj Isol).             ___ SAT STANDARD:                                                               ___ UNSAT Applicant depresses the green CLOSE pushbuttons for 1ND-32A and 1ND-65B on 1MC-11.
- CLOSED:   1ND-32A (ND Train 1A Hot Leg Inj Isol) 1ND-65B (ND Train 1B Hot Leg Inj Isol). STANDARD: Applicant depresses the green CLOSE pus hbuttons for 1ND
-32A and 1ND-65B on 1MC-11.
This step is critical to prevent pump run out should only one ND pump be running.
This step is critical to prevent pump run out should only one ND pump be running.
Examiner NOTE: Only one of the valves need to be closed to satisfy the critical step since the valves are in series.
COMMENTS:
PAGE 7 0F 14


Examiner NOTE: Only one of the valves need to be closed to satisfy the critical step since the valves are in series.
Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD                              SAT/UNSAT STEP 8 6. e. Isolate NI Pump Miniflow as follows:
COMMENTS:     CRITICAL STEP   ___ SAT   ___ UNSAT
___ SAT
: 1) Verify NC pressure - LESS THAN 1620 PSIG.
___ UNSAT STANDARD:
Applicant determines that NC (Reactor Coolant System) pressure is less than 1620 psig.
COMMENTS:
STEP 9        2) Ensure the following valves - CLOSED:
___ SAT
* 1NI-115A (NI Pump 1A Miniflow Isol)
* 1NI-144A (NI Pump 1B Miniflow Isol).              ___ UNSAT STANDARD:
Applicant determines that the green CLSD lights are lit for 1NI-115A and 1NI-144A on 1MC-11.
COMMENTS:
STEP 10      3) Ensure "PWR DISCON FOR 1NI-147B" switch in "ENABLE".                                            ___ SAT STANDARD:                                                              ___ UNSAT Applicant determines that the PWR DISCON FOR 1NI-147B is in ENABLE on 1MC-11.
COMMENTS:
PAGE 8 0F 14


Catawba Nuclear Station JPM B May 201 5 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 14  STEP 6. e. Isolate NI Pump Miniflow as follows:
Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD                               SAT/UNSAT STEP 11      4) Ensure 1NI-147B (NI Miniflow Hdr To FWST Isol) -
: 1) Verify NC pressure
CLOSED.                                                ___ SAT STANDARD:                                                                ___ UNSAT Applicant determines that the green CLSD light is lit for 1NI-147B on 1MC-11.
- LESS THAN 1620 PSIG.
COMMENTS:
STANDARD: Applicant determines that NC (Reactor Coolant System) pressure is less than 1620 psig.
STEP 12 6. f. Verify at least one of the following NV pumps miniflow valves - CLOSED:                                           ___ SAT
* 1NV-203A (NV Pumps A&B Recirc Isol)                   ___ UNSAT OR
* 1NV-202B (NV Pmps A&B Recirc Isol).
STANDARD:
Applicant determines that the green CLSD lights are lit for 1NV-203A &
1NV-202B on 1MC-10.
COMMENTS:
STEP 13  g. Ensure 1NI-334B (NI Pump Suct X-Over From ND) - OPEN.
___ SAT STANDARD:
___ UNSAT Applicant determines the red OPEN light is lit for 1NI-334B on 1MC-11.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT    STEP 9           2) Ensure the following valves
PAGE 9 0F 14
- CLOSED:      1NI-115A (NI Pump 1A Miniflow Isol)    1NI-144A (NI Pump 1B Miniflow Isol). STANDARD:  Applicant determines that the green CLSD lights are lit for 1NI
-115A and 1NI-144A on 1MC-11. COMMENTS:
___ SAT  ___ UNSAT    STEP 10          3) Ensure "PWR DISCON FOR 1NI
-147B" switch in "ENABLE". STANDARD:  Applicant determines that the "PWR DISCON FOR 1NI
-147B" is in "ENABLE" on 1MC-11. COMMENTS:
___ SAT  ___ UNSAT 


Catawba Nuclear Station JPM B May 201 5 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 14   STEP 11          4) Ensure 1NI
Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD                             SAT/UNSAT STEP 14   h. OPEN the following valves:
-147B (NI Miniflow Hdr To FWST Isol)  
___ SAT
- CLOSED. STANDARD: Applicant determines that the green CLSD light is lit for 1NI
* 1NI-332A (NI Pump Suct X-Over From ND)
-147B on 1MC-11. COMMENTS:       ___ SAT  ___ UNSAT STEP 12  6. f. Verify at least one of the following NV pumps miniflow valves - CLOSED:   1NV-203A (NV Pumps A&B Recirc Isol)
* 1NI-333B (NI Pump Suct From ND).                 ___ UNSAT STANDARD:
OR  1NV-202B (NV Pmps A&B Recirc Isol). STANDARD: Applicant determines that the green CLSD lights are lit for 1NV
Applicant depresses the red OPEN pushbuttons for 1NI-332A and 1NI-333B on 1MC-11.
-203A & 1NV-202B on 1MC-10.
COMMENTS:
STEP 15    i. Align ND discharge to suction of NI and NV pumps as follows:                                              ___ SAT
: 1) OPEN 1ND-28A (ND Supply To NV & 1A NI Pmps).       ___ UNSAT STANDARD:
Applicant depresses the red OPEN pushbutton for 1ND-28A on 1MC-11 and determines that the valve will not open and continues.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT    STEP 13    g. Ensure 1NI-334B (NI Pump Suct X-Over From ND)
PAGE 10 0F 14
- OPEN. STANDARD:  Applicant determines the red OPEN light is lit for 1NI
-334B on 1MC
-11. COMMENTS:        ___ SAT  ___ UNSAT 


Catawba Nuclear Station JPM B May 201 5 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 10 0F 14    STEP 14      h. OPEN the following valves:
Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD                                   SAT/UNSAT STEP 16      2) OPEN 1NI-136B (ND Supply To NI Pump 1B).
1NI-332A (NI Pump Suct X
___ SAT STANDARD:
-Over From ND)  1NI-333B (NI Pump Suct From ND).
___ UNSAT Applicant depresses the red OPEN pushbutton for 1NI-136B on 1MC-11, determines that the valve will not open and proceeds to the next step.
STANDARD: Applicant depresses the red OPEN pushbuttons for 1NI
Examiner NOTE: 1NI-136B will not open due to an interlock with 1NI-184B COMMENTS:
-332A and 1NI
STEP 17    j. Verify at least one ND train aligned to provide suction to NV and NI as follows:                                           ___ SAT
-333B on 1MC
* A Train:                                                  ___ UNSAT
-11. COMMENTS:
* 1A ND pump running
___ SAT  ___ UNSAT    STEP 15      i. Align ND discharge to suction of NI and NV pumps as follows: 1) OPEN 1ND-28A (ND Supply To NV
* 1ND-28A (ND Supply To NV & 1A NI Pmps) -
& 1A NI Pmps).
OPEN.
STANDARD: Applicant depresses the red OPEN pushbutton for 1ND-28A on 1MC
STANDARD:
-11 and determines that the valve will not open and continues.
Applicant determines no train can be aligned to provide suction to NV and NI and proceeds to the RNO.
EXAMINER NOTE: This begins the alternate path of this JPM.
COMMENTS:
PAGE 11 0F 14


COMMENTS:       ___ SAT   ___ UNSAT
Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD                                  SAT/UNSAT STEP 18  6.j. RNO j. Perform the following:
___ SAT
: 1) IF either valve is in intermediate position, THEN allow 20 seconds for valve to open.              ___ UNSAT STANDARD:
Applicant determines that this step does not apply.
COMMENTS:
STEP 19              2) IF either valve is open AND its associated ND pump on, THEN GO TO Step 6.k.                    ___ SAT STANDARD:                                                                  ___ UNSAT Applicant determines that this step does not apply.
COMMENTS:
PAGE 12 0F 14


Catawba Nuclear Station JPM B May 201 5 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 11 0F 14  STEP 16        2) OPEN 1NI-136B (ND Supply To NI Pump 1B). STANDARD: Applicant depresses the red OPEN pushbutton for 1NI
Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD                             SAT/UNSAT STEP 20                3) IF both A train and B train unavailable, THEN  CRITICAL trip all NV and NI pumps.                       STEP STANDARD:                                                               ___ SAT Applicant determines both A train and B train are unavailable and     ___ UNSAT depresses the green OFF pushbuttons for NV PMP 1A, NV PUMP 1B, NI PMP 1A and NI PUMP 1B.
-136B on 1MC
This step is critical to protect the NV and NI pumps from damage from loss of suction and allow them to be available later when the FWST has been refilled.
-11, determines that the valve will not open and proceeds to the next step. Examiner NOTE:  1NI-136B will not open due to an interlock with 1NI-184B  COMMENTS:
EXAMINER CUE: Another operator will complete ES-1.3. This JPM is complete.
___ SAT  ___ UNSAT     STEP 17      j. Verify at least one ND train aligned to provide suction to NV and NI as follows:
COMMENTS:
A Train:    1A ND pump running 1ND-28A (ND Supply To NV & 1A NI Pmps)
END OF TASK STOP TIME ________
- OPEN. STANDARD:  Applicant determines no train can be aligned to provide suction to NV and NI and proceeds to the RNO.
PAGE 13 0F 14
EXAMINER NOTE: This begins the alternate path of this JPM.
COMMENTS:       ___ SAT  ___ UNSAT 


Catawba Nuclear Station JPM B May 201 5 NRC Initial License Exam STEP/STANDARD SAT/UNSAT  PAGE 12 0F 14  STEP 1 8    6.j. RNO j. Perform the following:
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
: 1) IF either valve is in intermediate position, THEN allow 20 seconds for valve to open.
May 2015 NRC Initial License Exam JPM B INITIAL CONDITIONS:
STANDARD: Applicant determines that this step does not apply.
* A LOCA has occurred on Unit 1.
 
INITIATING CUES:
COMMENTS:        ___ SAT  ___ UNSAT STEP 19                      2)  IF either valve is open AND its  associated ND pump on, THEN GO TO Step 6.k. STANDARD:  Applicant determines that this step does not apply.
* 1AD-9, E/8 FWST LO-LO LEVEL annunciator is lit and the Control Room Supervisor instructs you, as the BOP, to transfer to Cold Leg Recirculation using EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) step 6.
 
COMMENTS:        ___ SAT  ___ UNSAT 
 
Catawba Nuclear Station JPM B May 201 5 NRC Initial License Exam STEP/STANDARD SAT/UNSAT  PAGE 13 0F 14  STEP 20                      3)  IF both A train and B train unavailable, THEN trip all NV and NI pumps. STANDARD:  Applicant determines both A train and B train are unavailable and depresses the green OFF pushbuttons for NV PMP 1A, NV PUMP 1B, NI PMP 1A and NI PUMP 1 B. This step is critical to protect the NV and NI pumps from damage from loss of suction and allow them to be available later when the FWST has been refilled.
EXAMINER CUE:  "Another operator will complete ES
-1.3. This JPM is complete."
COMMENTS:  END OF TASK CRITICAL STEP    ___ SAT  ___ UNSAT 


STOP TIME ________
Catawba Nuclear Station JPM C May 2015 NRC Exam JPM C PAGE 1 OF 10
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
May 201 5 NRC Initial License Exam JPM B   


INITIAL CONDITIONS:
Catawba Nuclear Station JPM C May 2015 NRC Exam EVALUATION SHEET Task:               Isolate Cold Leg Accumulators Following a Shutdown LOCA Alternate Path:     Yes Facility JPM #:    N/A Safety Function:    3
A LOCA has occurred on Unit 1
.
INITIATING CUES:   1AD-9, E/8 'FWST LO
-LO LEVEL' annunciator is lit and the Control Room Supervisor instructs you, as the BOP, to transfer to Cold Leg Recirculation using EP/1/A/5000/ES
-1.3 (Transfer to Cold Leg Recirculation) step 6.


Catawba Nuclear Station JPM C May 201 5 NRC Exam PAGE 1 OF 10 
==Title:==
Emergency Core Cooling System (ECCS)
K/A          006 A1.13    Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the ECCS controls including: Accumulator pressure (level, boron concentration)
Rating(s):  3.5 / 3.7    CFR:      41.5 / 45.5 Preferred Evaluation Location:                        Preferred Evaluation Method:
Simulator      X    In-Plant                        Perform            X      Simulate


JPM C 
==References:==
AP/1/A/5500/027 (Shutdown LOCA) rev. 38, Enclosure 14 (Isolating Cold Leg Accumulators)
Task Standard:      AP/1/A/5500/027 (Shutdown LOCA) Enclosure 14 (Isolating Cold Leg Accumulators) is performed and 1A & 1D Cold Leg Accumulators are isolated and 1B & 1C Cold Leg Accumulators are vented to containment.
Validation Time: 15 minutes                          Time Critical:        Yes          No    X
===========================================================================
Applicant:                                                                Time Start: __________
NAME___________________________ Docket #_______________ Time Finish: __________
Performance Rating:                                                        Performance Time _____
SAT ____ UNSAT ____
Examiner: _____________________________              _____________________________/________
NAME                                    SIGNATURE                  DATE
===========================================================================
COMMENTS PAGE 2 OF 10


Catawba Nuclear Station JPM C May 201 5 NRC Exam PAGE 2 OF 10  EVALUATION SHEET Task: Isolate Cold Leg Accumulators Following a Shutdown LOCA Alternate Path:
Catawba Nuclear Station JPM C May 2015 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:
Yes    Facility JPM #:
N/A  Safety Function:
3 Title: Emergency Core Cooling System (ECCS)
K/A  006 A1.13 Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the ECCS controls including:  Accumulator pressure (level, boron concentration)
Rating(s):
3.5  / 3.7 CFR: 41.5 / 45.5  Preferred Evaluation Location:
Preferred Evaluation  Method:
Simulator X In-Plant  Perform X Simulate  References
: AP/1/A/5500/027 (Shutdown LOCA) rev. 38, Enclosure 14 (Isolating Cold Leg Accumulators)
Task Standard:
AP/1/A/5500/027 (Shutdown LOCA) Enclosure 14 (Isolating Cold Leg Accumulators) is performed and 1A & 1D Cold Leg Accumulators are isolated and 1B & 1C Cold Leg Accumulators are vented to containment.
Validation Time:
1 5 minutes  Time Critical:
Yes  No X ===========================================================================
Applicant:
Time Start:    ______
____ NAME___________________________
Docket #_______________
Time Finish:  ________
__    Performance Rating:
SAT ____  UNSAT ____
Performance Time ___
__    Examiner: _____________________________
_____________________________/________
NAME  SIGNATURE DATE ===========================================================================
COMMENTS Catawba Nuclear Station JPM C May 201 5 NRC Exam PAGE 3 OF 10  SIMULATOR OPERATOR INSTRUCTIONS:
: 1. ENSURE NRC Examination Security has been established.
: 1. ENSURE NRC Examination Security has been established.
: 2. Reset to IC
: 2. Reset to IC # 165
# 165 3. Enter the password.
: 3. Enter the password.
: 4. Select "Yes" on the INITIAL CONDITION RESET pop
: 4. Select Yes on the INITIAL CONDITION RESET pop-up window.
-up window.
: 5. Ensure simulator setup per table below.
: 5. Ensure simulator setup per table below.
: 6. Place simulator in RUN and acknowledge any alarms.
: 6. Place simulator in RUN and acknowledge any alarms.
: 7. ENSURE "Extra Operator" is present in the simulator.
: 7. ENSURE Extra Operator is present in the simulator.
: 8. Place simulator in FREEZE until Examiner cue is given
: 8. Place simulator in FREEZE until Examiner cue is given.
. Instructor Action Final Delay Ramp Delete In Event PAGE 4 0F 10 Catawba Nuclear Station JPM C May 201 5 NRC Exam PAGE 4 OF 10  READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
Instructor Action               Final   Delay Ramp Delete In Event PAGE 3 OF 10
 
PAGE 4 0F 10 Catawba Nuclear Station JPM C May 2015 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 1 is in Mode 4.
* Unit 1 is in Mode 4.
Unit 1 shutdown was in progress for a refueling outage, when pressurizer pressure and level began to decrease uncontrollably.
* Unit 1 shutdown was in progress for a refueling outage, when pressurizer pressure and level began to decrease uncontrollably.
The CRS has entered AP/1/A/5500/027 (Shutdown LOCA) to address the reactor coolant system leak.
* The CRS has entered AP/1/A/5500/027 (Shutdown LOCA) to address the reactor coolant system leak.
 
INITIATING CUES:
INITIATING CUES:
The CRS has directed you to isolate the Unit 1 Cold Leg Accumulators by performing AP/1/A/5500/027 (Shutdown LOCA) Enclosure 14 (Isolating Cold Leg Accumulators).
* The CRS has directed you to isolate the Unit 1 Cold Leg Accumulators by performing AP/1/A/5500/027 (Shutdown LOCA) Enclosure 14 (Isolating Cold Leg Accumulators).
Power to all CLA discharge isolation valves has been restored per EP/1/A/5000/G
* Power to all CLA discharge isolation valves has been restored per EP/1/A/5000/G-1 (Generic Enclosures), Enclosure 9 (Power Alignment for CLA Valves).
-1 (Generic Enclosures), Enclosure 9 (Power Alignment for CLA Valves).
EXAMINER NOTE: After reading the cue, provide the applicant with a copy of AP/1/A/5500/027 Enclosure 14.
EXAMINER NOTE
PAGE 4 OF 10
:   After reading the cue, provide the applicant with a copy of AP/1/A/5500/027 Enclosure 14.


Catawba Nuclear Station JPM C May 201 5 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 10  START TIME: _______
Catawba Nuclear Station JPM C May 2015 NRC Exam STEP/STANDARD                                     SAT/UNSAT START TIME: _______
STEP 1:   1. Dispatch operator to restore power to all CLA discharge isolation valves. REFER TO EP/1/A/5000/G
STEP 1: 1. Dispatch operator to restore power to all CLA discharge isolation valves. REFER TO EP/1/A/5000/G-1 (Generic             ___ SAT Enclosures), Enclosure 9 (Power Alignment for CLA Valves)                                                         ___ UNSAT STANDARD:
-1 (Generic Enclosures), Enclosure 9 (Power Alignment for CLA Valves) STANDARD: Per initiating cue, the applicant should realize that this step is complete. Also valve indication for each of the CLA discharge isolation valves is available, due to power already being aligned by the AO.
Per initiating cue, the applicant should realize that this step is complete.
Also valve indication for each of the CLA discharge isolation valves is available, due to power already being aligned by the AO.
COMMENTS:
COMMENTS:
STEP 2: 2. Ensure S/I - RESET
___ SAT
___ SAT
___ UNSAT    STEP 2:   2. Ensure S/I
: a. ECCS
- RESET  a. ECCS b. D/G load sequencers
: b. D/G load sequencers                                           ___UNSAT
: c. IF AT ANY TIME a B/O occurs, THEN restart S/I equipment previously on.
: c. IF AT ANY TIME a B/O occurs, THEN restart S/I equipment previously on.
STANDARD:   Applicant verifies that the yellow ECCS and D/G load sequencer RESET lights are lit. Applicant acknowledges the If at any time statement.
STANDARD:
Applicant verifies that the yellow ECCS and D/G load sequencer RESET lights are lit. Applicant acknowledges the If at any time statement.
COMMENTS:
COMMENTS:
___ SAT    ___UNSAT 
PAGE 5 0F 10


Catawba Nuclear Station JPM C May 201 5 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 10  STEP 3:   3. WHEN power is aligned, THEN perform the following:
Catawba Nuclear Station JPM C May 2015 NRC Exam STEP/STANDARD                               SAT/UNSAT STEP 3: 3. WHEN power is aligned, THEN perform the following:               CRITICAL STEP
: a. CLOSE the following valves:
: a. CLOSE the following valves:
1NI-54A (C-Leg Accum A Disch Isol) 1NI-65B (C-Leg Accum B Disch Isol) 1NI-76A (C-Leg Accum C Disch Isol) 1NI-88B (C-Leg Accum D Disch Isol)
* 1NI-54A (C-Leg Accum A Disch Isol)                   ___ SAT
STANDARD: Applicant depresses the green CLOSE pushbutton for the valves listed, and verifies the green CLSD light lit and red OPEN light dark for valves 1NI
* 1NI-65B (C-Leg Accum B Disch Isol)
-54A & 1NI-88B. Applicant also verifies the red OPEN light lit and green CLSD light dark for valves 1NI
* 1NI-76A (C-Leg Accum C Disch Isol)                   ___ UNSAT
-65B & 1NI-76A and transitions to the RNO.
* 1NI-88B (C-Leg Accum D Disch Isol)
The critical part of this step is to close isolation valves 1NI
STANDARD:
-54A & 1NI-88B. The other 2 Cold Leg Accumulators will be vented to containment in subsequent steps in the RNO.
Applicant depresses the green CLOSE pushbutton for the valves listed, and verifies the green CLSD light lit and red OPEN light dark for valves 1NI-54A & 1NI-88B. Applicant also verifies the red OPEN light lit and green CLSD light dark for valves 1NI-65B & 1NI-76A and transitions to the RNO.
 
The critical part of this step is to close isolation valves 1NI-54A & 1NI-88B. The other 2 Cold Leg Accumulators will be vented to containment in subsequent steps in the RNO.
EXAMINER NOTE: This begins the alternate path of this JPM.
EXAMINER NOTE: This begins the alternate path of this JPM.
COMMENTS:
STEP 4: 3.RNOa. Perform the following:                                      ___ SAT
: 1) Ensure containment isolation signals - RESET:    ___ UNSAT
* Phase A
* Phase B STANDARD:
Applicant verifies that the yellow RESET lights are lit for both trains Phase A and Phase B isolations.
COMMENTS:
COMMENTS:
CRITICAL STEP  ___ SAT  ___ UNSAT STEP 4:  3.RNOa. Perform the following:
PAGE 6 0F 10
: 1)  Ensure containment isolation signals - RESET:  Phase A  Phase B  STANDARD:  Applicant verifies that the yellow RESET lights are lit for both trains Phase A and Phase B isolations.


Catawba Nuclear Station JPM C May 2015 NRC Exam STEP/STANDARD                              SAT/UNSAT STEP 5:              2) Ensure 1VI-77B (VI Cont Isol) - OPEN
___ SAT STANDARD:
___ UNSAT Applicant determines that the red OPEN light lit and green CLSD light dark for 1VI-77B.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT Catawba Nuclear Station JPM C May 201 5 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 7 0F 10    STEP 5:                       2)  Ensure 1VI
STEP 6:              3) IF VI pressure is less than 85 PSIG, THEN dispatch operator to ensure proper VI          ___ SAT compressor operation.
-77B (VI Cont Isol)
___ UNSAT STANDARD:
- OPEN  STANDARD:  Applicant determines that the red OPEN light lit and green CLSD light dark for 1VI
Applicant determines that VI pressure is ~ 90 PSIG. This step is N/A.
-77B.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT    STEP 6:                      3) IF VI pressure is less than 85 PSIG, THEN dispatch operator to ensure proper VI compressor operation.
STEP 7:             4) Vent any CLA which cannot be isolated as follows:                                     ___ SAT a) OPEN 1NI-47A (C-Leg Accum N2 Sup Cont     ___ UNSAT Isol)
 
STANDARD:
STANDARD:  Applicant determines that VI pressure is ~ 90 PSIG. This step is N/A.
Applicant depresses the red OPEN pushbutton for 1NI-47A and verifies the red OPEN light lit and green CLSD light dark.
 
COMMENTS:        ___ SAT  ___ UNSAT STEP 7:                       4) Vent any CLA which cannot be isolated as follows:
a) OPEN 1NI
-47A (C-Leg Accum N2 Sup Cont Isol) STANDARD: Applicant depresses the red OPEN pushbutton for 1NI
-47A and verifies the red OPEN light lit and green CLSD light dark.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT 
PAGE 7 0F 10


Catawba Nuclear Station JPM C May 201 5 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 10  STEP 8:                           b) Place breaker 1CB
Catawba Nuclear Station JPM C May 2015 NRC Exam STEP/STANDARD                           SAT/UNSAT STEP 8:                   b) Place breaker 1CB-1 (behind 1MC-6)(Key   CRITICAL
-1 (behind 1MC
                              #11) to - ON                             STEP STANDARD:                                                             ___ SAT Applicant lifts breaker 1CB-1 fully up to the ON position.         ___ UNSAT This step is critical to place power on Cold Leg Accumulator Nitrogen supply isolation valves for 1B and 1C CLAs which will be opened in the next step to allow venting the accumulators to containment.
-6)(Key #11) to - ON       STANDARD: Applicant lifts breaker 1CB
-1 fully up to the ON position.
This step is critical to place power on Cold Leg Accumulator Nitrogen supply isolation valves for 1B and 1C CLAs which will be opened in the next step to allow venting the accumulators to containment.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT    STEP 9:                           c) OPEN valve for CLA(s) to be vented:
STEP 9:                   c) OPEN valve for CLA(s) to be vented:     CRITICAL
1NI-50 (C-Leg Accum A N2 Supply Isol) 1NI-61 (C-Leg Accum B N2 Supply Isol) 1NI-72 (C-Leg Accum C N2 Supply Isol) 1NI-84 (C-Leg Accum D N2 Supply Isol)
* 1NI-50 (C-Leg Accum A N2 Supply Isol)   STEP
STANDARD: Applicant depresses the red OPEN pushbutton and verifies the r ed OPEN light lit and green CLSD light dark for 1NI
* 1NI-61 (C-Leg Accum B N2 Supply Isol)
-61 and 1NI
* 1NI-72 (C-Leg Accum C N2 Supply Isol) ___ SAT
-72.
* 1NI-84 (C-Leg Accum D N2 Supply Isol)
___ UNSAT STANDARD:
Applicant depresses the red OPEN pushbutton and verifies the red OPEN light lit and green CLSD light dark for 1NI-61 and 1NI-72.
This step is critical due to not being able to isolate these CLAs. If these CLAs are not vented to reduce the N2 overpressure, it could cause a hard bubble to form in the reactor coolant system as reactor coolant pressure continues to decrease.
This step is critical due to not being able to isolate these CLAs. If these CLAs are not vented to reduce the N2 overpressure, it could cause a hard bubble to form in the reactor coolant system as reactor coolant pressure continues to decrease.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT Catawba Nuclear Station JPM C May 201 5 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 10  STEP 10:                           d) CLOSE 1NI
PAGE 8 0F 10
-47A. STANDARD: Applicant depresses the green CLOSE pushbutton and verifies the green CLSD light lit and red OPEN light dark for 1NI
 
-47A. This step is critical to allow venting the 1B and 1C CLAs.
Catawba Nuclear Station JPM C May 2015 NRC Exam STEP/STANDARD                               SAT/UNSAT STEP 10:                     d) CLOSE 1NI-47A.                             CRITICAL STEP STANDARD:
COMMENTS:     CRITICAL STEP
___ SAT Applicant depresses the green CLOSE pushbutton and verifies the green CLSD light lit and red OPEN light dark for 1NI-47A.             ___ UNSAT This step is critical to allow venting the 1B and 1C CLAs.
___ SAT  ___ UNSAT STEP 11:                             e) OPEN 1NI
COMMENTS:
-83 (C-Leg Accums N2 Vent Ctrl) to depressurize affected CLA(s).
STEP 11:                     e) OPEN 1NI-83 (C-Leg Accums N2 Vent Ctrl)   CRITICAL to depressurize affected CLA(s).           STEP STANDARD:                                                                 ___ SAT Applicant rotates potentiometer for 1NI-83 clockwise to begin venting ___ UNSAT the 1B and 1C CLAs.
STANDARD: Applicant rotates potentiometer for 1NI
-83 clockwise to begin venting the 1B and 1C CLAs.
This step is critical to vent the 1B and 1C CLAs.
This step is critical to vent the 1B and 1C CLAs.
NOTE TO EVALUATOR: The time to fully vent the 1B & 1C CLAs would be approximately 30 minutes. The critical steps for this JPM have been met at this point and the JPM may be terminated at your discretion.
EVALUATOR CUE: Another operator will continue to vent the 1B and 1C Cold Leg Accumulators. This JPM is complete.
COMMENTS:
END OF TASK STOP TIME ________
PAGE 9 0F 10


NOTE TO EVALUATOR:  The time to fully vent the 1B & 1C CLAs would be approximately 30 minutes. The critical steps for this JPM have been met at this point and the JPM may be terminated at your discretion.
EVALUATOR CUE:  "Another operator will continue to vent the 1B and 1C Cold Leg Accumulators. This JPM is complete."
COMMENTS:  END OF TASK CRITICAL STEP    ___ SAT  ___ UNSAT STOP TIME ________
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
May 201 5 NRC Initial License Exam JPM C    
May 2015 NRC Initial License Exam JPM C INITIAL CONDITIONS:
* Unit 1 is in Mode 4.
* Unit 1 shutdown was in progress for a refueling outage, when pressurizer pressure and level began to decrease uncontrollably.
* The CRS has entered AP/1/A/5500/027 (Shutdown LOCA) to address the reactor coolant system leak.
INITIATING CUES:
* The CRS has directed you to isolate the Unit 1 Cold Leg Accumulators by performing AP/1/A/5500/027 (Shutdown LOCA) Enclosure 14 (Isolating Cold Leg Accumulators).
* An AO has been dispatched to restore power to all CLA discharge isolation valves per EP/1/A/5000/G-1 (Generic Enclosures), Enclosure 9 (Power Alignment for CLA Valves).


INITIAL CONDITIONS:
Catawba Nuclear Station JPM D May 2015 NRC Exam JPM D PAGE 1 OF 14
Unit 1 is in Mode 4.
Unit 1 shutdown was in progress for a refueling outage, when pressurizer pressure and level began to decrease uncontrollably.
The CRS has entered AP/1/A/5500/027 (Shutdown LOCA) to address the reactor coolant system leak.


INITIATING CUES:
Catawba Nuclear Station JPM D May 2015 NRC Exam EVALUATION SHEET Task:               Establish NC system Bleed and Feed per EP/1/A/5000/FR-H.1 Alternate Path:      Yes Facility JPM #:      NC-046 Safety Function:    4P
The CRS has directed you to isolate the Unit 1 Cold Leg Accumulators by performing AP/1/A/5500/027 (Shutdown LOCA) Enclosure 14 (Isolating Cold Leg Accumulators). An AO has been dispatched to restore power to all CLA discharge isolation valves per EP/1/A/5000/G
-1 (Generic Enclosures), Enclosure 9 (Power Alignment for CLA Valves).


Catawba Nuclear Station JPM D May 201 5 NRC Exam PAGE 1 OF 14 
==Title:==
Reactor Coolant System K/A          002 A2.04      Ability to (a) predict the impacts of the following malfunctions or operations on the RCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of heat sinks Rating(s):  4.3 / 4.6      CFR:      41.5 / 43.5 / 45.3 / 45.5 Preferred Evaluation Location:                          Preferred Evaluation Method:
Simulator      X      In-Plant                        Perform              X      Simulate


JPM D 
==References:==
EP/1/A/5000/FR-H.1 (Response to Loss of Secondary Heat Sink) rev. 42 Task Standard:      Aligns S/I feed path using NI and NV pumps and opens 1NC-32B and 1NC-34A PZR PORVs to establish NC system bleed path Validation Time: 10 minutes                            Time Critical:          Yes        No    X
===========================================================================
Applicant:                                                                    Time Start: __________
NAME___________________________ Docket #_______________ Time Finish: __________
Performance Rating:                                                            Performance Time _____
SAT ____ UNSAT ____
Examiner: _____________________________                _____________________________/________
NAME                                      SIGNATURE                  DATE
===========================================================================
COMMENTS PAGE 2 OF 14


Catawba Nuclear Station JPM D May 201 5 NRC Exam PAGE 2 OF 14  EVALUATION SHEET Task: Establish NC system Bleed and Feed per EP/1/A/5000/FR
Catawba Nuclear Station JPM D May 2015 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:
-H.1  Alternate Path:
Yes  Facility JPM #:
NC-046  Safety Function:
4P Title: Reactor Coolant System K/A  002 A2.04 Ability to (a) predict the impacts of the following malfunctions or operations on the RCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:  Loss of heat sinks Rating(s):
4.3 / 4.6 CFR: 41.5 / 43.5 / 45.3 / 45.5 Preferred Evaluation Location:
Preferred Evaluation  Method:
Simulator X In-Plant  Perform X Simulate  References
: EP/1/A/5000/FR
-H.1 (Response to Loss of Secondary Heat Sink) rev. 42  Task Standard:
Aligns S/I feed path using NI and NV pumps and opens 1NC
-32B and 1NC
-34A PZR PORVs to establish NC system bleed path Validation Time:
10 minutes Time Critical:
Yes  No X ===========================================================================
Applicant:
Time Start:    ______
____ NAME___________________________
Docket #_______________
Time Finish:  ________
__    Performance Rating:
SAT ____  UNSAT
____  Performance Time ___
__    Examiner: _____________________________
_____________________________/________
NAME  SIGNATURE DATE ===========================================================================
COMMENTS Catawba Nuclear Station JPM D May 201 5 NRC Exam PAGE 3 OF 14  SIMULATOR OPERATOR INSTRUCTIONS:
: 1. ENSURE NRC Examination Security has been established.
: 1. ENSURE NRC Examination Security has been established.
: 2. Reset to IC
: 2. Reset to IC #166.
#16 6. 3. Enter the password.
: 3. Enter the password.
: 4. Select "Yes" on the INITIAL CONDITION RESET pop
: 4. Select Yes on the INITIAL CONDITION RESET pop-up window.
-up window.
: 5. Ensure simulator setup per table below.
: 5. Ensure simulator setup per table below.
: 6. Place simulator in RUN and acknowledge any alarms.
: 6. Place simulator in RUN and acknowledge any alarms.
: 7. ENSURE "Extra Operator" is present in the simulator.
: 7. ENSURE Extra Operator is present in the simulator.
: 8. Place simulator in FREEZE until Examiner cue is given
: 8. Place simulator in FREEZE until Examiner cue is given.
. Instructor Action Final Delay Ramp Delete In Event MAL-CA003A CAPT SA2 FAILS TO START Active     MAL-CA003B CAPT SA5 FAILS TO START Active     MAL-CA004A FAILURE OF CA PUMP A TO START Both    MAL-CA004B FAILURE OF CA PUMP B TO START Both    MAL-NI001B NI PUMP B FAILURE Auto     OVR-ISE043 SAFETY INJECTION INITIATE PB TRN B Off    MAL-ISE002B (AUTO SI TRN B FAILS TO ACTUATE) Active    VLV-NI001F (NI9A B.I.T. DISCHARGE ISOL VLV FAIL TO POSITION) 0 REV. 0 PAGE 4 0F 14 Catawba Nuclear Station JPM D May 201 5 NRC Exam PAGE 4 OF 14  READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
Instructor Action               Final   Delay Ramp Delete In Event MAL-CA003A CAPT SA2 FAILS TO START           Active MAL-CA003B CAPT SA5 FAILS TO START           Active MAL-CA004A FAILURE OF CA PUMP A TO Both START MAL-CA004B FAILURE OF CA PUMP B TO Both START MAL-NI001B NI PUMP B FAILURE                 Auto OVR-ISE043 SAFETY INJECTION INITIATE Off PB TRN B MAL-ISE002B (AUTO SI TRN B FAILS TO Active ACTUATE)
VLV-NI001F (NI9A B.I.T. DISCHARGE ISOL 0
VLV FAIL TO POSITION)
PAGE 3 OF 14
 
REV. 0                                                                   PAGE 4 0F 14 Catawba Nuclear Station JPM D May 2015 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
A reactor trip has occurred on Unit 1 due to a loss of both Main Feedwater pumps. The CA system will not function.
* A reactor trip has occurred on Unit 1 due to a loss of both Main Feedwater pumps.
Attempts to restart the Main CF pumps have been unsuccessful.
* The CA system will not function.
EP/1/A/5000/FR
* Attempts to restart the Main CF pumps have been unsuccessful.
-H.1 (Response to Loss of Secondary Heat Sink) has been entered due to a "RED PATH" for the Heat Sink critical safety function while performing EP/1/A/5000/ES
* EP/1/A/5000/FR-H.1 (Response to Loss of Secondary Heat Sink) has been entered due to a RED PATH for the Heat Sink critical safety function while performing EP/1/A/5000/ES-0.1 (Reactor Trip Response).
-0.1 (Reactor Trip Response).
* Bleed and Feed initiation criteria have been met.
Bleed and Feed initiation criteria ha ve been met. INITIATING CUES:
INITIATING CUES:
The CRS instructs you to initiate NC system bleed and feed by performing
* The CRS instructs you to initiate NC system bleed and feed by performing steps 19-24 of EP/1/A/5000/FR-H.1. Inform the CRS when the bleed and feed path has been initiated and verified.
EXAMINER NOTE: After reading cue, provide the applicant with a copy of EP/1/A/5000/FR-H.1 pages 28-36.
PAGE 4 OF 14


step s 19-24 of EP/1/A/5000/FR
Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD                              SAT/UNSAT START TIME: _______
-H.1. Inform the CRS when the bleed and feed path has been initiated and verified.
STEP 1: 19. Perform Steps 20 through 24 quickly to establish NC heat removal by NC bleed and feed.                          ___ SAT STANDARD:                                                            ___ UNSAT Applicant acknowledges this step.
EXAMINER NOTE
COMMENTS:
: After reading cue, provide the applicant with a copy of EP/1/A/5000/FR
STEP 2 20. Ensure all NC pumps - OFF.                                 ___ SAT STANDARD:                                                            ___UNSAT Applicant ensures the NC pumps are off.
-H.1 pages 2 8-3 6.
COMMENTS:
PAGE 5 0F 14


Catawba Nuclear Station JPM D May 201 5 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 14  START TIME: _______
Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD                                 SAT/UNSAT STEP 3 21. Initiate S/I.                                                      CRITICAL STEP STANDARD:
STEP 1:  19. Perform Steps 20 through 24 quickly to establish NC heat removal by NC bleed and feed.
___ SAT Applicant depresses the red train A and B SAFETY INJECTION INITIATE pushbuttons and verifies the red SAFETY INJECTION              ___ UNSAT ACTUATED status light is lit on 1SI-13 or ECCS TRN A yellow reset light is dark on 1MC-11.
STANDARD: Applicant acknowledges this step.
This step is critical to start the NI pump and align the valves required for initiating an NC system feed path.
COMMENTS:       ___ SAT
COMMENTS:
___ UNSAT     STEP 2  20. Ensure all NC pumps
STEP 4 22. Verify NC System feed path as follows:                             ___ SAT
- OFF.
: a. Verify the following pumps - ON:                            ___ UNSAT
STANDARD:   Applicant ensures the NC pumps are off.
* At least one NV pump
* At least one NI pump.
STANDARD:
Applicant determines that at least one NV pump and one NI pump are running.
EXAMINER NOTE: Applicant may start 1B NI pump and 1B NV pump at this time due to it being a failed auto action. If not, the procedure will direct starting these pumps in the upcoming steps.
COMMENTS:
COMMENTS:
___ SAT    ___UNSAT 
PAGE 6 0F 14


Catawba Nuclear Station JPM D May 201 5 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 14  STEP 3  21. Initiate S/I.
Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD                                   SAT/UNSAT STEP 5    22 b. Verify "NV S/I FLOW" - INDICATING FLOW.
STANDARD: Applicant depresses the red train 'A' and 'B' "SAFETY INJECTION INITIATE" pushbuttons and verifies the red "SAFETY INJECTION ACTUATED" status light is lit on 1SI
___ SAT STANDARD:                                                                   ___ UNSAT Applicant determines that 1NVP6080 (NV S/I FLOW) on 1MC-3 indicates 0 GPM and transitions to the RNO.
-13 or "ECCS TRN A
EXAMINER NOTE: This begins the alternate path of this JPM.
" yellow reset light is dark on 1MC
-11. This step is critical to start the NI pump and align the valves required for initiating an NC system feed path.
COMMENTS:
COMMENTS:
CRITICAL STEP   ___ SAT  ___ UNSAT STEP 4  22. Verify NC System feed path as follows:
STEP 6 22 b. RNO Perform the following:
: a. Verify the following pumps  
___ SAT
- ON:   At least one NV pump At least one NI pump.
: 1) Ensure the following pumps - ON:
STANDARD: Applicant determines that at least one NV pump and one NI pump are running. EXAMINER NOTE:
___ UNSAT
Applicant may start 1B NI pump and 1B NV pump at this time due to it being a failed auto action. If not, the procedure will direct starting these pumps in the upcoming steps.
* NV Pumps
* NI Pumps.
STANDARD:
Applicant ensures that all NV pumps and NI pumps are running by depressing the red ON pushbuttons for any non-running pump, and verifying the red ON lights are lit and green OFF lights are dark for all pumps.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT Catawba Nuclear Station JPM D May 201 5 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 7 0F 14   STEP 5    22 b. Verify "NV S/I FLOW" - INDICATING FLOW.
PAGE 7 0F 14


STANDARD: Applicant determines that 1NVP6080 (NV S/I FLOW) on 1MC
Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD                                 SAT/UNSAT STEP 7 22 b. RNO 2) IF at least one NV pump in service, THEN perform the following:                                     ___ SAT a) Ensure the following valves - OPEN:            ___ UNSAT
-3 indicates 0 GPM and transitions to the RNO.
* 1NV-252A (NV Pumps Suct From FWST)
EXAMINER NOTE: This begins the alternate path of this JPM.
* 1NV-253B (NV Pumps Suct From FWST).
STANDARD:
Applicant verifies the red OPEN lights lit and green CLSD lights dark on 1NV-252A and 1NV-253B.
COMMENTS:
STEP 8 22 b. RNO 2) b) Ensure the following valves - CLOSED:
___ SAT
* 1NV-188A (VCT Otlt Isol)
___ UNSAT
* 1NV-189B (VCT Otlt Isol).
STANDARD:
Applicant determines that the green CLSD light is lit and red OPEN light is dark on 1NV-188A. Applicant determines that the green CLSD light is dark for 1NV-189B, and depresses the green CLOSE pushbutton and verifies the green CLSD light is lit and the red OPEN light is dark.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT    STEP 6  22 b. RNO  Perform the following:
PAGE 8 0F 14
: 1) Ensure the following pumps
- ON:  NV Pumps  NI Pumps. STANDARD:  Applicant ensures that all NV pumps and NI pumps are running by depressing the red ON pushbuttons for any non
-running pump, and verifying the red ON lights are lit and green OFF lights are dark for all pumps.
COMMENTS:        ___ SAT  ___ UNSAT 


Catawba Nuclear Station JPM D May 201 5 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 14  STEP 22 b. RNO 2) IF at least one NV pump in service, THEN perform the following:
Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD                               SAT/UNSAT STEP 9 22 b. RNO 2) c) Ensure the following valves - OPEN:                   CRITICAL STEP
a) Ensure the following valves  
* 1NI-9A (NV Pmp C/L Inj Isol)
- OPEN:   1NV-252A (NV Pumps Suct From FWST)  1NV-253B (NV Pumps Suct From FWST).
___ SAT
STANDARD:  Applicant verifies the red OPEN lights lit and green CLSD lights dark on 1NV-252A and 1NV
* 1NI-10B (NV Pmp C/L Inj Isol).
-253B.
___ UNSAT STANDARD:
COMMENTS:        ___ SAT  ___ UNSAT STEP 8  22 b. RNO 2) b) Ensure the following valves
Applicant determines the red OPEN light is dark and green CLSD light is lit on 1NI-9A and 1NI-10B. Applicant depresses the red OPEN pushbutton for 1NI-9A but the valve will not open. Applicant depresses the red OPEN pushbutton for 1NI-10B and verifies the red OPEN light is lit and the green CLSD light is dark.
- CLOSED:  1NV-188A (VCT Otlt Isol) 1NV-189B (VCT Otlt Isol)
This step is critical to align an NC (Reactor Coolant) system Feed path.
. STANDARD:  Applicant determines that the green CLSD light is lit and red OPEN light is dark on 1NV
COMMENTS:
-188A. Applicant determines that the green CLSD light is dark for 1NV-189B, and depresses the green CLOSE pushbutton and verifies the green CLSD light is lit and the red OPEN light is dark
STEP 10 22 b. RNO 3) IF NI Pump 1A is in service, THEN ensure the following valves - OPEN:                         ___ SAT
. COMMENTS:
* 1NI-103A (NI Pump 1A Suct)                     ___ UNSAT
___ SAT  ___ UNSAT Catawba Nuclear Station JPM D May 201 5 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 9 0F 14  STEP 9  22 b. RNO 2) c) Ensure the following valves
* 1NI-118A (NI Pump 1A C-Leg Inj Isol)
- OPEN:  1NI-9A (NV Pmp C/L Inj Isol) 1NI-10B (NV Pmp C/L Inj Isol).
* 1NI-162A (NI To C-Legs Inj Hdr Isol)
STANDARD: Applicant determines the red OPEN light is dark and green CLSD light is lit on 1NI-9A and 1NI-10B. Applicant depresses the red OPEN pushbutton for 1NI
* 1NI-100B (NI Pmps Suct From FWST).
-9A but the valve will not open. Applicant depresses the red OPEN pushbutton for 1NI-10B and verifies the red OPEN light is lit and the green CLSD light is dark
STANDARD:
. This step is critical to align an NC (Reactor Coolant) system Feed path. COMMENTS:
Applicant determines that the red OPEN light is lit and green CLSD light is dark on valves 1NI-103A, 1NI-118A, 1NI-162A, and 1NI-100B.
CRITICAL STEP    ___ SAT  ___ UNSAT    STEP 10 22 b. RNO 3) IF NI Pump 1A is in service, THEN ensure the following valves  
- OPEN:   1NI-103A (NI Pump 1A Suct) 1NI-118A (NI Pump 1A C
-Leg Inj Isol)   1NI-162A (NI To C
-Legs Inj Hdr Isol)   1NI-100B (NI Pmps Suct From FWST). STANDARD: Applicant determines that the red OPEN light is lit and green CLSD light is dark on valves 1NI
-103A, 1NI-118A, 1NI-162A, and 1NI
-100B.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT 
PAGE 9 0F 14


Catawba Nuclear Station JPM D May 201 5 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 10 0F 14  STEP 11 22 b. RNO 4) IF NI Pump 1B is in service, THEN ensure the following valves  
Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD                                 SAT/UNSAT STEP 11 22 b. RNO 4) IF NI Pump 1B is in service, THEN ensure the following valves - OPEN:                           ___ SAT
- OPEN:   1NI-135B (NI Pump 1B Suct) 1NI-150B (NI Pump 1B C
* 1NI-135B (NI Pump 1B Suct)                       ___ UNSAT
-Leg Inj Isol) 1NI-162A (NI To C
* 1NI-150B (NI Pump 1B C-Leg Inj Isol)
-Legs Inj Hdr Isol) 1NI-100B (NI Pmps Suct From FWST).
* 1NI-162A (NI To C-Legs Inj Hdr Isol)
STANDARD: Applicant verifies that the red OPEN light is lit and green CLSD light is dark on valves 1NI
* 1NI-100B (NI Pmps Suct From FWST).
-135B, 1NI-150B, 1NI-162A, and 1NI
STANDARD:
-100B.
Applicant verifies that the red OPEN light is lit and green CLSD light is dark on valves 1NI-135B, 1NI-150B, 1NI-162A, and 1NI-100B.
COMMENTS:       ___ SAT  ___ UNSAT STEP 12   22 b. RNO 5) IF no feed path can be aligned, THEN perform the following:
COMMENTS:
STANDARD: Applicant determines that a feed path does exist and this step is N/A.
STEP 12 22 b. RNO 5) IF no feed path can be aligned, THEN perform the following:                                   ___ SAT STANDARD:                                                                   ___ UNSAT Applicant determines that a feed path does exist and this step is N/A.
COMMENTS:
PAGE 10 0F 14


Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD                                SAT/UNSAT STEP 13 23. Establish NC System bleed path as follows:
___ SAT
: a. Ensure all Pzr PORV isolation valves - OPEN.
___ UNSAT STANDARD:
Applicant determines the RED lights are lit and GREEN lights are dark on valves 1NC-31B, 1NC-35B, and 1NC-33A.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT Catawba Nuclear Station JPM D May 201 5 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 11 0F 14  STEP 13  23. Establish NC System bleed path as follows:  a. Ensure all Pzr PORV isolation valves
STEP 14 23 b. Select "OPEN" on the following PZR PORVs:                   CRITICAL STEP
- OPEN. STANDARD:  Applicant determines the RED lights are lit and GREEN lights are dark on valves 1NC
* 1NC-34A (PZR PORV)
-31B, 1NC-35B, and 1NC
___ SAT
-33A.
* 1NC-32B (PZR PORV).
COMMENTS:        ___ SAT  ___ UNSAT STEP 14   23   b. Select "OPEN" on the following PZR PORVs:   1NC-34A (PZR PORV) 1NC-32B (PZR PORV).
___ UNSAT STANDARD:
STANDARD: Applicant rotates switches for 1NC
Applicant rotates switches for 1NC-34A and 1NC-32B, clockwise to the OPEN position and verifies RED lights are lit and GREEN lights are dark on both valves.
-34A and 1NC
-32B, clockwise to the OPEN position and verifies RED lights are lit and GREEN lights are dark on both valves.
This step is critical because it establishes an NC (Reactor Coolant) system Bleed path.
This step is critical because it establishes an NC (Reactor Coolant) system Bleed path.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT Catawba Nuclear Station JPM D May 201 5 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 12 0F 14  STEP 15   23   c. Align N 2 to Pzr PORVs by opening the following valves:
PAGE 11 0F 14
1NI-438A (Emer N2 From CLA A To 1NC
 
-34A)   1NI-439B (Emer N2 From CLA B To 1NC
Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD                               SAT/UNSAT STEP 15 23 c. Align N2 to Pzr PORVs by opening the following valves:
-32B). STANDARD: Applicant depresses the red OPEN pushbutton and verifies red OPEN light lit and green CLSD light dark on valves 1NI
___ SAT
-438A and 1NI
* 1NI-438A (Emer N2 From CLA A To 1NC-34A)
-439B. COMMENTS:       ___ SAT  ___ UNSAT STEP 16   23   d. Verify power to all Pzr PORV isolation valves  
___ UNSAT
- AVAILABLE.
* 1NI-439B (Emer N2 From CLA B To 1NC-32B).
STANDARD: Applicant verifies indicating lights lit on 1NC
STANDARD:
-31B, 1NC-35B, and 1NC
Applicant depresses the red OPEN pushbutton and verifies red OPEN light lit and green CLSD light dark on valves 1NI-438A and 1NI-439B.
-33A.
COMMENTS:
STEP 16 23 d. Verify power to all Pzr PORV isolation valves -
AVAILABLE.                                           ___ SAT STANDARD:                                                               ___ UNSAT Applicant verifies indicating lights lit on 1NC-31B, 1NC-35B, and 1NC-33A.
COMMENTS:
PAGE 12 0F 14
 
Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD                          SAT/UNSAT STEP 17 24. Verify the following valves - OPEN:
___ SAT
* 1NC-31B (PZR PORV Isol)
___ UNSAT
* 1NC-32B (PZR PORV)
* 1NC-33A (PZR PORV Isol)
* 1NC-34A (PZR PORV).
STANDARD:
Applicant verifies lights on 1NC-31B, 1NC-32B, 1NC-33A and 1NC-34A indicate OPEN.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT Catawba Nuclear Station JPM D May 201 5 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 13 0F 14   STEP 17  24. Verify the following valves
END OF TASK STOP TIME ________
- OPEN:    1NC-31B (PZR PORV Isol) 1NC-32B (PZR PORV) 1NC-33A (PZR PORV Isol) 1NC-34A (PZR PORV).
PAGE 13 0F 14
STANDARD:  Applicant verifies lights on 1NC
-31B, 1NC-3 2B, 1NC-33A and 1NC-34A indicate OPEN
. COMMENTS:  END OF TASK
___ SAT  ___ UNSAT 


STOP TIME ________
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
May 2015 NRC Initial License Exam JPM D    
May 2015 NRC Initial License Exam JPM D INITIAL CONDITIONS:
* A reactor trip has occurred on Unit 1 due to a loss of both Main Feedwater pumps.
* The CA system will not function.
* Attempts to restart the Main CF pumps have been unsuccessful.
* EP/1/A/5000/FR-H.1 (Response to Loss of Secondary Heat Sink) has been entered due to a RED PATH for the Heat Sink critical safety function while performing EP/1/A/5000/ES-0.1 (Reactor Trip Response).
* Bleed and Feed initiation criteria have been met.
INITIATING CUES:
* The CRS instructs you to initiate NC system bleed and feed by performing steps 19-24 of EP/1/A/5000/FR-H.1. Inform the CRS when the bleed and feed path has been initiated and verified.
 
Catawba Nuclear Station JPM E May 2015 NRC Exam JPM E PAGE 1 OF 8


INITIAL CONDITIONS:
Catawba Nuclear Station JPM E May 2015 NRC Exam EVALUATION SHEET Task:               Respond to Loss of Normal Steam Release Capabilities Alternate Path:    No Facility JPM #:    CSF-006 Modified Safety Function:   4S
A reactor trip has occurred on Unit 1 due to a loss of both Main Feedwater pumps. The CA system will not function.
Attempts to restart the Main CF pumps have been unsuccessful.
EP/1/A/5000/FR
-H.1 (Response to Loss of Secondary Heat Sink) has been entered due to a "RED PATH" for the Heat Sink critical safety function while performing EP/1/A/5000/ES
-0.1 (Reactor Trip Response).
Bleed and Feed initiation criteria have been met.
INITIATING CUES:
The CRS instructs you to initiate NC system bleed and feed by performing steps 19-24 of EP/1/A/5000/FR
-H.1. Inform the CRS when the bleed and feed path has been initiated and verified.


Catawba Nuclear Station JPM E May 201 5 NRC Exam PAGE 1 OF 8    
==Title:==
Main and Reheat Steam System K/A        E13 EA1.1       Ability to operate and/or monitor the following as they apply to the (Steam Generator Overpressure): Components and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Rating(s):   3.1 / 3.3    CFR:      41.7 / 45.5 / 45.6 Preferred Evaluation Location:                        Preferred Evaluation Method:
Simulator      X    In-Plant                        Perform            X      Simulate


JPM E 
==References:==
EP/1/A/5000/FR-H.4 (Response to Loss of Normal Steam Release Capabilities)
Task Standard:      Steam Generator PORVs operated in manual to decrease steam pressure to <
1175 PSIG.
Validation Time: 5 minutes                            Time Critical:        Yes          No      X
===========================================================================
Applicant:                                                                  Time Start: __________
NAME___________________________ Docket #_______________ Time Finish: __________
Performance Rating:                                                        Performance Time _____
SAT ____ UNSAT ____
Examiner: _____________________________                _____________________________/________
NAME                                      SIGNATURE                  DATE
===========================================================================
COMMENTS PAGE 2 OF 8


Catawba Nuclear Station JPM E May 201 5 NRC Exam PAGE 2 OF 8  EVALUATION SHEET Task: Respond to Loss of Normal Steam Release Capabilities Alternate Path:
Catawba Nuclear Station JPM E May 2015 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:
No    Facility JPM #:
CSF-006 Modified  Safety Function:
4S Title: Main and Reheat Steam System K/A  E13 EA1.1 Ability to operate and/or monitor the following as they apply to the (Steam Generator Overpressure):  Components and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Rating(s):
3.1  / 3.3 CFR: 41.7 / 4 5.5 / 45.6  Preferred Evaluation Location:
Preferred Evaluation  Method:
Simulator X In-Plant  Perform X Simulate  References
: EP/1/A/5000/FR
-H.4 (Response to Loss of Normal Steam Release Capabilities)
Task Standard:
Steam Generator PORVs operated in manual to decrease steam pressure to < 1175 PSIG.
Validation Time:
5 minutes  Time Critical:
Yes  No X ===========================================================================
Applicant:
Time Start:    ______
____ NAME___________________________
Docket #_______________
Time Finish:  ________
__    Performance Rating:
SAT ____  UNSAT ____
Performance Time ___
__    Examiner: _____________________________
_____________________________/________
NAME  SIGNATURE DATE ===========================================================================
COMMENTS Catawba Nuclear Station JPM E May 201 5 NRC Exam PAGE 3 OF 8  SIMULATOR OPERATOR INSTRUCTIONS:
: 1. ENSURE NRC Examination Security has been established.
: 1. ENSURE NRC Examination Security has been established.
: 2. Reset to IC
: 2. Reset to IC # 158
# 158 3. Enter the password.
: 3. Enter the password.
: 4. Select "Yes" on the INITIAL CONDITION RESET pop
: 4. Select Yes on the INITIAL CONDITION RESET pop-up window.
-up window.
: 5. Ensure simulator setup per table below.
: 5. Ensure simulator setup per table below.
: 6. Place simulator in RUN and acknowledge any alarms.
: 6. Place simulator in RUN and acknowledge any alarms.
: 7. ENSURE "Extra Operator" is present in the simulator.
: 7. ENSURE Extra Operator is present in the simulator.
: 8. Place simulator in FREEZE until Examiner cue is given
: 8. Place simulator in FREEZE until Examiner cue is given.
. Instructor Action Final Delay Ramp Delete In Event MAL-SM005A (S/G SAFETY VALVE SV20 FAILURE) 0    MAL-SM005B (S/G SAFETY VALVE SV14 FAILURE) 0    MAL-SM005C (S/G SAFETY VALVE SV8 FAILURE) 0    MAL-SM005D (S/G SAFETY VALVE SV2 FAILURE) 0    MAL-SM002A (S/G PORV SV19 FAILURE) 0     MAL-SM002B (S/G PORV SV13 FAILURE) 0     MAL-SM002C (S/G PORV SV7 FAILURE) 0     MAL-SM002D (S/G PORV SV1 FAILURE) 0     OVR-IDE025A (SBM
Instructor Action                         Delay Ramp Delete Event Final In MAL-SM005A (S/G SAFETY VALVE SV20 0
-Steam Dump INTLK Byp Trn A - OFF RST POS
FAILURE)
) ON    MAL-SM002A (S/G PORV SV19 FAILURE) 0   :01 1 MAL-SM002B (S/G PORV SV13 FAILURE) 0   :01 2 MAL-SM002C (S/G PORV SV7 FAILURE) 0   :01 3 MAL-SM002D (S/G PORV SV1 FAILURE) 0   :01 4 Ensure Event 1 = x02i088m Ensure Event 2 =
MAL-SM005B (S/G SAFETY VALVE SV14 0
x02i091m Ensure Event 3 = x02i096m Ensure Event 4 = x02i099m PAGE 4 0F 8 Catawba Nuclear Station JPM E May 201 5 NRC Exam PAGE 4 OF 8  READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
FAILURE)
MAL-SM005C (S/G SAFETY VALVE SV8 0
FAILURE)
MAL-SM005D (S/G SAFETY VALVE SV2 0
FAILURE)
MAL-SM002A (S/G PORV SV19 FAILURE)               0 MAL-SM002B (S/G PORV SV13 FAILURE)               0 MAL-SM002C (S/G PORV SV7 FAILURE)                 0 MAL-SM002D (S/G PORV SV1 FAILURE)                 0 OVR-IDE025A (SBM-Steam Dump INTLK Byp ON Trn A - OFF RST POS)
MAL-SM002A (S/G PORV SV19 FAILURE)               0                 :01     1 MAL-SM002B (S/G PORV SV13 FAILURE)               0                 :01     2 MAL-SM002C (S/G PORV SV7 FAILURE)                 0                 :01     3 MAL-SM002D (S/G PORV SV1 FAILURE)                 0                 :01     4 Ensure Event 1 = x02i088m Ensure Event 2 = x02i091m Ensure Event 3 = x02i096m Ensure Event 4 = x02i099m PAGE 3 OF 8
 
PAGE 4 0F 8 Catawba Nuclear Station JPM E May 2015 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
An inadvertent Main Steam Isolation Signal has caused a reactor trip on Unit 1. Steam system failures have caused steam generator pressure to exceed 1175 PSIG.
* An inadvertent Main Steam Isolation Signal has caused a reactor trip on Unit 1.
 
* Steam system failures have caused steam generator pressure to exceed 1175 PSIG.
INITIATING CUES:
INITIATING CUES:
The CRS has directed you to perform EP/1/A/5000/FR
* The CRS has directed you to perform EP/1/A/5000/FR-H.4 (Response to Loss of Normal Steam Release Capabilities) to restore steam generator pressure to < 1175 PSIG.
-H.4 (Respon se to Loss of Normal Steam Release Capabilities) to restore steam generator pressure to < 1175 PSIG.
EXAMINER NOTE: After reading the cue, provide the applicant with a copy of EP/1/A/5000/FR-H.4.
EXAMINER NOTE
PAGE 4 OF 8
:   After reading the cue, provide the applicant with a copy of EP/1/A/5000/FR
-H.4.
 
Catawba Nuclear Station JPM E May 201 5 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 5 0F 8   START TIME: _______
NOTE  Throughout this procedure, "affected" refers to any S/G in which pressure is greater than 1175 PSIG.
STEP 1:  1. IF AT ANY TIME affected S/G(s) N/R level increases to greater than 92% (80% ACC), THEN steam should not be released from affected S/G(s).
STANDARD:  Applicant acknowledges the continuous action statement and continues to step 2. COMMENTS:      ___ SAT
___ UNSAT    STEP 2:  2. Restore normal steam release capability of affected S/G(s) using S/G PORV as follows:
: a. Verify affected S/G(s) PORV isolation valve
- OPEN. STANDARD:  Applicant determines all S/G PORV isolation valves red OPEN lights are lit and green CLSD lights are dark.


Catawba Nuclear Station JPM E May 2015 NRC Exam STEP/STANDARD                                SAT/UNSAT START TIME: _______
NOTE Throughout this procedure, affected refers to any S/G in which pressure is greater than 1175 PSIG.
STEP 1: 1. IF AT ANY TIME affected S/G(s) N/R level increases to greater than 92% (80% ACC), THEN steam should not be        ___ SAT released from affected S/G(s).
___ UNSAT STANDARD:
Applicant acknowledges the continuous action statement and continues to step 2.
COMMENTS:
STEP 2: 2. Restore normal steam release capability of affected S/G(s) using S/G PORV as follows:                                    ___ SAT
: a. Verify affected S/G(s) PORV isolation valve - OPEN.        ___UNSAT STANDARD:
Applicant determines all S/G PORV isolation valves red OPEN lights are lit and green CLSD lights are dark.
COMMENTS:
COMMENTS:
___ SAT    ___UNSAT 
PAGE 5 0F 8
 
Catawba Nuclear Station JPM E May 201 5 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 6 0F 8   STEP 3:  2.b. Throttle open affected S/G(s) PORV.


STANDARD: Applicant must depress the manual pushbutton for each S/G PORV
Catawba Nuclear Station JPM E May 2015 NRC Exam STEP/STANDARD                              SAT/UNSAT STEP 3: 2.b. Throttle open affected S/G(s) PORV.                          CRITICAL STEP STANDARD:                                                               ___ SAT Applicant must depress the manual pushbutton for each S/G PORV.         ___ UNSAT This step is critical to gain control of all steam generator PORVs to be able to decrease steam generator pressures to < 1175 psig.
. This step is critical to gain control of all steam generator PORVs to be able to decrease steam generator pressures to < 1175 psig.
COMMENTS:
COMMENTS:
CRITICAL STEP  ___ SAT  ___ UNSAT STEP 4:   2.b. Throttle open affected S/G(s) PORV.
STEP 4: 2.b. Throttle open affected S/G(s) PORV.                         CRITICAL STEP STANDARD:                                                               ___ SAT The applicant must rotate each S/G PORV potentiometer clockwise to       ___ UNSAT open the applicable S/G PORV.
 
STANDARD: The applicant must rotate each S/G PORV potentiometer clockwise to open the applicable S/G PORV.
This step is critical to be able to decrease steam generator pressures to < 1175 psig.
This step is critical to be able to decrease steam generator pressures to < 1175 psig.
COMMENTS:
COMMENTS:
CRITICAL STEP  ___ SAT  ___ UNSAT 
PAGE 6 0F 8


Catawba Nuclear Station JPM E May 201 5 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 8    STEP 5:   2.c. GO TO Step 4. STANDARD: Applicant goes to step 4.
Catawba Nuclear Station JPM E May 2015 NRC Exam STEP/STANDARD                             SAT/UNSAT STEP 5: 2.c. GO TO Step 4.                                               ___ SAT STANDARD:                                                               ___ UNSAT Applicant goes to step 4.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT    STEP 6: 4. Verify S/G pressures  
STEP 6: 4. Verify S/G pressures - LESS THAN 1175 PSIG.
- LESS THAN 1175 PSIG.
___ SAT STANDARD:
STANDARD: Applicant either determines that S/G pressures are currently < 1175 PSIG or will loop back to step 1.
___ UNSAT Applicant either determines that S/G pressures are currently < 1175 PSIG or will loop back to step 1.
EXAMINER CUE: If the applicant does not terminate the JPM when S/G pressures are reduced to < 1175 PSIG, then provide the following cue  
EXAMINER CUE: If the applicant does not terminate the JPM when S/G pressures are reduced to < 1175 PSIG, then provide the following cue - The CRS is ready to return to the procedure and step in effect. This JPM is complete.
- "The CRS is ready to return to the procedure and step in effect. This JPM is complete."
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT    STOP TIME ________
STOP TIME ________
PAGE 7 0F 8
 
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
May 201 5 NRC Initial License Exam JPM E    
May 2015 NRC Initial License Exam JPM E INITIAL CONDITIONS:
* An inadvertent Main Steam Isolation Signal has caused a reactor trip on Unit 1.
* Steam system failures have caused steam generator pressure to exceed 1175 PSIG.
INITIATING CUES:
* The CRS has directed you to perform EP/1/A/5000/FR-H.4 (Response to Loss of Normal Steam Release Capabilities) to restore steam generator pressure to < 1175 PSIG.


INITIAL CONDITIONS:
Catawba Nuclear Station JPM F May 2015 NRC Exam JPM F PAGE 1 OF 9
An inadvertent Main Steam Isolation Signal has caused a reactor trip on Unit 1. Steam system failures have caused steam generator pressure to exceed 1175 PSIG.


INITIATING CUES:
Catawba Nuclear Station JPM F May 2015 NRC Exam EVALUATION SHEET Task:               Shift Upper Containment Ventilation Units Alternate Path:    No Facility JPM #:    NEW Safety Function:    5
The CRS has directed you to perform EP/1/A/5000/FR
-H.4 (Response to Loss of Normal Steam Release Capabilities) to restore steam generator pressure to < 1175 PSIG.


Catawba Nuclear Station JPM F May 201 5 NRC Exam PAGE 1 OF 9 
==Title:==
Containment Cooling System K/A          022 A4.01    Ability to manually operate and/or monitor in the control room: CCS fans Rating(s):  3.6 / 3.6    CFR:      41.7 / 45.5 to 45.8 Preferred Evaluation Location:                        Preferred Evaluation Method:
Simulator      X    In-Plant                        Perform            X      Simulate


JPM F 
==References:==
OP/1/A/6450/001 (Containment Ventilation (VV) Systems) rev. 42, Enclosure 4.12 (Shifting Operating Upper Containment Ventilation Units)
Task Standard:      OP/1/A/6450/001 (Containment Ventilation (VV) Systems) Enclosure 4.12 (Shifting Operating Upper Containment Ventilation Units) performed to start 1D UCVU and shutdown 1C UCVU.
Validation Time: 5 minutes                            Time Critical:        Yes        No    X
===========================================================================
Applicant:                                                                  Time Start: __________
NAME___________________________ Docket #_______________ Time Finish: __________
Performance Rating:                                                        Performance Time _____
SAT ____ UNSAT ____
Examiner: _____________________________              _____________________________/________
NAME                                    SIGNATURE                DATE
===========================================================================
COMMENTS PAGE 2 OF 9


Catawba Nuclear Station JPM F May 201 5 NRC Exam PAGE 2 OF 9  EVALUATION SHEET Task: Shift Upper Containment Ventilation Units Alternate Path:
Catawba Nuclear Station JPM F May 2015 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:
No    Facility JPM #:
NEW  Safety Function:
5 Title: Containment Cooling System K/A  0 22 A4.01 Ability to manually operate and/or monitor in the control room:  CCS fans Rating(s):
3.6  / 3.6 CFR: 41.7 / 45.5 to 45.8 Preferred Evaluation Location:
Preferred Evaluation  Method:
Simulator X In-Plant  Perform X Simulate  References
: OP/1/A/6450/001 (Containment Ventilation (VV) Systems) rev. 42, Enclosure 4.12 (Shifting Operating Upper Containment Ventilation Units)
Task Standard:
OP/1/A/6450/001 (Containment Ventilation (VV) Systems) Enclosure 4.12 (Shifting Operating Upper Containment Ventilation Units) performed to start 1D UCVU and shutdown 1 C UCVU. Validation Time:
5 minutes  Time Critical:
Yes  No X ===========================================================================
Applicant:
Time Start:    ______
____ NAME___________________________
Docket #_______________
Time Finish:  ________
__    Performance Rating:
SAT ____  UNSAT ____
Performance Time ___
__    Examiner: _____________________________
_____________________________/________
NAME  SIGNATURE DATE ===========================================================================
COMMENTS Catawba Nuclear Station JPM F May 201 5 NRC Exam PAGE 3 OF 9  SIMULATOR OPERATOR INSTRUCTIONS:
: 1. ENSURE NRC Examination Security has been established.
: 1. ENSURE NRC Examination Security has been established.
: 2. Reset to IC
: 2. Reset to IC # 167 (This JPM written to be done with JPM E and will have the same simulator setup as JPM E).
# 167 (This JPM written to be done with JPM E and will have the same simulator setup as JPM E
: 3. Enter the password.
). 3. Enter the password.
: 4. Select Yes on the INITIAL CONDITION RESET pop-up window.
: 4. Select "Yes" on the INITIAL CONDITION RESET pop
: 5. Ensure simulator setup per table in JPM E.
-up window.
: 6. Place simulator in RUN and acknowledge any alarms.
: 5. Ensure simulator setup per table in JPM E. 6. Place simulator in RUN and acknowledge any alarms.
: 7. ENSURE Extra Operator is present in the simulator.
: 7. ENSURE "Extra Operator" is present in the simulator.
: 8. Place simulator in FREEZE until Examiner cue is given.
: 8. Place simulator in FREEZE until Examiner cue is given
EXAMINER NOTE: This JPM can be performed in conjunction with JPM E.
. EXAMINER NOTE: This JPM can be performed in conjunction with JPM E.
PAGE 3 OF 9
PAGE 4 0F 9 Catawba Nuclear Station JPM F May 201 5 NRC Exam PAGE 4 OF 9  READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
 
PAGE 4 0F 9 Catawba Nuclear Station JPM F May 2015 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 1 is at 48% power.
* Unit 1 is at 48% power.
 
INITIATING CUES:
INITIATING CUES:
The CRS has directed you to shift operating Upper Containment Ventilation Units by starting 1D UCVU and stopping 1 C UCVU per OP/1/A/6450/001 (Containment Ventilation (VV) Systems) Enclosure 4.12 (Shifting Operating Upper Containment Ventilation Units)
* The CRS has directed you to shift operating Upper Containment Ventilation Units by starting 1D UCVU and stopping 1C UCVU per OP/1/A/6450/001 (Containment Ventilation (VV) Systems) Enclosure 4.12 (Shifting Operating Upper Containment Ventilation Units).
. EXAMINER NOTE
EXAMINER NOTE: After reading the cue, provide the applicant with a copy of OP/1/A/6450/001 (Containment Ventilation (VV) Systems) Enclosure 4.12 (Shifting Operating Upper Containment Ventilation Units).
:   After reading the cue, provide the applicant with a copy of OP/1/A/6450/001 (Containment Ventilation (VV) Systems) Enclosure 4.12 (Shifting Operating Upper Containment Ventilation Units)
PAGE 4 OF 9
.
Catawba Nuclear Station JPM F May 201 5 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 5 0F 9   START TIME: _______
STEP 1  3.1  IF only one UCVU is running, perform the following:


3.1.1 IF the running UCVU is operating in the "NORM" mode, start the UCVU to be placed in service by placing its control switch in the "NORM" position:
Catawba Nuclear Station JPM F May 2015 NRC Exam STEP/STANDARD                                SAT/UNSAT START TIME: _______
  "VV UCVU 1A" "VV UCVU 1B" "VV UCVU 1C" "VV UCVU 1D"
STEP 1 3.1 IF only one UCVU is running, perform the following:              CRITICAL STEP 3.1.1 IF the running UCVU is operating in the NORM mode, start the UCVU to be placed in service by placing its control ___ SAT switch in the NORM position:
 
* VV UCVU 1A                                           ___ UNSAT
STANDARD: Applicant places the control switch for "VV UCVU 1D" to the "NORM" position. This step is critical to meet the task of shifting operating UCVUs per the JPM standard.
* VV UCVU 1B
* VV UCVU 1C
* VV UCVU 1D STANDARD:
Applicant places the control switch for VV UCVU 1D to the NORM position.
This step is critical to meet the task of shifting operating UCVUs per the JPM standard.
COMMENTS:
STEP 2 3.1.2 IF the running UCVU is operating in the MAX mode, start the UCVU to be placed in service by placing its control  ___ SAT switch in the MAX position.
___UNSAT STANDARD:
Applicant determines this step is N/A.
COMMENTS:
COMMENTS:
CRITICAL STEP  ___ SAT
PAGE 5 0F 9
___ UNSAT    STEP 2  3.1.2  IF the running UCVU is operating in the "MAX" mode, start the UCVU to be placed in service by placing its control switch in the "MAX" position.
STANDARD:  Applicant determines this step is N/A.


Catawba Nuclear Station JPM F May 2015 NRC Exam STEP/STANDARD                                    SAT/UNSAT STEP 3 3.1.3 Verify the red indicating lights illuminate for the UCVU placed in service.                                          ___ SAT
___ UNSAT STANDARD:
Applicant determines the red indicating light lit for the 1D UCVU.
COMMENTS:
COMMENTS:
___ SAT    ___UNSAT 
STEP 4 3.1.4 Verify the red indicating lights illuminate for the return fan  ___ SAT placed in service.
 
___ UNSAT STANDARD:
Catawba Nuclear Station JPM F May 201 5 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 6 0F 9  STEP 3.1.Verify the red indicating lights illuminate for the UCVU placed in service.
Applicant determines the red indicating light lit for return fan 1D.
STANDARD: Applicant determines the red indicating light lit for the 1D UCVU.
 
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT STEP 4  3.1.4  Verify the red indicating lights illuminate for the return fan placed in service.
PAGE 6 0F 9
STANDARD:  Applicant determines the red indicating light lit for return fan 1D.


Catawba Nuclear Station JPM F May 2015 NRC Exam STEP/STANDARD                              SAT/UNSAT STEP 5 3.1.5 Place the control switch for the UCVU to be stopped in the  CRITICAL OFF position:                                            STEP
* VV UCVU 1A
* VV UCVU 1B                                        ___ SAT
* VV UCVU 1C
* VV UCVU 1D                                        ___ UNSAT STANDARD:
Applicant places the control switch for the 1C UCVU to the OFF position.
This step is critical to meet the task of shifting operating UCVUs per the JPM standard.
COMMENTS:
COMMENTS:
___ SAT    ___ UNSAT Catawba Nuclear Station JPM F May 201 5 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 7 0F 9  STEP 3.1.5  Place the control switch for the UCVU to be stopped in the "OFF" position:  "VV UCVU 1A" "VV UCVU 1B" "VV UCVU 1C" "VV UCVU 1D" STANDARD: Applicant places the control switch for the 1C UCVU to the "OFF" position. This step is critical to meet the task of shifting operating UCVUs per the JPM standard.
STEP 6 3.1.6 Verify the green indicating light illuminates for the UCVU fan stopped.                                            ___ SAT STANDARD:                                                               ___ UNSAT Applicant determines the green indicating light lit for the 1C UCVU.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT    ___ UNSAT    STEP 6  3.1.6  Verify the green indicating light illuminates for the UCVU fan stopped.
PAGE 7 0F 9
STANDARD:  Applicant determines the green indicating light lit for the 1C UCVU.


COMMENTS:        ___ SAT    ___ UNSAT 
Catawba Nuclear Station JPM F May 2015 NRC Exam STEP/STANDARD                                     SAT/UNSAT STEP 7 3.1.7 Verify the green indicating light illuminates for the return fan stopped.                                                       ___ SAT STANDARD:                                                                     ___ UNSAT Applicant determines the green indicating light lit for the 1C return fan.
 
COMMENTS:
Catawba Nuclear Station JPM F May 201 5 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 9  STEP 7 3.1.7 Verify the green indicating light illuminates for the return fan stopped. STANDARD: Applicant determines the green indicating light lit for the 1C return fan.
STEP 8 3.2 IF two or three UCVUs are running, perform the following:
___ SAT STANDARD:
___ UNSAT Applicant determines this step is N/A.
COMMENTS:
COMMENTS:
___ SAT    ___ UNSAT STEP 3.2  IF two or three UCVUs are running, perform the following:
STEP 9 3.3 Indicate below the operating UCVUs:
STANDARD: Applicant determines this step is N/A.
* VV UCVU 1A                                                ___ SAT
 
* VV UCVU 1B
* VV UCVU 1C                                                ___ UNSAT
* VV UCVU 1D STANDARD:
Applicant indicates that 1D UCVU is running.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT  STEP 9 3.3  Indicate below the operating UCVUs:
END OF TASK STOP TIME ________
  "VV UCVU 1A" "VV UCVU 1B" "VV UCVU 1C" "VV UCVU 1D" STANDARD:  Applicant indicates that 1D UCVU is running.
PAGE 8 0F 9


COMMENTS:
END OF TASK
___ SAT  ___ UNSAT    STOP TIME ________
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
May 201 5 NRC Initial License Exam JPM F    
May 2015 NRC Initial License Exam JPM F INITIAL CONDITIONS:
* Unit 1 is at 48% power.
INITIATING CUES:
* The CRS has directed you to shift operating Upper Containment Ventilation Units by starting 1D UCVU and stopping 1C UCVU per OP/1/A/6450/001 (Containment Ventilation (VV) Systems) Enclosure 4.12 (Shifting Operating Upper Containment Ventilation Units).
 
Catawba Nuclear Station JPM G May 2015 NRC Exam JPM G PAGE 1 OF 10


INITIAL CONDITIONS:
Catawba Nuclear Station JPM G May 2015 NRC Exam EVALUATION SHEET Task:               Reset Radiation Monitor Trip Setpoints Alternate Path:    No Facility JPM #:    WE-EMF-001 Safety Function:    7
Unit 1 is at 48% power.


INITIATING CUES:
==Title:==
The CRS has directed you to shift operating Upper Containment Ventilation Units by starting 1D UCVU and stopping 1C UCVU per OP/1/A/6450/001 (Containment Ventilation (VV) Systems) Enclosure 4.12 (Shifting Operating Upper Containment Ventilation Units)
Process Radiation Monitoring System K/A          073 A4.02    Ability to manually operate and/or monitor in the control room: Radiation monitoring system control panel Rating(s):  3.7 / 3.7    CFR:      41.7 / 45.5 to 45.8 Preferred Evaluation Location:                        Preferred Evaluation Method:
.
Simulator      X    In-Plant                        Perform            X      Simulate
Catawba Nuclear Station JPM G May 201 5 NRC Exam PAGE 1 OF 10 


JPM G 
==References:==
OP/0/A/6500/080 (EMF RP86A Output Modules) rev. 17, Enclosure 4.2 (EMF RP86A Trip Setpoint Adjustment)
Task Standard:      EMF50L TRIP 1 setpoint set to 6.3 E3 CPM and the TRIP 2 setpoint set to 9.0 E3 CPM per OP/0/A/6500/080 (EMF RP86A Output Modules) Enclosure 4.2 (EMF RP86A Trip Setpoint Adjustment).
Validation Time: 10 minutes                          Time Critical:        Yes        No      X
===========================================================================
Applicant:                                                                  Time Start: __________
NAME___________________________ Docket #_______________ Time Finish: __________
Performance Rating:                                                        Performance Time _____
SAT ____ UNSAT ____
Examiner: _____________________________              _____________________________/________
NAME                                    SIGNATURE                  DATE
===========================================================================
COMMENTS PAGE 2 OF 10


Catawba Nuclear Station JPM G May 201 5 NRC Exam PAGE 2 OF 10  EVALUATION SHEET Task: Reset Radiation Monitor Trip Setpoints Alternate Path:
Catawba Nuclear Station JPM G May 2015 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:
No    Facility JPM #:
WE-EMF-001  Safety Function: 7 Title: Process Radiation Monitoring System K/A  0 73 A4.0 2 Ability to manually operate and/or monitor in the control room:  Radiation monitoring system control panel Rating(s):
3.7  / 3.7 CFR: 41.7 / 45.5 to 45.8 Preferred Evaluation Location:  Preferred Evaluation  Method:
Simulator X In-Plant  Perform X Simulate  References
: OP/0/A/6500/080 (EMF RP86A Output Modules) rev. 17, Enclosure 4.2 (EMF RP86A Trip Setpoint Adjustment)
Task Standard:
EMF50L TRIP 1 setpoint set to 6.3 E3 CPM and the TRIP 2 setpoint set to 9.0 E3 CPM per OP/0/A/6500/080 (EMF RP86A Output Modules) Enclosure 4.2 (EMF RP86A Trip Setpoint Adjustment).
Validation Time:
10 minutes  Time Critical:
Yes  No X ===========================================================================
Applicant:
Time Start:    ______
____ NAME___________________________
Docket #_______________
Time Finish:  ________
__    Performance Rating:
SAT ____  UNSAT ____
Performance Time ___
__    Examiner: _____________________________
_____________________________/________
NAME  SIGNATURE DATE ===========================================================================
COMMENTS Catawba Nuclear Station JPM G May 201 5 NRC Exam PAGE 3 OF 10  SIMULATOR OPERATOR INSTRUCTIONS:
: 1. ENSURE NRC Examination Security has been established.
: 1. ENSURE NRC Examination Security has been established.
: 2. Reset to IC
: 2. Reset to IC # 168
# 168 3. Enter the password.
: 3. Enter the password.
: 4. Select "Yes" on the INITIAL CONDITION RESET pop
: 4. Select Yes on the INITIAL CONDITION RESET pop-up window.
-up window.
: 5. Ensure simulator setup per table below.
: 5. Ensure simulator setup per table below.
: 6. Place simulator in RUN and acknowledge any alarms.
: 6. Place simulator in RUN and acknowledge any alarms.
: 7. ENSURE "Extra Operator" is present in the simulator.
: 7. ENSURE Extra Operator is present in the simulator.
: 8. Ensure copy of EMF
: 8. Ensure copy of EMF-50 setpoint log page has been replaced.
-50 setpoint log page has been replaced.
: 9. Place simulator in FREEZE until Examiner cue is given.
: 9. Place simulator in FREEZE until Examiner cue is given
Instructor Action                         Delay Ramp Delete Event Final In PAGE 3 OF 10
. Instructor Action Final Delay Ramp Delete In Event Catawba Nuclear Station JPM G May 201 5 NRC Exam PAGE 4 OF 10    READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
 
Catawba Nuclear Station JPM G May 2015 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 1 is at 100% power.
* Unit 1 is at 100% power.
INITIATING CUES:
INITIATING CUES:
Following a discussion with Glenn from RP concerning a premature gaseous release termination, the Control Room Supervisor directs you to set EMF 50L setpoints using OP/0/A/6500/080 (EMF RP86A Output Modules) Enclosure 4.2 (EMF RP86A Trip Setpoint Adjustment) to the following values:
Following a discussion with Glenn from RP concerning a premature gaseous release termination, the Control Room Supervisor directs you to set EMF 50L setpoints using OP/0/A/6500/080 (EMF RP86A Output Modules) Enclosure 4.2 (EMF RP86A Trip Setpoint Adjustment) to the following values:
Trip 1 = 6300 CPM Trip 2 = 9000 CPM OAC Program EMFLIB is currently not available.
* Trip 1 = 6300 CPM
* Trip 2 = 9000 CPM OAC Program EMFLIB is currently not available.
EXAMINER NOTE: After reading the cue, provide the applicant with a copy of OP/0/A/6500/080 (EMF RP86A Output Modules) Enclosure 4.2 (EMF RP86A Trip Setpoint Adjustment).
PAGE 4 OF 10


EXAMINER NOTE
Catawba Nuclear Station JPM G May 2015 NRC Exam STEP/STANDARD                                       SAT/UNSAT START TIME: _______
:  After reading the cue, provide the applicant with a copy of OP/0/A/6500/080 (EMF RP86A Output Modules) Enclosure 4.2 (EMF RP86A Trip Setpoint Adjustment).
NOTE: 1. If desired, EMF setpoints adjustments may be performed from the EMF SETPOINT screen of OAC EMF Library (EMFLIB) Application. EMFLIB is user friendly, no procedure instructions are provided for this application.
 
Catawba Nuclear Station JPM G May 201 5 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 10  START TIME: _______
NOTE: 1. If desired, EMF setpoints adjustments may be performed from the "EMF SETPOINT" screen of OAC EMF Library (EMFLIB) Application. EMFLIB is user friendly, no procedure instructions are provided for this application.
: 2. The Trip Lamps can only be cleared if the activity level has decreased below the Trip Setpoint.
: 2. The Trip Lamps can only be cleared if the activity level has decreased below the Trip Setpoint.
: 3. If any trip setpoint is >1000 cpm, the entered setpoint should be rounded down to the nearest 100 prior to entering to ensure the entered setpoint remains conservative.
: 3. If any trip setpoint is >1000 cpm, the entered setpoint should be rounded down to the nearest 100 prior to entering to ensure the entered setpoint remains conservative.
STEP 1   3.1 IF necessary, press the clear key [CLR] to reset trip lamps STANDARD: Applicant verifies trip lamps dark or depresses the [CLR] key to clear alarms. COMMENTS:       ___ SAT
STEP 1 3.1 IF necessary, press the clear key [CLR] to reset trip lamps
___ UNSAT    STEP 2   3.2 Press the function key [FUN] to bring up the "SELECT FUNCTION" screen.
___ SAT STANDARD:
STANDARD:   Applicant depresses the [FUN] key to bring up the "SELECT FUNCTION" screen.
___ UNSAT Applicant verifies trip lamps dark or depresses the [CLR] key to clear alarms.
This step is critical, due to being the only way to get to the select function screen, which is required to input new Trip 1 and Trip 2 values. COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT    ___UNSAT 
STEP 2 3.2 Press the function key [FUN] to bring up the SELECT                     CRITICAL FUNCTION screen.                                                     STEP STANDARD:                                                                           ___ SAT Applicant depresses the [FUN] key to bring up the SELECT                       ___UNSAT FUNCTION screen.
This step is critical, due to being the only way to get to the select function screen, which is required to input new Trip 1 and Trip 2 values.
COMMENTS:
PAGE 5 0F 10


Catawba Nuclear Station JPM G May 201 5 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 10  STEP 3   3.3 Adjust Trip 1 Setpoint as follows:
Catawba Nuclear Station JPM G May 2015 NRC Exam STEP/STANDARD                               SAT/UNSAT STEP 3 3.3 Adjust Trip 1 Setpoint as follows:                             CRITICAL STEP 3.3.1 Press [1] for Trip 1 setting display screen.
 
___ SAT STANDARD:
====3.3.1 Press====
___ UNSAT Applicant depresses the [1] to bring up the Trip 1 setting display screen.
[1] for Trip 1 setting display screen.
This step is critical to bring up the screen that the new Trip 1 setting will be input into.
COMMENTS:
CRITICAL STEP 4 3.3.2 Key in the desired Trip 1 setpoint.                            STEP STANDARD:                                                                ___ SAT Applicant keys in 6300 CPM using the numeric keypad.                  ___ UNSAT This step is critical to input the new Trip 1 setpoint required to meet the task standard. This new setpoint is checked in the next step. The critical requirement is for the new trip setpoint of 6300 CPM to be entered by the end of this JPM.
COMMENTS:
PAGE 6 0F 10


STANDARD:  Applicant depresses the [1] to bring up the Trip 1 setting display screen. This step is critical to bring up the screen that the new Trip 1 setting will be input into.
Catawba Nuclear Station JPM G May 2015 NRC Exam STEP/STANDARD                                 SAT/UNSAT STEP 5 3.3.3 Ensure the setpoint is correctly displayed in the ENTER      CRITICAL block on the setpoint display screen.                         STEP
___ SAT STANDARD:
___ UNSAT Applicant ensures 6300 CPM is displayed in the ENTER block.
This step is only critical if setpoint was entered wrong in the previous step.
COMMENTS:
COMMENTS:
CRITICAL STEP  ___ SAT  ___ UNSAT STEP 4  3.3.2  Key in the desired Trip 1 setpoint.
NOTE: Once the enter key [ENT] is pressed, the change in Trip 1 alarm setpoint is active.
STANDARD:  Applicant keys in 6300 CPM using the numeric keypad.
STEP 6 3.3.4 Press the enter key [ENT]. This value is now displayed         CRITICAL under Trip 1 and the ENTER block is cleared.               STEP STANDARD:                                                                   ___ SAT Applicant presses the [ENT] key and verifies the correct value under     ___ UNSAT the Trip 1 on the display.
This step is critical to input the new Trip 1 setpoint required to meet the task standard. This new setpoint is checked in the next step. The critical requirement is for the new trip setpoint of 6300 CPM to be entered by the end of this JPM. COMMENTS:
CRITICAL STEP    ___ SAT    ___ UNSAT Catawba Nuclear Station JPM G May 201 5 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 7 0F 10  STEP 5  3.3.3  Ensure the setpoint is correctly displayed in the "ENTER" block on the setpoint display screen.
STANDARD:  Applicant ensures 6300 CPM is displayed in the ENTER block.
This step is only critical if setpoint was entered wrong in the previous step. COMMENTS:
CRITICAL STEP    ___ SAT    ___ UNSAT  NOTE: Once the enter key [ENT] is pressed, the change in Trip 1 alarm setpoint is active.
STEP 6 3.3.4 Press the enter key [ENT]. This value is now displayed under "Trip 1" and the "ENTER" block is cleared.
STANDARD: Applicant presses the [ENT] key and verifies the correct value under the "Trip 1" on the display.
This step is critical to input the new Trip 1 setpoint. Again the critical requirement is to have the Trip 1 setpoint set to 6300 CPM by the end of the JPM.
This step is critical to input the new Trip 1 setpoint. Again the critical requirement is to have the Trip 1 setpoint set to 6300 CPM by the end of the JPM.
COMMENTS:     CRITICAL STEP    ___ SAT    ___ UNSAT 
COMMENTS:
PAGE 7 0F 10


Catawba Nuclear Station JPM G May 201 5 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 10  STEP 7 3.3.5 Press the clear key [CLR] to return to the "SELECT FUNCTION" screen.
Catawba Nuclear Station JPM G May 2015 NRC Exam STEP/STANDARD                               SAT/UNSAT STEP 7 3.3.5 Press the clear key [CLR] to return to the SELECT FUNCTION screen.                                         ___ SAT STANDARD:                                                                 ___ UNSAT Applicant presses the [CLR] key to return to the SELECT FUNCTION screen.
STANDARD: Applicant presses the [CLR] key to return to the "SELECT FUNCTION" screen. COMMENTS:
COMMENTS:
___ SAT    ___ UNSAT STEP 8 3.4 Adjust Trip 2 Setpoint as follows:
STEP 8 3.4 Adjust Trip 2 Setpoint as follows:                             CRITICAL STEP 3.4.1 Press [2] for Trip 2 setting display screen.
___ SAT STANDARD:
___ UNSAT Applicant presses [2] to bring up the Trip 2 setting display screen.
This step is critical to get to the required screen to input the new Trip 2 setpoint.
COMMENTS:
STEP 9 3.4.2 Key in the desired Trip 2 setpoint.                          CRITICAL STEP STANDARD:
___ SAT Applicant enters 9000 CPM using the numeric keypad.
___ UNSAT This step is critical to input the new Trip 2 setpoint required to meet the task standard. This new setpoint is checked in the next step. The critical requirement is for the new trip setpoint of 9000 CPM to be entered by the end of this JPM.
COMMENTS:
PAGE 8 0F 10


====3.4.1 Press====
Catawba Nuclear Station JPM G May 2015 NRC Exam STEP/STANDARD                                SAT/UNSAT STEP 10 3.4.3 Ensure the setpoint is correctly displayed in the ENTER      CRITICAL block on the setpoint display screen.                       STEP STANDARD:                                                                   ___ SAT Applicant ensures 9000 CPM is displayed in the ENTER block.             ___ UNSAT This step is only critical if setpoint was entered wrong in the previous step.
[2] for Trip 2 setting display screen.
COMMENTS:
STANDARD: Applicant presses [2] to bring up the Trip 2 setting display screen
NOTE: Once the enter key [ENT] is pressed, the change in Trip 2 alarm setpoint is active.
. This step is critical to get to the required screen to input the new Trip 2 setpoint.
STEP 11 3.4.4 Press the enter key [ENT]. This value is now displayed        CRITICAL under Trip 2 and the ENTER block is cleared.             STEP STANDARD:                                                                   ___ SAT Applicant presses the [ENT] key and verifies the correct value under    ___ UNSAT the Trip 2 on the display.
COMMENTS:    CRITICAL STEP
This step is critical to input the new Trip 2 setpoint. Again the critical requirement is to have the Trip 2 setpoint set to 9000 CPM by the end of the JPM.
___ SAT  ___ UNSAT  STEP 3.4.2  Key in the desired Trip 2 setpoint.
COMMENTS:
STANDARD: Applicant enters 9000 CPM using the numeric keypad.
STEP 12 3.5 Press the clear key [CLR] twice to return to the normal display screen.                                          ___ SAT STANDARD:                                                                    ___ UNSAT Applicant presses the [CLR] key twice to return to the normal display screen.
This step is critical to input the new Trip 2 setpoint required to meet the task standard. This new setpoint is checked in the next step. The critical requirement is for the new trip setpoint of 9000 CPM to be entered by the end of this JPM.
EXAMINER CUE: Another operator will complete the procedure.
This JPM is complete.
COMMENTS:
COMMENTS:
CRITICAL STEP  ___ SAT  ___ UNSAT Catawba Nuclear Station JPM G May 201 5 NRC Exam  STEP/STANDARD SAT/UNSAT  PAGE 9 0F 10   STEP 10  3.4.3  Ensure the setpoint is correctly displayed in the "ENTER" block on the setpoint display screen.
END OF TASK STOP TIME ________
STANDARD:  Applicant ensures 9000 CPM is displayed in the ENTER block.
PAGE 9 0F 10
This step is only critical if setpoint was entered wrong in the previous step. COMMENTS:  CRITICAL STEP  ___ SAT  ___ UNSAT  NOTE:  Once the enter key [ENT] is pressed, the change in Trip 2 alarm setpoint is active.
STEP 11  3.4.4  Press the enter key [ENT]. This value is now displayed under "Trip 2" and the "ENTER" block is cleared.
STANDARD:  Applicant presses the [ENT] key and verifies the correct value under the "Trip 2" on the display. This step is critical to input the new Trip 2 setpoint. Again the critical requirement is to have the Trip 2 setpoint set to 9000 CPM by the end of the JPM.
COMMENTS:  CRITICAL STEP  ___ SAT  ___ UNSAT  STEP 12  3.5  Press the clear key [CLR] twice to return to the normal display screen.
STANDARD:  Applicant presses the [CLR] key twice to return to the normal display screen. EXAMINER CUE:  "Another operator will complete the procedure. This JPM is complete."


COMMENTS: END OF TASK
___ SAT  ___ UNSAT  STOP TIME ________
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
May 201 5 NRC Initial License Exam JPM G    
May 2015 NRC Initial License Exam JPM G INITIAL CONDITIONS:
* Unit 1 is at 100% power.
INITIATING CUES:
Following a discussion with Glenn from RP concerning a premature gaseous release termination, the Control Room Supervisor directs you to set EMF 50L setpoints using OP/0/A/6500/080 (EMF RP86A Output Modules) Enclosure 4.2 (EMF RP86A Trip Setpoint Adjustment) to the following values:
* Trip 1 = 6300 CPM
* Trip 2 = 9000 CPM OAC Program EMFLIB is currently not available.
 
Catawba Nuclear Station JPM H May 2015 NRC Exam JPM H PAGE 1 OF 10


INITIAL CONDITIONS:
Catawba Nuclear Station JPM H May 2015 NRC Exam EVALUATION SHEET Task:               Loss of KC AP-21 step 8 (Reactor Trip Sequence)
Unit 1 is at 100% power.
Alternate Path:      Yes Facility JPM #:      PSS-KC-083 Safety Function:    8


INITIATING CUES:
==Title:==
Following a discussion with Glenn from RP concerning a premature gaseous release termination, the Control Room Supervisor directs you to set EMF 50L setpoints using OP/0/A/6500/080 (EMF RP86A Output Modules) Enclosure 4.2 (EMF RP86A Trip Setpoint Adjustment) to the following values:
Component Cooling Water System K/A          008 A2.01      Ability to (a) predict the impacts of the following malfunctions or operations on the CCWS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of CCW pump Rating(s):  3.3 / 3.6      CFR:      41.5 / 43.5 / 45.3 / 45.13 Preferred Evaluation Location:                          Preferred Evaluation Method:
Trip 1 = 6300 CPM Trip 2 = 9000 CPM OAC Program EMFLIB is currently not available.
Simulator      X      In-Plant                        Perform              X      Simulate


Catawba Nuclear Station JPM H May 2015 NRC Exam PAGE 1 OF 10  
==References:==
AP/1/A/5500/021 (Loss of Component Cooling) rev. 42 Task Standard:      Aligns steam dumps to pressure mode, trips the reactor and when reactor power is < 5%, trips all NC pumps per AP/1/A/5500/021 (Loss of Component Cooling) step 8.
Validation Time: 5 minutes                              Time Critical:          Yes        No    X
===========================================================================
Applicant:                                                                      Time Start: __________
NAME___________________________ Docket #_______________ Time Finish: __________
Performance Rating:                                                            Performance Time _____
SAT ____ UNSAT ____
Examiner: _____________________________                _____________________________/________
NAME                                      SIGNATURE                  DATE
===========================================================================
COMMENTS PAGE 2 OF 10


JPM H    
Catawba Nuclear Station JPM H May 2015 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:
: 1.      ENSURE NRC Examination Security has been established.
: 2.      Reset to IC # 169.
: 3.      Enter the password.
: 4.      Select Yes on the INITIAL CONDITION RESET pop-up window.
: 5.      Ensure simulator setup per table below.
: 6.      Place simulator in RUN and acknowledge any alarms.
: 7.      ENSURE Extra Operator is present in the simulator.
: 8.      Place simulator in FREEZE until Examiner cue is given.
Instructor Action                Final  Delay Ramp Delete In Event VLV-KC024F (KC425A Rtn Hdr Cont Isol 0
Outside VLV Fail To Position)
Perform actions of AP-21 up to step 8.
PAGE 3 OF 10


Catawba Nuclear Station JPM H May 2015 NRC Exam PAGE 2 OF 10 EVALUATION SHEET Task: Loss of KC AP
Catawba Nuclear Station JPM H May 2015 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:
-21 step 8 (Reactor Trip Sequence)
Alternate Path:
Yes  Facility JPM #:
PSS-KC-083  Safety Function:
8 Title: Component Cooling Water System K/A  00 8 A2.0 1 Ability to (a) predict the impacts of the following malfunctions or operations on the CCWS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:  Loss of CCW pump  Rating(s):
3.3 / 3.6 CFR: 41.5 / 43.5 / 45.3 / 45.
13  Preferred Evaluation Location:
Preferred Evaluation  Method:
Simulator X In-Plant  Perform X Simulate  References
: AP/1/A/5500/021 (Loss of Component Cooling) rev. 42  Task Standard:
Aligns steam dumps to pressure mode, trips the reactor and when reactor power is < 5%, trips all NC pumps per AP/1/A/5500/021 (Loss of Component Cooling) step 8.
Validation Time:
5 minutes  Time Critical:
Yes  No X ===========================================================================
Applicant:
Time Start:    ______
____ NAME___________________________
Docket #_______________
Time Finish:  ________
__    Performance Rating:
SAT ____  UNSAT ____
Performance Time ___
__    Examiner: _____________________________
_____________________________/________
NAME  SIGNATURE DATE ===========================================================================
COMMENTS Catawba Nuclear Station JPM H May 2015 NRC Exam PAGE 3 OF 10  SIMULATOR OPERATOR INSTRUCTIONS:
: 1. ENSURE NRC Examination Security has been established.
: 2. Reset to IC
# 169. 3. Enter the password.
: 4. Select "Yes" on the INITIAL CONDITION RESET pop
-up window.
: 5. Ensure simulator setup per table below.
: 6. Place simulator in RUN and acknowledge any alarms.
: 7. ENSURE "Extra Operator" is present in the simulator.
: 8. Place simulator in FREEZE until Examiner cue is given
. Instructor Action Final Delay Ramp Delete In Event VLV-KC024F (KC425A Rtn Hdr Cont Isol Outside VLV Fail To Position) 0    Perform actions of AP
-21 up to step 8.
Catawba Nuclear Station JPM H May 2015 NRC Exam PAGE 4 OF 10  READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 1 is at 100% power.
* Unit 1 is at 100% power.
AP/1/A/5500/021 (Loss of Component Cooling) has been entered.
* AP/1/A/5500/021 (Loss of Component Cooling) has been entered.
 
INITIATING CUES:
INITIATING CUES:
The CRS instructs you to perform step 8 of AP/1/A/5500/021.
* The CRS instructs you to perform step 8 of AP/1/A/5500/021.
EXAMINER NOTE
EXAMINER NOTE: After reading cue, provide the applicant with a copy of AP/1/A/5500/021 (Loss of Component Cooling) completed through step 7.
: After reading cue, provide the applicant with a copy of AP/1/A/5500/021 (Loss of Component Cooling) completed through step 7.
PAGE 4 OF 10
Catawba Nuclear Station JPM H May 2015 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 5 0F 10   START TIME: _______
CAUTION  A loss of KC cooling to the NC pumps results in a gradual approach to an overheated condition in approximately 10 minutes which will result in shaft seizure. STEP 1  8. Verify KC flow to NC pumps as follows:
1AD-20, A/1 "KC SUPPLY HDR FLOW TO NCP BRGS LOW" - DARK  1AD-21, A/1 "KC SUPPLY HDR FLOW TO NCP BRGS LOW" - DARK  STANDARD:  Applicant determines that the listed alarms are lit and transitions to the RNO. COMMENTS: 


Catawba Nuclear Station JPM H May 2015 NRC Exam STEP/STANDARD                                    SAT/UNSAT START TIME: _______
CAUTION A loss of KC cooling to the NC pumps results in a gradual approach to an overheated condition in approximately 10 minutes which will result in shaft seizure.
STEP 1 8. Verify KC flow to NC pumps as follows:
___ SAT
___ SAT
___ UNSAT STEP 2   8.RNO.a. Ensure the following valves  
* 1AD-20, A/1 KC SUPPLY HDR FLOW TO NCP BRGS LOW - DARK                                                  ___ UNSAT
- OPEN:   1KC-425A (NC Pumps Ret Hdr Cont Isol) 1KC-338B (NC Pumps Sup Hdr Cont Isol) 1KC-424B (NC Pumps Ret Hdr Cont Isol)
* 1AD-21, A/1 KC SUPPLY HDR FLOW TO NCP BRGS LOW - DARK STANDARD:
 
Applicant determines that the listed alarms are lit and transitions to the RNO.
STANDARD:   Applicant determines the red OPEN lights lit and green CLSD lights dark for 1KC-338B & 1KC
COMMENTS:
-424B. Applicant determines that the green CLSD light is lit for 1KC
STEP 2 8.RNO.a. Ensure the following valves - OPEN:                           ___ SAT
-425A and depresses the red OPEN pushbutton. Applicant determines that 1KC
* 1KC-425A (NC Pumps Ret Hdr Cont Isol)             ___UNSAT
-425A will not open.
* 1KC-338B (NC Pumps Sup Hdr Cont Isol)
EXAMINER NOTE: This begins the alternate path of this JPM.
* 1KC-424B (NC Pumps Ret Hdr Cont Isol)
 
STANDARD:
COMMENTS:
Applicant determines the red OPEN lights lit and green CLSD lights dark for 1KC-338B & 1KC-424B. Applicant determines that the green CLSD light is lit for 1KC-425A and depresses the red OPEN pushbutton. Applicant determines that 1KC-425A will not open.
 
EXAMINER NOTE: This begins the alternate path of this JPM.
___ SAT    ___UNSAT 
COMMENTS:
 
PAGE 5 0F 10
Catawba Nuclear Station JPM H May 2015 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 6 0F 10   STEP 3  8.RNO.b.
IF AT ANY TIME any of the following conditions are met:  Time since loss of KC
- GREATER THAN 10 MINUTES OR  Any NC pump trip criteria from Enclosure 1 (Foldout Page) is met
 
THEN perform the following:
EXAMINER CUE:  "Loss of KC occurred greater than 10 minutes ago."
 
STANDARD:  Applicant determines that it has been > 10 minutes since loss of KC per examiner cue and continues with step b.1) of the RNO.
 
COMMENTS: 
 
___ SAT  ___ UNSAT 
 
STEP 4  8.RNO.b.1)
IF letdown is isolated, THEN perform the following:
STANDARD:  Applicant determines that letdown is in service and that this step is N/A.


Catawba Nuclear Station JPM H May 2015 NRC Exam STEP/STANDARD                                      SAT/UNSAT STEP 3 8.RNO.b. IF AT ANY TIME any of the following conditions are met:                                                      ___ SAT
* Time since loss of KC - GREATER THAN 10 MINUTES                                            ___ UNSAT OR
* Any NC pump trip criteria from Enclosure 1 (Foldout Page) is met THEN perform the following:
EXAMINER CUE: Loss of KC occurred greater than 10 minutes ago.
STANDARD:
Applicant determines that it has been > 10 minutes since loss of KC per examiner cue and continues with step b.1) of the RNO.
COMMENTS:
STEP 4 8.RNO.b.1) IF letdown is isolated, THEN perform the following:        ___ SAT
___ UNSAT STANDARD:
Applicant determines that letdown is in service and that this step is N/A.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT 
PAGE 6 0F 10
 
Catawba Nuclear Station JPM H May 2015 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 7 0F 10   STEP 5    8.RNO.b.2)  Ensure steam dumps
- IN PRESSURE MODE.
 
STANDARD:  Applicant places steam dump select switch to "PRESS".
 
This step is critical to ensure proper temperature control following trip of the NC pumps in subsequent steps.


Catawba Nuclear Station JPM H May 2015 NRC Exam STEP/STANDARD                                  SAT/UNSAT STEP 5      8.RNO.b.2) Ensure steam dumps - IN PRESSURE MODE.                  CRITICAL STEP STANDARD:                                                                    ___ SAT Applicant places steam dump select switch to PRESS.                    ___ UNSAT This step is critical to ensure proper temperature control following trip of the NC pumps in subsequent steps.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT STEP 6   8.RNO.b.3)
STEP 6 8.RNO.b.3) Ensure the Reactor - TRIPPED.                               CRITICAL STEP STANDARD:                                                                     ___ SAT Applicant rotates the reactor trip breaker pistol grips counter-clockwise ___ UNSAT to the trip position.
Ensure the Reactor  
EXAMINER CUE: If the applicant starts to perform actions to verify reactor trip, give the following cue - Another operator will perform the immediate actions of E-0.
- TRIPPED.
This step is critical to ensure reactor power is < 5% prior to tripping the NC pumps in subsequent steps.
 
STANDARD: Applicant rotates the reactor trip breaker pistol grips counter
-clockwise to the trip position.
 
EXAMINER CUE: If the applicant starts to perform actions to verify reactor trip, give the following cue  
- "Another operator will perform the immediate actions of E
-0."
This step is critical to ensure reactor power is < 5% prior to tripping the NC pumps in subsequent steps.
 
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT 
PAGE 7 0F 10
 
Catawba Nuclear Station JPM H May 2015 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 8 0F 10   STEP 7  8.RNO.b.4)  WHEN reactor power less than 5%, THEN perform the following:
a)  Trip all NC pumps.
b)  Ensure normal spray valve associated with tripped NC pump(s)
- IN MANUAL AND CLOSED STANDARD:  Applicant depresses the green OFF pushbutton for NC pumps 1A, 1B, 1C, and 1D and verifies the green OFF light lit and red ON light dark for each NC pump. Applicant will depress the [M] button on 1NC
-27 & 1NC-valve until the demand is reading 0%.
Tripping the NC pumps is critical to protect the NC pumps from failure due to a loss of cooling water supply. Closing the spray valve s is not critical.


Catawba Nuclear Station JPM H May 2015 NRC Exam STEP/STANDARD                                  SAT/UNSAT STEP 7 8.RNO.b.4) WHEN reactor power less than 5%, THEN perform                CRITICAL the following:                                          STEP a) Trip all NC pumps.                                ___ SAT b) Ensure normal spray valve associated with tripped NC pump(s) - IN MANUAL AND                ___ UNSAT CLOSED STANDARD:
Applicant depresses the green OFF pushbutton for NC pumps 1A, 1B, 1C, and 1D and verifies the green OFF light lit and red ON light dark for each NC pump. Applicant will depress the [M] button on 1NC-27 &
1NC-29 controllers and depress the [] demand pushbutton on each valve until the demand is reading 0%.
Tripping the NC pumps is critical to protect the NC pumps from failure due to a loss of cooling water supply. Closing the spray valves is not critical.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT STEP 8   8.RNO.b.5) Secure any dilutions in progress.
STEP 8 8.RNO.b.5) Secure any dilutions in progress.
STANDARD: Applicant determines that no dilutions are in progress and continues to the next step.
___ SAT STANDARD:                                                                     ___ UNSAT Applicant determines that no dilutions are in progress and continues to the next step.
 
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT 
PAGE 8 0F 10
 
Catawba Nuclear Station JPM H May 2015 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 9 0F 10   STEP 9  8.RNO.b.6)
IF reactor trip breakers were closed, THEN perform one of the following while continuing with this procedure as time and conditions allow:
IF above P-11, THEN GO TO EP/1/A/5000/E
-0 (Reactor Trip or Safety Injection)
OR  IF below P-11, THEN GO TO AP/1/A/5500/005 (Reactor Trip or Inadvertent S/I Below P
-11)
STANDARD:  Applicant determines the need to go to E
-0. EXAMINER CUE
:  "The CRS has pulled E
-0 and another RO will perform the immediate actions of E
-0. This JPM is complete."


Catawba Nuclear Station JPM H May 2015 NRC Exam STEP/STANDARD                              SAT/UNSAT STEP 9 8.RNO.b.6) IF reactor trip breakers were closed, THEN perform one of the following while continuing with this  ___ SAT procedure as time and conditions allow:
___ UNSAT
* IF above P-11, THEN GO TO EP/1/A/5000/E-0 (Reactor Trip or Safety Injection)
OR
* IF below P-11, THEN GO TO AP/1/A/5500/005 (Reactor Trip or Inadvertent S/I Below P-11)
STANDARD:
Applicant determines the need to go to E-0.
EXAMINER CUE: The CRS has pulled E-0 and another RO will perform the immediate actions of E-0. This JPM is complete.
COMMENTS:
COMMENTS:
END OF TASK
END OF TASK STOP TIME ________
___ SAT  ___ UNSAT 
PAGE 9 0F 10


STOP TIME ________
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
May 2015 NRC Initial License Exam JPM H    
May 2015 NRC Initial License Exam JPM H INITIAL CONDITIONS:
* Unit 1 is at 100% power.
* AP/1/A/5500/021 (Loss of Component Cooling) has been entered.
INITIATING CUES:
* The CRS instructs you to perform step 8 of AP/1/A/5500/021.


INITIAL CONDITIONS:
Catawba Nuclear Station JPM I May 2015 NRC Exam JPM I PAGE 1 OF 13
Unit 1 is at 100% power.
AP/1/A/5500/021 (Loss of Component Cooling) has been entered.


INITIATING CUES:
Catawba Nuclear Station JPM I May 2015 NRC Exam EVALUATION SHEET Task:               Place 1B Hydrogen Recombiner in Service Alternate Path:      No Facility JPM #:      VX-025 Safety Function:    5
The CRS instructs you to perform step 8 of AP/1/A/5500/021.


Catawba Nuclear Station JPM I May 2015 NRC Exam PAGE 1 OF 13  
==Title:==
Hydrogen Recombiner and Purge Control System K/A          028 A2.01      Malfunctions or operations on the HRPS; and (b) based on those predictions, use procedures to correct, control or mitigate the consequences of those malfunctions or operations: Hydrogen Recombiner power setting, determined by using plant data book Rating(s):  3.4 / 3.6      CFR:      41.5 / 43.5 / 45.3 / 45.13 Preferred Evaluation Location:                        Preferred Evaluation Method:
Simulator              In-Plant        X              Perform                    Simulate    X


JPM I 
==References:==
OP/1/A/6450/010 (Containment Hydrogen Control Systems) rev. 43, Enclosure 4.10 (Operation of the Hydrogen Recombiners Following a LOCA)
Unit 1 Revised Data Book, Figure 10 Task Standard:      Hydrogen Recombiner 1B in service with Power Adjust POT set to approximately 58 KW per Figure 10 of the Unit 1 Revised Data Book.
Validation Time: 15 minutes                            Time Critical:        Yes          No    X
===========================================================================
Applicant:                                                                  Time Start: __________
NAME___________________________ Docket #_______________ Time Finish: __________
Performance Rating:                                                        Performance Time _____
SAT ____ UNSAT ____
Examiner: _____________________________                _____________________________/________
NAME                                    SIGNATURE                  DATE
===========================================================================
COMMENTS PAGE 2 OF 13


Catawba Nuclear Station JPM I May 2015 NRC Exam PAGE 2 OF 13  EVALUATION SHEET Task: Place 1B Hydrogen Recombiner in Service Alternate Path:
Catawba Nuclear Station JPM I May 2015 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:
No  Facility JPM #:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
VX-025  Safety Function:
5 Title: Hydrogen Recombiner and Purge Control System K/A  0 2 8 A2.0 1 Malfunctions or operations on the HRPS; and (b) based on those predictions, use procedures to correct, control or mitigate the consequences of those malfunctions or operations:  Hydrogen Recombiner power setting, determined by using plant data book Rating(s):
3.4 / 3.6 CFR: 41.5 / 43.5 / 45.3 / 45.
13  Preferred Evaluation Location:
Preferred Evaluation  Method:
Simulator  In-Plant    X  Perform  Simulate      X  References
: OP/1/A/6450/010 (Containment Hydrogen Control Systems) rev. 43, Enclosure 4.10 (Operation of the Hydrogen Recombiners Following a LOCA)
Unit 1 Revised Data Book, Figure 10 Task Standard:
Hydrogen Recombiner 1B in service with Power Adjust "POT" set to approximately 58 KW per Figure 10 of the Unit 1 Revised Data Book.
Validation Time:
1 5 minutes  Time Critical:
Yes  No X ===========================================================================
Applicant:
Time Start:    ______
____ NAME___________________________
Docket #_______________
Time Finish:  ________
__    Performance Rating:
SAT ____  UNSAT ____
Performance Time ___
__    Examiner: _____________________________
_____________________________/________
NAME  SIGNATURE DATE ===========================================================================
COMMENTS Catawba Nuclear Station JPM I May 2015 NRC Exam PAGE 3 OF 13    READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
A LOCA has occurred on Unit 1.
* A LOCA has occurred on Unit 1.
 
INITIATING CUES:
INITIATING CUES:
The CRS instructs you to place Hydrogen Recombiner 1B in service at the required power per OP/1/A/6450/010 (Containment Hydrogen Control Systems), Enclosure 4.10 (Operation of the Hydrogen Recombiners Following a LOCA), steps 3.1 through 3.3.14.
* The CRS instructs you to place Hydrogen Recombiner 1B in service at the required power per OP/1/A/6450/010 (Containment Hydrogen Control Systems), Enclosure 4.10 (Operation of the Hydrogen Recombiners Following a LOCA), steps 3.1 through 3.3.14.
All initial conditions are complete.
* All initial conditions are complete.
Containment pressure is 4.3 psig.
* Containment pressure is 4.3 psig.
Containment hydrogen concentration is 5% as indicated on 1MC
* Containment hydrogen concentration is 5% as indicated on 1MC-7.
-7. Hydrogen Recombiner 1A is tagged for maintenance.
* Hydrogen Recombiner 1A is tagged for maintenance.
EXAMINER NOTE
EXAMINER NOTE: After reading cue, provide the applicant with a copy of OP/1/A/6450/010 rev. 43, Enclosure 4.10 signed off through step 2.2 and a copy of Unit 1 Revised Data Book Figure 10.
: After reading cue, provide the applicant with a copy of OP/1/A/6450/010 rev. 43, Enclosure 4.10 signed off through step 2.2 and a copy of Unit 1 Revised Data Book Figure 10.
PAGE 3 OF 13


Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 4 0F 13  START TIME: _______
Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD                                   SAT/UNSAT START TIME: _______
STEP 1   3.1 Ensure the H2 Skimmer Fans running per Enclosure 4.13 (Emergency Manual Operation of the H2 Skimmer Fans)
STEP 1 3.1 Ensure the H2 Skimmer Fans running per Enclosure 4.13 (Emergency Manual Operation of the H2 Skimmer Fans)           ___ SAT EXAMINER CUE: Hydrogen Skimmer Fans 1A & 1B are running per                 ___ UNSAT Enclosure 4.13.
EXAMINER CUE
STANDARD:
: "Hydrogen Skimmer Fans 1A & 1B are running per Enclosure 4.13."
Applicant acknowledges cue and signs off the step.
STANDARD: Applicant acknowledges cue and signs off the step.
COMMENTS:
COMMENTS:
___ SAT
CAUTION: Hydrogen Recombiners are NOT operated with hydrogen concentration > 6%
___ UNSAT    CAUTION: Hydrogen Recombiners are NOT operated with hydrogen concentration  
without TSC approval.
> 6% without TSC approval.
NOTE: 1. If desired to place both Hydrogen Recombiners in service, Steps 3.2 and 3.3 may be performed in conjunction.
NOTE: 1. If desired to place both Hydrogen Recombiners in service, Steps 3.2 and 3.3 may be performed in conjunction.
: 2. If desired to place both Hydrogen Recombiners in service, use additional Enclosure 4.11 (Hydrogen Recombiner Heater Temperature Log).
: 2. If desired to place both Hydrogen Recombiners in service, use additional Enclosure 4.11 (Hydrogen Recombiner Heater Temperature Log).
: 3. Placing Hydrogen Recombiner 1A in service is preferred for ALARA consideration.
: 3. Placing Hydrogen Recombiner 1A in service is preferred for ALARA consideration.
STEP 2   3.2 IF placing Hydrogen Recombiner 1A in service, perform the following at 1ELCP0139 (1A Hydrogen Recombiner Control Panel) (AB
STEP 2 3.2 IF placing Hydrogen Recombiner 1A in service, perform the following at 1ELCP0139 (1A Hydrogen Recombiner Control         ___ SAT Panel) (AB-577, DD-52, Rm 494):
-577, DD-52, Rm 494)
___UNSAT STANDARD:
:
Applicant determines that per the cue sheet, Hydrogen Recombiner 1A is tagged out for maintenance, and that this step is N/A.
STANDARD:   Applicant determines that per the cue sheet, Hydrogen Recombiner 1A is tagged out for maintenance, and that this step is N/A.
 
COMMENTS:
COMMENTS:
___ SAT    ___UNSAT 
PAGE 4 0F 13
 
Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 5 0F 13   STEP 3  3.3  IF placing Hydrogen Recombiner 1B in service, perform the following at 1ELCP0140 (1B Hydrogen Recombiner Control Panel) (AB
-560, DD-52, Rm 370):


====3.3.1 Ensure====
Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD                            SAT/UNSAT STEP 3 3.3 IF placing Hydrogen Recombiner 1B in service, perform the following at 1ELCP0140 (1B Hydrogen Recombiner Control  ___ SAT Panel) (AB-560, DD-52, Rm 370):
the "POWER OUT SWITCH" is in the "OFF" position. STANDARD: Applicant locates the Power Out Switch and ensures it is in the OFF position. EXAMINER CUE: "The "POWER OUT SWITCH" is in the "OFF" position."
___ UNSAT 3.3.1 Ensure the POWER OUT SWITCH is in the OFF position.
STANDARD:
Applicant locates the Power Out Switch and ensures it is in the OFF position.
EXAMINER CUE: The POWER OUT SWITCH is in the OFF position.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT STEP 4   3.3.2 Ensure the "POWER ADJUST" potentiometer is set to zero (000).
STEP 4 3.3.2 Ensure the POWER ADJUST potentiometer is set to zero   ___ SAT (000).
STANDARD: Applicant verifies the "POWER ADJUST" potentiometer is set to 000.
___ UNSAT STANDARD:
EXAMINER CUE: "The "POWER ADJUST" pot is set to zero (000)."
Applicant verifies the POWER ADJUST potentiometer is set to 000.
 
EXAMINER CUE: The POWER ADJUST pot is set to zero (000).
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 6 0F 13   STEP 5    3.3.3  IF the "POWER IN AVAILABLE" light is DARK, ensure 1EMXL-F07C (1B Electric Hydrogen Recombiner Power Supply Panel) (AB
PAGE 5 0F 13
-560, BB-47) is in the "ON" position.
EXAMINER CUE
:  "The "POWER IN AVAILABLE" light is lit."
STANDARD:  Applicant determines that with the POWER IN AVAILABLE light being lit, this step is N/A.


Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD                                SAT/UNSAT STEP 5      3.3.3 IF the POWER IN AVAILABLE light is DARK, ensure 1EMXL-F07C (1B Electric Hydrogen Recombiner Power      ___ SAT Supply Panel) (AB-560, BB-47) is in the ON position.
___ UNSAT EXAMINER CUE: The POWER IN AVAILABLE light is lit.
STANDARD:
Applicant determines that with the POWER IN AVAILABLE light being lit, this step is N/A.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT    STEP 6   3.3.4 Place the "POWER OUT SWITCH" in the "ON" position.
STEP 6 3.3.4 Place the POWER OUT SWITCH in the ON position.             CRITICAL STEP EXAMINER CUE: After applicant describes placing the POWER OUT SWITCH up to the ON position, The POWER OUT         ___ SAT SWITCH is in the ON position.
EXAMINER CUE: After applicant describes placing the POWER OUT SWITCH up to the ON position, "The POWER OUT SWITCH is in the "ON" position."
STANDARD:                                                                 ___ UNSAT Applicant places the POWER OUT SWITCH up to the ON position.
STANDARD: Applicant places the POWER OUT SWITCH up to the ON position.
This step is critical to place the hydrogen recombiner in service.
This step is critical to place the hydrogen recombiner in service.
COMMENTS:     CRITICAL STEP    ___ SAT  ___ UNSAT 
COMMENTS:
PAGE 6 0F 13


Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 13  STEP 7   3.3.5 Verify that the red indicating light is lit.
Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD                               SAT/UNSAT STEP 7 3.3.5 Verify that the red indicating light is lit.
EXAMINER CUE: After finding the indicating light on the switch plate inform the applicant  
___ SAT EXAMINER CUE: After finding the indicating light on the switch plate inform the applicant - The RED light on the switch   ___ UNSAT plate is lit.
- "The RED light on the switch plate is lit."
STANDARD:
STANDARD: Applicant finds the red indicating light on the switch plate and verifies that it is lit.
Applicant finds the red indicating light on the switch plate and verifies that it is lit.
COMMENTS:
STEP 8 3.3.6 Slowly turn the POWER ADJUST potentiometer clockwise until 5 KW is indicated on the POWER OUT      ___ SAT meter.
___ UNSAT EXAMINER CUE: After explaining operation of the potentiometer in the clockwise direction, inform applicant - The POWER OUT meter rises to 5 KW.
STANDARD:
Applicant describes turning the potentiometer clockwise to increase the POWER OUTPUT meter reading to 5 KW.
COMMENTS:
PAGE 7 0F 13


COMMENTS:        ___ SAT   ___ UNSAT STEP 3.3.6  Slowly turn the "POWER ADJUST" potentiometer clockwise until 5 KW is indicated on the "POWER OUT" meter.
Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD                                  SAT/UNSAT STEP 9 3.3.7 Maintain a 5 KW output for 10 minutes.
EXAMINER CUE:
___ SAT EXAMINER CUE: Using time compression, 10 minutes has elapsed.
After explaining operation of the potentiometer in the clockwise direction, inform applicant
___ UNSAT STANDARD:
- "The POWER OUT meter rises to 5 KW".
Applicant describes maintaining this power output for 10 minutes.
STANDARD: Applicant describes turning the potentiometer clockwise to increase the POWER OUTPUT meter reading to 5 KW.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 8 0F 13  STEP 9  3.3.7  Maintain a 5 KW output for 10 minutes.
STEP 10 3.3.8 Slowly advance the POWER ADJUST setting until an output of 10 KW is obtained on the POWER OUT meter.     ___ SAT EXAMINER CUE: After explaining the operation of the potentiometer in the ___ UNSAT clockwise direction inform applicant - The POWER OUT meter rises to 10 KW.
EXAMINER CUE
STANDARD:
"Using time compression, 10 minutes has elapsed."
Applicant describes turning the potentiometer clockwise to increase the POWER OUTPUT meter reading to 10 KW.
STANDARD: Applicant describes maintaining this power output for 10 minutes.
 
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT    STEP 10  3.3.8  Slowly advance the "POWER ADJUST" setting until an output of 10 KW is obtained on the "POWER OUT" meter.
STEP 11 3.3.9 Maintain a 10 KW output for 10 minutes.
 
___ SAT EXAMINER CUE: Using time compression, 10 minutes has elapsed.
EXAMINER CUE: After explaining the operation of the potentiometer in the clockwise direction inform applicant
___ UNSAT STANDARD:
-  "The POWER OUT meter rises to 10 KW."
Applicant describes maintaining this power output for 10 minutes.
STANDARD: Applicant describes turning the potentiometer clockwise to increase the POWER OUTPUT meter reading to 10 KW.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT    STEP 11  3.3.9  Maintain a 10 KW output for 10 minutes.
PAGE 8 0F 13
EXAMINER CUE
:  "Using time compression, 10 minutes has elapsed."
STANDARD:  Applicant describes maintaining this power output for 10 minutes.


Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD                                  SAT/UNSAT STEP 12 3.3.10 Advance the POWER ADJUST setting until an output of 20 KW is obtained on the POWER OUT meter.          ___ SAT EXAMINER CUE: After explaining the operation of the potentiometer in      ___ UNSAT the clockwise direction inform applicant - The POWER OUT meter rises to 20 KW.
STANDARD:
Applicant describes turning the potentiometer clockwise to increase the POWER OUTPUT meter reading to 20 KW.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 9 0F 13   STEP 12  3.3.10  Advance the "POWER ADJUST" setting until an output of 20 KW is obtained on the "POWER OUT" meter.
STEP 13 3.3.11 Maintain a 20 KW output for 5 minutes.
EXAMINER CUE
___ SAT EXAMINER CUE: Using time compression, 5 minutes has elapsed.
: After explaining the operation of the potentiometer in the clockwise direction inform applicant
___ UNSAT STANDARD:
-  "The POWER OUT meter rises to 20 KW."  STANDARD: Applicant describes turning the potentiometer clockwise to increase the POWER OUTPUT meter reading to 20 KW.
Applicant describes maintaining this power output for 5 minutes.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT    STEP 13   3.3.11  Maintain a 20 KW output for 5 minutes.
PAGE 9 0F 13
EXAMINER CUE
:  "Using time compression, 5 minutes has elapsed."
STANDARD:  Applicant describes maintaining this power output for 5 minutes.


Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD                                SAT/UNSAT STEP 14 3.3.12 Determine Hydrogen Recombiner 1B power setting as          CRITICAL follows:                                                STEP 3.3.12.1 Determine KW value from Figure 10 of the Unit ___ SAT 1 Revised Data Book.
___ UNSAT EXAMINER NOTE: The applicant will use the copy of Unit 1 Revised Data Book Figure 10 provided with the initiating cue.
STANDARD:
Applicant determines that the KW value from Figure 10 is 54 KW.
This step is critical in determining the proper power setting for the given containment conditions.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 10 0F 13  STEP 14  3.3.12 Determine Hydrogen Recombiner 1B power setting as follows:  3.3.12.1  Determine KW value from Figure 10 of the Unit 1 Revised Data Book.
STEP 15 3.3.12.2 H2 concentration (1MC-7) ________ %
EXAMINER NOTE:  The applicant will use the copy of Unit 1 Revised Data Book Figure 10 provided with the initiating cue. STANDARD: Applicant determines that the KW value from Figure 10 is 54 KW. This step is critical in determining the proper power setting for the given containment conditions.
___ SAT STANDARD:
___ UNSAT Applicant determines from cue sheet that hydrogen concentration is 5%.
COMMENTS:
COMMENTS:
CRITICAL STEP   ___ SAT   ___ UNSAT     STEP 15  3.3.12.2  H 2 concentration (1MC
PAGE 10 0F 13
-7) ________ %
 
STANDARD: Applicant determines from cue sheet that hydrogen concentration is 5%.
Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD                          SAT/UNSAT STEP 16 3.3.12.3 IF H2 concentration is > 3.5%, add 4 KW to            CRITICAL calculation.                                      STEP STANDARD:                                                             ___ SAT Applicant determines that H2 concentration is > 3.5% and adds 4 KW ___ UNSAT to the calculation.
This step is critical in determining the proper power setting for the given containment conditions.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 11 0F 13   STEP 16   3.3.12.3 IF H 2 concentration is > 3.5%, add 4 KW to calculation.
STEP 17 3.3.12.4 Calculate KW as follows:                              CRITICAL STEP 54    +        4        =   58   KW Step 3.3.12.1  Step 3.3.12.3 or N/A              ___ SAT STANDARD:
STANDARD: Applicant determines that H2 concentration is > 3.5% and adds 4 KW to the calculation.
___ UNSAT Applicant calculates the required power setting to be 58 KW.
This step is critical in determining the proper power setting for the given containment conditions.
This step is critical in determining the proper power setting for the given containment conditions.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT    STEP 1 7  3.3.12.4  Calculate KW as follows:
PAGE 11 0F 13
54      +
4         
=          58 KW Step 3.3.12.1 Step 3.3.12.3 or N/A STANDARD:  Applicant calculates the required power setting to be 58 KW.


This step is critical in determining the proper power setting for the given containment conditions.
Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD                               SAT/UNSAT STEP 18 3.3.13 Advance the POWER ADJUST setting until the                 CRITICAL POWER OUT meter indicates the value calculated in       STEP 3.3.12.4. Adjust POWER ADJUST as necessary to maintain this output.                                   ___ SAT EXAMINER CUE: After explaining the operation of the potentiometer in       ___ UNSAT the clockwise direction inform applicant - The POWER OUT meter rises to 58 KW.
COMMENTS:
STANDARD:
CRITICAL STEP    ___ SAT  ___ UNSAT Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 12 0F 13  STEP 1 8  3.3.13 Advance the "POWER ADJUST" setting until the "POWER OUT" meter indicates the value calculated in 3.3.12.4. Adjust "POWER ADJUST" as necessary to maintain this output.
Applicant describes turning the potentiometer clockwise to increase the POWER OUTPUT meter reading to 58 KW.
EXAMINER CUE: After explaining the operation of the potentiometer in the clockwise direction inform applicant  
- "The POWER OUT meter rises to 58 KW.STANDARD: Applicant describes turning the potentiometer clockwise to increase the POWER OUTPUT meter reading to 58 KW.
This step is critical to set the necessary power output setting for the given containment conditions.
This step is critical to set the necessary power output setting for the given containment conditions.
COMMENTS:
COMMENTS:
CRITICAL STEP   ___ SAT  ___ UNSAT    STEP 1 9  3.3.14 Notify the NCO that Hydrogen Recombiner 1B is now in service. Person notified _______________________
STEP 19 3.3.14 Notify the NCO that Hydrogen Recombiner 1B is now in service.                                               ___ SAT Person notified _______________________
STANDARD: Applicant calls the control room and notifies them that 1B Hydrogen Recombiner is in service.
___ UNSAT STANDARD:
EXAMINER CUE
Applicant calls the control room and notifies them that 1B Hydrogen Recombiner is in service.
: "Unit 1 Control Room, this is Greg."
EXAMINER CUE: Unit 1 Control Room, this is Greg. Repeat any additional information given.
Repeat any additional information given.
COMMENTS:
COMMENTS:
END OF TASK
END OF TASK STOP TIME ________
___ SAT  ___ UNSAT   
PAGE 12 0F 13


STOP TIME ________
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
May 2015 NRC Initial License Exam JPM I    
May 2015 NRC Initial License Exam JPM I INITIAL CONDITIONS:
* A LOCA has occurred on Unit 1.
INITIATING CUES:
* The CRS instructs you to place Hydrogen Recombiner 1B in service at the required power per OP/1/A/6450/010 (Containment Hydrogen Control Systems), Enclosure 4.10 (Operation of the Hydrogen Recombiners Following a LOCA), steps 3.1 through 3.3.14.
* All initial conditions are complete.
* Containment pressure is 4.3 psig.
* Containment hydrogen concentration is 5% as indicated on 1MC-7.
* Hydrogen Recombiner 1A is tagged for maintenance.


INITIAL CONDITIONS:
Catawba Nuclear Station JPM J May 2015 NRC Exam JPM J PAGE 1 OF 11
A LOCA has occurred on Unit 1.


INITIATING CUES:
Catawba Nuclear Station JPM J May 2015 NRC Exam EVALUATION SHEET Task:               Locally Start 2B Diesel Generator Alternate Path:      Yes Facility JPM #:      DG3-008 Safety Function:    6
The CRS instructs you to place Hydrogen Recombiner 1B in service at the required power per OP/1/A/6450/010 (Containment Hydrogen Control Systems), Enclosure 4.10 (Operation of the Hydrogen Recombiners Following a LOCA), steps 3.1 through 3.3.14.
All initial conditions are complete.
Containment pressure is 4.3 psig. Containment hydrogen concentration is 5% as indicated on 1MC
-7. Hydrogen Recombiner 1A is tagged for maintenance.


Catawba Nuclear Station JPM J May 2015 NRC Exam PAGE 1 OF 11 
==Title:==
Emergency Diesel Generators K/A          064 A2.01      Ability to (a) predict the impacts of the following malfunctions or operations on the ED/G system; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Failure modes of water, oil, and air valves Rating(s):  3.1 / 3.3      CFR:      41.5 / 43.5 / 45.3 / 45.13 Preferred Evaluation Location:                          Preferred Evaluation Method:
Simulator              In-Plant          X              Perform                    Simulate      X


JPM J 
==References:==
AP/2/A/5500/007 (Loss of Normal Power) rev. 72, Enclosure 11 (Energizing 2ETB From 2B D/G)
Task Standard:      2B D/G is started locally; then secured due to inability to align cooling water supply.
Validation Time: 17 minutes                            Time Critical:          Yes        No      X
===========================================================================
Applicant:                                                                    Time Start: __________
NAME___________________________ Docket #_______________ Time Finish: __________
Performance Rating:                                                            Performance Time _____
SAT ____ UNSAT ____
Examiner: _____________________________                _____________________________/________
NAME                                      SIGNATURE                  DATE
===========================================================================
COMMENTS PAGE 2 OF 11


Catawba Nuclear Station JPM J May 2015 NRC Exam PAGE 2 OF 11  EVALUATION SHEET Task: Locally Start 2B Diesel Generator Alternate Path:
Catawba Nuclear Station JPM J May 2015 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:
Yes  Facility JPM #:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
DG3-008  Safety Function:
6 Title: Emergency Diesel Generators K/A  0 64 A2.0 1 Ability to (a) predict the impacts of the following malfunctions or operations on the ED/G system; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:  Failure modes of water, oil, and air valves Rating(s):
3.1 / 3.3 CFR: 41.5 / 43.5 / 45.3 / 45.
13  Preferred Evaluation Location:
Preferred Evaluation  Method:
Simulator  In-Plant    X  Perform  Simulate      X  References
: AP/2/A/5500/007 (Loss of Normal Power) rev. 72, Enclosure 11 (Energizing 2ETB From 2B D/G)
Task Standard:
2B D/G is started locally; then secured due to inability to align cooling water supply. Validation Time:
1 7 minutes  Time Critical:  Yes  No X ===========================================================================
Applicant:
Time Start:    ______
____ NAME___________________________
Docket #_______________
Time Finish:  ________
__    Performance Rating:
SAT ____  UNSAT ____
Performance Time ___
__    Examiner: _____________________________
_____________________________/________
NAME  SIGNATURE DATE ===========================================================================
COMMENTS Catawba Nuclear Station JPM J May 2015 NRC Exam PAGE 3 OF 11    READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 2 has experienced a loss of all AC power to 2ETB.
* Unit 2 has experienced a loss of all AC power to 2ETB.
The reason for the loss of AC power has been corrected.
* The reason for the loss of AC power has been corrected.
The 2ETB load shed is complete.
* The 2ETB load shed is complete.
 
INITIATING CUES:
INITIATING CUES:
The CRS instructs you to energize 2ETB from 2B D/G by performing AP/2/A/5500/007 (Loss of Normal Power) Enclosure 11 (Energizing 2ETB From D/G).
* The CRS instructs you to energize 2ETB from 2B D/G by performing AP/2/A/5500/007 (Loss of Normal Power) Enclosure 11 (Energizing 2ETB From D/G).
Key #757 and flashlight have been obtained.
* Key #757 and flashlight have been obtained.
EXAMINER NOTE
EXAMINER NOTE: After reading cue, provide the applicant with a copy of AP/2/A/5500/007 rev. 72, Enclosure 11.
: After reading cue, provide the applicant with a copy of AP/2/A/5500/007 rev. 72, Enclosure 11.
PAGE 3 OF 11


Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 4 0F 11  START TIME: _______
Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD                                 SAT/UNSAT START TIME: _______
STEP 1   1. Obtain the following:
STEP 1 1. Obtain the following:
Key #757 (2A/2B D/G Test Start Switch) from WCC Key locker Flashlight.
___ SAT
 
* Key #757 (2A/2B D/G Test Start Switch) from WCC Key locker                                                     ___ UNSAT
STANDARD: Applicant determines from initiating cue that key #757 and flashlight have been obtained.
* Flashlight.
STANDARD:
Applicant determines from initiating cue that key #757 and flashlight have been obtained.
COMMENTS:
COMMENTS:
___ SAT
STEP 2 2. Do not continue in this enclosure until notified that load shed of 2ETB is complete.                                     ___ SAT STANDARD:                                                               ___UNSAT Applicant determines from initial conditions that 2ETB load shed is complete and continues with the procedure.
___ UNSAT    STEP 2   2. Do not continue in this enclosure until notified that load shed of 2ETB is complete.
 
STANDARD:   Applicant determines from initial conditions that 2ETB load shed is complete and continues with the procedure.
 
COMMENTS:
COMMENTS:
___ SAT    ___UNSAT 
PAGE 4 0F 11


Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 11  STEP 3   3. Start D/G 2B as follows:
Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD                               SAT/UNSAT STEP 3 3. Start D/G 2B as follows:                                         CRITICAL STEP
: a. Notify Control Room Operator to place "D/G 2B CTRL LOCATION" switch on 2MC
: a. Notify Control Room Operator to place D/G 2B CTRL LOCATION switch on 2MC-11 in LOCAL position.         ___ SAT STANDARD:                                                                 ___ UNSAT Applicant calls the control room operator and directs placing the D/G 2B CONTROL LOCATION switch to the LOCAL position.
-11 in "LOCAL" position.
EXAMINER CUE: D/G 2B CTRL LOCATION SWITCH is in the LOCAL position.
STANDARD: Applicant calls the control room operator and directs placing the D/G 2B CONTROL LOCATION switch to the LOCAL position.
EXAMINER CUE: "D/G 2B CTRL LOCATION SWITCH is in the LOCAL position."
This step is critical to be able to start 2B D/G locally and gain control of the D/G output breaker to tie 2B D/G to 2ETB.
This step is critical to be able to start 2B D/G locally and gain control of the D/G output breaker to tie 2B D/G to 2ETB.
COMMENTS:
COMMENTS:
CRITICAL STEP   ___ SAT   ___ UNSAT
STEP 4 3.b. IF unable to transfer diesel to Local Control, THEN actuate    ___ SAT CONTROL ROOM OVERRIDE at breakglass station on 2DGCPB.                                                    ___ UNSAT STANDARD:
Applicant determines that per previous examiner cue that this step is N/A.
COMMENTS:
PAGE 5 0F 11


STEP 3.b. IF unable to transfer diesel to Local Control, THEN actuate "CONTROL ROOM OVERRIDE" at breakglass station on 2DGCPB.
Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD                                  SAT/UNSAT STEP 5    3.c. Place key in MANUAL TEST START keyswitch and turn            CRITICAL to START position.                                        STEP EXAMINER CUE: After describing inserting the key and rotating                ___ SAT switch to the START position, notify applicant -
STANDARD: Applicant determines that per previous examiner cue that this step is N/A.
The 2B D/G has started and is coming up to            ___ UNSAT operating speed.
STANDARD:
Applicant describes inserting key #757 into the MANUAL TEST START keyswitch and rotating it clockwise to the START position.
This step is critical to start the D/G to meet the task given for this JPM.
COMMENTS:
STEP 6 3.d. Ensure SPEED CONTROL is adjusted to obtain frequency of between 58.8 and 61.2 Hz.                                ___ SAT EXAMINER CUE: When frequency meter is found, inform applicant -              ___ UNSAT Frequency is 60 Hz.
STANDARD:
Applicant finds the frequency meter and verifies that frequency is in the required band.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 6 0F 11   STEP 5    3.c. Place key in "MANUAL TEST START" keyswitch and turn to "START" position.
PAGE 6 0F 11
EXAMINER CUE
:  After describing inserting the key and rotating switch to the START position, notify applicant
-  "The 2B D/G has started and is coming up to operating speed."
STANDARD:  Applicant describes inserting key #757 into the MANUAL TEST START keyswitch and rotating it clockwise to the START position.
This step is critical to start the D/G to meet the task given for this JPM. COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT    STEP 6  3.d. Ensure "SPEED CONTROL" is adjusted to obtain frequency of between 58.8 and 61.2 Hz.
 
EXAMINER CUE
:  When frequency meter is found, inform applicant
- "Frequency is 60 Hz."
 
STANDARD:  Applicant finds the frequency meter and verifies that frequency is in the required band.
 
COMMENTS:        ___ SAT  ___ UNSAT 
 
Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 7 0F 11  STEP 7  3.e. Ensure "VOLTAGE CONTROL" is adjusted to obtain "D/G VOLTAGE" between 4160 and 4600 Volts.
EXAMINER CUE
:  When voltage meter is found, inform applicant
- "Voltage is 4100 Volts
."  STANDARD:  Applicant finds the D/G voltage meter and when discovering that voltage is low, will describe depressing the VOLTAGE RAISE pushbutton to increase D/G voltage.
EXAMINER CUE:  After applicant describes depressing the VOLTAGE RAISE pushbutton, inform them
- "D/G Voltage now reads 4200 Volts."


Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD                          SAT/UNSAT STEP 7 3.e. Ensure VOLTAGE CONTROL is adjusted to obtain D/G      CRITICAL VOLTAGE between 4160 and 4600 Volts.                  STEP EXAMINER CUE: When voltage meter is found, inform applicant -        ___ SAT Voltage is 4100 Volts.
___ UNSAT STANDARD:
Applicant finds the D/G voltage meter and when discovering that voltage is low, will describe depressing the VOLTAGE RAISE pushbutton to increase D/G voltage.
EXAMINER CUE: After applicant describes depressing the VOLTAGE RAISE pushbutton, inform them - D/G Voltage now reads 4200 Volts.
This step is critical to ensure the D/G is operating at the proper voltage prior to tying it to 2ETB in the following step.
This step is critical to ensure the D/G is operating at the proper voltage prior to tying it to 2ETB in the following step.
COMMENTS:     CRITICAL STEP    ___ SAT  ___ UNSAT STEP 8   4. WHEN D/G is running, THEN close "Diesel Generator 2B" breaker.
COMMENTS:
EXAMINER CUE:
STEP 8 4. WHEN D/G is running, THEN close Diesel Generator 2B       CRITICAL breaker.                                                 STEP EXAMINER CUE: After explaining depressing the RED CLOSE             ___ SAT pushbutton on D/G 2B breaker, inform applicant -
After explaining depressing the RED CLOSE pushbutton on D/G 2B breaker, inform applicant  
D/G 2B breaker RED CLSD light is lit.         ___ UNSAT STANDARD:
- "D/G 2B breaker RED CLSD light is lit."
Applicant describes depressing the RED CLOSE pushbutton and verifying the RED CLSD indicating light being lit.
STANDARD: Applicant describes depressing the RED CLOSE pushbutton and verifying the RED CLSD indicating light being lit.
 
This step is critical to meeting the task given in this JPM.
This step is critical to meeting the task given in this JPM.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 8 0F 11   STEP 9  5. IF D/G breaker will not close, THEN:  STANDARD:  Applicant determines from the previous cue that this step is N/A.
PAGE 7 0F 11


Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD                                SAT/UNSAT STEP 9 5. IF D/G breaker will not close, THEN:
___ SAT STANDARD:
___ UNSAT Applicant determines from the previous cue that this step is N/A.
COMMENTS:
STEP 10 6. Close the following essential load center normal                CRITICAL incoming breakers:                                            STEP
* 2ELXB-4B (Normal Incoming Breaker Fed From Xfmr        ___ SAT 2ETXB) (AB-560, AA-67, Rm 362)
* 2ELXD-4B (Normal Incoming Breaker Fed From Xfmr        ___ UNSAT 2ETXD) (AB-560, AA-68, Rm 362)
EXAMINER CUE: After explaining the operation of the Load Center pistol grip clockwise to the CLOSE position, inform applicant - Breaker is closed.
STANDARD:
Applicant describes rotating each breaker pistol grip clockwise to the CLOSE position and verifying the RED indicating light lit for each breaker.
This step is critical to provide power to the D/G cooling water valve, allowing it to open automatically and provide cooling to the D/G.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT    STEP 10  6. Close the following essential load center normal incoming breakers:
PAGE 8 0F 11
2ELXB-4B (Normal Incoming Breaker Fed From Xfmr 2ETXB) (AB
-560, AA-67, Rm 362) 2ELXD-4B (Normal Incoming Breaker Fed From Xfmr 2ETXD) (AB
-560, AA-68, Rm 362)


EXAMINER CUE
Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD                                  SAT/UNSAT STEP 11 7. Ensure RN flow through KD Hx as follows:
: After explaining the operation of the Load Center pistol grip clockwise to the CLOSE position, inform applicant
___ SAT
- "Breaker is closed."
: a. Verify 2RN-292B (2B D/G Hx Inlet Isol) (D2B-567, AA-76)
STANDARD: Applicant describes rotating each breaker pistol grip clockwise to the CLOSE position and verifying the RED indicating light lit for each breaker. This step is critical to provide power to the D/G cooling water valve, allowing it to open automatically and provide cooling to the D/G.
                  - OPEN                                                    ___ UNSAT EXAMINER CUE: When applicant finds 2RN-292B and describes verifying the valve indicator needle pointing to the OPEN position, inform them - Valve indicates CLOSED.
STANDARD:
Applicant describes verifying the valve position indicator pointing to the OPEN position.
COMMENTS:
COMMENTS:
CRITICAL STEP   ___ SAT  ___ UNSAT Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 9 0F 11  STEP 11  7. Ensure RN flow through KD Hx as follows:
STEP 12 7.b. IF 2RN 292B (2B D/G Hx Inlet Isol) does not open, THEN perform the following:                                      ___ SAT
: a. Verify 2RN
: 1) Open 2EMXF-F01A (2B Diesel Generator Hx Inlet Isol        ___ UNSAT Motor (2RN-292B)) (D2B-556, CC-75)
-292B (2B D/G Hx Inlet Isol) (D2B
EXAMINER CUE: When applicant describes the opening of 2EMXF-F01A, inform them - Breaker is OFF.
-567, AA-76) - OPEN  EXAMINER CUE
STANDARD:
: When applicant finds 2RN
Applicant describes inserting the locking tab on 2EMXF-F01A and rotating the breaker counter-clockwise to the OFF position and pulling the locking tab back out.
-292B and describes verifying the valve indicator needle pointing to the OPEN position, inform them  
- "Valve indicates CLOSED.STANDARD: Applicant describes verifying the valve position indicator pointing to the OPEN position.
 
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT    STEP 12  7.b. IF 2RN 292B (2B D/G Hx Inlet Isol) does not open, THEN perform the following:
PAGE 9 0F 11
: 1)  Open 2EMXF
-F01A (2B Diesel Generator Hx Inlet Isol Motor (2RN
-292B)) (D2B
-556, CC-75)
EXAMINER CUE
:  When applicant describes the opening of 2EMXF
-F01A, inform them
- "Breaker is O FF."  STANDARD:  Applicant describes inserting the locking tab on 2EMXF
-F01A and rotating the breaker counter-clockwise to the OFF position and pulling the locking tab back out.


Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD                                  SAT/UNSAT STEP 13 7.b.2) OPEN 2RN-292B (2B D/G Hx Inlet Isol).
___ SAT EXAMINER CUE: After applicant describes manually opening 2RN-292B, inform them - Valve does not move and the      ___ UNSAT position indicator still shows CLOSED.
STANDARD:
Applicant describes pulling the declutching lever and rotating the valve handwheel in the counter-clockwise direction.
EXAMINER NOTE: This begins the alternate path of this JPM.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 10 0F 11  STEP 13  7.b.2)  OPEN 2RN
STEP 14 8. IF RN flow cannot be established, THEN:                          CRITICAL STEP
-292B (2B D/G Hx Inlet Isol).
: a. Stop D/G 2B by depressing STOP on 2DECPB.
EXAMINER CUE
: b. Notify Control Room Supervisor of status.                ___ SAT
: After applicant describes manually opening 2RN
: c. Return this enclosure to Control Room Supervisor.
-292B, inform them  
___ UNSAT EXAMINER CUE: After applicant describes depressing the STOP pushbutton on 2DECPB, inform them - Diesel Generator is coasting down. Also repeat back any information given to the Control Room Supervisor.
- "Valve does not move and the position indicator still shows CLOSED
STANDARD:
."  STANDARD: Applicant describes pulling the declutching lever and rotating the valve handwheel in the counter
Applicant depresses the STOP pushbutton on 2DECPB and verifies the Diesel Generator is stopped.
-clockwise direction.
The only part of this step that is critical is to stop the 2B D/G. This step is critical to prevent damage to the 2B D/G due to no cooling water being available.
EXAMINER NOTE:  This begins the alternate path of this JPM.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT    STEP 14  8. IF RN flow cannot be established, THEN:  a. Stop D/G 2B by depressing "STOP" on 2DECPB.
END OF TASK STOP TIME ________
: b. Notify Control Room Supervisor of status. c. Return this enclosure to Control Room Supervisor.
PAGE 10 0F 11
 
EXAMINER CUE:  After applicant describes depressing the STOP pushbutton on 2DECPB, inform them
- "Diesel Generator is coasting down."
Also repeat back any information given to the Control Room Supervisor.
STANDARD:  Applicant depresses the STOP pushbutton on 2DECPB and verifies the Diesel Generator is stopped.
 
The only part of this step that is critical is to stop the 2B D/G. This step is critical to prevent damage to the 2B D/G due to no cooling water being available.
COMMENTS:  END OF TASK CRITICAL STEP    ___ SAT  ___ UNSAT   


STOP TIME ________
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
May 2015 NRC Initial License Exam JPM J    
May 2015 NRC Initial License Exam JPM J INITIAL CONDITIONS:
* Unit 2 has experienced a loss of all AC power to 2ETB.
* The reason for the loss of AC power has been corrected.
* The 2ETB load shed is complete.
INITIATING CUES:
* The CRS instructs you to energize 2ETB from 2B D/G by performing AP/2/A/5500/007 (Loss of Normal Power) Enclosure 11 (Energizing 2ETB From D/G).
* Key #757 and flashlight have been obtained.


INITIAL CONDITIONS:
Catawba Nuclear Station JPM K May 2015 NRC Exam JPM K PAGE 1 OF 24
Unit 2 has experienced a loss of all AC power to 2ETB.
The reason for the loss of AC power has been corrected.
The 2ETB load shed is complete.


INITIATING CUES:
Catawba Nuclear Station JPM K May 2015 NRC Exam EVALUATION SHEET Task:               Startup Backup Temporary VI Compressor Alternate Path:      No Facility JPM #:      VI-003 Safety Function:    8
The CRS instructs you to energize 2ETB from 2B D/G by performing AP/2/A/5500/007 (Loss of Normal Power) Enclosure 11 (Energizing 2ETB From D/G).
Key #757 and flashlight have been obtained.


Catawba Nuclear Station JPM K May 2015 NRC Exam PAGE 1 OF 24    
==Title:==
Instrument Air System K/A          APE065        Ability to operate and / or monitor the following as they apply to the Loss AA1.04        of Instrument Air: Emergency air compressor Rating(s):   3.4 / 3.6      CFR:      41.7 / 45.5 / 45.6 Preferred Evaluation Location:                          Preferred Evaluation Method:
Simulator              In-Plant          X              Perform                    Simulate        X


JPM K 
==References:==
AP/0/A/5500/022 (Loss of Instrument Air) rev. 35 EP/1/A/5000/G-1 (Unit 1 Generic Control Room Enclosures) rev. 09, Enclosure 23 (Backup VI Compressor(s))
Task Standard:      Temporary VI compressor started and aligned to the Instrument Air header through 1VI-417.
Validation Time: 20 minutes                            Time Critical:        Yes          No      X
===========================================================================
Applicant:                                                                    Time Start: __________
NAME___________________________ Docket #_______________ Time Finish: __________
Performance Rating:                                                          Performance Time _____
SAT ____ UNSAT ____
Examiner: _____________________________                _____________________________/________
NAME                                      SIGNATURE                    DATE
===========================================================================
COMMENTS PAGE 2 OF 24


Catawba Nuclear Station JPM K May 2015 NRC Exam PAGE 2 OF 24  EVALUATION SHEET Task: Startup Backup Temporary VI Compressor Alternate Path:
Catawba Nuclear Station JPM K May 2015 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:
No  Facility JPM #:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
VI-003  Safety Function:
8 Title: Instrument Air System K/A  APE 0 65 A A1.0 4 Ability to operate and / or monitor the following as they apply to the Loss of Instrument Air:  Emergency air compressor Rating(s):
3.4 / 3.6 CFR: 41.7 / 4 5.5 / 45.6  Preferred Evaluation Location:
Preferred Evaluation  Method:
Simulator  In-Plant    X  Perform  Simulate      X  References
: AP/0/A/5500/022 (Loss of Instrument Air) rev. 35 EP/1/A/5000/G
-1 (Unit 1 Generic Control Room Enclosures) rev. 09, Enclosure 23 (Backup VI Compressor(s))
Task Standard:
Temporary VI compressor started and aligned to the Instrument Air header through 1VI
-417. Validation Time:
20 minutes  Time Critical:
Yes  No X ===========================================================================
Applicant:
Time Start:    ______
____ NAME___________________________
Docket #_______________
Time Finish:  ________
__    Performance Rating:
SAT ____  UNSAT ____
Performance Time ___
__    Examiner: _____________________________
_____________________________/________
NAME  SIGNATURE DATE ===========================================================================
COMMENTS Catawba Nuclear Station JPM K May 2015 NRC Exam PAGE 3 OF 24    READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 1 and 2 are at 100% power.
* Unit 1 and 2 are at 100% power.
VI Lo Pressure annunciator is lit.
* VI Lo Pressure annunciator is lit.
VI pressure is 75 psig and slowly decreasing.
* VI pressure is 75 psig and slowly decreasing.
AP/0/A/5500/022 (Loss of Instrument Air) has been implemented.
* AP/0/A/5500/022 (Loss of Instrument Air) has been implemented.
 
INITIATING CUES:
INITIATING CUES:
The CRS instructs you to startup and align the Backup Temporary VI compressor #2 to the Instrument Air Header per the local copy of EP/1/A/5000/G
* The CRS instructs you to startup and align the Backup Temporary VI compressor #2 to the Instrument Air Header per the local copy of EP/1/A/5000/G-1 (Unit 1 Generic Control Room Enclosures) Enclosure 23 (Backup VI Compressor(s)) step 3.
-1 (Unit 1 Generic Control Room Enclosures) Enclosure 23 (Backup VI Compressor(s)) step 3.
EXAMINER NOTE: After applicant locates the local copy, hand them a copy of EP/1/A/5000/G-1 Enclosure 23.
EXAMINER NOTE
PAGE 3 OF 24
: After applicant locates the local copy, hand them a copy of EP/1/A/5000/G
-1 Enclosure 23.


Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 4 0F 24  START TIME: _______
Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD                                 SAT/UNSAT START TIME: _______
EXAMINER NOTE: Two Backup VI compressors should be available at any given time. A third backup compressor is stationed at the Catawba garage. Applicant should select Backup VI Compressor 2 for startup per the initiating cue.
EXAMINER NOTE:       Two Backup VI compressors should be available at any given time. A third backup compressor is stationed at the Catawba garage.
IF Backup Compressor 2 is not available then direct the operator to startup compressor 3 and start the JPM at step 5 (page 1 4 of this JPM). STEP 1   3. To Start Backup VI Compressor 2 perform the following:
Applicant should select Backup VI Compressor 2 for startup per the initiating cue.
: a. Verify engine oil (inside engine side panel)  
IF Backup Compressor 2 is not available then direct the operator to startup compressor 3 and start the JPM at step 5 (page 14 of this JPM).
- GREATER THAN "ADD" ON DIPSTICK.
STEP 1   3. To Start Backup VI Compressor 2 perform the following:
EXAMINER CUE
___ SAT
: When dipstick is located, inform applicant  
: a. Verify engine oil (inside engine side panel) - GREATER THAN ADD ON DIPSTICK.                                   ___ UNSAT EXAMINER CUE: When dipstick is located, inform applicant - Oil level is greater than ADD.
- "Oil level is greater than "ADD"."
STANDARD:
STANDARD: Applicant locates the dipstick and checks the oil level.
Applicant locates the dipstick and checks the oil level.
COMMENTS:
STEP 2 3.b. Verify compressor oil level (inside compressor front panel) -
VISIBLE IN SIGHTGLASS.                                      ___ SAT EXAMINER CUE: When sightglass is located, inform applicant - Oil          ___UNSAT level is visible in the sight glass (near full).
STANDARD:
Applicant locates sightglass and checks oil level.
COMMENTS:
COMMENTS:
___ SAT
PAGE 4 0F 24
___ UNSAT    STEP 2  3.b. Verify compressor oil level (inside compressor front panel)
- VISIBLE IN SIGHTGLASS.
EXAMINER CUE:  When sightglass is located, inform applicant
- "Oil level is visible in the sight glass (near full)."
 
STANDARD:  Applicant locates sightglass and checks oil level.


Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD                              SAT/UNSAT STEP 3 3.c. IF oil levels inadequate, THEN inform Control Room.
___ SAT STANDARD:
___ UNSAT Applicant determines per given cues that this step is N/A.
COMMENTS:
STEP 4 3.d. Ensure all compressor panel doors - CLOSED                  ___ SAT EXAMINER CUE: If asked, inform applicant - All doors are closed.      ___ UNSAT STANDARD:
Applicant ensures that all compressor panel doors are closed.
COMMENTS:
COMMENTS:
___ SAT    ___UNSAT 
STEP 5  3.e. Unplug battery charger power supply cord from the outlet (outside wall at TB 594, 2D-34).                          ___ SAT EXAMINER CUE: When plug is located, inform applicant - Battery        ___ UNSAT charger is unplugged.
 
STANDARD:
Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 5 0F 24  STEP 3   3.c. IF oil levels inadequate, THEN inform Control Room.
Applicant locates and describes unplugging the battery charger power supply cord.
STANDARD: Applicant determines per given cues that this step is N/A.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT STEP 4  3.d. Ensure all compressor panel doors
PAGE 5 0F 24
- CLOSED  EXAMINER CUE:  If asked, inform applicant
- "All doors are closed."
 
STANDARD:  Applicant ensures that all compressor panel doors are closed.


Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD                                  SAT/UNSAT STEP 6 3.f. Ensure 1VI-428 (VI Comp B/U2 Disch) - OPEN                      CRITICAL STEP EXAMINER CUE: When valve is located and applicant correctly describes opening the valve, inform applicant -        ___ SAT 1VI-428 is Open.
___ UNSAT STANDARD:
Applicant locates and describes the verification of or opening 1VI-428.
This step is critical to ensure a flow path from the compressor discharge to the VI header.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT    STEP 5    3.e. Unplug battery charger power supply cord from the outlet (outside wall at TB 594, 2D
NOTE The following steps are performed at control panel on front of Backup VI compressor 2.
-34). EXAMINER CUE
STEP 7 3.g. Rotate OFF/ON/START switch to - ON.
: When plug is located, inform applicant  
___ SAT EXAMINER CUE: When switch is located, and operation described, inform applicant - OFF/ON/START switch is in          ___ UNSAT ON.
- "Battery charger is unplugged."
STANDARD:
STANDARD: Applicant locates and describes unplugging the battery charger power supply cord.
Applicant locates and describes operation of the OFF/ON/START switch to the ON position.
 
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 6 0F 24   STEP 6  3.f. Ensure 1VI
PAGE 6 0F 24
-428 (VI Comp B/U2 Disch)
- OPEN  EXAMINER CUE:  When valve is located and applicant correctly describes opening the valve, inform applicant
- "1VI-428 is Open."
STANDARD:  Applicant locates and describes the verification of or opening 1VI
-428. This step is critical to ensure a flow path from the compressor discharge to the VI header.
COMMENTS:    CRITICAL STEP    ___ SAT  ___ UNSAT NOTE  The following steps are performed at control panel on front of Backup VI compressor 2.
STEP 7  3.g. Rotate OFF/ON/START switch to
- ON.
EXAMINER CUE
:  When switch is located, and operation described, inform applicant
- "OFF/ON/START switch is in ON."  STANDARD:  Applicant locates and describes operation of the OFF/ON/START switch to the ON position.
 
COMMENTS:        ___ SAT  ___ UNSAT 


Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 24  STEP 8   3.h. IF outside temperature less than or equal to 45&deg;F, THEN place "HEATERS" toggle switch  
Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD                                       SAT/UNSAT STEP 8 3.h. IF outside temperature less than or equal to 45&deg;F, THEN place HEATERS toggle switch - ON.                               ___ SAT EXAMINER CUE: If asked, inform applicant - Outside air temp is                   ___ UNSAT currently 87&deg;F.
- "ON". EXAMINER CUE:
STANDARD:
If asked, inform applicant  
Applicant determines from the examiner cue that this step is N/A.
- "Outside air temp is currently 87&deg;F."
STANDARD: Applicant determines from the examiner cue that this step is N/A.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT    NOTE Fuel level of 1/2 will provide approximately 3 hours of run time at full load.
NOTE Fuel level of 1/2 will provide approximately 3 hours of run time at full load.
STEP 9   3.i. Verify fuel level  
STEP 9 3.i. Verify fuel level - ON SCALE.
- ON SCALE.
___ SAT EXAMINER CUE: When fuel level gage is located, inform applicant -
EXAMINER CUE
Fuel oil level is at 3/4 mark.                                 ___ UNSAT STANDARD:
: When fuel level gage is located, inform applicant  
Applicant locates fuel level gage and verifies level is on scale per cue given.
- "Fuel oil level is at 3/4 mark."
STANDARD: Applicant locates fuel level gage and verifies level is on scale per cue given.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT    NOTE OFF/ON/START switch spring returns to ON when released.
NOTE OFF/ON/START switch spring returns to ON when released.
OFF/ON/START switch should not be held in the START position for greater than 10 seconds, to prevent starter overheating.
OFF/ON/START switch should not be held in the START position for greater than 10 seconds, to prevent starter overheating.
PAGE 7 0F 24


Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 24  STEP 10   3.j. Start Backup VI Compressor 2 as follows:
Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD                           SAT/UNSAT STEP 10 3.j. Start Backup VI Compressor 2 as follows:                 CRITICAL STEP
: 1) Rotate and hold OFF/ON/START switch to  
: 1) Rotate and hold OFF/ON/START switch to - START.
- START. EXAMINER CUE
___ SAT EXAMINER CUE: After explaining the operation of the OFF/ON/START switch, inform applicant - OFF/ON/START switch is ___ UNSAT in START.
: After explaining the operation of the OFF/ON/START switch, inform applicant  
STANDARD:
- "OFF/ON/START switch is in START."
Applicant describes turning OFF/ON/START switch to the START position.
STANDARD: Applicant describes turning OFF/ON/START switch to the START position. This step is critical to start the backup VI compressor prior to aligning to supply the instrument air header.
This step is critical to start the backup VI compressor prior to aligning to supply the instrument air header.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 24  STEP 11   3.j.2) Release OFF/ON/START switch when one of the following occurs:
PAGE 8 0F 24
Engine starts OR 10 seconds has elapsed.
 
EXAMINER CUE
Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD                                 SAT/UNSAT STEP 11 3.j.2) Release OFF/ON/START switch when one of the                 CRITICAL following occurs:                                         STEP
: Inform applicant  
* Engine starts                                         ___ SAT OR
- "The engine is running."
* 10 seconds has elapsed.                               ___ UNSAT EXAMINER CUE: Inform applicant - The engine is running.
EXAMINER CUE: Once applicant describes releasing the OFF/ON/START switch, inform applicant  
EXAMINER CUE: Once applicant describes releasing the OFF/ON/START switch, inform applicant -
- "OFF/ON/START switch has been released."
OFF/ON/START switch has been released.
STANDARD: Applicant describes releasing the OFF/ON/START switch following cue given by examiner.
STANDARD:
Applicant describes releasing the OFF/ON/START switch following cue given by examiner.
This step is critical to prevent overheating the engine starter.
This step is critical to prevent overheating the engine starter.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT    STEP 12   3.j.3) IF engine failed to start, THEN start compressor as follows: STANDARD: Applicant determines from examiner cue in previous step, that this step is N/A.
STEP 12 3.j.3) IF engine failed to start, THEN start compressor as follows:                                                 ___ SAT STANDARD:                                                                 ___ UNSAT Applicant determines from examiner cue in previous step, that this step is N/A.
COMMENTS:
___ SAT  ___ UNSAT Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 10 0F 24  STEP 13  3.k. WHEN compressor has been running for 60 seconds, THEN depress "PRESSURE CONTROL" switch.
EXAMINER CUE
:  Inform applicant
- "60 seconds ha ve elapsed."  When located and operation described, inform applicant
- "PRESSURE CONTROL button has been depressed.
If asked, "Diesel is heard to speed up and discharge pressure increases to ~ 110 psig."
STANDARD:  Applicant describes depressing the PRESSURE CONTROL button. This step is critical to ensure compressor discharge pressure is sufficient to supply the Instrument Air header.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT    STEP 14  3.l. IF outside air temperature greater than 32&deg;F, THEN ensure "HEATERS" toggle switch
PAGE 9 0F 24
- "OFF". EXAMINER CUE:  When located, inform applicant
- "HEATER toggle switch is in the OFF position."
STANDARD:  Applicant determines that per previous given cue, that this step is applicable and verifies the HEATERS toggle switch is OFF.


Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD                            SAT/UNSAT STEP 13 3.k. WHEN compressor has been running for 60 seconds,          CRITICAL THEN depress PRESSURE CONTROL switch.                  STEP EXAMINER CUE: Inform applicant - 60 seconds have elapsed.            ___ SAT When located and operation described, inform applicant - PRESSURE CONTROL button has          ___ UNSAT been depressed. If asked, Diesel is heard to speed up and discharge pressure increases to ~
110 psig.
STANDARD:
Applicant describes depressing the PRESSURE CONTROL button.
This step is critical to ensure compressor discharge pressure is sufficient to supply the Instrument Air header.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 11 0F 24  STEP 15  3.m. OPEN 1VI 425 (VI Comp B/U2 Manifold Inlet).
STEP 14 3.l. IF outside air temperature greater than 32&deg;F, THEN ensure HEATERS toggle switch - OFF.                       ___ SAT EXAMINER CUE: When located, inform applicant - HEATER toggle          ___ UNSAT switch is in the OFF position.
EXAMINER CUE:  When valve is located and proper operation described, inform applicant
STANDARD:
- "1VI-425 is Open."
Applicant determines that per previous given cue, that this step is applicable and verifies the HEATERS toggle switch is OFF.
STANDARD:  Applicant describes opening 1VI
-425. This step is critical to align proper flow path from the compressor to the Instrument Air header.
COMMENTS:
CRITICAL STEP    ___ SAT   ___ UNSAT    STEP 16  3.n. Ensure the following valves OPEN:
1VI-511 (B/U VI Compressor Air Dryer Bypass) (TB2
-598, 2C-34). 1VI-417 (B/U VI Compressor Header Isol)
(TB2-598, 2C-34).
EXAMINER CUE: When valves are located and proper operation to open is described, inform applicant  
- "1VI-511 is open. 1VI
-417 is open."
STANDARD: Applicant describes opening 1VI
-511 and 1VI
-417. This step is critical to align a flow path from the backup VI Compressor to the Instrument Air header.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 12 0F 24   STEP 1 7  3.o. Record the following:
PAGE 10 0F 24
Compressor start time ___________
HOURMETER __________
COMP DISH PRESS __________
EXAMINER CUE:  If asked, inform applicant
- "Use current run hours, time and discharge pressure is 110 psig."
STANDARD:  Applicant records the values for current time, engine run hours, and discharge pressure given in the cue
. COMMENTS:
___ SAT  ___ UNSAT Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 13 0F 24  STEP 1 8  3.p. Notify the control room of the following:
Status of backup compressor 2 IF idle compressor available, THEN request Control Room Supervisor to evaluate VI header pressure to determine whether additional backup compressor required  IF Control Room determines additional backup VI compressor required, THEN start idle Backup VI compressor.
EXAMINER CUE
:  Repeat back the information given, then inform applicant
- "The CRS has evaluated VI header pressure and an additional backup VI compressor is not needed at this time. The CRS will have the turbine building A O complete the steps. This JPM is complete."


EXAMINER NOTE: If backup compressor 2 was not available, the following steps will be to align backup compressor 3.
Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD                              SAT/UNSAT STEP 15 3.m. OPEN 1VI 425 (VI Comp B/U2 Manifold Inlet).                CRITICAL STEP EXAMINER CUE: When valve is located and proper operation described, inform applicant - 1VI-425 is Open. ___ SAT STANDARD:                                                               ___ UNSAT Applicant describes opening 1VI-425.
STANDARD: Applicant informs the Control Room of the status of backup compressor
This step is critical to align proper flow path from the compressor to the Instrument Air header.
: 2.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 14 0F 24  STEP 1    5. To Start Backup VI Compressor 3 perform the following:
STEP 16 3.n. Ensure the following valves OPEN:                           CRITICAL STEP
: a. Verify engine oil (inside engine side panel)  
* 1VI-511 (B/U VI Compressor Air Dryer Bypass) (TB2-598, 2C-34).                                       ___ SAT
- GREATER THAN "ADD" ON DIPSTICK.
* 1VI-417 (B/U VI Compressor Header Isol) (TB2-598, 2C-34).                                           ___ UNSAT EXAMINER CUE: When valves are located and proper operation to open is described, inform applicant - 1VI-511 is open. 1VI-417 is open.
EXAMINER CUE
STANDARD:
: When dipstick is located, inform applicant  
Applicant describes opening 1VI-511 and 1VI-417.
- "Oil level is greater than "ADD"."
This step is critical to align a flow path from the backup VI Compressor to the Instrument Air header.
STANDARD: Applicant locates the dipstick and checks the oil level.
COMMENTS:
COMMENTS:
PAGE 11 0F 24
Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD                              SAT/UNSAT STEP 17 3.o. Record the following:
___ SAT
___ SAT
___ UNSAT     STEP 2  5.b. Verify compressor oil level (inside compressor front panel)
* Compressor start time ___________
- VISIBLE IN SIGHTGLASS.
* HOURMETER __________                            ___ UNSAT
EXAMINER CUE: When sightglass is located, inform applicant  
* COMP DISH PRESS __________
- "Oil level is visible in the sight glass (near full)."
EXAMINER CUE: If asked, inform applicant - Use current run hours, time and discharge pressure is 110 psig.
STANDARD:
Applicant records the values for current time, engine run hours, and discharge pressure given in the cue.
COMMENTS:
PAGE 12 0F 24


STANDARD:   Applicant locates sightglass and checks oil level.
Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD                               SAT/UNSAT STEP 18 3.p. Notify the control room of the following:
___ SAT
* Status of backup compressor 2
* IF idle compressor available, THEN request Control ___ UNSAT Room Supervisor to evaluate VI header pressure to determine whether additional backup compressor required
* IF Control Room determines additional backup VI compressor required, THEN start idle Backup VI compressor.
EXAMINER CUE: Repeat back the information given, then inform applicant - The CRS has evaluated VI header pressure and an additional backup VI compressor is not needed at this time. The CRS will have the turbine building AO complete the steps. This JPM is complete.
EXAMINER NOTE: If backup compressor 2 was not available, the following steps will be to align backup compressor 3.
STANDARD:
Applicant informs the Control Room of the status of backup compressor 2.
COMMENTS:
PAGE 13 0F 24


Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD                                SAT/UNSAT STEP 1  5. To Start Backup VI Compressor 3 perform the following:
___ SAT
: a. Verify engine oil (inside engine side panel) - GREATER THAN ADD ON DIPSTICK.                                  ___ UNSAT EXAMINER CUE: When dipstick is located, inform applicant - Oil level is greater than ADD.
STANDARD:
Applicant locates the dipstick and checks the oil level.
COMMENTS:
STEP 2 5.b. Verify compressor oil level (inside compressor front panel) -
VISIBLE IN SIGHTGLASS.                                      ___ SAT EXAMINER CUE: When sightglass is located, inform applicant - Oil          ___UNSAT level is visible in the sight glass (near full).
STANDARD:
Applicant locates sightglass and checks oil level.
COMMENTS:
COMMENTS:
___ SAT    ___UNSAT STEP 3   5.c. IF oil levels inadequate, THEN inform Control Room.
STEP 3 5.c. IF oil levels inadequate, THEN inform Control Room.
STANDARD: Applicant determines per given cues that this step is N/A.
___ SAT STANDARD:
___ UNSAT Applicant determines per given cues that this step is N/A.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT 
PAGE 14 0F 24


Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 15 0F 24    STEP 4   5.d. Ensure all compressor panel doors  
Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD                             SAT/UNSAT STEP 4 5.d. Ensure all compressor panel doors - CLOSED                 ___ SAT EXAMINER CUE: If asked, inform applicant - All doors are closed. ___ UNSAT STANDARD:
- CLOSED EXAMINER CUE: If asked, inform applicant  
Applicant ensures that all compressor panel doors are closed.
- "All doors are closed."
COMMENTS:
 
STEP 5  5.e. Unplug battery charger power supply cord from the outlet (outside wall at TB 594, 2D-34).                        ___ SAT EXAMINER CUE: When plug is located, inform applicant - Battery        ___ UNSAT charger is unplugged.
STANDARD: Applicant ensures that all compressor panel doors are closed.
STANDARD:
Applicant locates and describes unplugging the battery charger power supply cord.
COMMENTS:
PAGE 15 0F 24


Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD                                  SAT/UNSAT STEP 6 5.f. Ensure 1VI-430 (VI Comp B/U3 Disch) - OPEN                      CRITICAL STEP EXAMINER CUE: When valve is located and applicant correctly describes opening the valve, inform applicant -        ___ SAT 1VI-430 is Open.
___ UNSAT STANDARD:
Applicant locates and describes the verification of or opening 1VI-430.
This step is critical to ensure a flow path from the compressor discharge to the VI header.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT    STEP 5    5.e. Unplug battery charger power supply cord from the outlet (outside wall at TB 594, 2D
NOTE The following steps are performed at control panel on front of Backup VI compressor 3.
-34). EXAMINER CUE
STEP 7 5.g. Rotate OFF/ON/START switch to - ON.
: When plug is located, inform applicant  
___ SAT EXAMINER CUE: When switch is located, and operation described, inform applicant - OFF/ON/START switch is in          ___ UNSAT ON.
- "Battery charger is unplugged."
STANDARD:
STANDARD: Applicant locates and describes unplugging the battery charger power supply cord.
Applicant locates and describes operation of the OFF/ON/START switch to the ON position.
 
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 16 0F 24   STEP 6  5.f. Ensure 1VI
PAGE 16 0F 24
-430 (VI Comp B/U3 Disch)
- OPEN  EXAMINER CUE:  When valve is located and applicant correctly describes opening the valve, inform applicant
- "1VI-4 30 is Open."  STANDARD:  Applicant locates and describes the verification of or opening 1VI
-430. This step is critical to ensure a flow path from the compressor discharge to the VI header.
COMMENTS:    CRITICAL STEP    ___ SAT  ___ UNSAT NOTE  The following steps are performed at control panel on front of Backup VI compressor 3.
STEP 7  5.g. Rotate OFF/ON/START switch to
- ON.
EXAMINER CUE
:  When switch is located, and operation described, inform applicant
- "OFF/ON/START switch is in ON."  STANDARD:  Applicant locates and describes operation of the OFF/ON/START switch to the ON position.
 
COMMENTS:        ___ SAT  ___ UNSAT 


Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 17 0F 24  STEP 8   5.h. IF outside temperature less than or equal to 45&deg;F, THEN place "HEATERS" toggle switch  
Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD                                       SAT/UNSAT STEP 8 5.h. IF outside temperature less than or equal to 45&deg;F, THEN place HEATERS toggle switch - ON.                               ___ SAT EXAMINER CUE: If asked, inform applicant - Outside air temp is                   ___ UNSAT currently 87&deg;F.
- "ON". EXAMINER CUE:
STANDARD:
If asked, inform applicant  
Applicant determines from the examiner cue that this step is N/A.
- "Outside air temp is currently 87&deg;F."
STANDARD: Applicant determines from the examiner cue that this step is N/A.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT    NOTE Fuel level of 1/2 will provide approximately 3 hours of run time at full load.
NOTE Fuel level of 1/2 will provide approximately 3 hours of run time at full load.
STEP 9   5.i. Verify fuel level  
STEP 9 5.i. Verify fuel level - ON SCALE.
- ON SCALE.
___ SAT EXAMINER CUE: When fuel level gage is located, inform applicant -
EXAMINER CUE
Fuel oil level is at 3/4 mark.                                 ___ UNSAT STANDARD:
: When fuel level gage is located, inform applicant  
Applicant locates fuel level gage and verifies level is on scale per cue given.
- "Fuel oil level is at 3/4 mark."
STANDARD: Applicant locates fuel level gage and verifies level is on scale per cue given.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT    NOTE OFF/ON/START switch spring returns to ON when released.
NOTE OFF/ON/START switch spring returns to ON when released.
OFF/ON/START switch should not be held in the START position for greater than 10 seconds, to prevent starter overheating.
OFF/ON/START switch should not be held in the START position for greater than 10 seconds, to prevent starter overheating.
PAGE 17 0F 24


Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 18 0F 24  STEP 10   5.j. Start Backup VI Compressor 3 as follows:
Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD                           SAT/UNSAT STEP 10 5.j. Start Backup VI Compressor 3 as follows:                 CRITICAL STEP
: 1) Rotate and hold OFF/ON/START switch to  
: 1) Rotate and hold OFF/ON/START switch to - START.
- START. EXAMINER CUE
___ SAT EXAMINER CUE: After explaining the operation of the OFF/ON/START switch, inform applicant - OFF/ON/START switch is ___ UNSAT in START.
: After explaining the operation of the OFF/ON/START switch, inform applicant  
STANDARD:
- "OFF/ON/START switch is in START."
Applicant describes turning OFF/ON/START switch to the START position.
STANDARD: Applicant describes turning OFF/ON/START switch to the START position. This step is critical to start the backup VI compressor prior to aligning to supply the instrument air header.
This step is critical to start the backup VI compressor prior to aligning to supply the instrument air header.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 19 0F 24  STEP 11   5.j.2) Release OFF/ON/START switch when one of the following occurs:
PAGE 18 0F 24
Engine starts OR 10 seconds has elapsed.
 
EXAMINER CUE
Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD                                 SAT/UNSAT STEP 11 5.j.2) Release OFF/ON/START switch when one of the                 CRITICAL following occurs:                                         STEP
: Inform applicant  
* Engine starts                                         ___ SAT OR
- "The engine is running."
* 10 seconds has elapsed.                               ___ UNSAT EXAMINER CUE: Inform applicant - The engine is running.
EXAMINER CUE: Once applicant describes releasing the OFF/ON/START switch, inform applicant  
EXAMINER CUE: Once applicant describes releasing the OFF/ON/START switch, inform applicant -
- "OFF/ON/START switch has been released."
OFF/ON/START switch has been released.
STANDARD: Applicant describes releasing the OFF/ON/START switch following cue given by examiner.
STANDARD:
Applicant describes releasing the OFF/ON/START switch following cue given by examiner.
This step is critical to prevent overheating the engine starter.
This step is critical to prevent overheating the engine starter.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT    STEP 12   5.j.3) IF engine failed to start, THEN start compressor as follows: STANDARD: Applicant determines from examiner cue in previous step, that this step is N/A.
STEP 12 5.j.3) IF engine failed to start, THEN start compressor as follows:                                                 ___ SAT STANDARD:                                                                 ___ UNSAT Applicant determines from examiner cue in previous step, that this step is N/A.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 20 0F 24  STEP 13   5.k. WHEN compressor has been running for 60 seconds, THEN depress "PRESSURE CONTROL" switch.
PAGE 19 0F 24
EXAMINER CUE
 
: Inform applicant  
Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD                             SAT/UNSAT STEP 13 5.k. WHEN compressor has been running for 60 seconds,           CRITICAL THEN depress PRESSURE CONTROL switch.                 STEP EXAMINER CUE: Inform applicant - 60 seconds have elapsed.           ___ SAT When located and operation described, inform applicant - PRESSURE CONTROL button has           ___ UNSAT been depressed.
- "60 seconds have elapsed."
STANDARD:
When located and operation described, inform applicant  
Applicant describes depressing the PRESSURE CONTROL button.
- "PRESSURE CONTROL button has been depressed."
STANDARD: Applicant describes depressing the PRESSURE CONTROL button.
This step is critical to ensure compressor discharge pressure is sufficient to supply the Instrument Air header.
This step is critical to ensure compressor discharge pressure is sufficient to supply the Instrument Air header.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT    STEP 14   5.l. IF outside air temperature greater than 32&deg;F, THEN ensure "HEATERS" toggle switch  
STEP 14 5.l. IF outside air temperature greater than 32&deg;F, THEN ensure HEATERS toggle switch - OFF.                       ___ SAT EXAMINER CUE: When located, inform applicant - HEATER toggle         ___ UNSAT switch is in the OFF position.
- "OFF". EXAMINER CUE: When located, inform applicant  
STANDARD:
- "HEATER toggle switch is in the OFF position."
Applicant determines that per previous given cue, that this step is applicable and verifies the HEATERS toggle switch is OFF.
STANDARD: Applicant determines that per previous given cue, that this step is applicable and verifies the HEATERS toggle switch is OFF.
COMMENTS:
PAGE 20 0F 24


Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD                              SAT/UNSAT STEP 15 5.m. OPEN 1VI 426 (VI Comp B/U3 Manifold Inlet).                CRITICAL STEP EXAMINER CUE: When valve is located and proper operation described, inform applicant - 1VI-426 is Open. ___ SAT STANDARD:                                                              ___ UNSAT Applicant describes opening 1VI-426.
This step is critical to align proper flow path from the compressor to the Instrument Air header.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 21 0F 24  STEP 15  5.m. OPEN 1VI 42 6 (VI Comp B/U 3 Manifold Inlet).
STEP 16 5.n. Ensure the following valves OPEN:                          CRITICAL STEP
EXAMINER CUE: When valve is located and proper operation described, inform applicant  
* 1VI-511 (B/U VI Compressor Air Dryer Bypass) (TB2-598, 2C-34).                                      ___ SAT
- "1VI-42 6 is Open.STANDARD: Applicant describes opening 1VI
* 1VI-417 (B/U VI Compressor Header Isol) (TB2-598, 2C-34).                                           ___ UNSAT EXAMINER CUE: When valves are located and proper operation to open is described, inform applicant - 1VI-511 is open. 1VI-417 is open.
-42 6. This step is critical to align proper flow path from the compressor to the Instrument Air header.
STANDARD:
Applicant describes opening 1VI-511 and 1VI-417.
This step is critical to align a flow path from the backup VI Compressor to the Instrument Air header.
COMMENTS:
COMMENTS:
CRITICAL STEP   ___ SAT   ___ UNSAT     STEP 16  5.n. Ensure the following valves OPEN:
PAGE 21 0F 24
1VI-511 (B/U VI Compressor Air Dryer Bypass) (TB2
 
-598, 2C-34). 1VI-417 (B/U VI Compressor Header Isol) (TB2
Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD                              SAT/UNSAT STEP 17 5.o. Record the following:
-598, 2C-34).
___ SAT
EXAMINER CUE: When valves are located and proper operation to open is described, inform applicant  
* Compressor start time ___________
- "1VI-511 is open. 1VI
* HOURMETER __________                            ___ UNSAT
-417 is open."
* COMP DISH PRESS __________
STANDARD: Applicant describes opening 1VI
EXAMINER CUE: If asked, inform applicant - Use current run hours, time and discharge pressure is 110 psig.
-511 and 1VI
STANDARD:
-417. This step is critical to align a flow path from the backup VI Compressor to the Instrument Air header.
Applicant records the values for current time, engine run hours, and discharge pressure given in the cue.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 22 0F 24   STEP 17  5.o. Record the following:
PAGE 22 0F 24
Compressor start time ___________
HOURMETER __________
COMP DISH PRESS __________
EXAMINER CUE:  If asked, inform applicant
- "Use current run hours, time and discharge pressure is 110 psig."
STANDARD:  Applicant records the values for current time, engine run hours, and discharge pressure given in the cue.


Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD                                SAT/UNSAT STEP 18 5.p. Notify the control room of the following:
___ SAT
* Status of backup compressor 3
* IF idle compressor available, THEN request Control ___ UNSAT Room Supervisor to evaluate VI header pressure to determine whether additional backup compressor required
* IF Control Room determines additional backup VI compressor required, THEN start idle Backup VI compressor.
EXAMINER CUE: Repeat back the information given, then inform applicant - The CRS has evaluated VI header pressure and an additional backup VI compressor is not needed at this time. The CRS will have the turbine building AO complete the steps. This JPM is complete.
STANDARD:
Applicant informs the Control Room of the status of backup compressor 3.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 23 0F 24   STEP 18  5.p. Notify the control room of the following:
END OF TASK STOP TIME ________
Status of backup compressor 3  IF idle compressor available, THEN request Control Room Supervisor to evaluate VI header pressure to determine whether additional backup compressor required  IF Control Room determines additional backup VI compressor required, THEN start idle Backup VI compressor.
PAGE 23 0F 24
EXAMINER CUE
:  Repeat back the information given, then inform applicant
- "The CRS has evaluated VI header pressure and an additional backup VI compressor is not needed at this time. The CRS will have the turbine building A O complete the steps. This JPM is complete."
STANDARD:  Applicant informs the Control Room of the status of backup compressor
: 3.
COMMENTS:
END OF TASK
___ SAT  ___ UNSAT   


STOP TIME ________
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
May 2015 NRC Initial License Exam JPM K    
May 2015 NRC Initial License Exam JPM K INITIAL CONDITIONS:
 
* Unit 1 and 2 are at 100% power.
INITIAL CONDITIONS:
* VI Lo Pressure annunciator is lit.
Unit 1 and 2 are at 100% power.
* VI pressure is 75 psig and slowly decreasing.
VI Lo Pressure annunciator is lit.
* AP/0/A/5500/022 (Loss of Instrument Air) has been implemented.
VI pressure is 75 psig and slowly decreasing.
AP/0/A/5500/022 (Loss of Instrument Air) has been implemented.
 
INITIATING CUES:
INITIATING CUES:
The CRS instructs you to startup and align the Backup Temporary VI compressor #2 to the Instrument Air Header per the local copy of EP/1/A/5000/G
* The CRS instructs you to startup and align the Backup Temporary VI compressor #2 to the Instrument Air Header per the local copy of EP/1/A/5000/G-1 (Unit 1 Generic Control Room Enclosures) Enclosure 23 (Backup VI Compressor(s)) step 3.}}
-1 (Unit 1 Generic Control Room Enclosures) Enclosure 23 (Backup VI Compressor(s)) step 3.}}

Latest revision as of 22:38, 4 December 2019

Initial Exam 2015-301 Final Sim In-Plant JPMs
ML15245A307
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 08/31/2015
From:
NRC/RGN-II
To:
Duke Energy Carolinas
References
50-413/15-301, 50-414/15-301
Download: ML15245A307 (132)


Text

Catawba Nuclear Station JPM A May 2015 NRC Exam JPM A PAGE 1 OF 9

Catawba Nuclear Station JPM A May 2015 NRC Exam EVALUATION SHEET Task: Emergency Borate the Reactor Coolant System Alternate Path: Yes Facility JPM #: NV-017 Safety Function: 1

Title:

Reactivity Control K/A 004 A2.14 Ability to (a) predict the impacts of the following malfunctions or operations on the CVCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Emergency Boration Rating(s): 3.8 / 3.9 CFR: 41.5 / 43/5 / 45/3 / 45/5 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References:

EP/1/A/5000/FR-S.1 (Nuclear Power Generation/ATWS) rev. 22 Task Standard: One NV pump running with its suction aligned to the FWST and isolated from the VCT.

Validation Time: 5 minutes Time Critical: Yes No X

===============================================================

Applicant: Time Start: __________

NAME___________________________ Docket #_______________ Time Finish: __________

Performance Rating: Performance Time _____

SAT ____ UNSAT ____

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 9

Catawba Nuclear Station JPM A May 2015 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:

1. ENSURE NRC Examination Security has been established.
2. Reset to IC #163
3. Enter the password.
4. Select Yes on the INITIAL CONDITION RESET pop-up window.
5. Ensure simulator setup per table below.
6. Place simulator in RUN and acknowledge any alarms.
7. ENSURE Extra Operator is present in the simulator.
8. Place simulator in FREEZE until Examiner cue is given.

Instructor Action Final Delay Ramp Delete In Event MAL-IPX003A(REACTOR TRIP BKR A ACTIVE FAILURE)

MAL-IPX003B (REACTOR TRIP BKR B ACTIVE FAILURE)

VLV-NV043F (NV236B BORIC ACID TO CHG 0

PMP VLV FAIL TO POSITION)

MAL-MT-007 (LOSS OF TURBINE LUBE OIL ACTIVE PRESSURE)

Instructor will act as the OATC and be manually inserting control rods when the simulator is placed in RUN.

PAGE 3 OF 9

REV. 0 PAGE 4 0F 9 Catawba Nuclear Station JPM A May 2015 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • The reactor will NOT trip automatically or manually.
  • A Red Path for Subcriticality is in effect.
  • The OATC is inserting rods manually.

INITIATING CUES:

The Control Room Supervisor instructs you to initiate emergency boration, per EP/1/A/5000/FR-S.1, (Nuclear Power Generation/ATWS), step 4.

EXAMINER NOTE: After reading cue, provide the applicant with a copy of EP/1/A/5000/FR-S.1 pages 3-5.

PAGE 4 OF 9

Catawba Nuclear Station JPM A May 2015 NRC Exam STEP/STANDARD SAT/UNSAT START TIME: _______

STEP 1: 4. Initiate emergency boration of NC System as follows:

___ SAT

a. Ensure at least one NV pump - ON.

___ UNSAT STANDARD:

Applicant verifies red ON light lit for NV PMP 1A or 1B (1MC-10).

COMMENTS:

STEP 2 4. b. OPEN 1NV-236B (Boric Acid To NV Pumps Suct).

___ SAT STANDARD:

___UNSAT Applicant depresses the red OPEN pushbutton for 1NV-236B and verifies the red OPEN light remains dark and the green CLSD light remains lit on 1MC-10. 1NV-236B remains closed.

COMMENTS:

STEP 3 4. c. Ensure both boric acid transfer pump switches - IN THE "ON" POSITION. ___ SAT STANDARD: ___ UNSAT Applicant rotates the switches for B/A XFER PMP 1A and B/A XFER PMP 1B to the ON position.

COMMENTS:

PAGE 5 0F 9

Catawba Nuclear Station JPM A May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 4 4. d. Verify emergency boration flow - GREATER THAN OR ___ SAT EQUAL TO 30 GPM.

___ UNSAT STANDARD:

Applicant verifies EMER BORATE FLOW (1NVP5440) indicates 0 gpm (1MC-5) and transitions to the RNO.

EXAMINER NOTE: This begins the alternate path of this JPM.

COMMENTS:

STEP 5 4. d. RNO d. Align NV pump suction to FWST as follows: CRITICAL STEP

1) OPEN the following valves:

___ SAT

___ UNSAT

STANDARD:

Applicant depresses the red OPEN pushbuttons for 1NV-252A and 1NV-253B This step is critical to align borated water to the suction of the charging pumps. Only ONE of the valves opened meets the Critical Step criteria.

COMMENTS:

PAGE 6 0F 9

Catawba Nuclear Station JPM A May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 6 4. d. RNO d. 2) CLOSE the following valves: CRITICAL STEP

___ SAT

___ UNSAT STANDARD:

Applicant depresses the green CLSD pushbutton for 1NV-188A and 1NV-189B.

This step is critical to prevent borated water from going to the VCT instead of the suction of the charging pumps. Closing only ONE of the valves meets the intent of the Critical Step criteria.

COMMENTS:

STEP 7 4. e. Verify the following charging line isolation valves - OPEN:

___ SAT

___ UNSAT

STANDARD:

Applicant verifies the red OPEN lights lit and green CLSD lights dark on 1NV-312A and 1NV-314B.

COMMENTS:

PAGE 7 0F 9

Catawba Nuclear Station JPM A May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 8 4. f. Verify Pzr pressure - LESS THAN 2335 PSIG.

___ SAT STANDARD:

___ UNSAT Applicant verifies PZR pressure instruments (1NCP5161, 1NCP5150, 1NCP5170 and 1NCP5171) indicate less than 2335 psig (1MC-10)

COMMENTS:

END OF TASK STOP TIME ________

PAGE 8 0F 9

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

May 2015 NRC Initial License Exam JPM A INITIAL CONDITIONS:

  • The reactor will NOT trip automatically or manually.
  • A Red Path for Subcriticality is in effect.
  • The OATC is inserting rods manually.

INITIATING CUES:

The Control Room Supervisor instructs you to initiate emergency boration, per EP/1/A/5000/FR-S.1, (Nuclear Power Generation/ATWS), step 4.

Catawba Nuclear Station JPM B May 2015 NRC Exam JPM B PAGE 1 OF 14

Catawba Nuclear Station JPM B May 2015 NRC Exam EVALUATION SHEET Task: Transfer the Emergency Core Coolant System to the Cold Leg Recirculation Alternate Path: Yes Facility JPM #: NI-088 Safety Function: 2

Title:

Emergency Core Cooling System (ECCS)

K/A 006 A4.07 Ability to manually operate and/or monitor in the control room: ECCS pumps and valves.

Rating(s): 4.4 / 4.4 CFR: 41.7 / 45.5 to 45.8 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References:

EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) rev. 29 Task Standard: EP/1/A/5000/ES-1.3 Transfer to Cold Leg Recirculation) step 6 is performed and the 1A and 1B NV (Chemical Volume and Control System) and NI (Safety Injection System) pumps are secured.

Validation Time: 15 minutes Time Critical: Yes No X

===============================================================

Applicant: Time Start: __________

NAME___________________________ Docket #_______________ Time Finish: __________

Performance Rating: Performance Time _____

SAT ____ UNSAT ____

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 14

Catawba Nuclear Station JPM B May 2015 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:

1. ENSURE NRC Examination Security has been established.
2. Reset to IC #164
3. Enter the password.
4. Select Yes on the INITIAL CONDITION RESET pop-up window.
5. Ensure simulator setup per table below.
6. Place simulator in RUN and acknowledge any alarms.
7. ENSURE Extra Operator is present in the simulator.
8. Place simulator in FREEZE until Examiner cue is given.

Instructor Action Final Delay Ramp Delete In Event VLV-NI037F (NI184B CNMT SUMP LINE 1B 0

ISOL (STEM) FAIL TO POSITION)

MAL-NC013A (NC COLD LEG A LEAK) 27.5 VLV-ND005F (ND28A ND HX A OUTLET TO 0

CHARG AB FAIL TO POSITION.

PAGE 3 OF 14

PAGE 4 0F 14 Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • A LOCA has occurred on Unit 1.

INITIATING CUES:

  • 1AD-9, E/8 FWST LO-LO LEVEL annunciator is lit and the Control Room Supervisor instructs you, as the BOP, to transfer to Cold Leg Recirculation using EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) step 6.

EXAMINER NOTE: After reading the cue, provide the applicant with a copy of EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) complete through step 8 with step 6 flagged.

PAGE 4 OF 14

Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD SAT/UNSAT START TIME: _______

STEP 1: 6. WHEN FWST level decreases to 5% (1AD-9, E/8 "FWST LO-LO LEVEL"), THEN align NV and NI Systems for recirc ___ SAT as follows:

___ UNSAT

a. Ensure Enclosure 1 (Foldout Page) is monitored.

STANDARD:

Applicant reads the step.

Examiner Cue: The OATC will monitor Enclosure 1 COMMENTS:

NOTE CSF should not be implemented until directed by this procedure.

STEP 2 b. Verify at least one of the following annunciators - LIT: ___ SAT

STANDARD:

Applicant determines that one or both annunciators are lit.

COMMENTS:

PAGE 5 0F 14

Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 3 c. Verify both ND pumps - ON.

___ SAT STANDARD:

___ UNSAT Applicant determines that only 1 ND pump is running and transitions to the RNO COMMENTS:

STEP 4 6.c. RNO c. Perform the following: ___ SAT

1) IF 1NI-185A (ND Pump 1A Cont Sump Suct) is ___ UNSAT open, THEN start ND pump 1A.

STANDARD:

Applicant determines that ND PUMP 1A is on by verifying the red ON light is lit on 1MC-11.

COMMENTS:

STEP 5 2) IF 1NI-184B (ND Pump 1B Cont Sump Suct) is open, THEN start ND pump 1B. ___ SAT STANDARD: ___ UNSAT Applicant determines that 1NI-184B is not open by verifying the green CLSD light is lit on 1MC-11 and determines that the step is not applicable.

COMMENTS:

PAGE 6 0F 14

Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 6 3) IF any ND pump running with suction aligned to sump, THEN GO TO Step 6.d. ___ SAT STANDARD: ___ UNSAT Applicant determines that ND Pump 1A is running with suction aligned to the sump and proceeds to step 6.d.

COMMENTS:

STEP 7 6. d. Ensure the following valves - CLOSED: CRITICAL STEP

  • 1ND-32A (ND Train 1A Hot Leg Inj Isol)
  • 1ND-65B (ND Train 1B Hot Leg Inj Isol). ___ SAT STANDARD: ___ UNSAT Applicant depresses the green CLOSE pushbuttons for 1ND-32A and 1ND-65B on 1MC-11.

This step is critical to prevent pump run out should only one ND pump be running.

Examiner NOTE: Only one of the valves need to be closed to satisfy the critical step since the valves are in series.

COMMENTS:

PAGE 7 0F 14

Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 8 6. e. Isolate NI Pump Miniflow as follows:

___ SAT

1) Verify NC pressure - LESS THAN 1620 PSIG.

___ UNSAT STANDARD:

Applicant determines that NC (Reactor Coolant System) pressure is less than 1620 psig.

COMMENTS:

STEP 9 2) Ensure the following valves - CLOSED:

___ SAT

  • 1NI-144A (NI Pump 1B Miniflow Isol). ___ UNSAT STANDARD:

Applicant determines that the green CLSD lights are lit for 1NI-115A and 1NI-144A on 1MC-11.

COMMENTS:

STEP 10 3) Ensure "PWR DISCON FOR 1NI-147B" switch in "ENABLE". ___ SAT STANDARD: ___ UNSAT Applicant determines that the PWR DISCON FOR 1NI-147B is in ENABLE on 1MC-11.

COMMENTS:

PAGE 8 0F 14

Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 11 4) Ensure 1NI-147B (NI Miniflow Hdr To FWST Isol) -

CLOSED. ___ SAT STANDARD: ___ UNSAT Applicant determines that the green CLSD light is lit for 1NI-147B on 1MC-11.

COMMENTS:

STEP 12 6. f. Verify at least one of the following NV pumps miniflow valves - CLOSED: ___ SAT

STANDARD:

Applicant determines that the green CLSD lights are lit for 1NV-203A &

1NV-202B on 1MC-10.

COMMENTS:

STEP 13 g. Ensure 1NI-334B (NI Pump Suct X-Over From ND) - OPEN.

___ SAT STANDARD:

___ UNSAT Applicant determines the red OPEN light is lit for 1NI-334B on 1MC-11.

COMMENTS:

PAGE 9 0F 14

Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 14 h. OPEN the following valves:

___ SAT

  • 1NI-333B (NI Pump Suct From ND). ___ UNSAT STANDARD:

Applicant depresses the red OPEN pushbuttons for 1NI-332A and 1NI-333B on 1MC-11.

COMMENTS:

STEP 15 i. Align ND discharge to suction of NI and NV pumps as follows: ___ SAT

1) OPEN 1ND-28A (ND Supply To NV & 1A NI Pmps). ___ UNSAT STANDARD:

Applicant depresses the red OPEN pushbutton for 1ND-28A on 1MC-11 and determines that the valve will not open and continues.

COMMENTS:

PAGE 10 0F 14

Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 16 2) OPEN 1NI-136B (ND Supply To NI Pump 1B).

___ SAT STANDARD:

___ UNSAT Applicant depresses the red OPEN pushbutton for 1NI-136B on 1MC-11, determines that the valve will not open and proceeds to the next step.

Examiner NOTE: 1NI-136B will not open due to an interlock with 1NI-184B COMMENTS:

STEP 17 j. Verify at least one ND train aligned to provide suction to NV and NI as follows: ___ SAT

  • A Train: ___ UNSAT
  • 1A ND pump running
  • 1ND-28A (ND Supply To NV & 1A NI Pmps) -

OPEN.

STANDARD:

Applicant determines no train can be aligned to provide suction to NV and NI and proceeds to the RNO.

EXAMINER NOTE: This begins the alternate path of this JPM.

COMMENTS:

PAGE 11 0F 14

Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 18 6.j. RNO j. Perform the following:

___ SAT

1) IF either valve is in intermediate position, THEN allow 20 seconds for valve to open. ___ UNSAT STANDARD:

Applicant determines that this step does not apply.

COMMENTS:

STEP 19 2) IF either valve is open AND its associated ND pump on, THEN GO TO Step 6.k. ___ SAT STANDARD: ___ UNSAT Applicant determines that this step does not apply.

COMMENTS:

PAGE 12 0F 14

Catawba Nuclear Station JPM B May 2015 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 20 3) IF both A train and B train unavailable, THEN CRITICAL trip all NV and NI pumps. STEP STANDARD: ___ SAT Applicant determines both A train and B train are unavailable and ___ UNSAT depresses the green OFF pushbuttons for NV PMP 1A, NV PUMP 1B, NI PMP 1A and NI PUMP 1B.

This step is critical to protect the NV and NI pumps from damage from loss of suction and allow them to be available later when the FWST has been refilled.

EXAMINER CUE: Another operator will complete ES-1.3. This JPM is complete.

COMMENTS:

END OF TASK STOP TIME ________

PAGE 13 0F 14

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

May 2015 NRC Initial License Exam JPM B INITIAL CONDITIONS:

  • A LOCA has occurred on Unit 1.

INITIATING CUES:

  • 1AD-9, E/8 FWST LO-LO LEVEL annunciator is lit and the Control Room Supervisor instructs you, as the BOP, to transfer to Cold Leg Recirculation using EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) step 6.

Catawba Nuclear Station JPM C May 2015 NRC Exam JPM C PAGE 1 OF 10

Catawba Nuclear Station JPM C May 2015 NRC Exam EVALUATION SHEET Task: Isolate Cold Leg Accumulators Following a Shutdown LOCA Alternate Path: Yes Facility JPM #: N/A Safety Function: 3

Title:

Emergency Core Cooling System (ECCS)

K/A 006 A1.13 Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the ECCS controls including: Accumulator pressure (level, boron concentration)

Rating(s): 3.5 / 3.7 CFR: 41.5 / 45.5 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References:

AP/1/A/5500/027 (Shutdown LOCA) rev. 38, Enclosure 14 (Isolating Cold Leg Accumulators)

Task Standard: AP/1/A/5500/027 (Shutdown LOCA) Enclosure 14 (Isolating Cold Leg Accumulators) is performed and 1A & 1D Cold Leg Accumulators are isolated and 1B & 1C Cold Leg Accumulators are vented to containment.

Validation Time: 15 minutes Time Critical: Yes No X

===============================================================

Applicant: Time Start: __________

NAME___________________________ Docket #_______________ Time Finish: __________

Performance Rating: Performance Time _____

SAT ____ UNSAT ____

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 10

Catawba Nuclear Station JPM C May 2015 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:

1. ENSURE NRC Examination Security has been established.
2. Reset to IC # 165
3. Enter the password.
4. Select Yes on the INITIAL CONDITION RESET pop-up window.
5. Ensure simulator setup per table below.
6. Place simulator in RUN and acknowledge any alarms.
7. ENSURE Extra Operator is present in the simulator.
8. Place simulator in FREEZE until Examiner cue is given.

Instructor Action Final Delay Ramp Delete In Event PAGE 3 OF 10

PAGE 4 0F 10 Catawba Nuclear Station JPM C May 2015 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Unit 1 is in Mode 4.
  • Unit 1 shutdown was in progress for a refueling outage, when pressurizer pressure and level began to decrease uncontrollably.

INITIATING CUES:

  • The CRS has directed you to isolate the Unit 1 Cold Leg Accumulators by performing AP/1/A/5500/027 (Shutdown LOCA) Enclosure 14 (Isolating Cold Leg Accumulators).
  • Power to all CLA discharge isolation valves has been restored per EP/1/A/5000/G-1 (Generic Enclosures), Enclosure 9 (Power Alignment for CLA Valves).

EXAMINER NOTE: After reading the cue, provide the applicant with a copy of AP/1/A/5500/027 Enclosure 14.

PAGE 4 OF 10

Catawba Nuclear Station JPM C May 2015 NRC Exam STEP/STANDARD SAT/UNSAT START TIME: _______

STEP 1: 1. Dispatch operator to restore power to all CLA discharge isolation valves. REFER TO EP/1/A/5000/G-1 (Generic ___ SAT Enclosures), Enclosure 9 (Power Alignment for CLA Valves) ___ UNSAT STANDARD:

Per initiating cue, the applicant should realize that this step is complete.

Also valve indication for each of the CLA discharge isolation valves is available, due to power already being aligned by the AO.

COMMENTS:

STEP 2: 2. Ensure S/I - RESET

___ SAT

a. ECCS
b. D/G load sequencers ___UNSAT
c. IF AT ANY TIME a B/O occurs, THEN restart S/I equipment previously on.

STANDARD:

Applicant verifies that the yellow ECCS and D/G load sequencer RESET lights are lit. Applicant acknowledges the If at any time statement.

COMMENTS:

PAGE 5 0F 10

Catawba Nuclear Station JPM C May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 3: 3. WHEN power is aligned, THEN perform the following: CRITICAL STEP

a. CLOSE the following valves:
  • 1NI-76A (C-Leg Accum C Disch Isol) ___ UNSAT

STANDARD:

Applicant depresses the green CLOSE pushbutton for the valves listed, and verifies the green CLSD light lit and red OPEN light dark for valves 1NI-54A & 1NI-88B. Applicant also verifies the red OPEN light lit and green CLSD light dark for valves 1NI-65B & 1NI-76A and transitions to the RNO.

The critical part of this step is to close isolation valves 1NI-54A & 1NI-88B. The other 2 Cold Leg Accumulators will be vented to containment in subsequent steps in the RNO.

EXAMINER NOTE: This begins the alternate path of this JPM.

COMMENTS:

STEP 4: 3.RNOa. Perform the following: ___ SAT

1) Ensure containment isolation signals - RESET: ___ UNSAT
  • Phase A
  • Phase B STANDARD:

Applicant verifies that the yellow RESET lights are lit for both trains Phase A and Phase B isolations.

COMMENTS:

PAGE 6 0F 10

Catawba Nuclear Station JPM C May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 5: 2) Ensure 1VI-77B (VI Cont Isol) - OPEN

___ SAT STANDARD:

___ UNSAT Applicant determines that the red OPEN light lit and green CLSD light dark for 1VI-77B.

COMMENTS:

STEP 6: 3) IF VI pressure is less than 85 PSIG, THEN dispatch operator to ensure proper VI ___ SAT compressor operation.

___ UNSAT STANDARD:

Applicant determines that VI pressure is ~ 90 PSIG. This step is N/A.

COMMENTS:

STEP 7: 4) Vent any CLA which cannot be isolated as follows: ___ SAT a) OPEN 1NI-47A (C-Leg Accum N2 Sup Cont ___ UNSAT Isol)

STANDARD:

Applicant depresses the red OPEN pushbutton for 1NI-47A and verifies the red OPEN light lit and green CLSD light dark.

COMMENTS:

PAGE 7 0F 10

Catawba Nuclear Station JPM C May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 8: b) Place breaker 1CB-1 (behind 1MC-6)(Key CRITICAL

  1. 11) to - ON STEP STANDARD: ___ SAT Applicant lifts breaker 1CB-1 fully up to the ON position. ___ UNSAT This step is critical to place power on Cold Leg Accumulator Nitrogen supply isolation valves for 1B and 1C CLAs which will be opened in the next step to allow venting the accumulators to containment.

COMMENTS:

STEP 9: c) OPEN valve for CLA(s) to be vented: CRITICAL

  • 1NI-50 (C-Leg Accum A N2 Supply Isol) STEP
  • 1NI-61 (C-Leg Accum B N2 Supply Isol)
  • 1NI-72 (C-Leg Accum C N2 Supply Isol) ___ SAT
  • 1NI-84 (C-Leg Accum D N2 Supply Isol)

___ UNSAT STANDARD:

Applicant depresses the red OPEN pushbutton and verifies the red OPEN light lit and green CLSD light dark for 1NI-61 and 1NI-72.

This step is critical due to not being able to isolate these CLAs. If these CLAs are not vented to reduce the N2 overpressure, it could cause a hard bubble to form in the reactor coolant system as reactor coolant pressure continues to decrease.

COMMENTS:

PAGE 8 0F 10

Catawba Nuclear Station JPM C May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 10: d) CLOSE 1NI-47A. CRITICAL STEP STANDARD:

___ SAT Applicant depresses the green CLOSE pushbutton and verifies the green CLSD light lit and red OPEN light dark for 1NI-47A. ___ UNSAT This step is critical to allow venting the 1B and 1C CLAs.

COMMENTS:

STEP 11: e) OPEN 1NI-83 (C-Leg Accums N2 Vent Ctrl) CRITICAL to depressurize affected CLA(s). STEP STANDARD: ___ SAT Applicant rotates potentiometer for 1NI-83 clockwise to begin venting ___ UNSAT the 1B and 1C CLAs.

This step is critical to vent the 1B and 1C CLAs.

NOTE TO EVALUATOR: The time to fully vent the 1B & 1C CLAs would be approximately 30 minutes. The critical steps for this JPM have been met at this point and the JPM may be terminated at your discretion.

EVALUATOR CUE: Another operator will continue to vent the 1B and 1C Cold Leg Accumulators. This JPM is complete.

COMMENTS:

END OF TASK STOP TIME ________

PAGE 9 0F 10

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

May 2015 NRC Initial License Exam JPM C INITIAL CONDITIONS:

  • Unit 1 is in Mode 4.
  • Unit 1 shutdown was in progress for a refueling outage, when pressurizer pressure and level began to decrease uncontrollably.

INITIATING CUES:

  • The CRS has directed you to isolate the Unit 1 Cold Leg Accumulators by performing AP/1/A/5500/027 (Shutdown LOCA) Enclosure 14 (Isolating Cold Leg Accumulators).
  • An AO has been dispatched to restore power to all CLA discharge isolation valves per EP/1/A/5000/G-1 (Generic Enclosures), Enclosure 9 (Power Alignment for CLA Valves).

Catawba Nuclear Station JPM D May 2015 NRC Exam JPM D PAGE 1 OF 14

Catawba Nuclear Station JPM D May 2015 NRC Exam EVALUATION SHEET Task: Establish NC system Bleed and Feed per EP/1/A/5000/FR-H.1 Alternate Path: Yes Facility JPM #: NC-046 Safety Function: 4P

Title:

Reactor Coolant System K/A 002 A2.04 Ability to (a) predict the impacts of the following malfunctions or operations on the RCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of heat sinks Rating(s): 4.3 / 4.6 CFR: 41.5 / 43.5 / 45.3 / 45.5 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References:

EP/1/A/5000/FR-H.1 (Response to Loss of Secondary Heat Sink) rev. 42 Task Standard: Aligns S/I feed path using NI and NV pumps and opens 1NC-32B and 1NC-34A PZR PORVs to establish NC system bleed path Validation Time: 10 minutes Time Critical: Yes No X

===============================================================

Applicant: Time Start: __________

NAME___________________________ Docket #_______________ Time Finish: __________

Performance Rating: Performance Time _____

SAT ____ UNSAT ____

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 14

Catawba Nuclear Station JPM D May 2015 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:

1. ENSURE NRC Examination Security has been established.
2. Reset to IC #166.
3. Enter the password.
4. Select Yes on the INITIAL CONDITION RESET pop-up window.
5. Ensure simulator setup per table below.
6. Place simulator in RUN and acknowledge any alarms.
7. ENSURE Extra Operator is present in the simulator.
8. Place simulator in FREEZE until Examiner cue is given.

Instructor Action Final Delay Ramp Delete In Event MAL-CA003A CAPT SA2 FAILS TO START Active MAL-CA003B CAPT SA5 FAILS TO START Active MAL-CA004A FAILURE OF CA PUMP A TO Both START MAL-CA004B FAILURE OF CA PUMP B TO Both START MAL-NI001B NI PUMP B FAILURE Auto OVR-ISE043 SAFETY INJECTION INITIATE Off PB TRN B MAL-ISE002B (AUTO SI TRN B FAILS TO Active ACTUATE)

VLV-NI001F (NI9A B.I.T. DISCHARGE ISOL 0

VLV FAIL TO POSITION)

PAGE 3 OF 14

REV. 0 PAGE 4 0F 14 Catawba Nuclear Station JPM D May 2015 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • The CA system will not function.
  • Attempts to restart the Main CF pumps have been unsuccessful.
  • EP/1/A/5000/FR-H.1 (Response to Loss of Secondary Heat Sink) has been entered due to a RED PATH for the Heat Sink critical safety function while performing EP/1/A/5000/ES-0.1 (Reactor Trip Response).
  • Bleed and Feed initiation criteria have been met.

INITIATING CUES:

  • The CRS instructs you to initiate NC system bleed and feed by performing steps 19-24 of EP/1/A/5000/FR-H.1. Inform the CRS when the bleed and feed path has been initiated and verified.

EXAMINER NOTE: After reading cue, provide the applicant with a copy of EP/1/A/5000/FR-H.1 pages 28-36.

PAGE 4 OF 14

Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD SAT/UNSAT START TIME: _______

STEP 1: 19. Perform Steps 20 through 24 quickly to establish NC heat removal by NC bleed and feed. ___ SAT STANDARD: ___ UNSAT Applicant acknowledges this step.

COMMENTS:

STEP 2 20. Ensure all NC pumps - OFF. ___ SAT STANDARD: ___UNSAT Applicant ensures the NC pumps are off.

COMMENTS:

PAGE 5 0F 14

Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 3 21. Initiate S/I. CRITICAL STEP STANDARD:

___ SAT Applicant depresses the red train A and B SAFETY INJECTION INITIATE pushbuttons and verifies the red SAFETY INJECTION ___ UNSAT ACTUATED status light is lit on 1SI-13 or ECCS TRN A yellow reset light is dark on 1MC-11.

This step is critical to start the NI pump and align the valves required for initiating an NC system feed path.

COMMENTS:

STEP 4 22. Verify NC System feed path as follows: ___ SAT

a. Verify the following pumps - ON: ___ UNSAT
  • At least one NV pump
  • At least one NI pump.

STANDARD:

Applicant determines that at least one NV pump and one NI pump are running.

EXAMINER NOTE: Applicant may start 1B NI pump and 1B NV pump at this time due to it being a failed auto action. If not, the procedure will direct starting these pumps in the upcoming steps.

COMMENTS:

PAGE 6 0F 14

Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 5 22 b. Verify "NV S/I FLOW" - INDICATING FLOW.

___ SAT STANDARD: ___ UNSAT Applicant determines that 1NVP6080 (NV S/I FLOW) on 1MC-3 indicates 0 GPM and transitions to the RNO.

EXAMINER NOTE: This begins the alternate path of this JPM.

COMMENTS:

STEP 6 22 b. RNO Perform the following:

___ SAT

1) Ensure the following pumps - ON:

___ UNSAT

  • NV Pumps
  • NI Pumps.

STANDARD:

Applicant ensures that all NV pumps and NI pumps are running by depressing the red ON pushbuttons for any non-running pump, and verifying the red ON lights are lit and green OFF lights are dark for all pumps.

COMMENTS:

PAGE 7 0F 14

Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 7 22 b. RNO 2) IF at least one NV pump in service, THEN perform the following: ___ SAT a) Ensure the following valves - OPEN: ___ UNSAT

STANDARD:

Applicant verifies the red OPEN lights lit and green CLSD lights dark on 1NV-252A and 1NV-253B.

COMMENTS:

STEP 8 22 b. RNO 2) b) Ensure the following valves - CLOSED:

___ SAT

___ UNSAT

STANDARD:

Applicant determines that the green CLSD light is lit and red OPEN light is dark on 1NV-188A. Applicant determines that the green CLSD light is dark for 1NV-189B, and depresses the green CLOSE pushbutton and verifies the green CLSD light is lit and the red OPEN light is dark.

COMMENTS:

PAGE 8 0F 14

Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 9 22 b. RNO 2) c) Ensure the following valves - OPEN: CRITICAL STEP

___ SAT

___ UNSAT STANDARD:

Applicant determines the red OPEN light is dark and green CLSD light is lit on 1NI-9A and 1NI-10B. Applicant depresses the red OPEN pushbutton for 1NI-9A but the valve will not open. Applicant depresses the red OPEN pushbutton for 1NI-10B and verifies the red OPEN light is lit and the green CLSD light is dark.

This step is critical to align an NC (Reactor Coolant) system Feed path.

COMMENTS:

STEP 10 22 b. RNO 3) IF NI Pump 1A is in service, THEN ensure the following valves - OPEN: ___ SAT

STANDARD:

Applicant determines that the red OPEN light is lit and green CLSD light is dark on valves 1NI-103A, 1NI-118A, 1NI-162A, and 1NI-100B.

COMMENTS:

PAGE 9 0F 14

Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 11 22 b. RNO 4) IF NI Pump 1B is in service, THEN ensure the following valves - OPEN: ___ SAT

STANDARD:

Applicant verifies that the red OPEN light is lit and green CLSD light is dark on valves 1NI-135B, 1NI-150B, 1NI-162A, and 1NI-100B.

COMMENTS:

STEP 12 22 b. RNO 5) IF no feed path can be aligned, THEN perform the following: ___ SAT STANDARD: ___ UNSAT Applicant determines that a feed path does exist and this step is N/A.

COMMENTS:

PAGE 10 0F 14

Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 13 23. Establish NC System bleed path as follows:

___ SAT

a. Ensure all Pzr PORV isolation valves - OPEN.

___ UNSAT STANDARD:

Applicant determines the RED lights are lit and GREEN lights are dark on valves 1NC-31B, 1NC-35B, and 1NC-33A.

COMMENTS:

STEP 14 23 b. Select "OPEN" on the following PZR PORVs: CRITICAL STEP

___ SAT

___ UNSAT STANDARD:

Applicant rotates switches for 1NC-34A and 1NC-32B, clockwise to the OPEN position and verifies RED lights are lit and GREEN lights are dark on both valves.

This step is critical because it establishes an NC (Reactor Coolant) system Bleed path.

COMMENTS:

PAGE 11 0F 14

Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 15 23 c. Align N2 to Pzr PORVs by opening the following valves:

___ SAT

___ UNSAT

STANDARD:

Applicant depresses the red OPEN pushbutton and verifies red OPEN light lit and green CLSD light dark on valves 1NI-438A and 1NI-439B.

COMMENTS:

STEP 16 23 d. Verify power to all Pzr PORV isolation valves -

AVAILABLE. ___ SAT STANDARD: ___ UNSAT Applicant verifies indicating lights lit on 1NC-31B, 1NC-35B, and 1NC-33A.

COMMENTS:

PAGE 12 0F 14

Catawba Nuclear Station JPM D May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 17 24. Verify the following valves - OPEN:

___ SAT

___ UNSAT

STANDARD:

Applicant verifies lights on 1NC-31B, 1NC-32B, 1NC-33A and 1NC-34A indicate OPEN.

COMMENTS:

END OF TASK STOP TIME ________

PAGE 13 0F 14

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

May 2015 NRC Initial License Exam JPM D INITIAL CONDITIONS:

  • The CA system will not function.
  • Attempts to restart the Main CF pumps have been unsuccessful.
  • EP/1/A/5000/FR-H.1 (Response to Loss of Secondary Heat Sink) has been entered due to a RED PATH for the Heat Sink critical safety function while performing EP/1/A/5000/ES-0.1 (Reactor Trip Response).
  • Bleed and Feed initiation criteria have been met.

INITIATING CUES:

  • The CRS instructs you to initiate NC system bleed and feed by performing steps 19-24 of EP/1/A/5000/FR-H.1. Inform the CRS when the bleed and feed path has been initiated and verified.

Catawba Nuclear Station JPM E May 2015 NRC Exam JPM E PAGE 1 OF 8

Catawba Nuclear Station JPM E May 2015 NRC Exam EVALUATION SHEET Task: Respond to Loss of Normal Steam Release Capabilities Alternate Path: No Facility JPM #: CSF-006 Modified Safety Function: 4S

Title:

Main and Reheat Steam System K/A E13 EA1.1 Ability to operate and/or monitor the following as they apply to the (Steam Generator Overpressure): Components and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Rating(s): 3.1 / 3.3 CFR: 41.7 / 45.5 / 45.6 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References:

EP/1/A/5000/FR-H.4 (Response to Loss of Normal Steam Release Capabilities)

Task Standard: Steam Generator PORVs operated in manual to decrease steam pressure to <

1175 PSIG.

Validation Time: 5 minutes Time Critical: Yes No X

===============================================================

Applicant: Time Start: __________

NAME___________________________ Docket #_______________ Time Finish: __________

Performance Rating: Performance Time _____

SAT ____ UNSAT ____

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 8

Catawba Nuclear Station JPM E May 2015 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:

1. ENSURE NRC Examination Security has been established.
2. Reset to IC # 158
3. Enter the password.
4. Select Yes on the INITIAL CONDITION RESET pop-up window.
5. Ensure simulator setup per table below.
6. Place simulator in RUN and acknowledge any alarms.
7. ENSURE Extra Operator is present in the simulator.
8. Place simulator in FREEZE until Examiner cue is given.

Instructor Action Delay Ramp Delete Event Final In MAL-SM005A (S/G SAFETY VALVE SV20 0

FAILURE)

MAL-SM005B (S/G SAFETY VALVE SV14 0

FAILURE)

MAL-SM005C (S/G SAFETY VALVE SV8 0

FAILURE)

MAL-SM005D (S/G SAFETY VALVE SV2 0

FAILURE)

MAL-SM002A (S/G PORV SV19 FAILURE) 0 MAL-SM002B (S/G PORV SV13 FAILURE) 0 MAL-SM002C (S/G PORV SV7 FAILURE) 0 MAL-SM002D (S/G PORV SV1 FAILURE) 0 OVR-IDE025A (SBM-Steam Dump INTLK Byp ON Trn A - OFF RST POS)

MAL-SM002A (S/G PORV SV19 FAILURE) 0 :01 1 MAL-SM002B (S/G PORV SV13 FAILURE) 0 :01 2 MAL-SM002C (S/G PORV SV7 FAILURE) 0 :01 3 MAL-SM002D (S/G PORV SV1 FAILURE) 0 :01 4 Ensure Event 1 = x02i088m Ensure Event 2 = x02i091m Ensure Event 3 = x02i096m Ensure Event 4 = x02i099m PAGE 3 OF 8

PAGE 4 0F 8 Catawba Nuclear Station JPM E May 2015 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

INITIATING CUES:

  • The CRS has directed you to perform EP/1/A/5000/FR-H.4 (Response to Loss of Normal Steam Release Capabilities) to restore steam generator pressure to < 1175 PSIG.

EXAMINER NOTE: After reading the cue, provide the applicant with a copy of EP/1/A/5000/FR-H.4.

PAGE 4 OF 8

Catawba Nuclear Station JPM E May 2015 NRC Exam STEP/STANDARD SAT/UNSAT START TIME: _______

NOTE Throughout this procedure, affected refers to any S/G in which pressure is greater than 1175 PSIG.

STEP 1: 1. IF AT ANY TIME affected S/G(s) N/R level increases to greater than 92% (80% ACC), THEN steam should not be ___ SAT released from affected S/G(s).

___ UNSAT STANDARD:

Applicant acknowledges the continuous action statement and continues to step 2.

COMMENTS:

STEP 2: 2. Restore normal steam release capability of affected S/G(s) using S/G PORV as follows: ___ SAT

a. Verify affected S/G(s) PORV isolation valve - OPEN. ___UNSAT STANDARD:

Applicant determines all S/G PORV isolation valves red OPEN lights are lit and green CLSD lights are dark.

COMMENTS:

PAGE 5 0F 8

Catawba Nuclear Station JPM E May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 3: 2.b. Throttle open affected S/G(s) PORV. CRITICAL STEP STANDARD: ___ SAT Applicant must depress the manual pushbutton for each S/G PORV. ___ UNSAT This step is critical to gain control of all steam generator PORVs to be able to decrease steam generator pressures to < 1175 psig.

COMMENTS:

STEP 4: 2.b. Throttle open affected S/G(s) PORV. CRITICAL STEP STANDARD: ___ SAT The applicant must rotate each S/G PORV potentiometer clockwise to ___ UNSAT open the applicable S/G PORV.

This step is critical to be able to decrease steam generator pressures to < 1175 psig.

COMMENTS:

PAGE 6 0F 8

Catawba Nuclear Station JPM E May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 5: 2.c. GO TO Step 4. ___ SAT STANDARD: ___ UNSAT Applicant goes to step 4.

COMMENTS:

STEP 6: 4. Verify S/G pressures - LESS THAN 1175 PSIG.

___ SAT STANDARD:

___ UNSAT Applicant either determines that S/G pressures are currently < 1175 PSIG or will loop back to step 1.

EXAMINER CUE: If the applicant does not terminate the JPM when S/G pressures are reduced to < 1175 PSIG, then provide the following cue - The CRS is ready to return to the procedure and step in effect. This JPM is complete.

COMMENTS:

STOP TIME ________

PAGE 7 0F 8

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

May 2015 NRC Initial License Exam JPM E INITIAL CONDITIONS:

INITIATING CUES:

  • The CRS has directed you to perform EP/1/A/5000/FR-H.4 (Response to Loss of Normal Steam Release Capabilities) to restore steam generator pressure to < 1175 PSIG.

Catawba Nuclear Station JPM F May 2015 NRC Exam JPM F PAGE 1 OF 9

Catawba Nuclear Station JPM F May 2015 NRC Exam EVALUATION SHEET Task: Shift Upper Containment Ventilation Units Alternate Path: No Facility JPM #: NEW Safety Function: 5

Title:

Containment Cooling System K/A 022 A4.01 Ability to manually operate and/or monitor in the control room: CCS fans Rating(s): 3.6 / 3.6 CFR: 41.7 / 45.5 to 45.8 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References:

OP/1/A/6450/001 (Containment Ventilation (VV) Systems) rev. 42, Enclosure 4.12 (Shifting Operating Upper Containment Ventilation Units)

Task Standard: OP/1/A/6450/001 (Containment Ventilation (VV) Systems) Enclosure 4.12 (Shifting Operating Upper Containment Ventilation Units) performed to start 1D UCVU and shutdown 1C UCVU.

Validation Time: 5 minutes Time Critical: Yes No X

===============================================================

Applicant: Time Start: __________

NAME___________________________ Docket #_______________ Time Finish: __________

Performance Rating: Performance Time _____

SAT ____ UNSAT ____

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 9

Catawba Nuclear Station JPM F May 2015 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:

1. ENSURE NRC Examination Security has been established.
2. Reset to IC # 167 (This JPM written to be done with JPM E and will have the same simulator setup as JPM E).
3. Enter the password.
4. Select Yes on the INITIAL CONDITION RESET pop-up window.
5. Ensure simulator setup per table in JPM E.
6. Place simulator in RUN and acknowledge any alarms.
7. ENSURE Extra Operator is present in the simulator.
8. Place simulator in FREEZE until Examiner cue is given.

EXAMINER NOTE: This JPM can be performed in conjunction with JPM E.

PAGE 3 OF 9

PAGE 4 0F 9 Catawba Nuclear Station JPM F May 2015 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Unit 1 is at 48% power.

INITIATING CUES:

  • The CRS has directed you to shift operating Upper Containment Ventilation Units by starting 1D UCVU and stopping 1C UCVU per OP/1/A/6450/001 (Containment Ventilation (VV) Systems) Enclosure 4.12 (Shifting Operating Upper Containment Ventilation Units).

EXAMINER NOTE: After reading the cue, provide the applicant with a copy of OP/1/A/6450/001 (Containment Ventilation (VV) Systems) Enclosure 4.12 (Shifting Operating Upper Containment Ventilation Units).

PAGE 4 OF 9

Catawba Nuclear Station JPM F May 2015 NRC Exam STEP/STANDARD SAT/UNSAT START TIME: _______

STEP 1 3.1 IF only one UCVU is running, perform the following: CRITICAL STEP 3.1.1 IF the running UCVU is operating in the NORM mode, start the UCVU to be placed in service by placing its control ___ SAT switch in the NORM position:

  • VV UCVU 1A ___ UNSAT
  • VV UCVU 1B
  • VV UCVU 1C
  • VV UCVU 1D STANDARD:

Applicant places the control switch for VV UCVU 1D to the NORM position.

This step is critical to meet the task of shifting operating UCVUs per the JPM standard.

COMMENTS:

STEP 2 3.1.2 IF the running UCVU is operating in the MAX mode, start the UCVU to be placed in service by placing its control ___ SAT switch in the MAX position.

___UNSAT STANDARD:

Applicant determines this step is N/A.

COMMENTS:

PAGE 5 0F 9

Catawba Nuclear Station JPM F May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 3 3.1.3 Verify the red indicating lights illuminate for the UCVU placed in service. ___ SAT

___ UNSAT STANDARD:

Applicant determines the red indicating light lit for the 1D UCVU.

COMMENTS:

STEP 4 3.1.4 Verify the red indicating lights illuminate for the return fan ___ SAT placed in service.

___ UNSAT STANDARD:

Applicant determines the red indicating light lit for return fan 1D.

COMMENTS:

PAGE 6 0F 9

Catawba Nuclear Station JPM F May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 5 3.1.5 Place the control switch for the UCVU to be stopped in the CRITICAL OFF position: STEP

  • VV UCVU 1A
  • VV UCVU 1B ___ SAT
  • VV UCVU 1C
  • VV UCVU 1D ___ UNSAT STANDARD:

Applicant places the control switch for the 1C UCVU to the OFF position.

This step is critical to meet the task of shifting operating UCVUs per the JPM standard.

COMMENTS:

STEP 6 3.1.6 Verify the green indicating light illuminates for the UCVU fan stopped. ___ SAT STANDARD: ___ UNSAT Applicant determines the green indicating light lit for the 1C UCVU.

COMMENTS:

PAGE 7 0F 9

Catawba Nuclear Station JPM F May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 7 3.1.7 Verify the green indicating light illuminates for the return fan stopped. ___ SAT STANDARD: ___ UNSAT Applicant determines the green indicating light lit for the 1C return fan.

COMMENTS:

STEP 8 3.2 IF two or three UCVUs are running, perform the following:

___ SAT STANDARD:

___ UNSAT Applicant determines this step is N/A.

COMMENTS:

STEP 9 3.3 Indicate below the operating UCVUs:

  • VV UCVU 1A ___ SAT
  • VV UCVU 1B
  • VV UCVU 1C ___ UNSAT
  • VV UCVU 1D STANDARD:

Applicant indicates that 1D UCVU is running.

COMMENTS:

END OF TASK STOP TIME ________

PAGE 8 0F 9

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

May 2015 NRC Initial License Exam JPM F INITIAL CONDITIONS:

  • Unit 1 is at 48% power.

INITIATING CUES:

  • The CRS has directed you to shift operating Upper Containment Ventilation Units by starting 1D UCVU and stopping 1C UCVU per OP/1/A/6450/001 (Containment Ventilation (VV) Systems) Enclosure 4.12 (Shifting Operating Upper Containment Ventilation Units).

Catawba Nuclear Station JPM G May 2015 NRC Exam JPM G PAGE 1 OF 10

Catawba Nuclear Station JPM G May 2015 NRC Exam EVALUATION SHEET Task: Reset Radiation Monitor Trip Setpoints Alternate Path: No Facility JPM #: WE-EMF-001 Safety Function: 7

Title:

Process Radiation Monitoring System K/A 073 A4.02 Ability to manually operate and/or monitor in the control room: Radiation monitoring system control panel Rating(s): 3.7 / 3.7 CFR: 41.7 / 45.5 to 45.8 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References:

OP/0/A/6500/080 (EMF RP86A Output Modules) rev. 17, Enclosure 4.2 (EMF RP86A Trip Setpoint Adjustment)

Task Standard: EMF50L TRIP 1 setpoint set to 6.3 E3 CPM and the TRIP 2 setpoint set to 9.0 E3 CPM per OP/0/A/6500/080 (EMF RP86A Output Modules) Enclosure 4.2 (EMF RP86A Trip Setpoint Adjustment).

Validation Time: 10 minutes Time Critical: Yes No X

===============================================================

Applicant: Time Start: __________

NAME___________________________ Docket #_______________ Time Finish: __________

Performance Rating: Performance Time _____

SAT ____ UNSAT ____

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 10

Catawba Nuclear Station JPM G May 2015 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:

1. ENSURE NRC Examination Security has been established.
2. Reset to IC # 168
3. Enter the password.
4. Select Yes on the INITIAL CONDITION RESET pop-up window.
5. Ensure simulator setup per table below.
6. Place simulator in RUN and acknowledge any alarms.
7. ENSURE Extra Operator is present in the simulator.
8. Ensure copy of EMF-50 setpoint log page has been replaced.
9. Place simulator in FREEZE until Examiner cue is given.

Instructor Action Delay Ramp Delete Event Final In PAGE 3 OF 10

Catawba Nuclear Station JPM G May 2015 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Unit 1 is at 100% power.

INITIATING CUES:

Following a discussion with Glenn from RP concerning a premature gaseous release termination, the Control Room Supervisor directs you to set EMF 50L setpoints using OP/0/A/6500/080 (EMF RP86A Output Modules) Enclosure 4.2 (EMF RP86A Trip Setpoint Adjustment) to the following values:

  • Trip 1 = 6300 CPM
  • Trip 2 = 9000 CPM OAC Program EMFLIB is currently not available.

EXAMINER NOTE: After reading the cue, provide the applicant with a copy of OP/0/A/6500/080 (EMF RP86A Output Modules) Enclosure 4.2 (EMF RP86A Trip Setpoint Adjustment).

PAGE 4 OF 10

Catawba Nuclear Station JPM G May 2015 NRC Exam STEP/STANDARD SAT/UNSAT START TIME: _______

NOTE: 1. If desired, EMF setpoints adjustments may be performed from the EMF SETPOINT screen of OAC EMF Library (EMFLIB) Application. EMFLIB is user friendly, no procedure instructions are provided for this application.

2. The Trip Lamps can only be cleared if the activity level has decreased below the Trip Setpoint.
3. If any trip setpoint is >1000 cpm, the entered setpoint should be rounded down to the nearest 100 prior to entering to ensure the entered setpoint remains conservative.

STEP 1 3.1 IF necessary, press the clear key [CLR] to reset trip lamps

___ SAT STANDARD:

___ UNSAT Applicant verifies trip lamps dark or depresses the [CLR] key to clear alarms.

COMMENTS:

STEP 2 3.2 Press the function key [FUN] to bring up the SELECT CRITICAL FUNCTION screen. STEP STANDARD: ___ SAT Applicant depresses the [FUN] key to bring up the SELECT ___UNSAT FUNCTION screen.

This step is critical, due to being the only way to get to the select function screen, which is required to input new Trip 1 and Trip 2 values.

COMMENTS:

PAGE 5 0F 10

Catawba Nuclear Station JPM G May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 3 3.3 Adjust Trip 1 Setpoint as follows: CRITICAL STEP 3.3.1 Press [1] for Trip 1 setting display screen.

___ SAT STANDARD:

___ UNSAT Applicant depresses the [1] to bring up the Trip 1 setting display screen.

This step is critical to bring up the screen that the new Trip 1 setting will be input into.

COMMENTS:

CRITICAL STEP 4 3.3.2 Key in the desired Trip 1 setpoint. STEP STANDARD: ___ SAT Applicant keys in 6300 CPM using the numeric keypad. ___ UNSAT This step is critical to input the new Trip 1 setpoint required to meet the task standard. This new setpoint is checked in the next step. The critical requirement is for the new trip setpoint of 6300 CPM to be entered by the end of this JPM.

COMMENTS:

PAGE 6 0F 10

Catawba Nuclear Station JPM G May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 5 3.3.3 Ensure the setpoint is correctly displayed in the ENTER CRITICAL block on the setpoint display screen. STEP

___ SAT STANDARD:

___ UNSAT Applicant ensures 6300 CPM is displayed in the ENTER block.

This step is only critical if setpoint was entered wrong in the previous step.

COMMENTS:

NOTE: Once the enter key [ENT] is pressed, the change in Trip 1 alarm setpoint is active.

STEP 6 3.3.4 Press the enter key [ENT]. This value is now displayed CRITICAL under Trip 1 and the ENTER block is cleared. STEP STANDARD: ___ SAT Applicant presses the [ENT] key and verifies the correct value under ___ UNSAT the Trip 1 on the display.

This step is critical to input the new Trip 1 setpoint. Again the critical requirement is to have the Trip 1 setpoint set to 6300 CPM by the end of the JPM.

COMMENTS:

PAGE 7 0F 10

Catawba Nuclear Station JPM G May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 7 3.3.5 Press the clear key [CLR] to return to the SELECT FUNCTION screen. ___ SAT STANDARD: ___ UNSAT Applicant presses the [CLR] key to return to the SELECT FUNCTION screen.

COMMENTS:

STEP 8 3.4 Adjust Trip 2 Setpoint as follows: CRITICAL STEP 3.4.1 Press [2] for Trip 2 setting display screen.

___ SAT STANDARD:

___ UNSAT Applicant presses [2] to bring up the Trip 2 setting display screen.

This step is critical to get to the required screen to input the new Trip 2 setpoint.

COMMENTS:

STEP 9 3.4.2 Key in the desired Trip 2 setpoint. CRITICAL STEP STANDARD:

___ SAT Applicant enters 9000 CPM using the numeric keypad.

___ UNSAT This step is critical to input the new Trip 2 setpoint required to meet the task standard. This new setpoint is checked in the next step. The critical requirement is for the new trip setpoint of 9000 CPM to be entered by the end of this JPM.

COMMENTS:

PAGE 8 0F 10

Catawba Nuclear Station JPM G May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 10 3.4.3 Ensure the setpoint is correctly displayed in the ENTER CRITICAL block on the setpoint display screen. STEP STANDARD: ___ SAT Applicant ensures 9000 CPM is displayed in the ENTER block. ___ UNSAT This step is only critical if setpoint was entered wrong in the previous step.

COMMENTS:

NOTE: Once the enter key [ENT] is pressed, the change in Trip 2 alarm setpoint is active.

STEP 11 3.4.4 Press the enter key [ENT]. This value is now displayed CRITICAL under Trip 2 and the ENTER block is cleared. STEP STANDARD: ___ SAT Applicant presses the [ENT] key and verifies the correct value under ___ UNSAT the Trip 2 on the display.

This step is critical to input the new Trip 2 setpoint. Again the critical requirement is to have the Trip 2 setpoint set to 9000 CPM by the end of the JPM.

COMMENTS:

STEP 12 3.5 Press the clear key [CLR] twice to return to the normal display screen. ___ SAT STANDARD: ___ UNSAT Applicant presses the [CLR] key twice to return to the normal display screen.

EXAMINER CUE: Another operator will complete the procedure.

This JPM is complete.

COMMENTS:

END OF TASK STOP TIME ________

PAGE 9 0F 10

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

May 2015 NRC Initial License Exam JPM G INITIAL CONDITIONS:

  • Unit 1 is at 100% power.

INITIATING CUES:

Following a discussion with Glenn from RP concerning a premature gaseous release termination, the Control Room Supervisor directs you to set EMF 50L setpoints using OP/0/A/6500/080 (EMF RP86A Output Modules) Enclosure 4.2 (EMF RP86A Trip Setpoint Adjustment) to the following values:

  • Trip 1 = 6300 CPM
  • Trip 2 = 9000 CPM OAC Program EMFLIB is currently not available.

Catawba Nuclear Station JPM H May 2015 NRC Exam JPM H PAGE 1 OF 10

Catawba Nuclear Station JPM H May 2015 NRC Exam EVALUATION SHEET Task: Loss of KC AP-21 step 8 (Reactor Trip Sequence)

Alternate Path: Yes Facility JPM #: PSS-KC-083 Safety Function: 8

Title:

Component Cooling Water System K/A 008 A2.01 Ability to (a) predict the impacts of the following malfunctions or operations on the CCWS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of CCW pump Rating(s): 3.3 / 3.6 CFR: 41.5 / 43.5 / 45.3 / 45.13 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References:

AP/1/A/5500/021 (Loss of Component Cooling) rev. 42 Task Standard: Aligns steam dumps to pressure mode, trips the reactor and when reactor power is < 5%, trips all NC pumps per AP/1/A/5500/021 (Loss of Component Cooling) step 8.

Validation Time: 5 minutes Time Critical: Yes No X

===============================================================

Applicant: Time Start: __________

NAME___________________________ Docket #_______________ Time Finish: __________

Performance Rating: Performance Time _____

SAT ____ UNSAT ____

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 10

Catawba Nuclear Station JPM H May 2015 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:

1. ENSURE NRC Examination Security has been established.
2. Reset to IC # 169.
3. Enter the password.
4. Select Yes on the INITIAL CONDITION RESET pop-up window.
5. Ensure simulator setup per table below.
6. Place simulator in RUN and acknowledge any alarms.
7. ENSURE Extra Operator is present in the simulator.
8. Place simulator in FREEZE until Examiner cue is given.

Instructor Action Final Delay Ramp Delete In Event VLV-KC024F (KC425A Rtn Hdr Cont Isol 0

Outside VLV Fail To Position)

Perform actions of AP-21 up to step 8.

PAGE 3 OF 10

Catawba Nuclear Station JPM H May 2015 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Unit 1 is at 100% power.
  • AP/1/A/5500/021 (Loss of Component Cooling) has been entered.

INITIATING CUES:

  • The CRS instructs you to perform step 8 of AP/1/A/5500/021.

EXAMINER NOTE: After reading cue, provide the applicant with a copy of AP/1/A/5500/021 (Loss of Component Cooling) completed through step 7.

PAGE 4 OF 10

Catawba Nuclear Station JPM H May 2015 NRC Exam STEP/STANDARD SAT/UNSAT START TIME: _______

CAUTION A loss of KC cooling to the NC pumps results in a gradual approach to an overheated condition in approximately 10 minutes which will result in shaft seizure.

STEP 1 8. Verify KC flow to NC pumps as follows:

___ SAT

Applicant determines that the listed alarms are lit and transitions to the RNO.

COMMENTS:

STEP 2 8.RNO.a. Ensure the following valves - OPEN: ___ SAT

  • 1KC-425A (NC Pumps Ret Hdr Cont Isol) ___UNSAT

STANDARD:

Applicant determines the red OPEN lights lit and green CLSD lights dark for 1KC-338B & 1KC-424B. Applicant determines that the green CLSD light is lit for 1KC-425A and depresses the red OPEN pushbutton. Applicant determines that 1KC-425A will not open.

EXAMINER NOTE: This begins the alternate path of this JPM.

COMMENTS:

PAGE 5 0F 10

Catawba Nuclear Station JPM H May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 3 8.RNO.b. IF AT ANY TIME any of the following conditions are met: ___ SAT

  • Time since loss of KC - GREATER THAN 10 MINUTES ___ UNSAT OR
  • Any NC pump trip criteria from Enclosure 1 (Foldout Page) is met THEN perform the following:

EXAMINER CUE: Loss of KC occurred greater than 10 minutes ago.

STANDARD:

Applicant determines that it has been > 10 minutes since loss of KC per examiner cue and continues with step b.1) of the RNO.

COMMENTS:

STEP 4 8.RNO.b.1) IF letdown is isolated, THEN perform the following: ___ SAT

___ UNSAT STANDARD:

Applicant determines that letdown is in service and that this step is N/A.

COMMENTS:

PAGE 6 0F 10

Catawba Nuclear Station JPM H May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 5 8.RNO.b.2) Ensure steam dumps - IN PRESSURE MODE. CRITICAL STEP STANDARD: ___ SAT Applicant places steam dump select switch to PRESS. ___ UNSAT This step is critical to ensure proper temperature control following trip of the NC pumps in subsequent steps.

COMMENTS:

STEP 6 8.RNO.b.3) Ensure the Reactor - TRIPPED. CRITICAL STEP STANDARD: ___ SAT Applicant rotates the reactor trip breaker pistol grips counter-clockwise ___ UNSAT to the trip position.

EXAMINER CUE: If the applicant starts to perform actions to verify reactor trip, give the following cue - Another operator will perform the immediate actions of E-0.

This step is critical to ensure reactor power is < 5% prior to tripping the NC pumps in subsequent steps.

COMMENTS:

PAGE 7 0F 10

Catawba Nuclear Station JPM H May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 7 8.RNO.b.4) WHEN reactor power less than 5%, THEN perform CRITICAL the following: STEP a) Trip all NC pumps. ___ SAT b) Ensure normal spray valve associated with tripped NC pump(s) - IN MANUAL AND ___ UNSAT CLOSED STANDARD:

Applicant depresses the green OFF pushbutton for NC pumps 1A, 1B, 1C, and 1D and verifies the green OFF light lit and red ON light dark for each NC pump. Applicant will depress the [M] button on 1NC-27 &

1NC-29 controllers and depress the [] demand pushbutton on each valve until the demand is reading 0%.

Tripping the NC pumps is critical to protect the NC pumps from failure due to a loss of cooling water supply. Closing the spray valves is not critical.

COMMENTS:

STEP 8 8.RNO.b.5) Secure any dilutions in progress.

___ SAT STANDARD: ___ UNSAT Applicant determines that no dilutions are in progress and continues to the next step.

COMMENTS:

PAGE 8 0F 10

Catawba Nuclear Station JPM H May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 9 8.RNO.b.6) IF reactor trip breakers were closed, THEN perform one of the following while continuing with this ___ SAT procedure as time and conditions allow:

___ UNSAT

  • IF above P-11, THEN GO TO EP/1/A/5000/E-0 (Reactor Trip or Safety Injection)

OR

  • IF below P-11, THEN GO TO AP/1/A/5500/005 (Reactor Trip or Inadvertent S/I Below P-11)

STANDARD:

Applicant determines the need to go to E-0.

EXAMINER CUE: The CRS has pulled E-0 and another RO will perform the immediate actions of E-0. This JPM is complete.

COMMENTS:

END OF TASK STOP TIME ________

PAGE 9 0F 10

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

May 2015 NRC Initial License Exam JPM H INITIAL CONDITIONS:

  • Unit 1 is at 100% power.
  • AP/1/A/5500/021 (Loss of Component Cooling) has been entered.

INITIATING CUES:

  • The CRS instructs you to perform step 8 of AP/1/A/5500/021.

Catawba Nuclear Station JPM I May 2015 NRC Exam JPM I PAGE 1 OF 13

Catawba Nuclear Station JPM I May 2015 NRC Exam EVALUATION SHEET Task: Place 1B Hydrogen Recombiner in Service Alternate Path: No Facility JPM #: VX-025 Safety Function: 5

Title:

Hydrogen Recombiner and Purge Control System K/A 028 A2.01 Malfunctions or operations on the HRPS; and (b) based on those predictions, use procedures to correct, control or mitigate the consequences of those malfunctions or operations: Hydrogen Recombiner power setting, determined by using plant data book Rating(s): 3.4 / 3.6 CFR: 41.5 / 43.5 / 45.3 / 45.13 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator In-Plant X Perform Simulate X

References:

OP/1/A/6450/010 (Containment Hydrogen Control Systems) rev. 43, Enclosure 4.10 (Operation of the Hydrogen Recombiners Following a LOCA)

Unit 1 Revised Data Book, Figure 10 Task Standard: Hydrogen Recombiner 1B in service with Power Adjust POT set to approximately 58 KW per Figure 10 of the Unit 1 Revised Data Book.

Validation Time: 15 minutes Time Critical: Yes No X

===============================================================

Applicant: Time Start: __________

NAME___________________________ Docket #_______________ Time Finish: __________

Performance Rating: Performance Time _____

SAT ____ UNSAT ____

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 13

Catawba Nuclear Station JPM I May 2015 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • A LOCA has occurred on Unit 1.

INITIATING CUES:

  • The CRS instructs you to place Hydrogen Recombiner 1B in service at the required power per OP/1/A/6450/010 (Containment Hydrogen Control Systems), Enclosure 4.10 (Operation of the Hydrogen Recombiners Following a LOCA), steps 3.1 through 3.3.14.
  • All initial conditions are complete.
  • Containment pressure is 4.3 psig.
  • Hydrogen Recombiner 1A is tagged for maintenance.

EXAMINER NOTE: After reading cue, provide the applicant with a copy of OP/1/A/6450/010 rev. 43, Enclosure 4.10 signed off through step 2.2 and a copy of Unit 1 Revised Data Book Figure 10.

PAGE 3 OF 13

Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT START TIME: _______

STEP 1 3.1 Ensure the H2 Skimmer Fans running per Enclosure 4.13 (Emergency Manual Operation of the H2 Skimmer Fans) ___ SAT EXAMINER CUE: Hydrogen Skimmer Fans 1A & 1B are running per ___ UNSAT Enclosure 4.13.

STANDARD:

Applicant acknowledges cue and signs off the step.

COMMENTS:

CAUTION: Hydrogen Recombiners are NOT operated with hydrogen concentration > 6%

without TSC approval.

NOTE: 1. If desired to place both Hydrogen Recombiners in service, Steps 3.2 and 3.3 may be performed in conjunction.

2. If desired to place both Hydrogen Recombiners in service, use additional Enclosure 4.11 (Hydrogen Recombiner Heater Temperature Log).
3. Placing Hydrogen Recombiner 1A in service is preferred for ALARA consideration.

STEP 2 3.2 IF placing Hydrogen Recombiner 1A in service, perform the following at 1ELCP0139 (1A Hydrogen Recombiner Control ___ SAT Panel) (AB-577, DD-52, Rm 494):

___UNSAT STANDARD:

Applicant determines that per the cue sheet, Hydrogen Recombiner 1A is tagged out for maintenance, and that this step is N/A.

COMMENTS:

PAGE 4 0F 13

Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 3 3.3 IF placing Hydrogen Recombiner 1B in service, perform the following at 1ELCP0140 (1B Hydrogen Recombiner Control ___ SAT Panel) (AB-560, DD-52, Rm 370):

___ UNSAT 3.3.1 Ensure the POWER OUT SWITCH is in the OFF position.

STANDARD:

Applicant locates the Power Out Switch and ensures it is in the OFF position.

EXAMINER CUE: The POWER OUT SWITCH is in the OFF position.

COMMENTS:

STEP 4 3.3.2 Ensure the POWER ADJUST potentiometer is set to zero ___ SAT (000).

___ UNSAT STANDARD:

Applicant verifies the POWER ADJUST potentiometer is set to 000.

EXAMINER CUE: The POWER ADJUST pot is set to zero (000).

COMMENTS:

PAGE 5 0F 13

Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 5 3.3.3 IF the POWER IN AVAILABLE light is DARK, ensure 1EMXL-F07C (1B Electric Hydrogen Recombiner Power ___ SAT Supply Panel) (AB-560, BB-47) is in the ON position.

___ UNSAT EXAMINER CUE: The POWER IN AVAILABLE light is lit.

STANDARD:

Applicant determines that with the POWER IN AVAILABLE light being lit, this step is N/A.

COMMENTS:

STEP 6 3.3.4 Place the POWER OUT SWITCH in the ON position. CRITICAL STEP EXAMINER CUE: After applicant describes placing the POWER OUT SWITCH up to the ON position, The POWER OUT ___ SAT SWITCH is in the ON position.

STANDARD: ___ UNSAT Applicant places the POWER OUT SWITCH up to the ON position.

This step is critical to place the hydrogen recombiner in service.

COMMENTS:

PAGE 6 0F 13

Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 7 3.3.5 Verify that the red indicating light is lit.

___ SAT EXAMINER CUE: After finding the indicating light on the switch plate inform the applicant - The RED light on the switch ___ UNSAT plate is lit.

STANDARD:

Applicant finds the red indicating light on the switch plate and verifies that it is lit.

COMMENTS:

STEP 8 3.3.6 Slowly turn the POWER ADJUST potentiometer clockwise until 5 KW is indicated on the POWER OUT ___ SAT meter.

___ UNSAT EXAMINER CUE: After explaining operation of the potentiometer in the clockwise direction, inform applicant - The POWER OUT meter rises to 5 KW.

STANDARD:

Applicant describes turning the potentiometer clockwise to increase the POWER OUTPUT meter reading to 5 KW.

COMMENTS:

PAGE 7 0F 13

Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 9 3.3.7 Maintain a 5 KW output for 10 minutes.

___ SAT EXAMINER CUE: Using time compression, 10 minutes has elapsed.

___ UNSAT STANDARD:

Applicant describes maintaining this power output for 10 minutes.

COMMENTS:

STEP 10 3.3.8 Slowly advance the POWER ADJUST setting until an output of 10 KW is obtained on the POWER OUT meter. ___ SAT EXAMINER CUE: After explaining the operation of the potentiometer in the ___ UNSAT clockwise direction inform applicant - The POWER OUT meter rises to 10 KW.

STANDARD:

Applicant describes turning the potentiometer clockwise to increase the POWER OUTPUT meter reading to 10 KW.

COMMENTS:

STEP 11 3.3.9 Maintain a 10 KW output for 10 minutes.

___ SAT EXAMINER CUE: Using time compression, 10 minutes has elapsed.

___ UNSAT STANDARD:

Applicant describes maintaining this power output for 10 minutes.

COMMENTS:

PAGE 8 0F 13

Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 12 3.3.10 Advance the POWER ADJUST setting until an output of 20 KW is obtained on the POWER OUT meter. ___ SAT EXAMINER CUE: After explaining the operation of the potentiometer in ___ UNSAT the clockwise direction inform applicant - The POWER OUT meter rises to 20 KW.

STANDARD:

Applicant describes turning the potentiometer clockwise to increase the POWER OUTPUT meter reading to 20 KW.

COMMENTS:

STEP 13 3.3.11 Maintain a 20 KW output for 5 minutes.

___ SAT EXAMINER CUE: Using time compression, 5 minutes has elapsed.

___ UNSAT STANDARD:

Applicant describes maintaining this power output for 5 minutes.

COMMENTS:

PAGE 9 0F 13

Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 14 3.3.12 Determine Hydrogen Recombiner 1B power setting as CRITICAL follows: STEP 3.3.12.1 Determine KW value from Figure 10 of the Unit ___ SAT 1 Revised Data Book.

___ UNSAT EXAMINER NOTE: The applicant will use the copy of Unit 1 Revised Data Book Figure 10 provided with the initiating cue.

STANDARD:

Applicant determines that the KW value from Figure 10 is 54 KW.

This step is critical in determining the proper power setting for the given containment conditions.

COMMENTS:

STEP 15 3.3.12.2 H2 concentration (1MC-7) ________ %

___ SAT STANDARD:

___ UNSAT Applicant determines from cue sheet that hydrogen concentration is 5%.

COMMENTS:

PAGE 10 0F 13

Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 16 3.3.12.3 IF H2 concentration is > 3.5%, add 4 KW to CRITICAL calculation. STEP STANDARD: ___ SAT Applicant determines that H2 concentration is > 3.5% and adds 4 KW ___ UNSAT to the calculation.

This step is critical in determining the proper power setting for the given containment conditions.

COMMENTS:

STEP 17 3.3.12.4 Calculate KW as follows: CRITICAL STEP 54 + 4 = 58 KW Step 3.3.12.1 Step 3.3.12.3 or N/A ___ SAT STANDARD:

___ UNSAT Applicant calculates the required power setting to be 58 KW.

This step is critical in determining the proper power setting for the given containment conditions.

COMMENTS:

PAGE 11 0F 13

Catawba Nuclear Station JPM I May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 18 3.3.13 Advance the POWER ADJUST setting until the CRITICAL POWER OUT meter indicates the value calculated in STEP 3.3.12.4. Adjust POWER ADJUST as necessary to maintain this output. ___ SAT EXAMINER CUE: After explaining the operation of the potentiometer in ___ UNSAT the clockwise direction inform applicant - The POWER OUT meter rises to 58 KW.

STANDARD:

Applicant describes turning the potentiometer clockwise to increase the POWER OUTPUT meter reading to 58 KW.

This step is critical to set the necessary power output setting for the given containment conditions.

COMMENTS:

STEP 19 3.3.14 Notify the NCO that Hydrogen Recombiner 1B is now in service. ___ SAT Person notified _______________________

___ UNSAT STANDARD:

Applicant calls the control room and notifies them that 1B Hydrogen Recombiner is in service.

EXAMINER CUE: Unit 1 Control Room, this is Greg. Repeat any additional information given.

COMMENTS:

END OF TASK STOP TIME ________

PAGE 12 0F 13

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

May 2015 NRC Initial License Exam JPM I INITIAL CONDITIONS:

  • A LOCA has occurred on Unit 1.

INITIATING CUES:

  • The CRS instructs you to place Hydrogen Recombiner 1B in service at the required power per OP/1/A/6450/010 (Containment Hydrogen Control Systems), Enclosure 4.10 (Operation of the Hydrogen Recombiners Following a LOCA), steps 3.1 through 3.3.14.
  • All initial conditions are complete.
  • Containment pressure is 4.3 psig.
  • Hydrogen Recombiner 1A is tagged for maintenance.

Catawba Nuclear Station JPM J May 2015 NRC Exam JPM J PAGE 1 OF 11

Catawba Nuclear Station JPM J May 2015 NRC Exam EVALUATION SHEET Task: Locally Start 2B Diesel Generator Alternate Path: Yes Facility JPM #: DG3-008 Safety Function: 6

Title:

Emergency Diesel Generators K/A 064 A2.01 Ability to (a) predict the impacts of the following malfunctions or operations on the ED/G system; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Failure modes of water, oil, and air valves Rating(s): 3.1 / 3.3 CFR: 41.5 / 43.5 / 45.3 / 45.13 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator In-Plant X Perform Simulate X

References:

AP/2/A/5500/007 (Loss of Normal Power) rev. 72, Enclosure 11 (Energizing 2ETB From 2B D/G)

Task Standard: 2B D/G is started locally; then secured due to inability to align cooling water supply.

Validation Time: 17 minutes Time Critical: Yes No X

===============================================================

Applicant: Time Start: __________

NAME___________________________ Docket #_______________ Time Finish: __________

Performance Rating: Performance Time _____

SAT ____ UNSAT ____

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 11

Catawba Nuclear Station JPM J May 2015 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Unit 2 has experienced a loss of all AC power to 2ETB.
  • The reason for the loss of AC power has been corrected.
  • The 2ETB load shed is complete.

INITIATING CUES:

  • The CRS instructs you to energize 2ETB from 2B D/G by performing AP/2/A/5500/007 (Loss of Normal Power) Enclosure 11 (Energizing 2ETB From D/G).
  • Key #757 and flashlight have been obtained.

EXAMINER NOTE: After reading cue, provide the applicant with a copy of AP/2/A/5500/007 rev. 72, Enclosure 11.

PAGE 3 OF 11

Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD SAT/UNSAT START TIME: _______

STEP 1 1. Obtain the following:

___ SAT

  • Key #757 (2A/2B D/G Test Start Switch) from WCC Key locker ___ UNSAT
  • Flashlight.

STANDARD:

Applicant determines from initiating cue that key #757 and flashlight have been obtained.

COMMENTS:

STEP 2 2. Do not continue in this enclosure until notified that load shed of 2ETB is complete. ___ SAT STANDARD: ___UNSAT Applicant determines from initial conditions that 2ETB load shed is complete and continues with the procedure.

COMMENTS:

PAGE 4 0F 11

Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 3 3. Start D/G 2B as follows: CRITICAL STEP

a. Notify Control Room Operator to place D/G 2B CTRL LOCATION switch on 2MC-11 in LOCAL position. ___ SAT STANDARD: ___ UNSAT Applicant calls the control room operator and directs placing the D/G 2B CONTROL LOCATION switch to the LOCAL position.

EXAMINER CUE: D/G 2B CTRL LOCATION SWITCH is in the LOCAL position.

This step is critical to be able to start 2B D/G locally and gain control of the D/G output breaker to tie 2B D/G to 2ETB.

COMMENTS:

STEP 4 3.b. IF unable to transfer diesel to Local Control, THEN actuate ___ SAT CONTROL ROOM OVERRIDE at breakglass station on 2DGCPB. ___ UNSAT STANDARD:

Applicant determines that per previous examiner cue that this step is N/A.

COMMENTS:

PAGE 5 0F 11

Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 5 3.c. Place key in MANUAL TEST START keyswitch and turn CRITICAL to START position. STEP EXAMINER CUE: After describing inserting the key and rotating ___ SAT switch to the START position, notify applicant -

The 2B D/G has started and is coming up to ___ UNSAT operating speed.

STANDARD:

Applicant describes inserting key #757 into the MANUAL TEST START keyswitch and rotating it clockwise to the START position.

This step is critical to start the D/G to meet the task given for this JPM.

COMMENTS:

STEP 6 3.d. Ensure SPEED CONTROL is adjusted to obtain frequency of between 58.8 and 61.2 Hz. ___ SAT EXAMINER CUE: When frequency meter is found, inform applicant - ___ UNSAT Frequency is 60 Hz.

STANDARD:

Applicant finds the frequency meter and verifies that frequency is in the required band.

COMMENTS:

PAGE 6 0F 11

Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 7 3.e. Ensure VOLTAGE CONTROL is adjusted to obtain D/G CRITICAL VOLTAGE between 4160 and 4600 Volts. STEP EXAMINER CUE: When voltage meter is found, inform applicant - ___ SAT Voltage is 4100 Volts.

___ UNSAT STANDARD:

Applicant finds the D/G voltage meter and when discovering that voltage is low, will describe depressing the VOLTAGE RAISE pushbutton to increase D/G voltage.

EXAMINER CUE: After applicant describes depressing the VOLTAGE RAISE pushbutton, inform them - D/G Voltage now reads 4200 Volts.

This step is critical to ensure the D/G is operating at the proper voltage prior to tying it to 2ETB in the following step.

COMMENTS:

STEP 8 4. WHEN D/G is running, THEN close Diesel Generator 2B CRITICAL breaker. STEP EXAMINER CUE: After explaining depressing the RED CLOSE ___ SAT pushbutton on D/G 2B breaker, inform applicant -

D/G 2B breaker RED CLSD light is lit. ___ UNSAT STANDARD:

Applicant describes depressing the RED CLOSE pushbutton and verifying the RED CLSD indicating light being lit.

This step is critical to meeting the task given in this JPM.

COMMENTS:

PAGE 7 0F 11

Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 9 5. IF D/G breaker will not close, THEN:

___ SAT STANDARD:

___ UNSAT Applicant determines from the previous cue that this step is N/A.

COMMENTS:

STEP 10 6. Close the following essential load center normal CRITICAL incoming breakers: STEP

  • 2ELXB-4B (Normal Incoming Breaker Fed From Xfmr ___ SAT 2ETXB) (AB-560, AA-67, Rm 362)
  • 2ELXD-4B (Normal Incoming Breaker Fed From Xfmr ___ UNSAT 2ETXD) (AB-560, AA-68, Rm 362)

EXAMINER CUE: After explaining the operation of the Load Center pistol grip clockwise to the CLOSE position, inform applicant - Breaker is closed.

STANDARD:

Applicant describes rotating each breaker pistol grip clockwise to the CLOSE position and verifying the RED indicating light lit for each breaker.

This step is critical to provide power to the D/G cooling water valve, allowing it to open automatically and provide cooling to the D/G.

COMMENTS:

PAGE 8 0F 11

Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 11 7. Ensure RN flow through KD Hx as follows:

___ SAT

a. Verify 2RN-292B (2B D/G Hx Inlet Isol) (D2B-567, AA-76)

- OPEN ___ UNSAT EXAMINER CUE: When applicant finds 2RN-292B and describes verifying the valve indicator needle pointing to the OPEN position, inform them - Valve indicates CLOSED.

STANDARD:

Applicant describes verifying the valve position indicator pointing to the OPEN position.

COMMENTS:

STEP 12 7.b. IF 2RN 292B (2B D/G Hx Inlet Isol) does not open, THEN perform the following: ___ SAT

1) Open 2EMXF-F01A (2B Diesel Generator Hx Inlet Isol ___ UNSAT Motor (2RN-292B)) (D2B-556, CC-75)

EXAMINER CUE: When applicant describes the opening of 2EMXF-F01A, inform them - Breaker is OFF.

STANDARD:

Applicant describes inserting the locking tab on 2EMXF-F01A and rotating the breaker counter-clockwise to the OFF position and pulling the locking tab back out.

COMMENTS:

PAGE 9 0F 11

Catawba Nuclear Station JPM J May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 13 7.b.2) OPEN 2RN-292B (2B D/G Hx Inlet Isol).

___ SAT EXAMINER CUE: After applicant describes manually opening 2RN-292B, inform them - Valve does not move and the ___ UNSAT position indicator still shows CLOSED.

STANDARD:

Applicant describes pulling the declutching lever and rotating the valve handwheel in the counter-clockwise direction.

EXAMINER NOTE: This begins the alternate path of this JPM.

COMMENTS:

STEP 14 8. IF RN flow cannot be established, THEN: CRITICAL STEP

a. Stop D/G 2B by depressing STOP on 2DECPB.
b. Notify Control Room Supervisor of status. ___ SAT
c. Return this enclosure to Control Room Supervisor.

___ UNSAT EXAMINER CUE: After applicant describes depressing the STOP pushbutton on 2DECPB, inform them - Diesel Generator is coasting down. Also repeat back any information given to the Control Room Supervisor.

STANDARD:

Applicant depresses the STOP pushbutton on 2DECPB and verifies the Diesel Generator is stopped.

The only part of this step that is critical is to stop the 2B D/G. This step is critical to prevent damage to the 2B D/G due to no cooling water being available.

COMMENTS:

END OF TASK STOP TIME ________

PAGE 10 0F 11

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

May 2015 NRC Initial License Exam JPM J INITIAL CONDITIONS:

  • Unit 2 has experienced a loss of all AC power to 2ETB.
  • The reason for the loss of AC power has been corrected.
  • The 2ETB load shed is complete.

INITIATING CUES:

  • The CRS instructs you to energize 2ETB from 2B D/G by performing AP/2/A/5500/007 (Loss of Normal Power) Enclosure 11 (Energizing 2ETB From D/G).
  • Key #757 and flashlight have been obtained.

Catawba Nuclear Station JPM K May 2015 NRC Exam JPM K PAGE 1 OF 24

Catawba Nuclear Station JPM K May 2015 NRC Exam EVALUATION SHEET Task: Startup Backup Temporary VI Compressor Alternate Path: No Facility JPM #: VI-003 Safety Function: 8

Title:

Instrument Air System K/A APE065 Ability to operate and / or monitor the following as they apply to the Loss AA1.04 of Instrument Air: Emergency air compressor Rating(s): 3.4 / 3.6 CFR: 41.7 / 45.5 / 45.6 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator In-Plant X Perform Simulate X

References:

AP/0/A/5500/022 (Loss of Instrument Air) rev. 35 EP/1/A/5000/G-1 (Unit 1 Generic Control Room Enclosures) rev. 09, Enclosure 23 (Backup VI Compressor(s))

Task Standard: Temporary VI compressor started and aligned to the Instrument Air header through 1VI-417.

Validation Time: 20 minutes Time Critical: Yes No X

===============================================================

Applicant: Time Start: __________

NAME___________________________ Docket #_______________ Time Finish: __________

Performance Rating: Performance Time _____

SAT ____ UNSAT ____

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 24

Catawba Nuclear Station JPM K May 2015 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Unit 1 and 2 are at 100% power.
  • VI pressure is 75 psig and slowly decreasing.
  • AP/0/A/5500/022 (Loss of Instrument Air) has been implemented.

INITIATING CUES:

  • The CRS instructs you to startup and align the Backup Temporary VI compressor #2 to the Instrument Air Header per the local copy of EP/1/A/5000/G-1 (Unit 1 Generic Control Room Enclosures) Enclosure 23 (Backup VI Compressor(s)) step 3.

EXAMINER NOTE: After applicant locates the local copy, hand them a copy of EP/1/A/5000/G-1 Enclosure 23.

PAGE 3 OF 24

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT START TIME: _______

EXAMINER NOTE: Two Backup VI compressors should be available at any given time. A third backup compressor is stationed at the Catawba garage.

Applicant should select Backup VI Compressor 2 for startup per the initiating cue.

IF Backup Compressor 2 is not available then direct the operator to startup compressor 3 and start the JPM at step 5 (page 14 of this JPM).

STEP 1 3. To Start Backup VI Compressor 2 perform the following:

___ SAT

a. Verify engine oil (inside engine side panel) - GREATER THAN ADD ON DIPSTICK. ___ UNSAT EXAMINER CUE: When dipstick is located, inform applicant - Oil level is greater than ADD.

STANDARD:

Applicant locates the dipstick and checks the oil level.

COMMENTS:

STEP 2 3.b. Verify compressor oil level (inside compressor front panel) -

VISIBLE IN SIGHTGLASS. ___ SAT EXAMINER CUE: When sightglass is located, inform applicant - Oil ___UNSAT level is visible in the sight glass (near full).

STANDARD:

Applicant locates sightglass and checks oil level.

COMMENTS:

PAGE 4 0F 24

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 3 3.c. IF oil levels inadequate, THEN inform Control Room.

___ SAT STANDARD:

___ UNSAT Applicant determines per given cues that this step is N/A.

COMMENTS:

STEP 4 3.d. Ensure all compressor panel doors - CLOSED ___ SAT EXAMINER CUE: If asked, inform applicant - All doors are closed. ___ UNSAT STANDARD:

Applicant ensures that all compressor panel doors are closed.

COMMENTS:

STEP 5 3.e. Unplug battery charger power supply cord from the outlet (outside wall at TB 594, 2D-34). ___ SAT EXAMINER CUE: When plug is located, inform applicant - Battery ___ UNSAT charger is unplugged.

STANDARD:

Applicant locates and describes unplugging the battery charger power supply cord.

COMMENTS:

PAGE 5 0F 24

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 6 3.f. Ensure 1VI-428 (VI Comp B/U2 Disch) - OPEN CRITICAL STEP EXAMINER CUE: When valve is located and applicant correctly describes opening the valve, inform applicant - ___ SAT 1VI-428 is Open.

___ UNSAT STANDARD:

Applicant locates and describes the verification of or opening 1VI-428.

This step is critical to ensure a flow path from the compressor discharge to the VI header.

COMMENTS:

NOTE The following steps are performed at control panel on front of Backup VI compressor 2.

STEP 7 3.g. Rotate OFF/ON/START switch to - ON.

___ SAT EXAMINER CUE: When switch is located, and operation described, inform applicant - OFF/ON/START switch is in ___ UNSAT ON.

STANDARD:

Applicant locates and describes operation of the OFF/ON/START switch to the ON position.

COMMENTS:

PAGE 6 0F 24

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 8 3.h. IF outside temperature less than or equal to 45°F, THEN place HEATERS toggle switch - ON. ___ SAT EXAMINER CUE: If asked, inform applicant - Outside air temp is ___ UNSAT currently 87°F.

STANDARD:

Applicant determines from the examiner cue that this step is N/A.

COMMENTS:

NOTE Fuel level of 1/2 will provide approximately 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> of run time at full load.

STEP 9 3.i. Verify fuel level - ON SCALE.

___ SAT EXAMINER CUE: When fuel level gage is located, inform applicant -

Fuel oil level is at 3/4 mark. ___ UNSAT STANDARD:

Applicant locates fuel level gage and verifies level is on scale per cue given.

COMMENTS:

NOTE OFF/ON/START switch spring returns to ON when released.

OFF/ON/START switch should not be held in the START position for greater than 10 seconds, to prevent starter overheating.

PAGE 7 0F 24

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 10 3.j. Start Backup VI Compressor 2 as follows: CRITICAL STEP

1) Rotate and hold OFF/ON/START switch to - START.

___ SAT EXAMINER CUE: After explaining the operation of the OFF/ON/START switch, inform applicant - OFF/ON/START switch is ___ UNSAT in START.

STANDARD:

Applicant describes turning OFF/ON/START switch to the START position.

This step is critical to start the backup VI compressor prior to aligning to supply the instrument air header.

COMMENTS:

PAGE 8 0F 24

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 11 3.j.2) Release OFF/ON/START switch when one of the CRITICAL following occurs: STEP

  • 10 seconds has elapsed. ___ UNSAT EXAMINER CUE: Inform applicant - The engine is running.

EXAMINER CUE: Once applicant describes releasing the OFF/ON/START switch, inform applicant -

OFF/ON/START switch has been released.

STANDARD:

Applicant describes releasing the OFF/ON/START switch following cue given by examiner.

This step is critical to prevent overheating the engine starter.

COMMENTS:

STEP 12 3.j.3) IF engine failed to start, THEN start compressor as follows: ___ SAT STANDARD: ___ UNSAT Applicant determines from examiner cue in previous step, that this step is N/A.

COMMENTS:

PAGE 9 0F 24

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 13 3.k. WHEN compressor has been running for 60 seconds, CRITICAL THEN depress PRESSURE CONTROL switch. STEP EXAMINER CUE: Inform applicant - 60 seconds have elapsed. ___ SAT When located and operation described, inform applicant - PRESSURE CONTROL button has ___ UNSAT been depressed. If asked, Diesel is heard to speed up and discharge pressure increases to ~

110 psig.

STANDARD:

Applicant describes depressing the PRESSURE CONTROL button.

This step is critical to ensure compressor discharge pressure is sufficient to supply the Instrument Air header.

COMMENTS:

STEP 14 3.l. IF outside air temperature greater than 32°F, THEN ensure HEATERS toggle switch - OFF. ___ SAT EXAMINER CUE: When located, inform applicant - HEATER toggle ___ UNSAT switch is in the OFF position.

STANDARD:

Applicant determines that per previous given cue, that this step is applicable and verifies the HEATERS toggle switch is OFF.

COMMENTS:

PAGE 10 0F 24

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 15 3.m. OPEN 1VI 425 (VI Comp B/U2 Manifold Inlet). CRITICAL STEP EXAMINER CUE: When valve is located and proper operation described, inform applicant - 1VI-425 is Open. ___ SAT STANDARD: ___ UNSAT Applicant describes opening 1VI-425.

This step is critical to align proper flow path from the compressor to the Instrument Air header.

COMMENTS:

STEP 16 3.n. Ensure the following valves OPEN: CRITICAL STEP

  • 1VI-417 (B/U VI Compressor Header Isol) (TB2-598, 2C-34). ___ UNSAT EXAMINER CUE: When valves are located and proper operation to open is described, inform applicant - 1VI-511 is open. 1VI-417 is open.

STANDARD:

Applicant describes opening 1VI-511 and 1VI-417.

This step is critical to align a flow path from the backup VI Compressor to the Instrument Air header.

COMMENTS:

PAGE 11 0F 24

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 17 3.o. Record the following:

___ SAT

  • Compressor start time ___________
  • HOURMETER __________ ___ UNSAT
  • COMP DISH PRESS __________

EXAMINER CUE: If asked, inform applicant - Use current run hours, time and discharge pressure is 110 psig.

STANDARD:

Applicant records the values for current time, engine run hours, and discharge pressure given in the cue.

COMMENTS:

PAGE 12 0F 24

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 18 3.p. Notify the control room of the following:

___ SAT

  • Status of backup compressor 2
  • IF idle compressor available, THEN request Control ___ UNSAT Room Supervisor to evaluate VI header pressure to determine whether additional backup compressor required
  • IF Control Room determines additional backup VI compressor required, THEN start idle Backup VI compressor.

EXAMINER CUE: Repeat back the information given, then inform applicant - The CRS has evaluated VI header pressure and an additional backup VI compressor is not needed at this time. The CRS will have the turbine building AO complete the steps. This JPM is complete.

EXAMINER NOTE: If backup compressor 2 was not available, the following steps will be to align backup compressor 3.

STANDARD:

Applicant informs the Control Room of the status of backup compressor 2.

COMMENTS:

PAGE 13 0F 24

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 1 5. To Start Backup VI Compressor 3 perform the following:

___ SAT

a. Verify engine oil (inside engine side panel) - GREATER THAN ADD ON DIPSTICK. ___ UNSAT EXAMINER CUE: When dipstick is located, inform applicant - Oil level is greater than ADD.

STANDARD:

Applicant locates the dipstick and checks the oil level.

COMMENTS:

STEP 2 5.b. Verify compressor oil level (inside compressor front panel) -

VISIBLE IN SIGHTGLASS. ___ SAT EXAMINER CUE: When sightglass is located, inform applicant - Oil ___UNSAT level is visible in the sight glass (near full).

STANDARD:

Applicant locates sightglass and checks oil level.

COMMENTS:

STEP 3 5.c. IF oil levels inadequate, THEN inform Control Room.

___ SAT STANDARD:

___ UNSAT Applicant determines per given cues that this step is N/A.

COMMENTS:

PAGE 14 0F 24

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 4 5.d. Ensure all compressor panel doors - CLOSED ___ SAT EXAMINER CUE: If asked, inform applicant - All doors are closed. ___ UNSAT STANDARD:

Applicant ensures that all compressor panel doors are closed.

COMMENTS:

STEP 5 5.e. Unplug battery charger power supply cord from the outlet (outside wall at TB 594, 2D-34). ___ SAT EXAMINER CUE: When plug is located, inform applicant - Battery ___ UNSAT charger is unplugged.

STANDARD:

Applicant locates and describes unplugging the battery charger power supply cord.

COMMENTS:

PAGE 15 0F 24

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 6 5.f. Ensure 1VI-430 (VI Comp B/U3 Disch) - OPEN CRITICAL STEP EXAMINER CUE: When valve is located and applicant correctly describes opening the valve, inform applicant - ___ SAT 1VI-430 is Open.

___ UNSAT STANDARD:

Applicant locates and describes the verification of or opening 1VI-430.

This step is critical to ensure a flow path from the compressor discharge to the VI header.

COMMENTS:

NOTE The following steps are performed at control panel on front of Backup VI compressor 3.

STEP 7 5.g. Rotate OFF/ON/START switch to - ON.

___ SAT EXAMINER CUE: When switch is located, and operation described, inform applicant - OFF/ON/START switch is in ___ UNSAT ON.

STANDARD:

Applicant locates and describes operation of the OFF/ON/START switch to the ON position.

COMMENTS:

PAGE 16 0F 24

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 8 5.h. IF outside temperature less than or equal to 45°F, THEN place HEATERS toggle switch - ON. ___ SAT EXAMINER CUE: If asked, inform applicant - Outside air temp is ___ UNSAT currently 87°F.

STANDARD:

Applicant determines from the examiner cue that this step is N/A.

COMMENTS:

NOTE Fuel level of 1/2 will provide approximately 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> of run time at full load.

STEP 9 5.i. Verify fuel level - ON SCALE.

___ SAT EXAMINER CUE: When fuel level gage is located, inform applicant -

Fuel oil level is at 3/4 mark. ___ UNSAT STANDARD:

Applicant locates fuel level gage and verifies level is on scale per cue given.

COMMENTS:

NOTE OFF/ON/START switch spring returns to ON when released.

OFF/ON/START switch should not be held in the START position for greater than 10 seconds, to prevent starter overheating.

PAGE 17 0F 24

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 10 5.j. Start Backup VI Compressor 3 as follows: CRITICAL STEP

1) Rotate and hold OFF/ON/START switch to - START.

___ SAT EXAMINER CUE: After explaining the operation of the OFF/ON/START switch, inform applicant - OFF/ON/START switch is ___ UNSAT in START.

STANDARD:

Applicant describes turning OFF/ON/START switch to the START position.

This step is critical to start the backup VI compressor prior to aligning to supply the instrument air header.

COMMENTS:

PAGE 18 0F 24

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 11 5.j.2) Release OFF/ON/START switch when one of the CRITICAL following occurs: STEP

  • 10 seconds has elapsed. ___ UNSAT EXAMINER CUE: Inform applicant - The engine is running.

EXAMINER CUE: Once applicant describes releasing the OFF/ON/START switch, inform applicant -

OFF/ON/START switch has been released.

STANDARD:

Applicant describes releasing the OFF/ON/START switch following cue given by examiner.

This step is critical to prevent overheating the engine starter.

COMMENTS:

STEP 12 5.j.3) IF engine failed to start, THEN start compressor as follows: ___ SAT STANDARD: ___ UNSAT Applicant determines from examiner cue in previous step, that this step is N/A.

COMMENTS:

PAGE 19 0F 24

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 13 5.k. WHEN compressor has been running for 60 seconds, CRITICAL THEN depress PRESSURE CONTROL switch. STEP EXAMINER CUE: Inform applicant - 60 seconds have elapsed. ___ SAT When located and operation described, inform applicant - PRESSURE CONTROL button has ___ UNSAT been depressed.

STANDARD:

Applicant describes depressing the PRESSURE CONTROL button.

This step is critical to ensure compressor discharge pressure is sufficient to supply the Instrument Air header.

COMMENTS:

STEP 14 5.l. IF outside air temperature greater than 32°F, THEN ensure HEATERS toggle switch - OFF. ___ SAT EXAMINER CUE: When located, inform applicant - HEATER toggle ___ UNSAT switch is in the OFF position.

STANDARD:

Applicant determines that per previous given cue, that this step is applicable and verifies the HEATERS toggle switch is OFF.

COMMENTS:

PAGE 20 0F 24

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 15 5.m. OPEN 1VI 426 (VI Comp B/U3 Manifold Inlet). CRITICAL STEP EXAMINER CUE: When valve is located and proper operation described, inform applicant - 1VI-426 is Open. ___ SAT STANDARD: ___ UNSAT Applicant describes opening 1VI-426.

This step is critical to align proper flow path from the compressor to the Instrument Air header.

COMMENTS:

STEP 16 5.n. Ensure the following valves OPEN: CRITICAL STEP

  • 1VI-417 (B/U VI Compressor Header Isol) (TB2-598, 2C-34). ___ UNSAT EXAMINER CUE: When valves are located and proper operation to open is described, inform applicant - 1VI-511 is open. 1VI-417 is open.

STANDARD:

Applicant describes opening 1VI-511 and 1VI-417.

This step is critical to align a flow path from the backup VI Compressor to the Instrument Air header.

COMMENTS:

PAGE 21 0F 24

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 17 5.o. Record the following:

___ SAT

  • Compressor start time ___________
  • HOURMETER __________ ___ UNSAT
  • COMP DISH PRESS __________

EXAMINER CUE: If asked, inform applicant - Use current run hours, time and discharge pressure is 110 psig.

STANDARD:

Applicant records the values for current time, engine run hours, and discharge pressure given in the cue.

COMMENTS:

PAGE 22 0F 24

Catawba Nuclear Station JPM K May 2015 NRC Exam STEP/STANDARD SAT/UNSAT STEP 18 5.p. Notify the control room of the following:

___ SAT

  • Status of backup compressor 3
  • IF idle compressor available, THEN request Control ___ UNSAT Room Supervisor to evaluate VI header pressure to determine whether additional backup compressor required
  • IF Control Room determines additional backup VI compressor required, THEN start idle Backup VI compressor.

EXAMINER CUE: Repeat back the information given, then inform applicant - The CRS has evaluated VI header pressure and an additional backup VI compressor is not needed at this time. The CRS will have the turbine building AO complete the steps. This JPM is complete.

STANDARD:

Applicant informs the Control Room of the status of backup compressor 3.

COMMENTS:

END OF TASK STOP TIME ________

PAGE 23 0F 24

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

May 2015 NRC Initial License Exam JPM K INITIAL CONDITIONS:

  • Unit 1 and 2 are at 100% power.
  • VI pressure is 75 psig and slowly decreasing.
  • AP/0/A/5500/022 (Loss of Instrument Air) has been implemented.

INITIATING CUES:

  • The CRS instructs you to startup and align the Backup Temporary VI compressor #2 to the Instrument Air Header per the local copy of EP/1/A/5000/G-1 (Unit 1 Generic Control Room Enclosures) Enclosure 23 (Backup VI Compressor(s)) step 3.