| number = ML15355A533
| number = ML15355A533
| issue date = 12/21/2015
| issue date = 12/21/2015
| title = Ltr 12/21/15 Monticello Nuclear Generating Plant Follow-Up to Disputed Violations of NRC Inspection Report 05000263/2015007 (NJA)
| title = Follow-Up to Disputed Violations of NRC Inspection Report 05000263/2015007 (Nja)
| author name = Lipa C A
| author name = Lipa C
| author affiliation = NRC/RGN-III/DRS/EB2
| author affiliation = NRC/RGN-III/DRS/EB2
| addressee name = Gardner P A
| addressee name = Gardner P
| addressee affiliation = Northern States Power Co
| addressee affiliation = Northern States Power Co
| docket = 05000263
| docket = 05000263
Line 15: Line 15:
| page count = 2
| page count = 2
}}
}}
See also: [[followed by::IR 05000263/2015007]]
See also: [[see also::IR 05000263/2015007]]


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES
[[Issue date::December 21, 2015]]
                              NUCLEAR REGULATORY COMMISSION
                                                  REGION III
                                      2443 WARRENVILLE RD. SUITE 210
                                            LISLE, IL 60532-4352
                                            December 21, 2015
EA-15-206
Mr. Peter A. Gardner
Site Vice President
Monticello Nuclear Generating Plant
Northern States Power Company, Minnesota
2807 West County Road 75
Monticello, MN 55362-9637
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT FOLLOW-UP TO DISPUTED
              VIOLATION OF NRC INSPECTION REPORT 05000263/2015007
Dear Mr. Gardner:
This is a follow-up letter to the U.S. Nuclear Regulatory Commission (NRC) acknowledgement
of disputed violation of NRC Inspection Report (IR) 05000263/2015007. Specifically, on
October 28, 2015, the NRC acknowledged your letter sent to the NRC, dated October 2, 2015,
that contested a Non-Cited Violation (NCV) documented in our IR issued on September 2, 2015.
The contested NCV is Failure to Review for Suitability of Application Safety-Related Relays
Installed Beyond their Service Life.
The NRC seeks to provide a thorough response to disputed violations within 90 days of
receipt of licensees points of contention, as described in Section 2.2.8 of the NRC Enforcement
Manual, Part I. However, the NRC review of this disputed violation is expected to take longer
than 90 days because of ongoing activities related to the subject of this disputed violation. We
will inform you as soon as we complete our evaluation, which is expected to occur during the
first quarter of calendar year 2016.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
of this letter will be available electronically for public inspection in the NRCs Public Document
Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC
Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
                                                  Sincerely,
                                                  /RA Benny Jose Acting for/
                                                  Christine A. Lipa, Chief
                                                  Engineering Branch 2
                                                  Division of Reactor Safety
Docket No. 50-263
License No. DPR-22
cc: Distribution via LISTSERV


EA-15-206 Mr. Peter Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362-9637
                                                                  December 21, 2015
 
EA-15-206
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT FOLLOW-UP TO DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007
Mr. Peter A. Gardner
 
Site Vice President
==Dear Mr. Gardner:==
Monticello Nuclear Generating Plant
This is a follow-up letter to the U.S. Nuclear Regulatory Commission (NRC) acknowledgement of disputed violation of NRC Inspection Report (IR) 05000263/2015007. Specifically, on October 28, 2015, the NRC acknowledged your letter sent to the NRC, dated October 2, 2015, that contested a Non-Cited Violation (NCV) documented in our IR issued on September 2, 2015. The contested NCV is "Failure to Review for Suitability of Application Safety-Related Relays Installed Beyond their Service Life." The NRC seeks to provide a thorough response to disputed violations within 90 days of receipt of licensee's points of contention, as described in Section 2.2.8 of the NRC Enforcement Manual, Part I. However, the NRC review of this disputed violation is expected to take longer than 90 days because of ongoing activities related to the subject of this disputed violation. We will inform you as soon as we complete our evaluation, which is expected to occur during the first quarter of calendar year 2016. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Northern States Power Company, Minnesota
 
2807 West County Road 75
Sincerely,/RA Benny Jose Acting for/ Christine A. Lipa, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-263 License No. DPR-22 cc: Distribution via LISTSERV December 21, 2015 EA-15-206 Mr. Peter Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362-9637
Monticello, MN 55362-9637
 
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT FOLLOW-UP TO DISPUTED
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT FOLLOW-UP TO DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007
                  VIOLATION OF NRC INSPECTION REPORT 05000263/2015007
 
Dear Mr. Gardner:
==Dear Mr. Gardner:==
This is a follow-up letter to the U.S. Nuclear Regulatory Commission (NRC) acknowledgement of disputed
This is a follow-up letter to the U.S. Nuclear Regulatory Commission (NRC) acknowledgement of disputed violation of NRC Inspection Report (IR) 05000263/2015007. Specifically, on October 28, 2015, the NRC acknowledged your letter sent to the NRC, dated October 2, 2015, that contested a Non-Cited Violation (NCV) documented in our IR issued on September 2, 2015. The contested NCV is "Failure to Review for Suitability of Application Safety-Related Relays Installed Beyond their Service Life." The NRC seeks to provide a thorough response to disputed violations within 90 days of receipt of licensee's points of contention, as described in Section 2.2.8 of the NRC Enforcement Manual, Part I. However, the NRC review of this disputed violation is expected to take longer than 90 days because of ongoing activities related to the subject of this disputed violation. We will inform you as soon as we complete our evaluation, which is expected to occur during the first quarter of calendar year 2016. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
violation of NRC Inspection Report (IR) 05000263/2015007. Specifically, on October 28, 2015, the NRC
 
acknowledged your letter sent to the NRC, dated October 2, 2015, that contested a Non-Cited Violation
Sincerely,/RA Benny Jose Acting for/ Christine A. Lipa, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-263 License No. DPR-22 cc: Distribution via LISTSERV DISTRIBUTION: Janelle Jessie RidsNrrDorlLpl3-1 Resource RidsNrrPMMonticello RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Jim Clay Carmen Olteanu ADAMS Accession Number ML15355A533 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME BJose for NFeliz-Adorno:cl BJose for CLipa DATE 12/21/15 12/21/15 OFFICIAL RECORD COPY
(NCV) documented in our IR issued on September 2, 2015. The contested NCV is Failure to Review for
Suitability of Application Safety-Related Relays Installed Beyond their Service Life.
The NRC seeks to provide a thorough response to disputed violations within 90 days of receipt of
licensees points of contention, as described in Section 2.2.8 of the NRC Enforcement Manual, Part I.
However, the NRC review of this disputed violation is expected to take longer than 90 days because of
ongoing activities related to the subject of this disputed violation. We will inform you as soon as we
complete our evaluation, which is expected to occur during the first quarter of calendar year 2016.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections,
Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRCs Public Document Room or from the Publicly
Available Records (PARS) component of the NRC's Agencywide Documents Access and Management
System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
                                                                          Sincerely,
                                                                          /RA Benny Jose Acting for/
                                                                          Christine A. Lipa, Chief
                                                                          Engineering Branch 2
                                                                          Division of Reactor Safety
Docket No. 50-263
License No. DPR-22
cc: Distribution via LISTSERV
DISTRIBUTION:
Janelle Jessie                                             Darrell Roberts                                          DRPIII
RidsNrrDorlLpl3-1 Resource                                 Richard Skokowski                                       DRSIII
RidsNrrPMMonticello                                        Allan Barker                                             Jim Clay
RidsNrrDirsIrib Resource                                  Carole Ariano                                           Carmen Olteanu
Cynthia Pederson                                          Linda Linn
ADAMS Accession Number ML15355A533
    Publicly Available                           Non-Publicly Available                   Sensitive               Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
  OFFICE             RIII                                       RIII                         RIII                         RIII
  NAME               BJose for NFeliz-Adorno:cl BJose for CLipa
  DATE               12/21/15                                   12/21/15
                                                            OFFICIAL RECORD COPY
}}
}}

Latest revision as of 20:19, 4 December 2019

Follow-Up to Disputed Violations of NRC Inspection Report 05000263/2015007 (Nja)
ML15355A533
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 12/21/2015
From: Christine Lipa
NRC/RGN-III/DRS/EB2
To: Gardner P
Northern States Power Co
References
EA-15-206 IR 2015007
Download: ML15355A533 (2)


See also: IR 05000263/2015007

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, IL 60532-4352

December 21, 2015

EA-15-206

Mr. Peter A. Gardner

Site Vice President

Monticello Nuclear Generating Plant

Northern States Power Company, Minnesota

2807 West County Road 75

Monticello, MN 55362-9637

SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT FOLLOW-UP TO DISPUTED

VIOLATION OF NRC INSPECTION REPORT 05000263/2015007

Dear Mr. Gardner:

This is a follow-up letter to the U.S. Nuclear Regulatory Commission (NRC) acknowledgement

of disputed violation of NRC Inspection Report (IR) 05000263/2015007. Specifically, on

October 28, 2015, the NRC acknowledged your letter sent to the NRC, dated October 2, 2015,

that contested a Non-Cited Violation (NCV) documented in our IR issued on September 2, 2015.

The contested NCV is Failure to Review for Suitability of Application Safety-Related Relays

Installed Beyond their Service Life.

The NRC seeks to provide a thorough response to disputed violations within 90 days of

receipt of licensees points of contention, as described in Section 2.2.8 of the NRC Enforcement

Manual, Part I. However, the NRC review of this disputed violation is expected to take longer

than 90 days because of ongoing activities related to the subject of this disputed violation. We

will inform you as soon as we complete our evaluation, which is expected to occur during the

first quarter of calendar year 2016.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy

of this letter will be available electronically for public inspection in the NRCs Public Document

Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC

Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA Benny Jose Acting for/

Christine A. Lipa, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-263

License No. DPR-22

cc: Distribution via LISTSERV

December 21, 2015

EA-15-206

Mr. Peter A. Gardner

Site Vice President

Monticello Nuclear Generating Plant

Northern States Power Company, Minnesota

2807 West County Road 75

Monticello, MN 55362-9637

SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT FOLLOW-UP TO DISPUTED

VIOLATION OF NRC INSPECTION REPORT 05000263/2015007

Dear Mr. Gardner:

This is a follow-up letter to the U.S. Nuclear Regulatory Commission (NRC) acknowledgement of disputed

violation of NRC Inspection Report (IR) 05000263/2015007. Specifically, on October 28, 2015, the NRC

acknowledged your letter sent to the NRC, dated October 2, 2015, that contested a Non-Cited Violation

(NCV) documented in our IR issued on September 2, 2015. The contested NCV is Failure to Review for

Suitability of Application Safety-Related Relays Installed Beyond their Service Life.

The NRC seeks to provide a thorough response to disputed violations within 90 days of receipt of

licensees points of contention, as described in Section 2.2.8 of the NRC Enforcement Manual, Part I.

However, the NRC review of this disputed violation is expected to take longer than 90 days because of

ongoing activities related to the subject of this disputed violation. We will inform you as soon as we

complete our evaluation, which is expected to occur during the first quarter of calendar year 2016.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections,

Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRCs Public Document Room or from the Publicly

Available Records (PARS) component of the NRC's Agencywide Documents Access and Management

System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA Benny Jose Acting for/

Christine A. Lipa, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-263

License No. DPR-22

cc: Distribution via LISTSERV

DISTRIBUTION:

Janelle Jessie Darrell Roberts DRPIII

RidsNrrDorlLpl3-1 Resource Richard Skokowski DRSIII

RidsNrrPMMonticello Allan Barker Jim Clay

RidsNrrDirsIrib Resource Carole Ariano Carmen Olteanu

Cynthia Pederson Linda Linn

ADAMS Accession Number ML15355A533

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE RIII RIII RIII RIII

NAME BJose for NFeliz-Adorno:cl BJose for CLipa

DATE 12/21/15 12/21/15

OFFICIAL RECORD COPY