ML041890344: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:ES-301 Control Room Systems and Facility Walk-Through Test Outline Form ES-301-2 | {{#Wiki_filter:ES-301 Control Room Systems and Facility Walk-Through Test Outline Form ES-301-2 Facility: Oyster Creek NRC Date of Examination: Week of April 19, 2004 Exam Level (circle one): RO / SRO(I) / SRO(U) Operating Test No.: 2004NRC Control Room Systems (8 for RO, 7 for SRO-I, 2 or 3 for SRO-U) | ||
Week of April 19, 2004 Exam Level (circle one): RO / SRO(I) / SRO(U) Control Room Systems (8 for RO, 7 for SRO-I, 2 or 3 for SRO-U) | System / JPM Title I Type Code* | ||
: d. Primary Containment | I Function Safety | ||
/ Bypass Isolation Interlock for Torus Vent valves and prepare to vent the Torus | : a. Stm&yTQu ia Gontrol (SLC) / 21 1.01 | ||
: e. AC Electrical | -pump 0 1 | ||
/Transfer Bus 1A from Auxiliary Transformer to Start-up Transformer | : b. ADS / Close a stuck open EMRV (Alternate Path - fail first step) 218.01 3 D. S. A | ||
: c. Recirculation system / Respond to a tripped recirc pump with 5 202.1 0 4 operating (Alternate Path - Discharge Valve will not close) Last NRC D, s, A | |||
/ Shutdown SGTS after Auto Initiation (Alternate Path - normal fan does not start) | : d. Primary Containment / Bypass Isolation Interlock for Torus Vent 223.01 5 valves and prepare to vent the Torus D, s | ||
/ Line-up Fire Water to the Core Spray System | : e. AC Electrical /Transfer Bus 1A from Auxiliary Transformer to 262.07 6 Start-up Transformer D, s, L f . Control Room Ventilation / Purge Control Room using Control Room HVAC System | ||
[PRA related] | : g. Standby Gas Treatment system (SGTS) / Shutdown SGTS after 261.03 9 Auto Initiation (Alternate Path - normal fan does not start) N, S, A | ||
: | : h. For RO - Recirculation system / Conduct Recirc Pump Trip Logic 202.1 1 functional test D, S | ||
/ | : a. Fire Water system / Line-up Fire Water to the Core Spray System 286.04 2 | ||
* Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol room, (S)imulator, (L)ow-Power, (R)CA AmerGen,. | [PRA related] M,R, L Emergency | ||
: b. CRD/lnitiate the Remote Shutdown Panel on Control Room 308.01 .PPI Evacuation D, R, L Emergency | |||
RO - 4.4 SRO - 4.4 Validation Time 13 minutes Time Critical NO | : c. TBCCW/Line-up TBCCW during SBO 274.01 8 D, R, L Abnormal | ||
To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence. Peer checking will not be provided during the performance of required tasks. NOTE: Directions are only required once in a given JPM session. Comments Date Page 1 of 6 REFERENCE SECTION: | * Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol room, (S)imulator, (L)ow-Power, (R)CA | ||
JOB PERFORMANCE AmerGen,. MEASURE An ExelonlBritish Energy Company 218.01 Title: Close a stuck open EMRV Task: Diagnose and recover from a stuck open EMRV 2 18040100 1 KA# 218000 A4.01 RATING: RO - 4.4 SRO - 4.4 Validation Time I 13 minutes I Time Critical I NO Name Social Security Number I | |||
DIRECTIONS TO TRAINEE: | |||
Before you start, I will state the task conditions and initiating cues and fully answer any questions. To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence. Peer checking will not be provided during the performance of required tasks. | |||
NOTE: Directions are only required once in a given JPM session. | |||
Comments Date Page 1 of 6 | |||
REFERENCE SECTION: | |||
b TASK CONDITIONS: | b TASK CONDITIONS: | ||
Reactor power loo%, all system operating properly. | Reactor power loo%, all system operating properly. | ||
Line 39: | Line 47: | ||
==REFERENCES:== | ==REFERENCES:== | ||
Procedure, ABN-40, Stuck Open EMRV, Rev. 1 TASK STANDARD: "A" EMRV NormaVDisable switch in "disable" , valve closed. | |||
CRITICAL ELEMENTS: | Procedure, ABN-40, Stuck Open EMRV, Rev. 1 TASK STANDARD: | ||
(*) | "A" EMRV NormaVDisable switch in "disable" , valve closed. | ||
INITIATING CUES: Your task will be associated | b CRITICAL ELEMENTS: (*) | ||
START TIME - PERFORMANCE CHECKLIST STANDARD I INITIAL SATNNSAT | 6 | ||
\-- | |||
Upon request discharge temperature is 290 | Page 2 of 6 | ||
: 6. Used procedure properly. | |||
JPM 218.01 PERFORMANCE SECTION: | |||
100% Reactor Power Setup: 1. initialize to any 100% power IC 2. RUN file SIMPROB.CAE Malfunctions: | TASK CONDITIONS: | ||
None Remotes: None Overrides: | Reactor Power 1OO%, all systems operating properly. | ||
SWI- | INITIATING CUES: | ||
SIMPROB-CAE Page 5 of 6 TASK CONDITIONS: Reactor Power 100% All systems operating satisfactory INITIATING CUES: Your task will be associated with ADS/EMRV System operation; you are expected to respond to any further alarms that are received. | Your task will be associated w i t h c n; you are expected to respond to any further alarms that are received. | ||
Page 6 of 6 AmerGen,. | START TIME - | ||
JOB PERFORMANCE MEASURE | PERFORMANCE CHECKLIST STANDARD I I INITIAL SATNNSAT CI: When directed by the Floor Instructor, activate MAL-NSS025A, 100% | ||
RO - 4.2 SRO - 4.2 Validation Time 8 minutes I Time Critical I | I I | ||
To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence. Peer checking will not be provided during the performance of required tasks. NOTE: Directions are only required once in a given JPM session. Comments JPM 21 1.01 REFERENCE SECTION: | : 1. Obtain controlled Refers to RAP 8-3-9 and B-4-g Verifies " A copy of procedure EMRV is open. | ||
: 2. Obtains controlled copy of Obtains ABN 40 ABN 40 as directed by RAP | |||
: 3. Places Feed water Control Depresses MANUAL butt n on M ster in manual. Level Controller 6 I | |||
4 4 1' ' | |||
4& | |||
* h q Lcyl !l 0 | |||
: 4. Attempts to close "A" EMRV On 1F/2F, places "A" Auto Depress Valve using ADS switch switch in "Off" observes that valve is still open. | |||
/- | |||
: 5. Cycles switch off to Manual Cycles "A" EMRV control switch to Manual to off 3 times. to OFF 3 times. Observes valve is still I | |||
open. I CUE: (Cf) Upon request discharge temperature is 300 *Fa Once the Disable Alarm comes in DELETE MAL-NSSO25A I I | |||
*6. Places "A" EMRV Places "A" NormaVDisable switch in NormaVDisable switch "Disable" at rear of 1F/2F Observes that " A in "Disable" I EMRV is closed. I CUE: (CI) Upon request discharge temperature is 290 QFand decreasing Page 3 of 6 | |||
JPM 218.01 PERFORMANCE CHECKLIST STANDARD | |||
: 6. Used procedure properly. Used procedure properly according to its level of usage. | |||
COMPLETION TIME Page 4 of 6 | |||
JPM 218.01 SIMULATOR SETUP Initial Condition(s): 100% Reactor Power Setup: | |||
: 1. initialize to any 100% power IC | |||
: 2. RUN file SIMPROB.CAE Malfunctions: | |||
None Remotes: | |||
None Overrides: | |||
SWI-ADS001C, ON Computer Aided Exercises: | |||
SIMPROB-CAE Page 5 of 6 | |||
TASK CONDITIONS: | |||
Reactor Power 100% | |||
All systems operating satisfactory INITIATING CUES: | |||
Your task will be associated with ADS/EMRV System operation; you are expected to respond to any further alarms that are received. | |||
Page 6 of 6 | |||
AmerGen,. JOB PERFORMANCE MEASURE An Exelon/British Energy Company 21 1.01 Title: Manual Initiation of the Standby Liquid Control System Task: Inject liquid poison into the reactor vessel using the Liquid Poison 21 10501401 System KA# 21 1000 A4.02 RATING: RO - 4.2 SRO - 4.2 Validation Time I 8 minutes I Time Critical I | |||
I I | |||
NO Name Social Security Number I I DIRECTIONS TO TRAINEE: | |||
Before you start, I will state the task conditions and initiating cues and fully answer any questions. To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence. Peer checking will not be provided during the performance of required tasks. | |||
NOTE: Directions are only required once in a given JPM session. | |||
Comments | |||
JPM 21 1.01 REFERENCE SECTION: | |||
u TASK CONDITIONS: | u TASK CONDITIONS: | ||
A failure to fully scram from 100% Rx power has occurred Reactor power is | A failure to fully scram from 100% Rx power has occurred Reactor power is -45% | ||
-45% All recirc pumps have tripped All methods to insert control rods have failed Pressure is being maintained 850-1000 psig using Main Turbine Power oscillations are occurring GENERAL TOOLS AND EQUIPMENT: Key for SLC Keylock switch | All recirc pumps have tripped All methods to insert control rods have failed Pressure is being maintained 850-1000 psig using Main Turbine Power oscillations are occurring GENERAL TOOLS AND EQUIPMENT: | ||
[PA22351 GENERAL | Key for SLC Keylock switch [PA22351 GENERAL | ||
==REFERENCES:== | ==REFERENCES:== | ||
EMG-3200. | EMG-3200.01B, RPV Control with ATWS, Rev. 12 Support Procedure 22, Initiating the Liquid Poison System, u | ||
Liquid poison entering reactor CRITICAL ELEMENTS: | TASK STANDARD: | ||
(*) 4 | Liquid poison entering reactor CRITICAL ELEMENTS: (*) | ||
4 INIT1AT1NG CUES: | |||
As Unit Supervisor, I am directing you to inject liquid poison into the reactor with Standby Liquid Control System 1, | |||
: 1. Obtains controlled copy of Support Procedure 22 obtained procedure I NOTE: When the keylock switch is placed in Sys 1 in the following stel NPO2A will fail to start. [CLF PMP SLC1, shaft break, opt. | |||
_ _ _ _ _ ~ ~ | |||
> Reactor Pressure ~ (Panel 4F) (pressure will not develop) . "FLOW ON" alarm NOT lit (G-1-b) . "SQUIB VALVE | JPM 21 1.01 PERFORMANCE SECTION: | ||
IC- | START TIME PERFORMANCE CHECKLIST STANDARD INITIAL SATNNSAT | ||
IC preset Component Level Failures: | : 1. Obtains controlled copy of Support Procedure 22 obtained procedure I NOTE: When the keylock switch is placed in Sys 1 in the following stel NPO2A will fail to start. [CLF PMP SLC1, shaft break, opt. 11 | ||
IC Preset u CLF PMP SLC1, shaft break, Option 1 preinserted (Fails 'A' SLC Pump) Instructor Overrides: | : 2. Starts poison pump NP02A Rotates STANDBY LIQUID CONTROL keylock switch on 4F to Fire Sys 1 position | ||
IC preset Local Operator Actions: | : 3. Verify flow to reactor Verifies the following for system #1: | ||
IC preset Computer Aided Exercises: None | . "PUMP ON" light is lit (Panel 4F) | ||
A failure to fully scram from 100% Rx power has occurred Reactor power is -45% All recirc pumps have tripped All methods to insert control rods have failed Pressure is being maintained 850- | . Squib for Sys 1 light is lit (Panel 4F) | ||
. Pump Disch Press > Reactor Pressure | |||
AmerGen,, An Exelon/British Energy Company | ~ (Panel 4F) (pressure will not develop) | ||
To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence. Peer checking will not be provided during the performance of required tasks. | . "FLOW ON" alarm NOT lit (G-1-b) | ||
NOTE: Directions are only required once in a given JPM session. Comments I | . "SQUIB VALVE O P m a l a r m lit (G-2-b) | ||
*4. Responds to failure of Places STANDBY LIQUID CONTROL pump NP02A to start keylock switch on 4F to Fire Sys 2 position | |||
: 5. Verify flow to reactor Verifies the following for system #2: | |||
. "PUMP ON" light is lit (Panel 4F) (System 1 light goes out & System 2 light goes on) | |||
. Squib for Sys 2 light is lit (Panel 4F) | |||
. Pump Disch Press > Reactor Pressure (Panel 4F) | |||
. "FLOW ON" alarm lit (G-1-b) | |||
. "SQUIB VALVE OPEN" alarm lit (G-2-b) | |||
I COMPLETION TIME | |||
JPM 21 1.01 SIMULATOR SETUP Initial Condition(s): IC-104 Includes the following: | |||
Init to IC 94 Not necessary to insert SIMPROB BYPASS Lo-Lo MSlV Closure using jumpers (IAW SP-16) [V-6-395 does not have to be byy Insert File JPM211 Notes: | |||
file will freeze the simulator after 140 seconds go back to run 0 reduce recirc flow to minimum (11.4), then trip all the recirc pumps place the mode switch to SHUTDOWN simulator is now ready for jpm use Malfunctions: IC preset Component Level Failures: IC Preset u CLF PMP SLC1, shaft break, Option 1 preinserted (Fails 'A' SLC Pump) | |||
Instructor Overrides: IC preset Local Operator Actions: IC preset Computer Aided Exercises: None | |||
1 TASK CONDITIONS: | |||
A failure to fully scram from 100% Rx power has occurred Reactor power is -45% | |||
All recirc pumps have tripped All methods to insert control rods have failed Pressure is being maintained 850-1000 psig using Main Turbine Power oscillations are occurring 1 INITIATING CUES: | |||
As Unit Supervisor, I am directing you to inject liquid poison into the reactor with Standby Liquid Control System 1 using Support Procedure 22. | |||
AmerGen,, JOB PERFORMANCE MEASURE An Exelon/British Energy Company 202.10 Title: Respond to a Tripped Recirc Pump with 5 Recirc Pumps Operating (Alternate Path) | |||
Task: Respond to a Tripped Recirc Pump with 5 Recirc Pumps Operating I 2020401404 I RO - 3.6 KA# 202001 A2.03 Validation Time - 15 min I | |||
RATING: | |||
Alternate Path - Yes I I | |||
Time Critical 1 | |||
I SRO- 3.7 NO Name Social Security Number I I DIRECTIONS TO TRAINEE: | |||
Before you start, I will state the task conditions and initiating cues and fully answer any questions. To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence. Peer checking will not be provided during the performance of required tasks. | |||
NOTE: Directions are only required once in a given JPM session. | |||
Comments I | |||
. | |||
* Date 1 . | |||
JPM 202.10 Rev. 1 REFERENCE SECTION: | |||
i/ | |||
TASK CONDITIONS: | |||
Reactor power 1OO%, all systems operating properly. | |||
GENERAL TOOLS AND EQUIPMENT: | |||
None GENERAL | None GENERAL | ||
Line 87: | Line 168: | ||
ABN-02, Recirculation System Failures, Rev. 0 TASK STANDARD: | ABN-02, Recirculation System Failures, Rev. 0 TASK STANDARD: | ||
Four pumps running in automatic, the other loop idle. | Four pumps running in automatic, the other loop idle. | ||
i, CRITICAL ELEMENTS: | i, CRITICAL ELEMENTS: (*) | ||
(*) Page 2 of 7 JPM 202.10 Rev. 1 PERFORMANCE SECTION: | Page 2 of 7 | ||
b | |||
n; you are now to respond to any f\ re received. | JPM 202.10 Rev. 1 PERFORMANCE SECTION: | ||
1 START TIME | b TASK CONDITIONS: | ||
Reactor power 1OO%, all system operating properly. | |||
I At Panel 3F, takes "E" recirculation pump discharge valve control switch to close. Procedure ABN-2, Section 3.1.2 obtained. | n; you are now to respond to any f\ re received. | ||
At Panel 3F, Determines Discharge Valve will not close. | 1 n START TIME I I U | ||
Page 3 of 7 JPM 202.10 Rev. - PERFORMANCE CHECKLIST STANDARD I INITIAL SAT/ | PERFORMANCE CHECKLIST STANDARD I | ||
I CUE: (FI) Acknowledge as the US that a plant shutdown is required. | CI: PREINSERT CLF VL\ NSS020 option 6 conditional on R3754.LE.0.2 if not already done. | ||
*6. Dispatches Electrician. Dispatches/directs Electrician to attempt to close the discharge valve IAW attachment ABN-2-1. 7. Determines loop | INSERT MALF RFCO( E when instructed by the FI. | ||
I | |||
I I *8. Opens the suction | : 1. Confirms discharge At Panel 3F, confirms discharge bypass bypass valve for "E" loop valve for "E" loop open. | ||
: 9. Maintain reactor power At Panels 3F and 4F, verifies below rod block on power operation curve. | open CI: MONV R3754 to verii that the discharge valve mechanicallyseizes at approx. 0.2. IF the conditions fails to take then go ahead and seize the wrlve before it fully closes using CLF VLV JSS020, Mech Siezure. | ||
: 13. Refer to Tech Spec for | I 4 2. Closes "E" pump discharge valve At Panel 3F, takes "E" recirculation pump discharge valve control switch to close. | ||
: 3. Obtains controlled copy of Procedure ABN-2, Section 3.1.2 obtained. | |||
procedure 4 4 Determines Discharge Valve will not close At Panel 3F, Determines Discharge Valve will not close. | |||
L Page 3 of 7 | |||
& Rx Coolant Activity. (No notifications because no limitations) Notifies Chemistry if power changed by 289.5 MWth. Notifies Rx engineer. | |||
or will perform diagnosis Used procedure properly according to its level of usaae. | JPM 202.10 Rev. | ||
IC-65, 100% Reactor Power 1. Initialize to IC 65 and perform switch check 2. Enter file SIMPROB 3. Execute VLV-NSS020, Mech Siezure. conditional on R3754 .LE. 0.2. Malfunctions: | - | ||
MAL- | PERFORMANCE CHECKLIST STANDARD I INITIAL SAT/UNSAT | ||
VLV-NSS020, Mech Siezure. conditional on R3754.LE.0.2 Command Files: SIMPROB c Page 6 of 7 u TASK CONDITIONS: | *5 Closes "E" pump At Panel 3F, takes "E" recirculation pump suction valve suction valve control switch to close. | ||
Reactor power | I CUE: (FI) Acknowledge as the US that a plant shutdown is required. | ||
INITIATING CUE: Your task will be associated with Recirculation System operation; you are now to respond to any further alarms that are received. | *6. Dispatches Electrician. Dispatches/directs Electrician to attempt to close the discharge valve IAW attachment ABN-2-1. | ||
Page 7 of 7 AmerGen - SM 274.01 An Exelon/British Energy Company | : 7. Determines loop Determines that the loop can either be configuration placed in an "IDLE" or "ISOLATED" I | ||
To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence. | condition. I CUE:(FI) As US, direct operator to place the loop in an "IDLE"configuration. | ||
Peer checking will not be provided during the performance of required tasks. | I I | ||
NOTE: Directions are only required once in a given JPM session. Comments Date Page 1 of 4 JPM 274.01 Rev. 1 TASK CONDITIONS: - Reactor Scram - Loss of all Off-site and On-site AC Electrical Power. - Breakers USlT and US2T are racked in. GENERAL TOOLS AND EQUIPMENT: | *8. Opens the suction Re-opens the suction valve by taking its valve control switch to the OPEN position. | ||
: 9. Maintain reactor power At Panels 3F and 4F, verifies below rod below rod block setpoint block on power operation curve. | |||
: 10. Maintains RPV level 155 At Panel 5F/6F, ensures FWC system to 165" maintaining level. | |||
: 11. Monitor Nls for At Panel 4F, monitors APRMs. | |||
indication of power oscillation | |||
: 12. Verifies did not enter At Panels 3F and 4F, monitors APRMs and exclusion region of the total recirc flow; verifies not in exclusion power operation curve region of power operation curve. | |||
Page 4 of 7 | |||
Rev. 1 FORMANCE CHECKLIST STANDARD INITIAL SATNNSAT | |||
: 13. Refer to Tech Spec for Uses Tech Spec Sections 3.3.F to limitations on continued determine no limitation or informs Shift plant operations Supervisor to refer to TS 3.3.F, 3.1 O.A. | |||
: 14. Confirms one of the Selects an operating loop for one of the recirc pump suction temp RECIRC PUMP SUCTION TEMPS. | |||
indicators on 3F is selected to an operating loop CUE: (FI) Acknowledge hat no limitations exist and that another 01 brator will maintain power at ts present level. | |||
: 15. Monitors for Fuel Monitors Off-Gas, MSL Radiation & Rx Element Failure. Coolant Activity. | |||
: 16. Notify system dispatcher (No notifications because no limitations) of power limitations | |||
: 17. Notifies Chemistry if Notifies Chemistry if power changed by power changed by 289.5 289.5 MWth. | |||
MWth. | |||
Notifies designated Rx Notifies Rx engineer. | |||
engineer CUE: (FI) Another operi or will perform diagnosis | |||
: 18. Used procedure properly. Used procedure properly according to its level of usaae. | |||
COMPLETION TIME Page 5 of 7 | |||
JPM 202.10 u | |||
SIMULATOR SETUP Initial Condition(s): IC-65, 100% Reactor Power | |||
: 1. Initialize to IC 65 and perform switch check | |||
: 2. Enter file SIMPROB | |||
: 3. Execute VLV-NSS020, Mech Siezure. conditional on R3754 .LE. 0.2. | |||
Malfunctions: | |||
MAL-RFCOO1E Mech Siezure Component Level Failures: | |||
VLV-NSS020, Mech Siezure. conditional on R3754.LE.0.2 Command Files: | |||
SIMPROB c | |||
Page 6 of 7 | |||
u TASK CONDITIONS: | |||
Reactor power 1OO%, all systems operating properly. | |||
INITIATING CUE: | |||
Your task will be associated with Recirculation System operation; you are now to respond to any further alarms that are received. | |||
Page 7 of 7 | |||
JOB PERFORMANCE AmerGen - SM MEASURE 274.01 An Exelon/British Energy Company Title: Line up the TBCCW Heat Exchangers to Service Water Following a Station Blackout Task: Perform Lineups of the TBCCW system 1 2740104001 KA# RATING: | |||
Validation Time 10 minutes Time Critical No Name Social Security Number I I DIRECTIONS TO TRANEE: | |||
Before you start, I will state the task conditions and initiating cues and fully answer any questions. To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence. Peer checking will not be provided during the performance of required tasks. | |||
NOTE: Directions are only required once in a given JPM session. | |||
Comments Date Page 1 of 4 | |||
JPM 274.01 Rev. 1 TASK CONDITIONS: | |||
- Reactor Scram | |||
- Loss of all Off-site and On-site AC Electrical Power. | |||
- Breakers USlT and US2T are racked in. | |||
GENERAL TOOLS AND EQUIPMENT: | |||
MB1 key Radio Flashlight GENERAL | MB1 key Radio Flashlight GENERAL | ||
==REFERENCES:== | ==REFERENCES:== | ||
Station Procedure, ABN-37, STATION BLACKOUT, Rev 0 - TASK STANDARD: | |||
TBCCW valves lined up per ABN-37, Attachment | Station Procedure, ABN-37, STATION BLACKOUT, Rev 0 | ||
-3, step 4.0 CRITICAL ELEMENTS: | - TASK STANDARD: | ||
(*) 2,3,4 & 5 INITIATING CUES: A Station Blackout has occurred, (total loss of off-site and on-site AC electrical power). The SM/US has directed you to line up TBCCW valves for TBCCW heat exchanger 1- | TBCCW valves lined up per ABN-37, Attachment -3, step 4.0 CRITICAL ELEMENTS: (*) | ||
-3, Step 4.0. Page 2 of 4 | 2,3,4 & 5 INITIATING CUES: | ||
____~ JPM 274.01 Rev. 1 START TIME - PERFORMANCE CHECKLIST STANDARD INITIAL SAT/UNSAT | A Station Blackout has occurred, (total loss of off-site and on-site AC electrical power). The SM/US has directed you to line up TBCCW valves for TBCCW heat exchanger 1-1per ABN 3200.37, Attachment -3, Step 4.0. | ||
: 1. Obtain controlled copy of Obtain controlled copy of kBW'37 procedure. Attachment 444 5 "2. Close V-3-58. Closes V-3-58 in the Turbine Bldg. basement. | Page 2 of 4 | ||
____~ | |||
CUE: V-3-76 one turn open. I I 6. Confirm V-3-74 is fully open. | JPM 274.01 Rev. 1 START TIME - | ||
Opens V-3-74 in the Turbine Bldg. basement. | PERFORMANCE CHECKLIST STANDARD INITIAL SAT/UNSAT | ||
: 1. Obtain controlled copy of Obtain controlled copy of kBW'37 procedure. Attachment 444 5 "2. Close V-3-58. Closes V-3-58 in the Turbine Bldg. | |||
Before you start, I will state the task conditions and initiating cues and fully answer any questions. | I basement. I CUE: V-3-58 closed. | ||
To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence. | I I "3. Open V-3-59. | ||
Peer checking will not be provided during the performance of required tasks. NOTE: Directions are only required once in a given JPM session. Comments | I I | ||
Opens V-3-59 in the Turbine Bldg. | |||
basement . I C!uE: V-3-59 open. | |||
I I "4. Close V-3-76 and V-3-77. Closes V-3-76 and V-3-77 in the I | |||
Turbine Bldg. - basement. I CUE: V-3-76 and V-3-77 are closed. | |||
I I "5. Open V-3-76 one turn open. Throttles V-3-76 to a position not fully closed in the Turbine Bldg. | |||
basement. | |||
CUE: V-3-76 one turn open. | |||
I I | |||
: 6. Confirm V-3-74 is fully open. Opens V-3-74 in the Turbine Bldg. | |||
I basement. I CUE: V-3-74 is full open. | |||
: 7. Used procedure properly. Used procedure properly according to its level of usage. | |||
COMPLETION TIME Page 3 of 4 | |||
TASK CONDITIONS: | |||
- Reactor Scram | |||
- Loss of all Off-site and On-site AC Electrical Power. | |||
- Breakers USlT and US2T are racked in. | |||
INITIATING CUES: | |||
A Station Blackout has occurred, (total loss of off-site and on-site AC electrical power). The SM/US has directed you to line up TBCCW valves for TBCCW heat exchanger 1-1per ABN-37,Attachment 3, Step 4.0. | |||
Page 2 of 4 | |||
AmerGen,, JOB PERFORMANCE MEASURE An Exelon/British Energy Company 223.01 Title: Bypass Isolation Interlock for Torus Vent Valves Task: Bypass Isolation Interlock on Drywell and Torus Vent and Purge 2230501501 Valve KA# 295024 EA1.14 I RAT1NG: RO - 3.4 SRO- 3.5 Validation Time 13 min I I | |||
Alternate Path No I I | |||
Time Critical I I | |||
NO Name Social Security Number 1 I DIRECTIONS TO TRAINEE: | |||
Before you start, I will state the task conditions and initiating cues and fully answer any questions. To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence. Peer checking will not be provided during the performance of required tasks. | |||
NOTE: Directions are only required once in a given JPM session. | |||
Comments 1Of7 | |||
JPM 223.01 | |||
'EFERENCE SECTION: | |||
b TASK CONDITIONS: | |||
Reactor scrammed due to a LOCA CHRRMS reading greater than 20,000 WHR All automatic actions due to LOCA have occurred GENERAL TOOLS AND EQUIPMENT: | Reactor scrammed due to a LOCA CHRRMS reading greater than 20,000 WHR All automatic actions due to LOCA have occurred GENERAL TOOLS AND EQUIPMENT: | ||
EOP BYPASS PLUGS GENERAL | EOP BYPASS PLUGS GENERAL | ||
==REFERENCES:== | ==REFERENCES:== | ||
EMG-3200.02, Primary Containment Control, Rev. 16 3~ppot- | |||
(*) 11, 12, 13, 14 2 of 7 | EMG-3200.02, Primary Containment Control, Rev. 16 3~ppot-tProcedure 32 L | ||
- JPM 223.01 | TASK STANDARD: | ||
Lv | Isolation for V-28-18 and V-28-47 have been bypassed CRITICAL ELEMENTS: (*) | ||
' r V-28-18 and V-28-47 using Support Procedure 32. | 11, 12, 13, 14 2 of 7 | ||
Inform me when ready to vent. START TIME PERFORMANCE CHECKLIST 1 Obtain controlled copy of procedure CUE: Prerequisites are c | |||
: 7. Confirms Reactor Bldg. | - | ||
4 of 7 PERFORMANCE CHECKLIST Y | JPM 223.01 "ERFORMANCE SECTION: | ||
Lv TASK CONDITIONS: | |||
Reactor scrammed due to a LOCA CHRRMS reading greater than 20,000 WHR All automatic actions due to LOCA have occurred INITIATING CUES: | |||
As the US I am directing you to bypass lorus Vent Isolation- ' r V-28-18 and V-28-47 using Support Procedure 32. Inform me when ready to vent. | |||
IC-65, 100% Rx PWR Setup 1. Digital Feed and Recirc Flow control 2. Set Master Recirc flow controller to 44.44 cycles | START TIME PERFORMANCE CHECKLIST 1 Obtain controlled copy STANDARD Support Procedure 32 obtained 1 INITIAL SAT/ | ||
: 3. Set Feedwater master controller to 163.5 inches, and in "Auto" 2. Initialize to IC 65 and perform switch check 3. Run SIMPROBxae | UNSAT of procedure Verifies prerequisites I | ||
: 4. Go to "RUN" and execute MAL-NSS004A, | u I | ||
: 9. "FREEZE" simulator when reactor pressure decreases to less than 130 psig | CUE: Prerequisites are c | ||
MAL-NSS004A, 100% Overrides: | : 3. Verifies Torus level is below 348 in. | ||
SWI-NSS066V, ON SWI-NSS068V, ON Remotes: Computer Aided Exercises: | At Panel 1F/2F, verifies Torus water level is below 348 in. | ||
I | |||
' g 4. Evacuates personnel I | |||
7 of 7 AmerGensM | - Sound the Reactor Building-from the Reactor Building Evacuation f Alarm | ||
To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence. Peer checking will not be provided during the performance of required tasks. | - Announces: "Primary Containment Venting will commence in approximately 5 minutes. All personnel evacuate the Reactor Building immediately." | ||
NOTE: Directions are only required once in a given JPM session. Comments .. . 4). Date | : 5. Starts SGTS | ||
~~ JPM 262.07 REFERENCE SECTION: | -$r At Panel 11R, selects a SGTS fan and places it control switch in HAND. | ||
3 of 7 | |||
JPM 223.01 PERFORMANCE STANDARD INITIAL CHECKLIST SAT/ | |||
UNSAT y 6. Closes V-28-48 At Panel 11R, places the SGTS crosstie valve V-28-48 in the CLOSED position | |||
: 7. Confirms Reactor Bldg. At Panel 11R, confirms the Reactor Supply Fans secured Bldg. Supply fans are secured | |||
: 8. Confirms Reactor Bldg. At Panel 11R, confirms the Reactor Exhaust Fans secured Bldg. Exhaust fans are secured | |||
: 9. Confirm that the Verifies 4F "Reactor Mode Selector "Reactor Mode Selector Switch" is NOT in "Run" Switch" is NOT in the "Run" position 1O.Obtains bypass plug Obtains one(1) bypass plug from the | |||
* EOP station in the control room. | |||
*11 Inserts bypass plug Inserts bypass plug in 1OXF: | |||
in 1OXF. - Opens EOP BYPASS PLUGS panel (rear of 1OXF) | |||
- Inserts bypass plug in position BP5. | |||
*12 Inserts bypass plug Inserts bypass plug in 11R: | |||
in 11R. - Opens EOP BYPASS PLUGS panel (rear of 11R) | |||
- Removes bypass plug in position BP4 | |||
- Inserts bypass plug in position BP1. | |||
"13 Places the TORUS/ At Panel 11F, places the DW ISOLATION VALVE TORUS/DRYWELL ISOLATION BYPASS keylock switch VALVE BYPASS PERMISSIVE in the TORUS position keylock switch in the TORUS position. | |||
4 of 7 | |||
JPM 223.01 PERFORMANCE STANDARD INITIAL CHECKLIST SAT/ | |||
Y UNSAT | |||
*14 Places the DW/TORUS VENT & At Panel 11F , places the PURGE ISOL HI DRYWELL/TORUS VENT & PURGE RAD BYPASS ISOLATION HI RAD BYP Keylock keylock switch switches in BYPASS channel 1 and 2 in BYPASS | |||
: 15. Informs the US, Torus Tells the US (Evaluator) that the is ready to vent torus is ready to vent via the torus vent valves. | |||
I 2 when informed that the Torus is ready for venting. | |||
: 6. Used procedure Used procedure properly according to properly. its level of usage. | |||
COMPLETION TIME 5 of 7 | |||
JPM 223.01 u | |||
SIMULATOR SETUP Initial Condition(s): IC-65, 100% Rx PWR Setup | |||
: 1. Digital Feed and Recirc Flow control | |||
: 2. Set Master Recirc flow controller to 44.44 cycles | |||
: 3. Set Feedwater master controller to 163.5 inches, and in "Auto" Place the "A/B/C" MFRV and " N C LFRV in "AUTO" | |||
: 2. Initialize to IC 65 and perform switch check | |||
: 3. Run SIMPROBxae | |||
: 4. Go to "RUN" and execute MAL-NSS004A, 1OO%, ACT | |||
: 5. Run JPM22301.CAE | |||
: 6. Take mode switch to shutdown | |||
: 7. Open all EMRV's | |||
: 8. Turn on Fuel Zones | |||
: 9. "FREEZE" simulator when reactor pressure decreases to less than 130 psig Malfunctions: | |||
MAL-NSS004A, 100% | |||
Overrides: | |||
SWI-NSS066V, ON SWI-NSS068V, ON Remotes: | |||
Computer Aided Exercises: | |||
SIMPROB.CAE JPM22301.CAE 6 of 7 | |||
TASK CONDITIONS: | |||
Reactor scrammed due to a LOCA CHRRMS reading greater than 20,000 WHR All automatic actions due to LOCA have occurred INITIATING CUES: | |||
As the US I am directing you to bypass Torus Vent Isolation logic for V-28-18 and V-28-47 using Support Procedure 32. Inform me when ready to vent. | |||
7 of 7 | |||
JOB PERFORMANCE AmerGensM MEASURE An Exelon/British Energy Company 262.07 Title: Manual Transfer of the 4160 VAC Bus 1A from the Auxiliary Transformer to the Startup Transformer Task: Shift Station Loads between Aux. and S/U Transformers I 2620101002 KA# 262001 A4.04 RATING: RO - 3.6 SRO - 3.7 Validation Time 12 minutes Time Critical NO Name Social Securiity Number I I DIRECTIONS TO TRAINEE: | |||
Before you start, I will state the task conditions and initiating cues and fully answer any questions. To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence. Peer checking will not be provided during the performance of required tasks. | |||
NOTE: Directions are only required once in a given JPM session. | |||
Comments | |||
. . | |||
. 4). | |||
Date | |||
~~ | |||
JPM 262.07 REFERENCE SECTION: | |||
ii TASK CONDITIONS: | ii TASK CONDITIONS: | ||
Plant is at 100% Power | Plant is at 100% Power 4160V 1A main breaker needs to be removed from service GENERAL TOOLS AND EQUIPMENT: | ||
None GENERAL | None GENERAL | ||
==REFERENCES:== | ==REFERENCES:== | ||
Procedure 337, | |||
57 L TASK STANDARD: | Procedure 337, 4160 Volt Electrical System, Section 3.4, Rev. 57 L | ||
1A | TASK STANDARD: | ||
(*) 739 Page 2 of 6 PERFORMANCE SECTION: %u INITIATING CUES: I As the US I am directing you to transfer 4160-volt bus 1A to the startup I transformer in accordance with Ops Procedure 337 | 1A 4160-volt bus is energized from the startup transformer CRITICAL ELEMENTS: (*) | ||
START TIME - | 739 Page 2 of 6 | ||
~~ 2. Verifies all prerequisites | |||
: 4. Verifies | PERFORMANCE SECTION: | ||
%u INITIATING CUES: | |||
I As the US I am directing you to transfer 4160-volt bus 1A to the startup I transformer in accordance with Ops Procedure 337. | |||
JPM 262.07 STANDARD At panel 8F/9F places key in S1A synchronizing switch and turns to "On" At Panel 8F/9F, verifies synchroscope is stationary and pointing at 12 o'clock with both synch lights out. Place S1A control switch on 8F/9F to "Close" position. Checks the breaker closed light is energized and breaker 1A opens. On Panel 8F/9F, Places synchronizing switch in Off and removes key Operates main breaker 1A to the trip position to match mechanical indication Used procedure properly according to its level of usage. | START TIME - | ||
PERFORMANCE CHECKLIST STANDARD 1 INITIAL SAT/UNSAT | |||
Instructor Overrides: Local Operator Actions: L Monitored Variables: | : 1. Obtains controlled copy of Procedure 337, section 3.4 obtained procedure I | ||
Command Files: SIMPROB Computer Aided Exercises: Remote Control Assignments: | ~~ | ||
Page 5 of 6 TASK CONDITIONS: | : 2. Verifies all prerequisites Verifies prereqs met I | ||
Plant is 100% Power 4160V 1A main breaker needs to be removed from service INITIATING CUES: As the US I am directing you to transfer 4160-volt bus 1A to the startup transformer in accordance with Ops Procedure 337. Page 6 of 6 AmerGen,, An Exelon/British Enerqy | CUE:(FI) As requested, individual prerequisites not verifiable in the Control Room can be verified met, Bank 5 voltage regulator is in service. | ||
20 min I Faulted: NO Time Critical: | I I | ||
NO | : 3. Reviews all applicable Reviews all applicable precautions and precautions and limitations limitations | ||
To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence. | : 4. Verifies 4160 volt main Verifies on panel 8F/9F red closed light is breaker 1A control switch energized with red target for breaker 1A. | ||
NOTE: Directions are only required once in a given JPM session. Comments: | is in the "Closed" position | ||
Date: 1 Of7 | : 5. Verifies that SU Breaker Verifies that the S1A breaker "OPEN" light S1A racked in and open. and "BREAKER UP" light located on panel 8F/9F are energized. | ||
~ | : 6. Verifies that the 34.5 kV Verifies red light for Bank No. 5 feed on breaker feed to bank No. 12F is energized. | ||
_/I TASK CONDITIONS: - Plant is at 100% power - Division I test was complete on the last shift. - All system operable GENERAL TOOLS AND EQUIPMENT: | 5 is in the closed position. | ||
Key for Division Normal - Test Keylock switch Stopwatch - Student will be expected to record control number and calibration date. GENERAL | Page 3 of 6 | ||
JPM 262.07 PERFORMANCE CHECKLIST STANDARD INITIAL SATNNSAT | |||
*7. Puts synchroscope At panel 8F/9F places key in S1A key into synchronizing synchronizing switch and turns to "On" switch for S1A on 8F/9F and turns on. | |||
: 8. Verifies power is At Panel 8F/9F, verifies synchroscope is synchronized across S1A stationary and pointing at 12 o'clock with both synch lights out. | |||
*9. Closes S1A Place S1A control switch on 8F/9F to "Close" position. Checks the breaker closed light is energized and breaker 1A opens. | |||
: 10. Turn synchronizing On Panel 8F/9F, Places synchronizing switch off and remove switch in Off and removes key key from 8F/9F | |||
: 11. Matches main breaker Operates main breaker 1A to the trip targets position to match mechanical indication | |||
: 12. Used procedure properly. Used procedure properly according to its level of usage. | |||
COMPLETION TIME Page 4 of 6 | |||
JPM 262.07 u | |||
SIMULATOR SETUP Initial Condition(s) : IC-65 SET-UP ACTIONS: | |||
: 1. Digital Feed and Recirc Flow control 9 Set Master Recirc flow controller to 44.44 cycles 9 Set Feedwater master controller to 163.5 inches, and in "Auto" 9 Place the "A/B/C" MFRV and "A/C LFRV in "AUTO" | |||
: 2. Init to IC 65 and perform switch check | |||
: 3. File SIMPROB | |||
: 4. FREEZE" simuIator I' | |||
Malfunctions: | |||
Component Level Failures: | |||
Instructor Overrides: | |||
Local Operator Actions: | |||
L Monitored Variables: | |||
Command Files: | |||
SIMPROB Computer Aided Exercises: | |||
Remote Control Assignments: | |||
Page 5 of 6 | |||
TASK CONDITIONS: | |||
Plant is 100% Power 4160V 1A main breaker needs to be removed from service INITIATING CUES: | |||
As the US I am directing you to transfer 4160-volt bus 1A to the startup transformer in accordance with Ops Procedure 337. | |||
Page 6 of 6 | |||
AmerGen,, JOB PERFORMANCE MEASURE An Exelon/British Enerqy | |||
-- Company | |||
. - | |||
202.1 1 Title: CONDUCT RECIRC PUMP TRIP LOGIC SYS FUNCTIONAL TEST Task: CONDUCT RECIRC PUMP TRIP LOGIC SYS FUNCTIONAL TEST 2020201004 KA#202001 K1.27 RATING: RO - 4.1 SRO - 4.3 Validation Time: 20 min I Faulted: NO I | |||
Time Critical: NO Name Social Security Number 1 I DIRECTIONS TO TRAINEE: | |||
Before you start, I will state the task conditions and initiating cues and fully answer any questions. To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence. | |||
NOTE: Directions are only required once in a given JPM session. | |||
Comments: | |||
Date: | |||
1 Of7 | |||
~ _ _ _ _ _ _ _ | |||
JPM 202.1 1 Rev.1 REFERENCE SECTION: | |||
_/I TASK CONDITIONS: | |||
- Plant is at 100% power | |||
- Division I test was complete on the last shift. | |||
- All system operable GENERAL TOOLS AND EQUIPMENT: | |||
Key for Division Normal - Test Keylock switch Stopwatch - Student will be expected to record control number and calibration date. | |||
GENERAL | |||
==REFERENCES:== | ==REFERENCES:== | ||
Recirculation Pumps Trip Circuitry Test Proc. 603.4.001, Rev. | Recirculation Pumps Trip Circuitry Test Proc. 603.4.001, Rev. 9 TASK STANDARD: | ||
9 TASK STANDARD: | u Division I I Surveillance completed. | ||
u Division | CRITICAL ELEMENTS: (*) | ||
CRITICAL ELEMENTS: | 4, 5, 6, 7, 9, 10, 11, 13, 14, 15 2 of 7 | ||
(*) 4, 5, 6, 7, 9, 10, 11, 13, 14, 15 2 of 7 JPM 202. | |||
JPM 202.11 Rev.1 PERFORMANCE SECTION: | |||
: 3. Reviews all applicable precautions and limitations | u | ||
*4. Places Division II in test Places Division 2 Normal - Test Keylock switch to the test position. - Verifies TEST-II alarm (E-3-b) annunciates. | / TASK CONDITIONS: | ||
- Plant is at 100% power | |||
3 of 7 | - All system operable INITIATING CUES: | ||
*6. Tests Relay 6K12AA | - As US, I am directing you to complete the Recirculation Pumps Trip Circuitry Test Proc. 603.4.001 on Division II. | ||
START TIME PERFORMANCE CHECKLIST STANDARD INITIAL SAT/UNSAT | |||
ljustment will not be necessary. | : 1. Obtain controlled copy of Obtains controlled copy of Proc. 603.4.001 procedure L 2. Verifies all prerequisites Verifies prerequisites met are met | ||
Momentarily depresses CHAN C RESET pushbutton switch on 3F - Verifies ACTUATE C-ll alarm (E-1 -b) has cleared. | : 3. Reviews all applicable Reviews precautions and limitations precautions and limitations | ||
Verifies the Division II lamps for all five recirculation pumps are NOT lit. | *4. Places Division II in test Places Division 2 Normal - Test Keylock switch to the test position. | ||
- Verifies TEST-II alarm (E-3-b) annunciates. | |||
Momentarily depresses CHAN C RESET pushbutton switch on 3F - Verifies ACTUATE C-ll alarm (E-1-b) has cleared. - Verifies the Division | 4.Tests Channel A Momentarily depresses CHAN C TRIP pushbutton switch on 3F | ||
\/ Initial Condition(s): | - Verifies ACTUATE C-Il alarm (E-1-b) annunciates. | ||
100% Power Malfunctions: | 3 of 7 | ||
JPM 202.11 Rev.1 I PERFORMANCE CHECKLIST STANDARD INITIAL SATAJNSAT L | |||
*6. Tests Relay 6K12AA Simultaneously momentarily depress CHAN D TRIP pushbutton switch on 3F and start stopwatch. | |||
- Verifies ACTUATE D-ll alarm (E-2-b) annunciates. | |||
- Verifies the Division II lamps for A, B, | |||
& E recirculation pumps light instantly. | |||
~~~ | |||
*7. Times trip When Division II lamps for Recirc Pumps C | |||
& D light then stop the stopwatch and record As-Found value. | |||
: 8. If the As-Found value is not 10.5 +/- 0.5 seconds then adjust the relay 6K12AA. | |||
Relay a ljustment will not be necessary. | |||
*9. Resets Channel C Momentarily depresses CHAN C RESET pushbutton switch on 3F | |||
- Verifies ACTUATE C-ll alarm (E-1-b) has cleared. | |||
- Verifies the Division II lamps for all five recirculation pumps are NOT lit. | |||
*lo. | |||
I Tests Relay 6K1O A A Simultaneously momentarily depress CHAN C TRIP pushbutton switch on 3F and start stopwatch. | |||
- Verifies ACTUATE C-ll alarm (E-1-b) annunciates. | |||
- Verifies the Division II lamps for A, B, | |||
& E recirculation pumps light instantly. | |||
*11. Times trip When Division II lamps for Recirc Pumps C | |||
& D light then stop the stopwatch and record As-Found value. | |||
112. If the As-Found value is not 10.5 +/- 0.5 seconds then adjust the relay 6K1OAA. | |||
4 of 7 | |||
JPM 202.1 1 Rev.1 I PERFORMANCE CHECKLIST STANDARD I | |||
INITIAL SAT/U NSAT Relay i ljustment will not be necessary. | |||
*13. Resets Channel C Momentarily depresses CHAN C RESET pushbutton switch on 3F | |||
- Verifies ACTUATE C-ll alarm (E-1-b) has cleared. | |||
- Verifies the Division I I lamps for all five recirculation pumps are NOT lit. | |||
*14. Resets Channel B Momentarily depresses CHAN D RESET pushbutton switch on 3F | |||
- Verifies ACTUATE D-ll alarm (E-2-b) has cleared. | |||
*15. Places Division II in Places Division II Normal - Test Keylock Normal switch to the Normal position. | |||
- Verifies TEST II alarm (E-3-b) has cleared. | |||
: 16. Used procedure properly. Used procedure properly according to its level of usage. | |||
COMPLETION TIME 5 of 7 | |||
JPM 202.11 Rev.1 | |||
\/ | |||
SIMULATOR SETUP Initial Condition(s): 100% Power Malfunctions: | |||
NONE Computer Aided Exercises: | NONE Computer Aided Exercises: | ||
SIMPROB.CAE 6 of 7 | |||
To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence. Peer checking will not be provided during the performance of required tasks. NOTE: Directions are only required once in a given JPM session. | |||
_____ ~~ - ~~ JPM 288.02 Rev 1 b REFERENCE SECTION: | TASK CONDI TI0 NS: | ||
- Plant is at 100% power | |||
'"GENERAL TOOLS AND EQUIPMENT: | - All system operable INITIATING CUES: | ||
- As US, I am directing you to perform Recirculation Pumps Trip Circuitry Test Proc. 603.4.001 7 of 7 | |||
JOB PERFORMANCE MEASURE An Exelon/British Energy Company 288.02 L/ | |||
Title: Purge Control Room Using Control Room HVAC System Task: Purge Control Room Using Control Room HVAC System 2880101403 KA# 2900003 A2.04 RATING: R O - 3.1 SRO- 3.3 Validation Time 15 min Alternate Path - No Time NO I I Critical I Name Social Security Number I I l DIRECTIONS TO TRAINEE: | |||
Before you start, I will state the task conditions and initiating cues and fully answer any questions. To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence. Peer checking will not be provided during the performance of required tasks. | |||
il NOTE: Directions are only required once in a given JPM session. | |||
Comments Page 1 of 6 | |||
_____ ~~ - ~~ | |||
JPM 288.02 Rev 1 b | |||
REFERENCE SECTION: | |||
I TASK CONDITIONS: | |||
~~ | |||
- Reactor Power 100% | |||
- "B" Control Room HVAC is tagged out of service | |||
- A fire has been recently extinguished in the Control Room, fumes are still present | |||
- All other plant systems are operating normally | |||
- Immediate actions of ABN-29 are complete. | |||
'"GENERAL TOOLS AND EQUIPMENT: | |||
None GENERAL | None GENERAL | ||
==REFERENCES:== | ==REFERENCES:== | ||
ABN-29, Response to Fire: Rev 0 TASK STANDARD: One complete purge has been performed and "B" 460 volt switchgear ventilation has been restarted. | |||
CRITICAL ELEMENTS: | ABN-29, Response to Fire: Rev 0 TASK STANDARD: | ||
(*) 2,3,4,5,7,8 Page 2 of 6 L PERFORMANCE SECTION: | One complete purge has been performed and "B" 460 volt switchgear ventilation has been restarted. | ||
INITIATING CUES: Control Room fire has been extinguished, with residual smoke existing., the Unit Supervisor has directed you to purge the Control Room and restore normal ventilation to the Control Room using HVAC System "A" per ABN-29 "1 START TIME PERFORMANCE CHECKLIST STANDARD INITIAL SAT/UN SAT 1. Obtains controlled Procedure ABN-29, Section 3.4.8 copy of procedure | CRITICAL ELEMENTS: (*) | ||
*2. Shuts down "B" 460 | 2,3,4,5,7,8 Page 2 of 6 | ||
*3. Lines up the Control | L PERFORMANCE SECTION: | ||
1 TASK CONDITIONS: | |||
- Reactor Power 100% | |||
- "B" Control Room HVAC is tagged out of service | |||
- A fire has been recently extinguished in the Control Room, fumes are still present | |||
- All other plant systems are operating normally | |||
100% Power IC Turn off "B" Control Room HVAC Tag the "B" Control Room HVAC out of service Malfunctions: FPS3A,22 for Panel A, Zone 1 alarm on Master Fire alarm panel in the Control Room (NOTE: Remove Malfunction(s) when directed by the Evaluator) | - Immediate actions of ABN-29 are complete. | ||
Component Level Failures: | INITIATING CUES: | ||
'nstructor Overrides: | Control Room fire has been extinguished, with residual smoke existing., the Unit Supervisor has directed you to purge the Control Room and restore normal ventilation to the Control Room using HVAC System "A" per ABN-29 "1 | ||
b SWI-TBS24A to "fail off" SWI-TBS28A to "fail off" Computer Aided Exercises: Simprob. CAE Page 5 of 6 | START TIME PERFORMANCE CHECKLIST STANDARD INITIAL SAT/UN SAT | ||
: 1. Obtains controlled Procedure ABN-29, Section 3.4.8 copy of procedure | |||
INITIATING CUES: Control Room fire has been extinguished, with residual smoke existing., the US has directed you to purge the Control Room and restore normal ventilation to the Control Room using HVAC System "A" per ABN-29, section 3.4.8 I' Page 6 of 6 OYSTER CREEK GENERATING STATION PROCEDURE | *2. Shuts down "B"460 Places "Bl' 460V SWGR Room Supply and volt switchgear Exhaust Fans, SF-1-21 and EF-1-21, in the room ventilation OFF position. | ||
system I | |||
B. PLACE CONT RM HVAC | Page 3 of 6 | ||
START the | |||
If temperature approaches | JPM 288.02 Rev 1 PERFORMANCE CHECKLIST STANDARD INITIAL SAT/UN SAT | ||
*3. Lines up the Control Places the "A Control Rm HVAC Damper Room HVAC system Control" switch in "Pur" on panel 11R for purging | |||
*4. Places the Places "HVAC A Bypass Switch" on 11R in I NormaVReseVBypa I' Byp" ss Switch in the "Bypass" position | |||
*5. Start CR HVAC A For HVAC "A", places "System Initiation" system fan switch in "on" on panel 1I R | |||
: 6. Monitor "B" 460V In the "B" 460V switchgear room, have the Switchgear Room EO monitor temperature and notify if it Temperature approaches 104' F. | |||
*7. Reset fire alarms Resets fire detection alarms on Control Module 6 | |||
*8. Reset Control On Panel 11R, take the Bypass switch to Room HVACA "Reset" and then to "Norm" | |||
: 9. Return CR HVAC to Places Control RM HVAC A Damper I' Nor Control switch in "Nor" on 11R .' | |||
: 11. Used procedure properly. Used procedure properly according to its level of usage. | |||
COMPLETION TIME Page 4 of 6 | |||
JPM 288.02 Rev 1 SIMULATOR SETUP Initial Condition(s): 100% Power IC Turn off "B" Control Room HVAC Tag the "B" Control Room HVAC out of service Malfunctions: | |||
FPS3A,22 for Panel A, Zone 1 alarm on Master Fire alarm panel in the Control Room (NOTE: Remove Malfunction(s) when directed by the Evaluator) | |||
Component Level Failures: | |||
'nstructor Overrides: | |||
b SWI-TBS24A to "fail off" SWI-TBS28A to "fail off" Computer Aided Exercises: | |||
Simprob. CAE Page 5 of 6 | |||
I__ | |||
Error! Main Document Only. | |||
TASK CONDITIONS: | |||
- Reactor Power 100% | |||
- "B" Control Room HVAC is tagged out of service | |||
- A fire has been recently extinguished in the Control Room, fumes are still present | |||
- All other plant systems are operating normally | |||
- Immediate actions of ABN-29 are complete. | |||
INITIATING CUES: | |||
Control Room fire has been extinguished, with residual smoke existing., the US has directed you to purge the Control Room and restore normal ventilation to the Control Room using HVAC System "A" per ABN-29, section 3.4.8 I' | |||
Page 6 of 6 | |||
OYSTER CREEK GENERATING Number STATION PROCEDURE ABN-29 I | |||
L/ Title Revision No. | |||
PLANT FIRES 0 | |||
: 8. When the Control Room fire is extinguished, then PERFORM the following: | |||
NOTE: Shutting down 480V switchgear room ventilation will prevent smoke and fumes from being sucked in when the Control Room is purged. Ensure Standing Order 51 is adhered to. | |||
A. SHUT DOWN the B 480V Switchgear Room ventilation system manually by placing the control switch for SF 1-21 and EF 1-21 in the OFF position I 1 on Panel 1IR. | |||
NOTE: Either Control Room HVAC System B or A may be used. Direction for System A is shown in parentheses. | |||
B. PLACE CONT RM HVAC B (A)DAMPER CONTROL switch on Panel 9XR (1 1R) in PUR. I 1 C. PLACE HVAC B (A)BYPASS switch in BYP. [ I D. START the B (A)Control Room HVAC system. [ I E. MONITOR B 480V switchgear room temperature. If temperature approaches 104F, it may be necessary to secure Control Room HVAC and I 1 restart B 480V Switchgear Room Ventilation, per step 8-1below. | |||
NOTE: Venting the Control Room for 15 minutes will allow for approximately 3 changes of air, which wifl normally provide adequate ventilation. | |||
F. When smoke is cleared from the Control Room, then PERFORM the following: | F. When smoke is cleared from the Control Room, then PERFORM the following: | ||
: 1) RESET Fire | : 1) RESET Fire DetectionAlarms on Control Module 6 and FAMP. [ I 10.0 | ||
Setup the Remote Shutdown Panel for operation upon Control Room | AmerGem JOB PERFORMANCE An Exelon/British Energy Company Title: Operate the Remote Shutdown Panel on Control RoodEvacuation. | ||
I 3080401401 KA# 295016 AA1.07 I RATING: $0 - 4.2 SRO -4.3 Validation Time I 10 Minutes 1 TidCritical I | Setup the Remote Shutdown Panel for operation upon Control Room d c u a t i o n . I 3080401401 KA# 295016 AA1.07 I RATING: $0 - 4.2 SRO -4.3 Validation Time I 10 Minutes 1 TidCritical I | ||
To will not be provided during the performance | I I | ||
/ NOTE: Directions are only require once in a given JPM session. | No Name Social Security Number DIRECTIONS TO TRAINEE: | ||
T = 0 minutes ; Reactor operating at 100% power T = 10 minutes ; Toxic atmosphere Control Room evacuated and all required and desired actions have been performed per ABN 3200.30 "B" Isolation condenser is in service "B" CRD pump operating V-11-34 is closed V-14-35 is open GENERAL TOOLS AND EQUIPMENT: | Before you start, I will state the task | ||
/ | |||
and initiating cues and fully answer any questions. To complete this task successfully, you or simulate each critical element correctly and demonstrate proper procedural will not be provided during the performance of required tasks. | |||
/ | |||
u' NOTE: Directions are only require once in a given JPM session. | |||
Page 1 of 5 | |||
JPM 308.01 Rev. 1 1 TASK CONDITIONS: | |||
T = 0 minutes ; Reactor operating at 100%power T = 10 minutes ;Toxic atmosphere Control Room evacuated and all required and desired actions have been performed per ABN 3200.30 "B" Isolation condenser is in service "B" CRD pump operating V-11-34 is closed V-14-35 is open GENERAL TOOLS AND EQUIPMENT: | |||
MB-1 key GENERAL | MB-1 key GENERAL | ||
==REFERENCES:== | ==REFERENCES:== | ||
W Procedure 346, Remote Shutdown, Rev. | W Procedure 346, Remote Shutdown, Rev. 9, Section 7 TASK STANDARD: | ||
9, Section 7 TASK STANDARD: | All controls and indications on the Remote Shutdown Panel are active CRITICAL ELEMENTS: (*) | ||
All controls and indications on the Remote Shutdown Panel are active CRITICAL ELEMENTS: | 5,7,8,9,11 INITIATING CUES: | ||
(*) 5,7,8,9,11 INITIATING CUES: Toxic atmosphere has caused an evacuation of the control room. The US has directed you to place the Remote Shutdown Panel into operation in accordance with procedure 346, Section 7, Operation of the Remote and Local Shutdown Panels. | Toxic atmosphere has caused an evacuation of the control room. The US has directed you to place the Remote Shutdown Panel into operation in accordance with procedure 346, Section 7, Operation of the Remote and Local Shutdown Panels. | ||
Page 2 of 5 JPM 308.01 Rev. 1 START TIME | Page 2 of 5 | ||
: 1. | |||
Obtain controlled copy of procedure. | JPM 308.01 Rev. 1 u START TIME PERFORMANCE CHECKLIST STANDARD INITIAL SAT/UNSAT | ||
Procedure 346, section 7, obtained. | : 1. Obtain controlled copy of procedure. Procedure 346, section 7, obtained. | ||
I I UPON REQUEST: Individual prereqs not verifiable at location, can be verified as met. I I 3. Reviews all applicable precautions and | : 2. Verifies prerequisites met. I Verifies prereqs met. I UPON REQUEST:Individual prereqs not verifiable at location, can be verified as met. | ||
Reviews all applicable precautions and | I I | ||
: 4. Obtains keys for remote shutdown | : 3. Reviews all applicable precautions and Reviews all applicable precautions and limitations. limitations. | ||
Unlock key ring to right of Remote "5. Places the "CRD control transfer" keylock to the alternate position. | : 4. Obtains keys for remote shutdown Unlock key ring to right of Remote panel. Shutdown Panel. | ||
"5. Places the "CRD control transfer" Inserts key and places CRD control keylock to the alternate position. I transfer switch in "Alternate" position. I CUE: CRD Control transfer keylock is in alternate. | |||
I I | |||
I I "7. Lines up IC "B" valve control. | : 6. Confirms 1B2M closed. "Red" indicating light lit for breaker I | ||
On Remote S/D panel, places control switch for V-14-35 in open and control switch for V-11-34 remains closed. | 1B2M at the RSP. I L CUE: 1B2M breaker indicates closed (E3 CRD pump operating, no action required. | ||
I I "7. Lines up IC "B" valve control. On Remote S / D panel, places control switch for V-14-35 in open and control I | |||
switch for V-11-34 remains closed. I CUE: V-14-35 control switch is in open and V-11-34 control switch is in close. | |||
W O N REQUEST: | |||
* | V-14-35 is open V-11-34 is closed I | ||
*8. Places bypass switch on the breaker at Place the NormaVBypass switch for USS 1B2 for RBCCW pump 1-2 to the RBCCW pump 1-2 to bypass. | |||
CUE: A11 fuel zone meters at 155 TAF. | bypass | ||
Used procedure properly according to its level of usage. COMPLETION TIME Page 4 of 5 TASK CONDITIONS: | __ position. I I CUE: RBCCW pump 1-2 normalhypass switch is in bypass. | ||
T = 0 minutes ; Reactor operating at 100% power T = 10 minutes ; Toxic atmosphere 0 | Page 3 of 5 | ||
The US has directed you to place the Remote Shutdown Panel into operation in accordance with procedure 346, Section 7, Operation of the Remote and Local Shutdown Panels. | |||
Page 5 of 5 AmerGem An ExelonlBritish Energy Company | PERFORMANCE CHECKLIST STANDARD INITIAL 1 SATKINSAT l | ||
Before you start, I will state the task conditions and initiating cues and fully answer any questions. | 1 "9. Places train "A" and train "B" to the alternate position. I Insert keys and rotate Train "A"and Train "B" transfer switches to "Alternate". I CUE: Red "On" status lights lit for "B" 460V SWGR Room and "A/B" battery room fans after two seconds UPON REQUEST: | ||
To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence. Peer checking will not be provided during the performance of required tasks. | V-14-35 indicates open (red) | ||
NOTE: Directions are only required once in a given JPM session. Comments I Page 1 of 5 JPM 286.04 REFERENCE SECTION TASK CONDITIONS | V-11-34 indicates closed (green) n | ||
/ 10. Confirms all recirc pumps tripped. | |||
I Performance met by prereq of "All actions of ABN 3200.30 met". I CUE: If requested by operator, evaluator reports as EO all recirc pump breakers verified open in 4160V switchgear room. | |||
I I | |||
* 11. | |||
I Activates RSP fuel zone level. Place both fuel zone level On/Off switches to "On". | |||
CUE: A11 fuel zone meters at 155 TAF. | |||
1 12. Used procedure properly. | |||
I Used procedure properly according to its I I level of usage. | |||
COMPLETION TIME Page 4 of 5 | |||
TASK CONDITIONS: | |||
T = 0 minutes ;Reactor operating at 100%power T = 10 minutes ;Toxic atmosphere 0 Control Room evacuated and all required and desired actions have been performed per ABN 3200.30 "B" Isolation condenser is in service 0 "B" CRD pump operating 0 V-11-34 is closed 0 V-14-35 is open INITIATING CUES: | |||
Toxic atmosphere has caused an evacuation of the control room. The US has directed you to place the Remote Shutdown Panel into operation in accordance with procedure 346, Section 7, Operation of the Remote and Local Shutdown Panels. | |||
Page 5 of 5 | |||
JOB PERFORMANCE AmerGem MEASURE An ExelonlBritish Energy Company 286.04 Title: Lineup Fire Protection to the Core Spray System Task: Lineup Fire Protection to the Core Spray System 2860401403 2860404404 KA# 209001 G 009 I RATING: - | |||
RO 3.9 - | |||
SRO 3.7 Validation Time I 6 minutes I Time Critical I I No Name Social Security Number DIRECTIONS TO TRAINEE: | |||
Before you start, I will state the task conditions and initiating cues and fully answer any questions. To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence. Peer checking will not be provided during the performance of required tasks. | |||
NOTE: Directions are only required once in a given JPM session. | |||
Comments I Page 1 of 5 | |||
JPM 286.04 REFERENCE SECTION TASK CONDITIONS: | |||
Reactor scrammed Both Core Spray Main pumps failed LOCA in progress RPV level 60" GENERAL TOOLS AND EQUIPMENT: | |||
None Optional: Plant radio GENERAL | None Optional: Plant radio GENERAL | ||
==REFERENCES:== | ==REFERENCES:== | ||
EMG 3200.01 B, RPV Control with ATWS, Rev. | EMG 3200.01 B, RPV Control with ATWS, Rev. 12 Support Proc. 20, Low Pressure Injection During An ATWS, Section 3.3, Rev. 12 L | ||
12 Support Proc. 20, Low Pressure Injection During An ATWS, Section 3.3, Rev. 12 L TASK STANDARD: Core spray system 1 injecting into the core with fire water CRITICAL ELEMENTS: | TASK STANDARD: | ||
(*) 4&9 INITIATING CUES: The FS/US has directed you to line up fire water to Core Spray System 1 per Support Procedure | Core spray system 1 injecting into the core with fire water CRITICAL ELEMENTS: (*) | ||
4&9 INITIATING CUES: | |||
Procedure | The FS/US has directed you to line up fire water to Core Spray System 1 per Support Procedure 20. | ||
: | Page 2 of 5 | ||
I I CUE: Control Room reports Core Spray System 1 pumps stopped. I I 3. Place Core Spray System 1 Main Pump control switches in Pull-to-Lock position. | |||
JPM 286.04 PERFORMANCE SECTION L | |||
I I 5. Confirm running all Diesel Communicates with Control Room to Fire Pumps by placing their control switches in MANUAL running. position (1 3R). | , STARTTIME PERFORMANCE CHECKLIST STANDARD INITIAL SAT/UNSAT | ||
: 6. Confirms open Core Spray 1 discharge valves V-20-12 and either V-20-15 or V 40. | : 1. Obtain controlled copy of Obtain controlled copy of Support procedure. Procedure 20. | ||
: 2. Confirms stopped the Core Communicates with Control Room to Spray Main and Booster confirm all Core Spray System 1 Pumps in Core Spray pumps stopped. | |||
System 1. | |||
CUE: Upon request the evaluator | I I CUE: Control Room reports Core Spray System 1 pumps stopped. | ||
I I | |||
. | : 3. Place Core Spray System 1 Communicates with Control Room to Main Pump control switches confirm Core Spray System 1 Main in Pull-to-Lock position. Pumps in Pull-to Lock. | ||
I Communicates with Control Room to close suction valves V-20-32 and V 3. 2losed" indicating lights for V-20-32 and V-20-3. I Opens valve V-20-83 locally, adjacent to V-20-91, at the North side of reactor {stem. I Used procedure properly according to its level of usage. COMPLETION TIME L Page 4 of 5 TASK | I I CUE: Control Room reports Core Spray System 1 Main Pumps in Pull-to- Lock. | ||
I | |||
3 minutes I No Time Critical: | *4. Closes telltale drain valve Closes handwheel for V-20-91 located V-20-91. on North side of reactor building 23'. | ||
No | I I CUE: V-20-91 closed. | ||
NOTE: Directions are only required once in a given JPM session. "II Comments 1 Of5 | I I | ||
INITIATING CUES: As the US I am directing you to perform Support Procedure 17, Termination and Prevention of Injection. | : 5. Confirm running all Diesel Communicates with Control Room to Fire Pumps by placing their confirm all Diesel Fire Pumps are control switches in MANUAL running. | ||
GENERAL TOOLS AND EQUIPMENT: GENERAL | position (1 3R). | ||
I I CUE: Control Room reports that both Diesel Fire Pumps running. | |||
Page 3 of 5 | |||
JPM 286.04 PERFORMANCE CHECKLIST STANDARD INITIAL SAT/UNSAT | |||
: 6. Confirms open Core Spray Confirms valves open locally, 1 discharge valves V-20-12 Rx Bldg. 75' elev. OR communicates and either V-20-15 or V with Control Room to confirm | |||
: 40. discharge valves V-20-12 and either V-20-15 or V-20-40 are open. | |||
CUE: Upon request the evaluator \n I provide the following: | |||
V-20-12 and V-20-15 (or V-2 .40) open. | |||
I | |||
: 7. Confirms closed test Confirms valve closed locally, discharge valve V-20-27. Rx Bldg. 75' elev. OR communcates with Control Room to confirm test discharge valve V-20-27 is closed. | |||
I CUE: Upon request the evaluator H I provide the following: | |||
V-20-27 closed. | |||
I | |||
: 8. Closes Core Spray 1 Communicates with Control Room to suction valve V-20-32 and V- close suction valves V-20-32 and V 20-3 3. | |||
CUE: Control Room reports Green 2losed" indicating lights for V-20-32 and V-20-3. | |||
I | |||
*9. Throttle open V-20-83, Fire Opens valve V-20-83 locally, adjacent Water Supply valve. to V-20-91, at the North side of reactor CUE: Flow noise is heard from the {stem. | |||
(V-20-83 open) | |||
I | |||
: 10. Used procedure properly. Used procedure properly according to its level of usage. | |||
COMPLETION TIME L | |||
Page 4 of 5 | |||
TASK CONDIT10NS: | |||
Reactor scrammed Both Core Spray Main pumps failed LOCA in progress RPV level 60" INITIATING CUES: | |||
The FS/US has directed you to line up fire water to Core Spray System 1 per Support I | |||
Procedure 20. | |||
1 1 I | |||
Page 5 of 5 | |||
AmerGen, An ExelontBnhsh Energy Company Title: TERMINATION AND PREVENTION OF INJECTION Task: ENTER AND CONTROL RPV LEVEL, PRESSURE AND 2000501441 POWER AS DIRECTED BY EMG-3200.01B, "RPV CONTROL-With ATWS KA# 295037 EA2.02 I RATING: SRO 4.2 RO 4.1 Validation Time: 3 minutes I I | |||
No I Time Critical: No Name Social Security Number I | |||
DIRECTIONS TO TRAINEE: | |||
Before you start, I will state the task conditions and initiating cues and fully answer any questions. To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence. | |||
NOTE: Directions are only required once in a given JPM session. | |||
"II Comments 1 Of5 | |||
JPM 200.00Q Rev. 00 REFERENCE SECTION L | |||
TASK CONDITIONS: | |||
The plant is in an ATWOS condition at approximately 40% power. | |||
RPV Control w/ ATWOS has been entered. | |||
All efforts to insert control rods have been unsuccessful Support Procedure 16 has been completed bypassing the LO-LO Water Level Interlocks. | |||
INITIATING CUES: | |||
As the US I am directing you to perform Support Procedure 17, Termination and Prevention of Injection. | |||
GENERAL TOOLS AND EQUIPMENT: | |||
GENERAL | |||
==REFERENCES:== | ==REFERENCES:== | ||
3upport Procedure 17, "Termination and Prevention of Injection" - revision 12 b TASK STANDARD: | 3upport Procedure 17, "Termination and Prevention of Injection" - revision 12 b | ||
TASK STANDARD: | |||
All Core Spray Main Pumps in Pull-to-Lock, All FW pumps off, one (1) Condensate pump running, all Feed Reg. Valves closed. | All Core Spray Main Pumps in Pull-to-Lock, All FW pumps off, one (1) Condensate pump running, all Feed Reg. Valves closed. | ||
CRITICAL ELEMENTS: | CRITICAL ELEMENTS: (*) | ||
(*) 7, 8, 9, and 10. 2 of 5 JPM 200.00Q Rev. 00 TASK CONDITIONS: | 7, 8, 9, and 10. | ||
i/ 0 The plant is in an ATWOS condition at approximately 40% power. RPV Control w/ ATWOS has been entered. All efforts to insert control rods have been unsuccessful 0 Support Procedure 16 has been completed bypassing the LO-LO Water Level Interlocks. | 2 of 5 | ||
INITIATING CUES: As the US I am directing you to perform Support Procedure 17, Termination and Prevention of Injection. | |||
PERFORMANCE SECTION START TIME PERFORMANCE CHECKLIST STANDARD INITIAL 1. Obtain controlled copy of Obtains controlled copy of Support 2. Verifies all prerequisites are Verifies all prerequisites are met | JPM 200.00Q Rev. 00 TASK CONDITIONS: | ||
i/ | |||
' PERFORMANCE CHECKLIST | 0 The plant is in an ATWOS condition at approximately 40% power. | ||
*7. Confirms all Core spray | RPV Control w/ ATWOS has been entered. | ||
All efforts to insert control rods have been unsuccessful 0 Support Procedure 16 has been completed bypassing the LO-LO Water Level Interlocks. | |||
INITIATING CUES: | |||
Used procedure properly according to its level of usage. | As the US I am directing you to perform Support Procedure 17, Termination and Prevention of Injection. | ||
IC-65 SETUP 1. Run Simprob.cae and ATWS.CAE 2. Complete Support Procedure 16 to bypass Lo-Lo interlocks. | PERFORMANCE SECTION START TIME PERFORMANCE CHECKLIST STANDARD INITIAL SATNNSAT | ||
: 1. Obtain controlled copy of Obtains controlled copy of Support procedure Procedure 17. | |||
NONE Command Files: | : 2. Verifies all prerequisites are Verifies all prerequisites are met 1 AI met I | ||
~ | -1 I | ||
INITIATING CUES: As the US I am directing you to perform Support Procedure 17, Termination and Prevention of Injection. | Prerequisites have been met. | ||
CUE: | |||
: 3. Informs operator controlling Informs operator controlling pressure that reactor pressure of the ICs will initiate when level reaches impending IC initiation. LO-LO level | |||
: 4. Overrides all core spray Depresses OVERRIDE switches for all initiation logic. sensors that are lit or unlit and depresses all ACTUATED switches whether lit or unlit. | |||
: 5. Confirms all Core Spray Confirms all Core Spray Parallel Isolation Parallel Isolation Valves Valves closed by observing GREEN closed. CLOSED indicating lights for V-20-15, 40, 21 & 41 lit. | |||
1 6. Confirms all Core Spray Booster Pumps tripped. | |||
Confirms all Core Spray Booster Pumps tripped by observing the GREEN OFF indicating lights lit. | |||
3 of 5 | |||
JPM 200.00Q Rev. 00 | |||
' PERFORMANCE CHECKLIST STANDARD INITIAL SATNNSAT | |||
*7. Confirms all Core spray Places the control switches for all Core Main Pump control switches Spray Main Pumps into the PULL-TO-tin PULL-TO-LOCK LOCK position. | |||
*8. Trips all operating Trips all operating Feedwater pumps by Feedwater pumps. placing their respective control switches to the STOP position 23 returning to the NORMAL position. | |||
*9. Confirms one (1) Trips two (2) of the running condensate Condensate pump running. pumps leaving one (1) running. | |||
*lo. Place all Individual FRV Places all Individual FRV controllers in controllers in MAN position MAN position and closes all FRV's & | |||
and closes all FRV's. LFRV's. | |||
: 11. Reports to US that SP 1 7 is Reports to US that SP 17 is complete. | |||
Used procedure properly according to its level of usage. | |||
COMPLETION TIME 4 of 5 | |||
JPM 200.00Q Rev. 00 SIMULATOR SETUP Initial Condition(s): IC-65 SETUP | |||
: 1. Run Simprob.cae and ATWS.CAE | |||
: 2. Complete Support Procedure 16 to bypass Lo-Lo interlocks. | |||
3. | |||
Malfunctions: | |||
NONE Command Files: | |||
SIMPROB.CAE ATW S.CAE c | |||
5 of 5 | |||
TASK CONDITIONS: | |||
~ | |||
0 The plant is in an ATWOS condition at approximately 40% power. | |||
0 RPV Control w/ ATWOS has been entered. | |||
~ | |||
0 All efforts to insert control rods have been unsuccessful 0 Support Procedure 16 has been completed bypassing the LO-LO Water Level Interlocks. | |||
INITIATING CUES: | |||
As the US I am directing you to perform Support Procedure 17, Termination and Prevention of Injection. | |||
6 of 5}} | 6 of 5}} |
Revision as of 01:03, 24 November 2019
ML041890344 | |
Person / Time | |
---|---|
Site: | Oyster Creek |
Issue date: | 04/19/2004 |
From: | Hackenberg J AmerGen Energy Co |
To: | Conte R NRC/RGN-I/DRS/OSB |
Conte R | |
References | |
-RFPFR, 50-219/04-301, ES-301, ES-301-2 50-219/04-301 | |
Download: ML041890344 (66) | |
Text
ES-301 Control Room Systems and Facility Walk-Through Test Outline Form ES-301-2 Facility: Oyster Creek NRC Date of Examination: Week of April 19, 2004 Exam Level (circle one): RO / SRO(I) / SRO(U) Operating Test No.: 2004NRC Control Room Systems (8 for RO, 7 for SRO-I, 2 or 3 for SRO-U)
System / JPM Title I Type Code*
I Function Safety
- a. Stm&yTQu ia Gontrol (SLC) / 21 1.01
-pump 0 1
- c. Recirculation system / Respond to a tripped recirc pump with 5 202.1 0 4 operating (Alternate Path - Discharge Valve will not close) Last NRC D, s, A
- d. Primary Containment / Bypass Isolation Interlock for Torus Vent 223.01 5 valves and prepare to vent the Torus D, s
- e. AC Electrical /Transfer Bus 1A from Auxiliary Transformer to 262.07 6 Start-up Transformer D, s, L f . Control Room Ventilation / Purge Control Room using Control Room HVAC System
- g. Standby Gas Treatment system (SGTS) / Shutdown SGTS after 261.03 9 Auto Initiation (Alternate Path - normal fan does not start) N, S, A
- h. For RO - Recirculation system / Conduct Recirc Pump Trip Logic 202.1 1 functional test D, S
- a. Fire Water system / Line-up Fire Water to the Core Spray System 286.04 2
[PRA related] M,R, L Emergency
- b. CRD/lnitiate the Remote Shutdown Panel on Control Room 308.01 .PPI Evacuation D, R, L Emergency
- c. TBCCW/Line-up TBCCW during SBO 274.01 8 D, R, L Abnormal
- Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol room, (S)imulator, (L)ow-Power, (R)CA
JOB PERFORMANCE AmerGen,. MEASURE An ExelonlBritish Energy Company 218.01 Title: Close a stuck open EMRV Task: Diagnose and recover from a stuck open EMRV 2 18040100 1 KA# 218000 A4.01 RATING: RO - 4.4 SRO - 4.4 Validation Time I 13 minutes I Time Critical I NO Name Social Security Number I
DIRECTIONS TO TRAINEE:
Before you start, I will state the task conditions and initiating cues and fully answer any questions. To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence. Peer checking will not be provided during the performance of required tasks.
NOTE: Directions are only required once in a given JPM session.
Comments Date Page 1 of 6
REFERENCE SECTION:
b TASK CONDITIONS:
Reactor power loo%, all system operating properly.
I GENERAL TOOLS AND EQUIPMENT:
None GENERAL
REFERENCES:
Procedure, ABN-40, Stuck Open EMRV, Rev. 1 TASK STANDARD:
"A" EMRV NormaVDisable switch in "disable" , valve closed.
b CRITICAL ELEMENTS: (*)
6
\--
Page 2 of 6
JPM 218.01 PERFORMANCE SECTION:
TASK CONDITIONS:
Reactor Power 1OO%, all systems operating properly.
INITIATING CUES:
Your task will be associated w i t h c n; you are expected to respond to any further alarms that are received.
START TIME -
PERFORMANCE CHECKLIST STANDARD I I INITIAL SATNNSAT CI: When directed by the Floor Instructor, activate MAL-NSS025A, 100%
I I
- 2. Obtains controlled copy of Obtains ABN 40 ABN 40 as directed by RAP
- 3. Places Feed water Control Depresses MANUAL butt n on M ster in manual. Level Controller 6 I
4 4 1' '
4&
- h q Lcyl !l 0
- 4. Attempts to close "A" EMRV On 1F/2F, places "A" Auto Depress Valve using ADS switch switch in "Off" observes that valve is still open.
/-
- 5. Cycles switch off to Manual Cycles "A" EMRV control switch to Manual to off 3 times. to OFF 3 times. Observes valve is still I
open. I CUE: (Cf) Upon request discharge temperature is 300 *Fa Once the Disable Alarm comes in DELETE MAL-NSSO25A I I
- 6. Places "A" EMRV Places "A" NormaVDisable switch in NormaVDisable switch "Disable" at rear of 1F/2F Observes that " A in "Disable" I EMRV is closed. I CUE: (CI) Upon request discharge temperature is 290 QFand decreasing Page 3 of 6
JPM 218.01 PERFORMANCE CHECKLIST STANDARD
- 6. Used procedure properly. Used procedure properly according to its level of usage.
COMPLETION TIME Page 4 of 6
JPM 218.01 SIMULATOR SETUP Initial Condition(s): 100% Reactor Power Setup:
- 1. initialize to any 100% power IC
- 2. RUN file SIMPROB.CAE Malfunctions:
None Remotes:
None Overrides:
SWI-ADS001C, ON Computer Aided Exercises:
SIMPROB-CAE Page 5 of 6
TASK CONDITIONS:
Reactor Power 100%
All systems operating satisfactory INITIATING CUES:
Your task will be associated with ADS/EMRV System operation; you are expected to respond to any further alarms that are received.
Page 6 of 6
AmerGen,. JOB PERFORMANCE MEASURE An Exelon/British Energy Company 21 1.01 Title: Manual Initiation of the Standby Liquid Control System Task: Inject liquid poison into the reactor vessel using the Liquid Poison 21 10501401 System KA# 21 1000 A4.02 RATING: RO - 4.2 SRO - 4.2 Validation Time I 8 minutes I Time Critical I
I I
NO Name Social Security Number I I DIRECTIONS TO TRAINEE:
Before you start, I will state the task conditions and initiating cues and fully answer any questions. To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence. Peer checking will not be provided during the performance of required tasks.
NOTE: Directions are only required once in a given JPM session.
Comments
JPM 21 1.01 REFERENCE SECTION:
u TASK CONDITIONS:
A failure to fully scram from 100% Rx power has occurred Reactor power is -45%
All recirc pumps have tripped All methods to insert control rods have failed Pressure is being maintained 850-1000 psig using Main Turbine Power oscillations are occurring GENERAL TOOLS AND EQUIPMENT:
Key for SLC Keylock switch [PA22351 GENERAL
REFERENCES:
EMG-3200.01B, RPV Control with ATWS, Rev. 12 Support Procedure 22, Initiating the Liquid Poison System, u
TASK STANDARD:
Liquid poison entering reactor CRITICAL ELEMENTS: (*)
4 INIT1AT1NG CUES:
As Unit Supervisor, I am directing you to inject liquid poison into the reactor with Standby Liquid Control System 1,
_ _ _ _ _ ~ ~
JPM 21 1.01 PERFORMANCE SECTION:
START TIME PERFORMANCE CHECKLIST STANDARD INITIAL SATNNSAT
- 1. Obtains controlled copy of Support Procedure 22 obtained procedure I NOTE: When the keylock switch is placed in Sys 1 in the following stel NPO2A will fail to start. [CLF PMP SLC1, shaft break, opt. 11
- 2. Starts poison pump NP02A Rotates STANDBY LIQUID CONTROL keylock switch on 4F to Fire Sys 1 position
- 3. Verify flow to reactor Verifies the following for system #1:
. "PUMP ON" light is lit (Panel 4F)
. Squib for Sys 1 light is lit (Panel 4F)
. Pump Disch Press > Reactor Pressure
~ (Panel 4F) (pressure will not develop)
. "FLOW ON" alarm NOT lit (G-1-b)
. "SQUIB VALVE O P m a l a r m lit (G-2-b)
- 4. Responds to failure of Places STANDBY LIQUID CONTROL pump NP02A to start keylock switch on 4F to Fire Sys 2 position
- 5. Verify flow to reactor Verifies the following for system #2:
. "PUMP ON" light is lit (Panel 4F) (System 1 light goes out & System 2 light goes on)
. Squib for Sys 2 light is lit (Panel 4F)
. Pump Disch Press > Reactor Pressure (Panel 4F)
. "FLOW ON" alarm lit (G-1-b)
. "SQUIB VALVE OPEN" alarm lit (G-2-b)
I COMPLETION TIME
JPM 21 1.01 SIMULATOR SETUP Initial Condition(s): IC-104 Includes the following:
Init to IC 94 Not necessary to insert SIMPROB BYPASS Lo-Lo MSlV Closure using jumpers (IAW SP-16) [V-6-395 does not have to be byy Insert File JPM211 Notes:
file will freeze the simulator after 140 seconds go back to run 0 reduce recirc flow to minimum (11.4), then trip all the recirc pumps place the mode switch to SHUTDOWN simulator is now ready for jpm use Malfunctions: IC preset Component Level Failures: IC Preset u CLF PMP SLC1, shaft break, Option 1 preinserted (Fails 'A' SLC Pump)
Instructor Overrides: IC preset Local Operator Actions: IC preset Computer Aided Exercises: None
1 TASK CONDITIONS:
A failure to fully scram from 100% Rx power has occurred Reactor power is -45%
All recirc pumps have tripped All methods to insert control rods have failed Pressure is being maintained 850-1000 psig using Main Turbine Power oscillations are occurring 1 INITIATING CUES:
As Unit Supervisor, I am directing you to inject liquid poison into the reactor with Standby Liquid Control System 1 using Support Procedure 22.
AmerGen,, JOB PERFORMANCE MEASURE An Exelon/British Energy Company 202.10 Title: Respond to a Tripped Recirc Pump with 5 Recirc Pumps Operating (Alternate Path)
Task: Respond to a Tripped Recirc Pump with 5 Recirc Pumps Operating I 2020401404 I RO - 3.6 KA# 202001 A2.03 Validation Time - 15 min I
RATING:
Alternate Path - Yes I I
Time Critical 1
I SRO- 3.7 NO Name Social Security Number I I DIRECTIONS TO TRAINEE:
Before you start, I will state the task conditions and initiating cues and fully answer any questions. To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence. Peer checking will not be provided during the performance of required tasks.
NOTE: Directions are only required once in a given JPM session.
Comments I
.
- Date 1 .
JPM 202.10 Rev. 1 REFERENCE SECTION:
i/
TASK CONDITIONS:
Reactor power 1OO%, all systems operating properly.
GENERAL TOOLS AND EQUIPMENT:
None GENERAL
REFERENCES:
ABN-02, Recirculation System Failures, Rev. 0 TASK STANDARD:
Four pumps running in automatic, the other loop idle.
i, CRITICAL ELEMENTS: (*)
Page 2 of 7
JPM 202.10 Rev. 1 PERFORMANCE SECTION:
b TASK CONDITIONS:
Reactor power 1OO%, all system operating properly.
n; you are now to respond to any f\ re received.
1 n START TIME I I U
PERFORMANCE CHECKLIST STANDARD I
CI: PREINSERT CLF VL\ NSS020 option 6 conditional on R3754.LE.0.2 if not already done.
INSERT MALF RFCO( E when instructed by the FI.
I
- 1. Confirms discharge At Panel 3F, confirms discharge bypass bypass valve for "E" loop valve for "E" loop open.
open CI: MONV R3754 to verii that the discharge valve mechanicallyseizes at approx. 0.2. IF the conditions fails to take then go ahead and seize the wrlve before it fully closes using CLF VLV JSS020, Mech Siezure.
I 4 2. Closes "E" pump discharge valve At Panel 3F, takes "E" recirculation pump discharge valve control switch to close.
- 3. Obtains controlled copy of Procedure ABN-2, Section 3.1.2 obtained.
procedure 4 4 Determines Discharge Valve will not close At Panel 3F, Determines Discharge Valve will not close.
L Page 3 of 7
JPM 202.10 Rev.
-
PERFORMANCE CHECKLIST STANDARD I INITIAL SAT/UNSAT
- 5 Closes "E" pump At Panel 3F, takes "E" recirculation pump suction valve suction valve control switch to close.
I CUE: (FI) Acknowledge as the US that a plant shutdown is required.
- 6. Dispatches Electrician. Dispatches/directs Electrician to attempt to close the discharge valve IAW attachment ABN-2-1.
- 7. Determines loop Determines that the loop can either be configuration placed in an "IDLE" or "ISOLATED" I
condition. I CUE:(FI) As US, direct operator to place the loop in an "IDLE"configuration.
I I
- 8. Opens the suction Re-opens the suction valve by taking its valve control switch to the OPEN position.
- 9. Maintain reactor power At Panels 3F and 4F, verifies below rod below rod block setpoint block on power operation curve.
- 10. Maintains RPV level 155 At Panel 5F/6F, ensures FWC system to 165" maintaining level.
- 11. Monitor Nls for At Panel 4F, monitors APRMs.
indication of power oscillation
- 12. Verifies did not enter At Panels 3F and 4F, monitors APRMs and exclusion region of the total recirc flow; verifies not in exclusion power operation curve region of power operation curve.
Page 4 of 7
Rev. 1 FORMANCE CHECKLIST STANDARD INITIAL SATNNSAT
- 13. Refer to Tech Spec for Uses Tech Spec Sections 3.3.F to limitations on continued determine no limitation or informs Shift plant operations Supervisor to refer to TS 3.3.F, 3.1 O.A.
- 14. Confirms one of the Selects an operating loop for one of the recirc pump suction temp RECIRC PUMP SUCTION TEMPS.
indicators on 3F is selected to an operating loop CUE: (FI) Acknowledge hat no limitations exist and that another 01 brator will maintain power at ts present level.
- 15. Monitors for Fuel Monitors Off-Gas, MSL Radiation & Rx Element Failure. Coolant Activity.
- 16. Notify system dispatcher (No notifications because no limitations) of power limitations
- 17. Notifies Chemistry if Notifies Chemistry if power changed by power changed by 289.5 289.5 MWth.
MWth.
Notifies designated Rx Notifies Rx engineer.
engineer CUE: (FI) Another operi or will perform diagnosis
- 18. Used procedure properly. Used procedure properly according to its level of usaae.
COMPLETION TIME Page 5 of 7
JPM 202.10 u
SIMULATOR SETUP Initial Condition(s): IC-65, 100% Reactor Power
- 1. Initialize to IC 65 and perform switch check
- 2. Enter file SIMPROB
- 3. Execute VLV-NSS020, Mech Siezure. conditional on R3754 .LE. 0.2.
Malfunctions:
MAL-RFCOO1E Mech Siezure Component Level Failures:
VLV-NSS020, Mech Siezure. conditional on R3754.LE.0.2 Command Files:
SIMPROB c
Page 6 of 7
u TASK CONDITIONS:
Reactor power 1OO%, all systems operating properly.
INITIATING CUE:
Your task will be associated with Recirculation System operation; you are now to respond to any further alarms that are received.
Page 7 of 7
JOB PERFORMANCE AmerGen - SM MEASURE 274.01 An Exelon/British Energy Company Title: Line up the TBCCW Heat Exchangers to Service Water Following a Station Blackout Task: Perform Lineups of the TBCCW system 1 2740104001 KA# RATING:
Validation Time 10 minutes Time Critical No Name Social Security Number I I DIRECTIONS TO TRANEE:
Before you start, I will state the task conditions and initiating cues and fully answer any questions. To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence. Peer checking will not be provided during the performance of required tasks.
NOTE: Directions are only required once in a given JPM session.
Comments Date Page 1 of 4
JPM 274.01 Rev. 1 TASK CONDITIONS:
- Reactor Scram
- Loss of all Off-site and On-site AC Electrical Power.
- Breakers USlT and US2T are racked in.
GENERAL TOOLS AND EQUIPMENT:
MB1 key Radio Flashlight GENERAL
REFERENCES:
Station Procedure, ABN-37, STATION BLACKOUT, Rev 0
- TASK STANDARD:
TBCCW valves lined up per ABN-37, Attachment -3, step 4.0 CRITICAL ELEMENTS: (*)
2,3,4 & 5 INITIATING CUES:
A Station Blackout has occurred, (total loss of off-site and on-site AC electrical power). The SM/US has directed you to line up TBCCW valves for TBCCW heat exchanger 1-1per ABN 3200.37, Attachment -3, Step 4.0.
Page 2 of 4
____~
JPM 274.01 Rev. 1 START TIME -
PERFORMANCE CHECKLIST STANDARD INITIAL SAT/UNSAT
- 1. Obtain controlled copy of Obtain controlled copy of kBW'37 procedure. Attachment 444 5 "2. Close V-3-58. Closes V-3-58 in the Turbine Bldg.
I basement. I CUE: V-3-58 closed.
I I "3. Open V-3-59.
I I
Opens V-3-59 in the Turbine Bldg.
basement . I C!uE: V-3-59 open.
I I "4. Close V-3-76 and V-3-77. Closes V-3-76 and V-3-77 in the I
Turbine Bldg. - basement. I CUE: V-3-76 and V-3-77 are closed.
I I "5. Open V-3-76 one turn open. Throttles V-3-76 to a position not fully closed in the Turbine Bldg.
basement.
CUE: V-3-76 one turn open.
I I
- 6. Confirm V-3-74 is fully open. Opens V-3-74 in the Turbine Bldg.
I basement. I CUE: V-3-74 is full open.
- 7. Used procedure properly. Used procedure properly according to its level of usage.
COMPLETION TIME Page 3 of 4
TASK CONDITIONS:
- Reactor Scram
- Loss of all Off-site and On-site AC Electrical Power.
- Breakers USlT and US2T are racked in.
INITIATING CUES:
A Station Blackout has occurred, (total loss of off-site and on-site AC electrical power). The SM/US has directed you to line up TBCCW valves for TBCCW heat exchanger 1-1per ABN-37,Attachment 3, Step 4.0.
Page 2 of 4
AmerGen,, JOB PERFORMANCE MEASURE An Exelon/British Energy Company 223.01 Title: Bypass Isolation Interlock for Torus Vent Valves Task: Bypass Isolation Interlock on Drywell and Torus Vent and Purge 2230501501 Valve KA# 295024 EA1.14 I RAT1NG: RO - 3.4 SRO- 3.5 Validation Time 13 min I I
Alternate Path No I I
Time Critical I I
NO Name Social Security Number 1 I DIRECTIONS TO TRAINEE:
Before you start, I will state the task conditions and initiating cues and fully answer any questions. To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence. Peer checking will not be provided during the performance of required tasks.
NOTE: Directions are only required once in a given JPM session.
Comments 1Of7
JPM 223.01
'EFERENCE SECTION:
b TASK CONDITIONS:
Reactor scrammed due to a LOCA CHRRMS reading greater than 20,000 WHR All automatic actions due to LOCA have occurred GENERAL TOOLS AND EQUIPMENT:
EOP BYPASS PLUGS GENERAL
REFERENCES:
EMG-3200.02, Primary Containment Control, Rev. 16 3~ppot-tProcedure 32 L
TASK STANDARD:
Isolation for V-28-18 and V-28-47 have been bypassed CRITICAL ELEMENTS: (*)
11, 12, 13, 14 2 of 7
-
JPM 223.01 "ERFORMANCE SECTION:
Lv TASK CONDITIONS:
Reactor scrammed due to a LOCA CHRRMS reading greater than 20,000 WHR All automatic actions due to LOCA have occurred INITIATING CUES:
As the US I am directing you to bypass lorus Vent Isolation- ' r V-28-18 and V-28-47 using Support Procedure 32. Inform me when ready to vent.
START TIME PERFORMANCE CHECKLIST 1 Obtain controlled copy STANDARD Support Procedure 32 obtained 1 INITIAL SAT/
UNSAT of procedure Verifies prerequisites I
u I
CUE: Prerequisites are c
- 3. Verifies Torus level is below 348 in.
At Panel 1F/2F, verifies Torus water level is below 348 in.
I
' g 4. Evacuates personnel I
- Sound the Reactor Building-from the Reactor Building Evacuation f Alarm
- Announces: "Primary Containment Venting will commence in approximately 5 minutes. All personnel evacuate the Reactor Building immediately."
- 5. Starts SGTS
-$r At Panel 11R, selects a SGTS fan and places it control switch in HAND.
3 of 7
JPM 223.01 PERFORMANCE STANDARD INITIAL CHECKLIST SAT/
UNSAT y 6. Closes V-28-48 At Panel 11R, places the SGTS crosstie valve V-28-48 in the CLOSED position
- 7. Confirms Reactor Bldg. At Panel 11R, confirms the Reactor Supply Fans secured Bldg. Supply fans are secured
- 8. Confirms Reactor Bldg. At Panel 11R, confirms the Reactor Exhaust Fans secured Bldg. Exhaust fans are secured
- 9. Confirm that the Verifies 4F "Reactor Mode Selector "Reactor Mode Selector Switch" is NOT in "Run" Switch" is NOT in the "Run" position 1O.Obtains bypass plug Obtains one(1) bypass plug from the
- EOP station in the control room.
- 11 Inserts bypass plug Inserts bypass plug in 1OXF:
in 1OXF. - Opens EOP BYPASS PLUGS panel (rear of 1OXF)
- Inserts bypass plug in position BP5.
- 12 Inserts bypass plug Inserts bypass plug in 11R:
in 11R. - Opens EOP BYPASS PLUGS panel (rear of 11R)
- Removes bypass plug in position BP4
- Inserts bypass plug in position BP1.
"13 Places the TORUS/ At Panel 11F, places the DW ISOLATION VALVE TORUS/DRYWELL ISOLATION BYPASS keylock switch VALVE BYPASS PERMISSIVE in the TORUS position keylock switch in the TORUS position.
4 of 7
JPM 223.01 PERFORMANCE STANDARD INITIAL CHECKLIST SAT/
Y UNSAT
- 14 Places the DW/TORUS VENT & At Panel 11F , places the PURGE ISOL HI DRYWELL/TORUS VENT & PURGE RAD BYPASS ISOLATION HI RAD BYP Keylock keylock switch switches in BYPASS channel 1 and 2 in BYPASS
- 15. Informs the US, Torus Tells the US (Evaluator) that the is ready to vent torus is ready to vent via the torus vent valves.
I 2 when informed that the Torus is ready for venting.
- 6. Used procedure Used procedure properly according to properly. its level of usage.
COMPLETION TIME 5 of 7
JPM 223.01 u
SIMULATOR SETUP Initial Condition(s): IC-65, 100% Rx PWR Setup
- 1. Digital Feed and Recirc Flow control
- 2. Set Master Recirc flow controller to 44.44 cycles
- 3. Set Feedwater master controller to 163.5 inches, and in "Auto" Place the "A/B/C" MFRV and " N C LFRV in "AUTO"
- 2. Initialize to IC 65 and perform switch check
- 3. Run SIMPROBxae
- 4. Go to "RUN" and execute MAL-NSS004A, 1OO%, ACT
- 5. Run JPM22301.CAE
- 6. Take mode switch to shutdown
- 7. Open all EMRV's
- 8. Turn on Fuel Zones
- 9. "FREEZE" simulator when reactor pressure decreases to less than 130 psig Malfunctions:
MAL-NSS004A, 100%
Overrides:
SWI-NSS066V, ON SWI-NSS068V, ON Remotes:
Computer Aided Exercises:
SIMPROB.CAE JPM22301.CAE 6 of 7
TASK CONDITIONS:
Reactor scrammed due to a LOCA CHRRMS reading greater than 20,000 WHR All automatic actions due to LOCA have occurred INITIATING CUES:
As the US I am directing you to bypass Torus Vent Isolation logic for V-28-18 and V-28-47 using Support Procedure 32. Inform me when ready to vent.
7 of 7
JOB PERFORMANCE AmerGensM MEASURE An Exelon/British Energy Company 262.07 Title: Manual Transfer of the 4160 VAC Bus 1A from the Auxiliary Transformer to the Startup Transformer Task: Shift Station Loads between Aux. and S/U Transformers I 2620101002 KA# 262001 A4.04 RATING: RO - 3.6 SRO - 3.7 Validation Time 12 minutes Time Critical NO Name Social Securiity Number I I DIRECTIONS TO TRAINEE:
Before you start, I will state the task conditions and initiating cues and fully answer any questions. To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence. Peer checking will not be provided during the performance of required tasks.
NOTE: Directions are only required once in a given JPM session.
Comments
. .
. 4).
Date
~~
JPM 262.07 REFERENCE SECTION:
ii TASK CONDITIONS:
Plant is at 100% Power 4160V 1A main breaker needs to be removed from service GENERAL TOOLS AND EQUIPMENT:
None GENERAL
REFERENCES:
Procedure 337, 4160 Volt Electrical System, Section 3.4, Rev. 57 L
TASK STANDARD:
1A 4160-volt bus is energized from the startup transformer CRITICAL ELEMENTS: (*)
739 Page 2 of 6
PERFORMANCE SECTION:
%u INITIATING CUES:
I As the US I am directing you to transfer 4160-volt bus 1A to the startup I transformer in accordance with Ops Procedure 337.
START TIME -
PERFORMANCE CHECKLIST STANDARD 1 INITIAL SAT/UNSAT
- 1. Obtains controlled copy of Procedure 337, section 3.4 obtained procedure I
~~
- 2. Verifies all prerequisites Verifies prereqs met I
CUE:(FI) As requested, individual prerequisites not verifiable in the Control Room can be verified met, Bank 5 voltage regulator is in service.
I I
- 3. Reviews all applicable Reviews all applicable precautions and precautions and limitations limitations
- 4. Verifies 4160 volt main Verifies on panel 8F/9F red closed light is breaker 1A control switch energized with red target for breaker 1A.
is in the "Closed" position
- 5. Verifies that SU Breaker Verifies that the S1A breaker "OPEN" light S1A racked in and open. and "BREAKER UP" light located on panel 8F/9F are energized.
- 6. Verifies that the 34.5 kV Verifies red light for Bank No. 5 feed on breaker feed to bank No. 12F is energized.
5 is in the closed position.
Page 3 of 6
JPM 262.07 PERFORMANCE CHECKLIST STANDARD INITIAL SATNNSAT
- 7. Puts synchroscope At panel 8F/9F places key in S1A key into synchronizing synchronizing switch and turns to "On" switch for S1A on 8F/9F and turns on.
- 8. Verifies power is At Panel 8F/9F, verifies synchroscope is synchronized across S1A stationary and pointing at 12 o'clock with both synch lights out.
- 9. Closes S1A Place S1A control switch on 8F/9F to "Close" position. Checks the breaker closed light is energized and breaker 1A opens.
- 10. Turn synchronizing On Panel 8F/9F, Places synchronizing switch off and remove switch in Off and removes key key from 8F/9F
- 11. Matches main breaker Operates main breaker 1A to the trip targets position to match mechanical indication
- 12. Used procedure properly. Used procedure properly according to its level of usage.
COMPLETION TIME Page 4 of 6
JPM 262.07 u
SIMULATOR SETUP Initial Condition(s) : IC-65 SET-UP ACTIONS:
- 1. Digital Feed and Recirc Flow control 9 Set Master Recirc flow controller to 44.44 cycles 9 Set Feedwater master controller to 163.5 inches, and in "Auto" 9 Place the "A/B/C" MFRV and "A/C LFRV in "AUTO"
- 2. Init to IC 65 and perform switch check
- 3. File SIMPROB
- 4. FREEZE" simuIator I'
Malfunctions:
Component Level Failures:
Instructor Overrides:
Local Operator Actions:
L Monitored Variables:
Command Files:
SIMPROB Computer Aided Exercises:
Remote Control Assignments:
Page 5 of 6
TASK CONDITIONS:
Plant is 100% Power 4160V 1A main breaker needs to be removed from service INITIATING CUES:
As the US I am directing you to transfer 4160-volt bus 1A to the startup transformer in accordance with Ops Procedure 337.
Page 6 of 6
AmerGen,, JOB PERFORMANCE MEASURE An Exelon/British Enerqy
-- Company
. -
202.1 1 Title: CONDUCT RECIRC PUMP TRIP LOGIC SYS FUNCTIONAL TEST Task: CONDUCT RECIRC PUMP TRIP LOGIC SYS FUNCTIONAL TEST 2020201004 KA#202001 K1.27 RATING: RO - 4.1 SRO - 4.3 Validation Time: 20 min I Faulted: NO I
Time Critical: NO Name Social Security Number 1 I DIRECTIONS TO TRAINEE:
Before you start, I will state the task conditions and initiating cues and fully answer any questions. To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence.
NOTE: Directions are only required once in a given JPM session.
Comments:
Date:
1 Of7
~ _ _ _ _ _ _ _
JPM 202.1 1 Rev.1 REFERENCE SECTION:
_/I TASK CONDITIONS:
- Plant is at 100% power
- Division I test was complete on the last shift.
- All system operable GENERAL TOOLS AND EQUIPMENT:
Key for Division Normal - Test Keylock switch Stopwatch - Student will be expected to record control number and calibration date.
GENERAL
REFERENCES:
Recirculation Pumps Trip Circuitry Test Proc. 603.4.001, Rev. 9 TASK STANDARD:
u Division I I Surveillance completed.
CRITICAL ELEMENTS: (*)
4, 5, 6, 7, 9, 10, 11, 13, 14, 15 2 of 7
JPM 202.11 Rev.1 PERFORMANCE SECTION:
u
/ TASK CONDITIONS:
- Plant is at 100% power
- All system operable INITIATING CUES:
- As US, I am directing you to complete the Recirculation Pumps Trip Circuitry Test Proc. 603.4.001 on Division II.
START TIME PERFORMANCE CHECKLIST STANDARD INITIAL SAT/UNSAT
- 1. Obtain controlled copy of Obtains controlled copy of Proc. 603.4.001 procedure L 2. Verifies all prerequisites Verifies prerequisites met are met
- 3. Reviews all applicable Reviews precautions and limitations precautions and limitations
- 4. Places Division II in test Places Division 2 Normal - Test Keylock switch to the test position.
- Verifies TEST-II alarm (E-3-b) annunciates.
4.Tests Channel A Momentarily depresses CHAN C TRIP pushbutton switch on 3F
- Verifies ACTUATE C-Il alarm (E-1-b) annunciates.
3 of 7
JPM 202.11 Rev.1 I PERFORMANCE CHECKLIST STANDARD INITIAL SATAJNSAT L
- 6. Tests Relay 6K12AA Simultaneously momentarily depress CHAN D TRIP pushbutton switch on 3F and start stopwatch.
- Verifies ACTUATE D-ll alarm (E-2-b) annunciates.
- Verifies the Division II lamps for A, B,
& E recirculation pumps light instantly.
~~~
- 7. Times trip When Division II lamps for Recirc Pumps C
& D light then stop the stopwatch and record As-Found value.
- 8. If the As-Found value is not 10.5 +/- 0.5 seconds then adjust the relay 6K12AA.
Relay a ljustment will not be necessary.
- 9. Resets Channel C Momentarily depresses CHAN C RESET pushbutton switch on 3F
- Verifies ACTUATE C-ll alarm (E-1-b) has cleared.
- Verifies the Division II lamps for all five recirculation pumps are NOT lit.
- lo.
I Tests Relay 6K1O A A Simultaneously momentarily depress CHAN C TRIP pushbutton switch on 3F and start stopwatch.
- Verifies ACTUATE C-ll alarm (E-1-b) annunciates.
- Verifies the Division II lamps for A, B,
& E recirculation pumps light instantly.
- 11. Times trip When Division II lamps for Recirc Pumps C
& D light then stop the stopwatch and record As-Found value.
112. If the As-Found value is not 10.5 +/- 0.5 seconds then adjust the relay 6K1OAA.
4 of 7
JPM 202.1 1 Rev.1 I PERFORMANCE CHECKLIST STANDARD I
INITIAL SAT/U NSAT Relay i ljustment will not be necessary.
- 13. Resets Channel C Momentarily depresses CHAN C RESET pushbutton switch on 3F
- Verifies ACTUATE C-ll alarm (E-1-b) has cleared.
- Verifies the Division I I lamps for all five recirculation pumps are NOT lit.
- 14. Resets Channel B Momentarily depresses CHAN D RESET pushbutton switch on 3F
- Verifies ACTUATE D-ll alarm (E-2-b) has cleared.
- 15. Places Division II in Places Division II Normal - Test Keylock Normal switch to the Normal position.
- Verifies TEST II alarm (E-3-b) has cleared.
- 16. Used procedure properly. Used procedure properly according to its level of usage.
COMPLETION TIME 5 of 7
JPM 202.11 Rev.1
\/
SIMULATOR SETUP Initial Condition(s): 100% Power Malfunctions:
NONE Computer Aided Exercises:
SIMPROB.CAE 6 of 7
TASK CONDI TI0 NS:
- Plant is at 100% power
- All system operable INITIATING CUES:
- As US, I am directing you to perform Recirculation Pumps Trip Circuitry Test Proc. 603.4.001 7 of 7
JOB PERFORMANCE MEASURE An Exelon/British Energy Company 288.02 L/
Title: Purge Control Room Using Control Room HVAC System Task: Purge Control Room Using Control Room HVAC System 2880101403 KA# 2900003 A2.04 RATING: R O - 3.1 SRO- 3.3 Validation Time 15 min Alternate Path - No Time NO I I Critical I Name Social Security Number I I l DIRECTIONS TO TRAINEE:
Before you start, I will state the task conditions and initiating cues and fully answer any questions. To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence. Peer checking will not be provided during the performance of required tasks.
il NOTE: Directions are only required once in a given JPM session.
Comments Page 1 of 6
_____ ~~ - ~~
JPM 288.02 Rev 1 b
REFERENCE SECTION:
I TASK CONDITIONS:
~~
- Reactor Power 100%
- "B" Control Room HVAC is tagged out of service
- A fire has been recently extinguished in the Control Room, fumes are still present
- All other plant systems are operating normally
- Immediate actions of ABN-29 are complete.
'"GENERAL TOOLS AND EQUIPMENT:
None GENERAL
REFERENCES:
ABN-29, Response to Fire: Rev 0 TASK STANDARD:
One complete purge has been performed and "B" 460 volt switchgear ventilation has been restarted.
CRITICAL ELEMENTS: (*)
2,3,4,5,7,8 Page 2 of 6
L PERFORMANCE SECTION:
1 TASK CONDITIONS:
- Reactor Power 100%
- "B" Control Room HVAC is tagged out of service
- A fire has been recently extinguished in the Control Room, fumes are still present
- All other plant systems are operating normally
- Immediate actions of ABN-29 are complete.
INITIATING CUES:
Control Room fire has been extinguished, with residual smoke existing., the Unit Supervisor has directed you to purge the Control Room and restore normal ventilation to the Control Room using HVAC System "A" per ABN-29 "1
START TIME PERFORMANCE CHECKLIST STANDARD INITIAL SAT/UN SAT
- 1. Obtains controlled Procedure ABN-29, Section 3.4.8 copy of procedure
- 2. Shuts down "B"460 Places "Bl' 460V SWGR Room Supply and volt switchgear Exhaust Fans, SF-1-21 and EF-1-21, in the room ventilation OFF position.
system I
Page 3 of 6
JPM 288.02 Rev 1 PERFORMANCE CHECKLIST STANDARD INITIAL SAT/UN SAT
- 3. Lines up the Control Places the "A Control Rm HVAC Damper Room HVAC system Control" switch in "Pur" on panel 11R for purging
- 4. Places the Places "HVAC A Bypass Switch" on 11R in I NormaVReseVBypa I' Byp" ss Switch in the "Bypass" position
- 6. Monitor "B" 460V In the "B" 460V switchgear room, have the Switchgear Room EO monitor temperature and notify if it Temperature approaches 104' F.
- 7. Reset fire alarms Resets fire detection alarms on Control Module 6
- 8. Reset Control On Panel 11R, take the Bypass switch to Room HVACA "Reset" and then to "Norm"
- 11. Used procedure properly. Used procedure properly according to its level of usage.
COMPLETION TIME Page 4 of 6
JPM 288.02 Rev 1 SIMULATOR SETUP Initial Condition(s): 100% Power IC Turn off "B" Control Room HVAC Tag the "B" Control Room HVAC out of service Malfunctions:
FPS3A,22 for Panel A, Zone 1 alarm on Master Fire alarm panel in the Control Room (NOTE: Remove Malfunction(s) when directed by the Evaluator)
Component Level Failures:
'nstructor Overrides:
b SWI-TBS24A to "fail off" SWI-TBS28A to "fail off" Computer Aided Exercises:
Simprob. CAE Page 5 of 6
I__
Error! Main Document Only.
TASK CONDITIONS:
- Reactor Power 100%
- "B" Control Room HVAC is tagged out of service
- A fire has been recently extinguished in the Control Room, fumes are still present
- All other plant systems are operating normally
- Immediate actions of ABN-29 are complete.
INITIATING CUES:
Control Room fire has been extinguished, with residual smoke existing., the US has directed you to purge the Control Room and restore normal ventilation to the Control Room using HVAC System "A" per ABN-29, section 3.4.8 I'
Page 6 of 6
OYSTER CREEK GENERATING Number STATION PROCEDURE ABN-29 I
L/ Title Revision No.
PLANT FIRES 0
- 8. When the Control Room fire is extinguished, then PERFORM the following:
NOTE: Shutting down 480V switchgear room ventilation will prevent smoke and fumes from being sucked in when the Control Room is purged. Ensure Standing Order 51 is adhered to.
A. SHUT DOWN the B 480V Switchgear Room ventilation system manually by placing the control switch for SF 1-21 and EF 1-21 in the OFF position I 1 on Panel 1IR.
NOTE: Either Control Room HVAC System B or A may be used. Direction for System A is shown in parentheses.
B. PLACE CONT RM HVAC B (A)DAMPER CONTROL switch on Panel 9XR (1 1R) in PUR. I 1 C. PLACE HVAC B (A)BYPASS switch in BYP. [ I D. START the B (A)Control Room HVAC system. [ I E. MONITOR B 480V switchgear room temperature. If temperature approaches 104F, it may be necessary to secure Control Room HVAC and I 1 restart B 480V Switchgear Room Ventilation, per step 8-1below.
NOTE: Venting the Control Room for 15 minutes will allow for approximately 3 changes of air, which wifl normally provide adequate ventilation.
F. When smoke is cleared from the Control Room, then PERFORM the following:
- 1) RESET Fire DetectionAlarms on Control Module 6 and FAMP. [ I 10.0
AmerGem JOB PERFORMANCE An Exelon/British Energy Company Title: Operate the Remote Shutdown Panel on Control RoodEvacuation.
Setup the Remote Shutdown Panel for operation upon Control Room d c u a t i o n . I 3080401401 KA# 295016 AA1.07 I RATING: $0 - 4.2 SRO -4.3 Validation Time I 10 Minutes 1 TidCritical I
I I
No Name Social Security Number DIRECTIONS TO TRAINEE:
Before you start, I will state the task
/
and initiating cues and fully answer any questions. To complete this task successfully, you or simulate each critical element correctly and demonstrate proper procedural will not be provided during the performance of required tasks.
/
u' NOTE: Directions are only require once in a given JPM session.
Page 1 of 5
JPM 308.01 Rev. 1 1 TASK CONDITIONS:
T = 0 minutes ; Reactor operating at 100%power T = 10 minutes ;Toxic atmosphere Control Room evacuated and all required and desired actions have been performed per ABN 3200.30 "B" Isolation condenser is in service "B" CRD pump operating V-11-34 is closed V-14-35 is open GENERAL TOOLS AND EQUIPMENT:
MB-1 key GENERAL
REFERENCES:
W Procedure 346, Remote Shutdown, Rev. 9, Section 7 TASK STANDARD:
All controls and indications on the Remote Shutdown Panel are active CRITICAL ELEMENTS: (*)
5,7,8,9,11 INITIATING CUES:
Toxic atmosphere has caused an evacuation of the control room. The US has directed you to place the Remote Shutdown Panel into operation in accordance with procedure 346, Section 7, Operation of the Remote and Local Shutdown Panels.
Page 2 of 5
JPM 308.01 Rev. 1 u START TIME PERFORMANCE CHECKLIST STANDARD INITIAL SAT/UNSAT
- 1. Obtain controlled copy of procedure. Procedure 346, section 7, obtained.
- 2. Verifies prerequisites met. I Verifies prereqs met. I UPON REQUEST:Individual prereqs not verifiable at location, can be verified as met.
I I
- 3. Reviews all applicable precautions and Reviews all applicable precautions and limitations. limitations.
- 4. Obtains keys for remote shutdown Unlock key ring to right of Remote panel. Shutdown Panel.
"5. Places the "CRD control transfer" Inserts key and places CRD control keylock to the alternate position. I transfer switch in "Alternate" position. I CUE: CRD Control transfer keylock is in alternate.
I I
- 6. Confirms 1B2M closed. "Red" indicating light lit for breaker I
1B2M at the RSP. I L CUE: 1B2M breaker indicates closed (E3 CRD pump operating, no action required.
I I "7. Lines up IC "B" valve control. On Remote S / D panel, places control switch for V-14-35 in open and control I
switch for V-11-34 remains closed. I CUE: V-14-35 control switch is in open and V-11-34 control switch is in close.
W O N REQUEST:
V-14-35 is open V-11-34 is closed I
- 8. Places bypass switch on the breaker at Place the NormaVBypass switch for USS 1B2 for RBCCW pump 1-2 to the RBCCW pump 1-2 to bypass.
bypass
__ position. I I CUE: RBCCW pump 1-2 normalhypass switch is in bypass.
Page 3 of 5
PERFORMANCE CHECKLIST STANDARD INITIAL 1 SATKINSAT l
1 "9. Places train "A" and train "B" to the alternate position. I Insert keys and rotate Train "A"and Train "B" transfer switches to "Alternate". I CUE: Red "On" status lights lit for "B" 460V SWGR Room and "A/B" battery room fans after two seconds UPON REQUEST:
V-14-35 indicates open (red)
V-11-34 indicates closed (green) n
/ 10. Confirms all recirc pumps tripped.
I Performance met by prereq of "All actions of ABN 3200.30 met". I CUE: If requested by operator, evaluator reports as EO all recirc pump breakers verified open in 4160V switchgear room.
I I
- 11.
I Activates RSP fuel zone level. Place both fuel zone level On/Off switches to "On".
CUE: A11 fuel zone meters at 155 TAF.
1 12. Used procedure properly.
I Used procedure properly according to its I I level of usage.
COMPLETION TIME Page 4 of 5
TASK CONDITIONS:
T = 0 minutes ;Reactor operating at 100%power T = 10 minutes ;Toxic atmosphere 0 Control Room evacuated and all required and desired actions have been performed per ABN 3200.30 "B" Isolation condenser is in service 0 "B" CRD pump operating 0 V-11-34 is closed 0 V-14-35 is open INITIATING CUES:
Toxic atmosphere has caused an evacuation of the control room. The US has directed you to place the Remote Shutdown Panel into operation in accordance with procedure 346, Section 7, Operation of the Remote and Local Shutdown Panels.
Page 5 of 5
JOB PERFORMANCE AmerGem MEASURE An ExelonlBritish Energy Company 286.04 Title: Lineup Fire Protection to the Core Spray System Task: Lineup Fire Protection to the Core Spray System 2860401403 2860404404 KA# 209001 G 009 I RATING: -
RO 3.9 -
SRO 3.7 Validation Time I 6 minutes I Time Critical I I No Name Social Security Number DIRECTIONS TO TRAINEE:
Before you start, I will state the task conditions and initiating cues and fully answer any questions. To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence. Peer checking will not be provided during the performance of required tasks.
NOTE: Directions are only required once in a given JPM session.
Comments I Page 1 of 5
JPM 286.04 REFERENCE SECTION TASK CONDITIONS:
Reactor scrammed Both Core Spray Main pumps failed LOCA in progress RPV level 60" GENERAL TOOLS AND EQUIPMENT:
None Optional: Plant radio GENERAL
REFERENCES:
EMG 3200.01 B, RPV Control with ATWS, Rev. 12 Support Proc. 20, Low Pressure Injection During An ATWS, Section 3.3, Rev. 12 L
TASK STANDARD:
Core spray system 1 injecting into the core with fire water CRITICAL ELEMENTS: (*)
4&9 INITIATING CUES:
The FS/US has directed you to line up fire water to Core Spray System 1 per Support Procedure 20.
Page 2 of 5
JPM 286.04 PERFORMANCE SECTION L
, STARTTIME PERFORMANCE CHECKLIST STANDARD INITIAL SAT/UNSAT
- 1. Obtain controlled copy of Obtain controlled copy of Support procedure. Procedure 20.
- 2. Confirms stopped the Core Communicates with Control Room to Spray Main and Booster confirm all Core Spray System 1 Pumps in Core Spray pumps stopped.
System 1.
I I CUE: Control Room reports Core Spray System 1 pumps stopped.
I I
- 3. Place Core Spray System 1 Communicates with Control Room to Main Pump control switches confirm Core Spray System 1 Main in Pull-to-Lock position. Pumps in Pull-to Lock.
I I CUE: Control Room reports Core Spray System 1 Main Pumps in Pull-to- Lock.
I
- 4. Closes telltale drain valve Closes handwheel for V-20-91 located V-20-91. on North side of reactor building 23'.
I I CUE: V-20-91 closed.
I I
- 5. Confirm running all Diesel Communicates with Control Room to Fire Pumps by placing their confirm all Diesel Fire Pumps are control switches in MANUAL running.
position (1 3R).
I I CUE: Control Room reports that both Diesel Fire Pumps running.
Page 3 of 5
JPM 286.04 PERFORMANCE CHECKLIST STANDARD INITIAL SAT/UNSAT
- 6. Confirms open Core Spray Confirms valves open locally, 1 discharge valves V-20-12 Rx Bldg. 75' elev. OR communicates and either V-20-15 or V with Control Room to confirm
- 40. discharge valves V-20-12 and either V-20-15 or V-20-40 are open.
CUE: Upon request the evaluator \n I provide the following:
V-20-12 and V-20-15 (or V-2 .40) open.
I
- 7. Confirms closed test Confirms valve closed locally, discharge valve V-20-27. Rx Bldg. 75' elev. OR communcates with Control Room to confirm test discharge valve V-20-27 is closed.
I CUE: Upon request the evaluator H I provide the following:
V-20-27 closed.
I
- 8. Closes Core Spray 1 Communicates with Control Room to suction valve V-20-32 and V- close suction valves V-20-32 and V 20-3 3.
CUE: Control Room reports Green 2losed" indicating lights for V-20-32 and V-20-3.
I
- 9. Throttle open V-20-83, Fire Opens valve V-20-83 locally, adjacent Water Supply valve. to V-20-91, at the North side of reactor CUE: Flow noise is heard from the {stem.
(V-20-83 open)
I
- 10. Used procedure properly. Used procedure properly according to its level of usage.
COMPLETION TIME L
Page 4 of 5
TASK CONDIT10NS:
Reactor scrammed Both Core Spray Main pumps failed LOCA in progress RPV level 60" INITIATING CUES:
The FS/US has directed you to line up fire water to Core Spray System 1 per Support I
Procedure 20.
1 1 I
Page 5 of 5
AmerGen, An ExelontBnhsh Energy Company Title: TERMINATION AND PREVENTION OF INJECTION Task: ENTER AND CONTROL RPV LEVEL, PRESSURE AND 2000501441 POWER AS DIRECTED BY EMG-3200.01B, "RPV CONTROL-With ATWS KA# 295037 EA2.02 I RATING: SRO 4.2 RO 4.1 Validation Time: 3 minutes I I
No I Time Critical: No Name Social Security Number I
DIRECTIONS TO TRAINEE:
Before you start, I will state the task conditions and initiating cues and fully answer any questions. To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence.
NOTE: Directions are only required once in a given JPM session.
"II Comments 1 Of5
JPM 200.00Q Rev. 00 REFERENCE SECTION L
TASK CONDITIONS:
The plant is in an ATWOS condition at approximately 40% power.
RPV Control w/ ATWOS has been entered.
All efforts to insert control rods have been unsuccessful Support Procedure 16 has been completed bypassing the LO-LO Water Level Interlocks.
INITIATING CUES:
As the US I am directing you to perform Support Procedure 17, Termination and Prevention of Injection.
GENERAL TOOLS AND EQUIPMENT:
GENERAL
REFERENCES:
3upport Procedure 17, "Termination and Prevention of Injection" - revision 12 b
TASK STANDARD:
All Core Spray Main Pumps in Pull-to-Lock, All FW pumps off, one (1) Condensate pump running, all Feed Reg. Valves closed.
CRITICAL ELEMENTS: (*)
7, 8, 9, and 10.
2 of 5
JPM 200.00Q Rev. 00 TASK CONDITIONS:
i/
0 The plant is in an ATWOS condition at approximately 40% power.
RPV Control w/ ATWOS has been entered.
All efforts to insert control rods have been unsuccessful 0 Support Procedure 16 has been completed bypassing the LO-LO Water Level Interlocks.
INITIATING CUES:
As the US I am directing you to perform Support Procedure 17, Termination and Prevention of Injection.
PERFORMANCE SECTION START TIME PERFORMANCE CHECKLIST STANDARD INITIAL SATNNSAT
- 1. Obtain controlled copy of Obtains controlled copy of Support procedure Procedure 17.
- 2. Verifies all prerequisites are Verifies all prerequisites are met 1 AI met I
-1 I
Prerequisites have been met.
CUE:
- 3. Informs operator controlling Informs operator controlling pressure that reactor pressure of the ICs will initiate when level reaches impending IC initiation. LO-LO level
- 4. Overrides all core spray Depresses OVERRIDE switches for all initiation logic. sensors that are lit or unlit and depresses all ACTUATED switches whether lit or unlit.
- 5. Confirms all Core Spray Confirms all Core Spray Parallel Isolation Parallel Isolation Valves Valves closed by observing GREEN closed. CLOSED indicating lights for V-20-15, 40, 21 & 41 lit.
1 6. Confirms all Core Spray Booster Pumps tripped.
Confirms all Core Spray Booster Pumps tripped by observing the GREEN OFF indicating lights lit.
3 of 5
JPM 200.00Q Rev. 00
' PERFORMANCE CHECKLIST STANDARD INITIAL SATNNSAT
- 7. Confirms all Core spray Places the control switches for all Core Main Pump control switches Spray Main Pumps into the PULL-TO-tin PULL-TO-LOCK LOCK position.
- 8. Trips all operating Trips all operating Feedwater pumps by Feedwater pumps. placing their respective control switches to the STOP position 23 returning to the NORMAL position.
- 9. Confirms one (1) Trips two (2) of the running condensate Condensate pump running. pumps leaving one (1) running.
- lo. Place all Individual FRV Places all Individual FRV controllers in controllers in MAN position MAN position and closes all FRV's &
and closes all FRV's. LFRV's.
Used procedure properly according to its level of usage.
COMPLETION TIME 4 of 5
JPM 200.00Q Rev. 00 SIMULATOR SETUP Initial Condition(s): IC-65 SETUP
- 1. Run Simprob.cae and ATWS.CAE
- 2. Complete Support Procedure 16 to bypass Lo-Lo interlocks.
3.
Malfunctions:
NONE Command Files:
SIMPROB.CAE ATW S.CAE c
5 of 5
TASK CONDITIONS:
~
0 The plant is in an ATWOS condition at approximately 40% power.
0 RPV Control w/ ATWOS has been entered.
~
0 All efforts to insert control rods have been unsuccessful 0 Support Procedure 16 has been completed bypassing the LO-LO Water Level Interlocks.
INITIATING CUES:
As the US I am directing you to perform Support Procedure 17, Termination and Prevention of Injection.
6 of 5