|
|
(One intermediate revision by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML061630389 | | | number = ML061630389 |
| | issue date = 06/07/2006 | | | issue date = 06/07/2006 |
| | title = Byron Tritium Analyses (Batch BY-2006-2) | | | title = Tritium Analyses (Batch BY-2006-2) |
| | author name = Cameron J L | | | author name = Cameron J |
| | author affiliation = NRC/RGN-III/DNMS | | | author affiliation = NRC/RGN-III/DNMS |
| | addressee name = Orth S K | | | addressee name = Orth S |
| | addressee affiliation = NRC/RGN-III/DRS | | | addressee affiliation = NRC/RGN-III/DRS |
| | docket = 05000454, 05000455 | | | docket = 05000454, 05000455 |
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:MEMORANDUM TO: FROM: | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 111 2443 WARRENVILLE ROAD, SUITE 2 IO LISLE, ILLINOIS 60532-4352 June 7,2006 MEMORANDUMTO: Steven K. Orth, Team Leader Plant Support Team Division of Reactor Safety FROM: Jamnes L. Cameron, Chief Decommissioning Branch Division of Nuclear Materials Safety |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 111 2443 WARRENVILLE ROAD, SUITE 2 IO LISLE, ILLINOIS 60532-4352 June 7,2006 Steven K. Orth, Team Leader Plant Support Team Division of Reactor Safety Jamnes L. Cameron, Chief Decommissioning Branch Division of Nuclear Materials Safety ANALYTICAL RESULTS OF WATER SAMPLES FROM THE VICINITY OF THE BYRON NUCLEAR POWER STATION (BATCH BY-2006-02)
| | ANALYTICAL RESULTS OF WATER SAMPLES FROM THE VICINITY OF THE BYRON NUCLEAR POWER STATION (BATCH BY-2006-02) |
| By letter dated April 27, 2006, (ML061220683), we received the results of the analysis of 41 water samples from the NRC's contract laboratory, the Oak Ridge Institute for Science and Education (ORISE). | | By letter dated April 27, 2006, (ML061220683), we received the results of the analysis of 41 water samples from the NRCs contract laboratory, the Oak Ridge Institute for Science and Education (ORISE). These were samples collected by Exelon personnel from February 3 to March 29, 2006, in the vicinity of the Byron Nuclear Power Station and provided to Region 111 for analysis for tritium. The licensee collected separate samples for their analysis at the same time they collected the samples for the NRC. |
| These were samples collected by Exelon personnel from February 3 to March 29, 2006, in the vicinity of the Byron Nuclear Power Station and provided to Region 111 for analysis for tritium. The licensee collected separate samples for their analysis at the same time they collected the samples for the NRC. We have reviewed the analysis results from ORISE and compared the results with the licensee's results for their samples. | | We have reviewed the analysis results from ORISE and compared the results with the licensees results for their samples. The enclosed Table provides the results of the analyses and an assessment of how they compared. The comparison was based on the Confirmatory Measurements Program criteria provided in Inspection Procedure 84750, Radioactive Waste Treatment, and Effluent and Environmental Monitoring, dated March 15, 1994. There was agreement in the results between the ORISE and licensee analyses for all 41 samples. Six samples were also analyzed for gamma emitting nuclides. No radioactivity was identified in the samples in excess of the minimum detectable concentrations for cobalt-58, cobalt-60, cesium-134. or cesium-137. |
| The enclosed Table provides the results of the analyses and an assessment of how they compared. | |
| The comparison was based on the Confirmatory Measurements Program criteria provided in Inspection Procedure 84750, "Radioactive Waste Treatment, and Effluent and Environmental Monitoring," dated March 15, 1994. There was "agreement" in the results between the ORISE and licensee analyses for all 41 samples. Six samples were also analyzed for gamma emitting nuclides. | |
| No radioactivity was identified in the samples in excess of the minimum detectable concentrations for cobalt-58, cobalt-60, cesium-134. | |
| or cesium-137. | |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| | As Stated CONTACT: William G. Snell, DNMS 630-829-9871 |
|
| |
|
| As Stated CONTACT: William G. Snell, DNMS 630-829-9871 Tritium SamDle Results # I I Ratio: to NRC Collection Tritium Tritium Date NRC Sample ID ~CUL uncertainty MDC Licensee Sample ID pCii *uncertainty Licensee Result BY-06-2-01 thru -41 Analysis.xls Last Modified 05/25/2006@3:20 PM Page 1 of 2 Collection Date # BY-06-2-01 thru
| | Tritium SamDle Results I I Ratio: |
| -41 Analysis.xis Last Modified 05/25/2006@3:20 PM Ratio: to NRC Tritium Tritium NRC Sample ID pci/~ uncertainty MDC Licensee Sample ID pCK uncertainty Licensee Result Page 2 of 2}} | | # Collection Tritium Tritium Date NRC Sample ID ~ C U L uncertainty MDC Licensee Sample ID p C i i *uncertainty Licensee Result to NRC BY-06-2-01 thru -41 Analysis.xls Last Modified 05/25/2006@3:20PM Page 1 of 2 |
| | |
| | Ratio: |
| | Collection Tritium Tritium |
| | # NRC Sample ID p c i / ~ uncertainty MDC Licensee Sample ID pCK uncertainty Licensee Result Date to NRC BY-06-2-01 thru -41 Analysis.xis Last Modified 05/25/2006@3:20 PM Page 2 of 2}} |
Similar Documents at Byron |
---|
Category:Memoranda
MONTHYEARML24152A1852024-06-0404 June 2024 Summary of March 28, 2024, Closed Hybrid Pre-Submittal Meeting Between Constellation Energy Generation, LLC and the U.S. Nuclear Regulatory Commission Regarding a Future Amendment Request for Fuel Transition ML23044A3662023-02-15015 February 2023 Calendar Year 2022 Reactor Oversight Process Baseline Inspection Program Completion - Region III ML21277A2472021-11-0505 November 2021 Notification of Significant Licensing Action - Proposed Issuance of Order Approving the Transfer of Licenses for Which a Hearing Has Been Requested - Exelon Generation Company, LLC; Et. Al ML20155K6802020-11-23023 November 2020 Memo to File: Environmental Assessment and Finding of No Significant Impact and NRC Financial Analysis for Exelon Corporation, LLC, Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30(b) and (C) for Byron ISFSI ML17335A0442017-12-0404 December 2017 Tvel Lead Test Assembly 3rd Closed Meeting ML17164A3302017-06-13013 June 2017 Safety Evaluation Regarding the Proposed License Amendment to Revise the Byron Licensing Bases for Protection from Tornado-Generated Missiles (CAC Number MF8446 and 8447) ML17142A2382017-05-25025 May 2017 OEDO-17-00280 - Briefing Package for Drop-In Visit on June 9, 2017, by Senior Management of Exelon Generation Company, LLC with Chairman Svinicki, Commissioner Baran, and Commissioner Burns ML16236A2022016-08-24024 August 2016 Backfit Appeal Review Panel Findings Associated with Byron and Braidwood Compliance ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML16082A5422016-03-25025 March 2016 Backfit Review Panel Recommendation Regarding Exelon Appeal of Backfit Affecting Braidwood and Byron Stations Regarding Compliance with 10 CFR 50.34(b), GDC 15, GDC 21, GDC 29, and the Licensing Basis ML16075A3292016-03-16016 March 2016 OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for Operations ML16070A3622016-03-15015 March 2016 03/07/2016 Summary of Public Meeting Between U.S. Nuclear Regulatory Commission Staff and Exelon Generation Company, LLC to Discuss an Appeal of a Compliance Backfit ML15355A0812016-01-12012 January 2016 Backfit Review Panel Charter Regarding December 8, 2015, Exelon Appeal of Imposed Backfit Affecting Braidwood and Byron Stations ML15267A7342015-11-10010 November 2015 Renewal of Full-Power Operating Licenses for Byron, Units 1 and 2 ML15253A9132015-09-11011 September 2015 ACRS Full Committee - Corrections to the Aging Management Programs Table ML15187A3272015-07-13013 July 2015 Request for ACRS Review of Byron Braidwood SER ML15051A3612015-03-0303 March 2015 02/05/2015 Summary of Telephone Conference Call No 2 Held Between the NRC and Exelon Generation Co., LLC Concerning Request for Additional Information, Set 45, Pertaining to the Byron, and Braidwood, License Renewal Application ML15016A4732015-01-15015 January 2015 Ltr 2014 Byron EP Annual Closeout (Rdj) ML14317A5432014-11-17017 November 2014 Federal Register Notice Regarding the ACRS Plant License Renewal Subcommittee Meeting (Braidwood/Byron), December 3, 2014 ML14205A5752014-08-11011 August 2014 Summary of Telephone Conference Call Held on June 10, 2014, Between U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Concerning Fire Water System Request for Additional Information Responses Pertaining to Byron Station. ML14227A1092014-07-0909 July 2014 Bryron, Units 1 & 2 - Imposition of Facility-Specific Baskfit Compliance with Licensing Basis Plant Design Requirements ML14177A4302014-07-0202 July 2014 06/23/2014 Summary of Telephone Conference Call Between NRC and Exelon Generation Co., LLC, Concerning the Byron and Braidwood, License Renewal Application (TAC Nos. MF1879, MF1880, MF1881 and MF1882) ML14148A3882014-06-0505 June 2014 Summary of Telephone Conference Call Held on May 19, 2014, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Concerning Draft Request for Additional Information, Set 28, Pertaining to the Byron Station and Br ML14126A5432014-05-19019 May 2014 Summary of Telephone Conference Call Held on April 22, 2014, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Concerning Draft Request for Additional Information, Set 24, Pertaining to the Byron Station and ML14092A4402014-05-14014 May 2014 Summary of Telephone Conference Call Held on March 19, 2014, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Concerning Draft Request for Additional Information, Set 18, Pertaining to the Byron Station and ML14107A2262014-05-14014 May 2014 Summary of Telephone Conference Call Held on March 26, 2014, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Concerning Draft Request for Additional Information, Set 21, Pertaining to the Byron Station and ML12194A5002014-03-31031 March 2014 Final TIA Response Byron Braidwood Single Spurious Assumption ML14064A4032014-03-11011 March 2014 Summary of Telephone Conference Call on February 27, 2014, Between U.S. Nuclear Regulatory Commission & Exelon Generation Company, LLC Concerning Draft Request for Additional Information Re Byron Station & Braidwood Station License Renewal ML14058B1802014-03-11011 March 2014 Summary of Telephone Conference Call on February 18, 2014, Between U.S. Nuclear Regulatory Commission & Exelon Generation Company, LLC Concerning Draft Request for Additional Information Regarding Byron & Braidwood Stations, License Renewal ML14036A3102014-03-0404 March 2014 Summary of Telephone Conference Call Held on January 28, 2014, Between NRC and Exelon, Concerning RAI Set 10, for the Byron and Braidwood Station, LRA ML14063A1742014-01-28028 January 2014 Making Non-Concurrence NCP-2013-014 Public Available ML13267A0802013-12-0909 December 2013 Reactor Systems Branch Safety Evaluation Input to Byron Station Units 1 and 2 and Braidwood Station Units 1 and 2 Measurement Uncertainty Recapture Power Update ML13303B4632013-11-25025 November 2013 Summary of Telephone Conference Call Held on October 22, 2013, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC, Concerning RAI Set 3 for the Byron-Braidwood LRA ML13240A2342013-10-0404 October 2013 8/10/2013 - Summary of Public Scoping Meetings Conducted Related to the Review of the Byron Nuclear Station, License Renewal Application(Tac Nos. MF1790 and MF1791) ML13205A0452013-08-0707 August 2013 08/20/2013 Forthcoming Meeting to Discuss the License Renewal Process and Environmental Scoping for Exelon Generation Company, Llc(Exelon), Byron Nuclear Station, Units 1 and 2 ML13190A3522013-07-10010 July 2013 Notice of Forthcoming Teleconference with Exelon Generation Company, LLC ML13094A0922013-04-0404 April 2013 Notice of Forthcoming Meeting with Exelon Generation Company, LLC to Discuss Future Submittal of a License Amendment Request to Modify Technical Specifications for the Main Steam Isolation Valves & Their Actuators ML13014A7652013-02-0404 February 2013 03/20/2013 Notice of Forthcoming Meeting with Exelon Corporation Regarding License Renewal Application for the Byron and Braidwood Nuclear Power Stations ML12335A2162012-12-20020 December 2012 Review of the Spring 2011 Steam Generator Tube Inservice Inspections During Refueling Outage 17 ML12348A6962012-12-17017 December 2012 1/3/2013 - Notice of Forthcoming Meeting with Exelon Generation Company, LLC, to Discuss Requests for Additional Information Regarding Exelon Physical Security Plans ML1208602902012-03-26026 March 2012 Notice of Forthcoming Public Meeting with Exelon Generation to Discuss Future Fleet Submittal Regarding Licensed Operator Eligibility Requirements ML1206700932012-03-0707 March 2012 Notice of Forthcoming Meeting with Exelon Generation Company, LLC (Exelon) Regarding Byron Station Single Phase Failure Event of February 28, 2012 ML1204817082012-02-17017 February 2012 Summary of Meeting with Exelon, LLC to Discuss Approach to Unrestrained Stack-Up Operations at the Upcoming Loading Campaign at Byron Nuclear Station (Byron), Enclosure 1 - Meeting Attendees, Enc 2- Agenda ML1110202372011-05-0606 May 2011 Verbal Authorization of Relief Request I3R-19 - Relief for Repair of Seal Welds Associated with Reactor Vessel Head Penetrations 31 and 64 ML1110906502011-05-0505 May 2011 Notice of Forthcoming Meeting with Exelon Generation Company, LLC Pre-Application Meeting to Discuss Proposed Amendment Uncertainty Recapture (Mur) Power Uprate License Amendment Request for Braidwood Station, Units 1 & 2 and Byron, Units 1 ML1109103802011-04-13013 April 2011 Verbal Authorization of Relief Request I3R-19 - Alternative Requirements for Repair of Reactors Vessel Head Penetrations Nos. 31 and 43 ML1108405122011-03-29029 March 2011 Verbal Authorization of Relief Request I3R-9 - Alternative Requirements for Repair of Reactor Vessel Head Penetrations 64. and 76 ML11132A1292011-03-17017 March 2011 Transmittal of Ihpb Safety Evaluation, Byron, Units 1 and 2, Braidwood, Units 1 and 2, License Amendment Request Regarding Low Temperature Overpressure Protection and Loss of Decay Heat Removal ML1104505662011-02-15015 February 2011 3/01/2011 Notice of Forthcoming Meeting with Exelon to Discuss Nrc'S Staff'S Review of the Ultimate Head Sink License Amendment Request for the Byron Station, Units 1 and 2 2024-06-04
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 111 2443 WARRENVILLE ROAD, SUITE 2 IO LISLE, ILLINOIS 60532-4352 June 7,2006 MEMORANDUMTO: Steven K. Orth, Team Leader Plant Support Team Division of Reactor Safety FROM: Jamnes L. Cameron, Chief Decommissioning Branch Division of Nuclear Materials Safety
SUBJECT:
ANALYTICAL RESULTS OF WATER SAMPLES FROM THE VICINITY OF THE BYRON NUCLEAR POWER STATION (BATCH BY-2006-02)
By letter dated April 27, 2006, (ML061220683), we received the results of the analysis of 41 water samples from the NRCs contract laboratory, the Oak Ridge Institute for Science and Education (ORISE). These were samples collected by Exelon personnel from February 3 to March 29, 2006, in the vicinity of the Byron Nuclear Power Station and provided to Region 111 for analysis for tritium. The licensee collected separate samples for their analysis at the same time they collected the samples for the NRC.
We have reviewed the analysis results from ORISE and compared the results with the licensees results for their samples. The enclosed Table provides the results of the analyses and an assessment of how they compared. The comparison was based on the Confirmatory Measurements Program criteria provided in Inspection Procedure 84750, Radioactive Waste Treatment, and Effluent and Environmental Monitoring, dated March 15, 1994. There was agreement in the results between the ORISE and licensee analyses for all 41 samples. Six samples were also analyzed for gamma emitting nuclides. No radioactivity was identified in the samples in excess of the minimum detectable concentrations for cobalt-58, cobalt-60, cesium-134. or cesium-137.
Enclosure:
As Stated CONTACT: William G. Snell, DNMS 630-829-9871
Tritium SamDle Results I I Ratio:
- Collection Tritium Tritium Date NRC Sample ID ~ C U L uncertainty MDC Licensee Sample ID p C i i *uncertainty Licensee Result to NRC BY-06-2-01 thru -41 Analysis.xls Last Modified 05/25/2006@3:20PM Page 1 of 2
Ratio:
Collection Tritium Tritium
- NRC Sample ID p c i / ~ uncertainty MDC Licensee Sample ID pCK uncertainty Licensee Result Date to NRC BY-06-2-01 thru -41 Analysis.xis Last Modified 05/25/2006@3:20 PM Page 2 of 2