MONTHYEARML24152A1852024-06-0404 June 2024 Summary of March 28, 2024, Closed Hybrid Pre-Submittal Meeting Between Constellation Energy Generation, LLC and the U.S. Nuclear Regulatory Commission Regarding a Future Amendment Request for Fuel Transition ML23044A3662023-02-15015 February 2023 Calendar Year 2022 Reactor Oversight Process Baseline Inspection Program Completion - Region III ML21277A2472021-11-0505 November 2021 Notification of Significant Licensing Action - Proposed Issuance of Order Approving the Transfer of Licenses for Which a Hearing Has Been Requested - Exelon Generation Company, LLC; Et. Al ML20155K6802020-11-23023 November 2020 Memo to File: Environmental Assessment and Finding of No Significant Impact and NRC Financial Analysis for Exelon Corporation, LLC, Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30(b) and (C) for Byron ISFSI ML17335A0442017-12-0404 December 2017 Tvel Lead Test Assembly 3rd Closed Meeting ML17164A3302017-06-13013 June 2017 Safety Evaluation Regarding the Proposed License Amendment to Revise the Byron Licensing Bases for Protection from Tornado-Generated Missiles (CAC Number MF8446 and 8447) ML17142A2382017-05-25025 May 2017 OEDO-17-00280 - Briefing Package for Drop-In Visit on June 9, 2017, by Senior Management of Exelon Generation Company, LLC with Chairman Svinicki, Commissioner Baran, and Commissioner Burns ML16236A2022016-08-24024 August 2016 Backfit Appeal Review Panel Findings Associated with Byron and Braidwood Compliance ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML16082A5422016-03-25025 March 2016 Backfit Review Panel Recommendation Regarding Exelon Appeal of Backfit Affecting Braidwood and Byron Stations Regarding Compliance with 10 CFR 50.34(b), GDC 15, GDC 21, GDC 29, and the Licensing Basis ML16075A3292016-03-16016 March 2016 OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for Operations ML16070A3622016-03-15015 March 2016 03/07/2016 Summary of Public Meeting Between U.S. Nuclear Regulatory Commission Staff and Exelon Generation Company, LLC to Discuss an Appeal of a Compliance Backfit ML15355A0812016-01-12012 January 2016 Backfit Review Panel Charter Regarding December 8, 2015, Exelon Appeal of Imposed Backfit Affecting Braidwood and Byron Stations ML15267A7342015-11-10010 November 2015 Renewal of Full-Power Operating Licenses for Byron, Units 1 and 2 ML15253A9132015-09-11011 September 2015 ACRS Full Committee - Corrections to the Aging Management Programs Table ML15187A3272015-07-13013 July 2015 Request for ACRS Review of Byron Braidwood SER ML15051A3612015-03-0303 March 2015 02/05/2015 Summary of Telephone Conference Call No 2 Held Between the NRC and Exelon Generation Co., LLC Concerning Request for Additional Information, Set 45, Pertaining to the Byron, and Braidwood, License Renewal Application ML15016A4732015-01-15015 January 2015 Ltr 2014 Byron EP Annual Closeout (Rdj) ML14317A5432014-11-17017 November 2014 Federal Register Notice Regarding the ACRS Plant License Renewal Subcommittee Meeting (Braidwood/Byron), December 3, 2014 ML14205A5752014-08-11011 August 2014 Summary of Telephone Conference Call Held on June 10, 2014, Between U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Concerning Fire Water System Request for Additional Information Responses Pertaining to Byron Station. ML14227A1092014-07-0909 July 2014 Bryron, Units 1 & 2 - Imposition of Facility-Specific Baskfit Compliance with Licensing Basis Plant Design Requirements ML14177A4302014-07-0202 July 2014 06/23/2014 Summary of Telephone Conference Call Between NRC and Exelon Generation Co., LLC, Concerning the Byron and Braidwood, License Renewal Application (TAC Nos. MF1879, MF1880, MF1881 and MF1882) ML14148A3882014-06-0505 June 2014 Summary of Telephone Conference Call Held on May 19, 2014, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Concerning Draft Request for Additional Information, Set 28, Pertaining to the Byron Station and Br ML14126A5432014-05-19019 May 2014 Summary of Telephone Conference Call Held on April 22, 2014, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Concerning Draft Request for Additional Information, Set 24, Pertaining to the Byron Station and ML14092A4402014-05-14014 May 2014 Summary of Telephone Conference Call Held on March 19, 2014, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Concerning Draft Request for Additional Information, Set 18, Pertaining to the Byron Station and ML14107A2262014-05-14014 May 2014 Summary of Telephone Conference Call Held on March 26, 2014, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Concerning Draft Request for Additional Information, Set 21, Pertaining to the Byron Station and ML12194A5002014-03-31031 March 2014 Final TIA Response Byron Braidwood Single Spurious Assumption ML14064A4032014-03-11011 March 2014 Summary of Telephone Conference Call on February 27, 2014, Between U.S. Nuclear Regulatory Commission & Exelon Generation Company, LLC Concerning Draft Request for Additional Information Re Byron Station & Braidwood Station License Renewal ML14058B1802014-03-11011 March 2014 Summary of Telephone Conference Call on February 18, 2014, Between U.S. Nuclear Regulatory Commission & Exelon Generation Company, LLC Concerning Draft Request for Additional Information Regarding Byron & Braidwood Stations, License Renewal ML14036A3102014-03-0404 March 2014 Summary of Telephone Conference Call Held on January 28, 2014, Between NRC and Exelon, Concerning RAI Set 10, for the Byron and Braidwood Station, LRA ML14063A1742014-01-28028 January 2014 Making Non-Concurrence NCP-2013-014 Public Available ML13267A0802013-12-0909 December 2013 Reactor Systems Branch Safety Evaluation Input to Byron Station Units 1 and 2 and Braidwood Station Units 1 and 2 Measurement Uncertainty Recapture Power Update ML13303B4632013-11-25025 November 2013 Summary of Telephone Conference Call Held on October 22, 2013, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC, Concerning RAI Set 3 for the Byron-Braidwood LRA ML13240A2342013-10-0404 October 2013 8/10/2013 - Summary of Public Scoping Meetings Conducted Related to the Review of the Byron Nuclear Station, License Renewal Application(Tac Nos. MF1790 and MF1791) ML13205A0452013-08-0707 August 2013 08/20/2013 Forthcoming Meeting to Discuss the License Renewal Process and Environmental Scoping for Exelon Generation Company, Llc(Exelon), Byron Nuclear Station, Units 1 and 2 ML13190A3522013-07-10010 July 2013 Notice of Forthcoming Teleconference with Exelon Generation Company, LLC ML13094A0922013-04-0404 April 2013 Notice of Forthcoming Meeting with Exelon Generation Company, LLC to Discuss Future Submittal of a License Amendment Request to Modify Technical Specifications for the Main Steam Isolation Valves & Their Actuators ML13014A7652013-02-0404 February 2013 03/20/2013 Notice of Forthcoming Meeting with Exelon Corporation Regarding License Renewal Application for the Byron and Braidwood Nuclear Power Stations ML12335A2162012-12-20020 December 2012 Review of the Spring 2011 Steam Generator Tube Inservice Inspections During Refueling Outage 17 ML12348A6962012-12-17017 December 2012 1/3/2013 - Notice of Forthcoming Meeting with Exelon Generation Company, LLC, to Discuss Requests for Additional Information Regarding Exelon Physical Security Plans ML1208602902012-03-26026 March 2012 Notice of Forthcoming Public Meeting with Exelon Generation to Discuss Future Fleet Submittal Regarding Licensed Operator Eligibility Requirements ML1206700932012-03-0707 March 2012 Notice of Forthcoming Meeting with Exelon Generation Company, LLC (Exelon) Regarding Byron Station Single Phase Failure Event of February 28, 2012 ML1204817082012-02-17017 February 2012 Summary of Meeting with Exelon, LLC to Discuss Approach to Unrestrained Stack-Up Operations at the Upcoming Loading Campaign at Byron Nuclear Station (Byron), Enclosure 1 - Meeting Attendees, Enc 2- Agenda ML1110202372011-05-0606 May 2011 Verbal Authorization of Relief Request I3R-19 - Relief for Repair of Seal Welds Associated with Reactor Vessel Head Penetrations 31 and 64 ML1110906502011-05-0505 May 2011 Notice of Forthcoming Meeting with Exelon Generation Company, LLC Pre-Application Meeting to Discuss Proposed Amendment Uncertainty Recapture (Mur) Power Uprate License Amendment Request for Braidwood Station, Units 1 & 2 and Byron, Units 1 ML1109103802011-04-13013 April 2011 Verbal Authorization of Relief Request I3R-19 - Alternative Requirements for Repair of Reactors Vessel Head Penetrations Nos. 31 and 43 ML1108405122011-03-29029 March 2011 Verbal Authorization of Relief Request I3R-9 - Alternative Requirements for Repair of Reactor Vessel Head Penetrations 64. and 76 ML11132A1292011-03-17017 March 2011 Transmittal of Ihpb Safety Evaluation, Byron, Units 1 and 2, Braidwood, Units 1 and 2, License Amendment Request Regarding Low Temperature Overpressure Protection and Loss of Decay Heat Removal ML1104505662011-02-15015 February 2011 3/01/2011 Notice of Forthcoming Meeting with Exelon to Discuss Nrc'S Staff'S Review of the Ultimate Head Sink License Amendment Request for the Byron Station, Units 1 and 2 2024-06-04
[Table view] |
Text
May 6, 2011 MEMORANDUM TO: Robert D. Carlson, Chief Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Nicholas J. DiFrancesco, Project Manager /RA/
Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
BYRON STATION, UNIT NO. 1 - RETRACTION OF VERBAL AUTHORIZATION RELIEF REQUEST I3R ALTERNATIVE SEAL WELDS REPAIR METHOD FOR REACTOR VESSEL HEAD PENETRATIONS NOS. 31 AND 64 (TAC NOS. ME6061)
By letter dated March 24, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML110830837), Exelon Generation Company, LLC (EGC, the licensee), requested relief from the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, "Rules for Inservice Inspection of Nuclear Power Plant Components," on the basis that the proposed alternatives would provide an acceptable level of quality and safety. A conference call between the U.S. Nuclear Regulatory Commission (NRC) staff and the licensee on March 28, 2011, and by memorandum dated March 29, 2011 (ADAMS Accession No. ML110840512), NRC provided verbal authorization for the repair of vessel head penetration (VHP) nozzles 64 and 76. Subsequently, on March 29, 2011, EGC identified additional indications in the Outside Diameter of Control Rod Drive Mechanism VHP Nos. 31 and 43 within the J-groove attachment weld on the underside of the reactor vessel head. On April 10, 2011, at 12:00 pm Eastern Daylight Time (EDT), by memorandum dated April 13, 2011 (ADAMS Accession No. ML110910380), NRC provided verbal authorization for alternative repair technique to repair the flaws in VHP Nos. 31 and 43.
By letter dated April 8, 2011(ADAMS Accession No. ML111010578), and supplemented by letters dated April 10, 2011 (ADAMS Accession Nos. ML111010202 and ML111010199), EGC modified Relief Request I3R-19 by requesting relief from the ASME Code requirements of Section III, NB-4450, to eliminate mechanical discontinuities detected in the seal weld during initial installation. The letter dated April 8, identified multiple indications found by surface examination of the seal welds of VHP Nos. 31 and 64. NRC staff reviewed the licensees submittal and determined that the proposed alternative will provide an acceptable level of quality and safety. During a conference call, on April 10, 2011, at 5:00 pm EDT, NRC provided verbal authorization (Enclosure 1) for repairs of seal welds associated with VHP Nos. 31 and 64 on the alternative to ASME Code,Section III, NB-4450 requirements.
On April 12, 2011, the NRC staff learned that the licensee had taken actions which differed from the scope of the relief request which had been verbally authorized. Based on the licensees actions, the NRC staff rescinded the authorization. Justification of the NRC staff decision is provided in Enclosure 2.
R. Carlson April 10, 2011 (5:00 pm EDT) - Verbal Authorization Conference Call NRC
Participants:
Licensee
Participants:
R. D. Carlson B. Jacobs T. R. Lupold R. McIntosh J. Collins J. Langan N. J. DiFrancesco D. Gudger D. Hills R. Gesior A. Shaikh D. Benyak J. Hansen B. Newton D. Anthony April 12, 2011 (4:45 pm EDT) - Retraction of Authorization Conference Call NRC
Participants:
Licensee
Participants:
M. Mahoney D. Gudger J. Collins J. Hansen N. J. DiFrancesco L. Schofield D. Hills D. Benyak A. Shaikh B. Jacobs B. Bartlett W. Feimster M. Holmberg G. S. Gerzen et. al. G. DeBoo H. Q. Do R. McIntosh J. Langan et. al.
Docket No. 50-454
Enclosures:
- 1. Verbal Authorization Script from April 10, 2011
- 2. Staff Decision on Retraction of Authorization
ML111020237 NRR-106 OFFICE LPL3-2/PM LPL3-2/LA DCI/CPNB/BC LPL3-2/BC NAME NDiFrancesco SRohrer TLupold /JTsao for RCarlson DATE 4/28/11 4/28/11 4/28/11 5/6/11 VERBAL AUTHORIZATION FOR RELIEF REQUEST I3R-19 RELIEF FOR REPAIR OF SEAL WELDS ASSOCIATED WITH REACTOR VESSEL HEAD PENETRATIONS NOS. 31 AND 64 BYRON STATION, UNIT NO. 1 TAC NO. ME6061 By letter dated April 8, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML111010578), and supplemented by letters dated April 10, 2011 (ADAMS Accession No. ML111010202 and ML111010199, respectively), Exelon Generation Company, LLC (EGC, the licensee), modified Relief Request (RR) I3R-19 by requesting relief from the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code), requirements of ASME Code,Section III, NB-4450, to eliminate mechanical discontinuities detected in the seal weld during initial installation. Multiple flaws were identified by surface examination of the embedded flaw seal welds of vessel head penetration (VHP) Nos.
31 and 64.
The licensee requested relief to perform an alternative repair in lieu of the requirements of ASME Code,Section III, NB-4450, by welding over the flaws that are considered by the licensee to be mechanical discontinuities. The licensee identified flaw indications 1, 2, and 3 of VHP No. 31 and indications 1, 3, 6, 7, 8, and 9 of VHP No. 64 as mechanical discontinuities. The licensee stated that a radiological dose of 7 REM minimum could be avoided by using the automated welding process to repair the flaws versus the mechanical removal technique and verification of flaw removal required by ASME Code,Section III, NB-4450. By the letters dated April 10, 2011, EGC provided details of each new seal welds area of coverage.
The U.S. Nuclear Regulatory Commission (NRC) staff reviewed EGCs proposed alternative for the flaw indications. NRC staff finds the radiological dose associated with the ASME Code,Section III, NB-4450, repair of each indication would be a hardship. Each flaw in the seal weld was located in an area of the seal weld covering the penetration nozzle below the J-groove weld or on an area of the seal weld covering the stainless steel cladding of the reactor pressure vessel head.
Therefore, given the sizes of the flaws and each new seal welds area of coverage, the NRC staff finds the licensees modified proposed alternative, RR I3R-19, provides reasonable assurance of structural integrity and leak tightness of VHP Nos. 31 and 64, complying with the requirements of ASME Code,Section III, NB-4450, for the flaws identified by EGC in the letter dated April 8, 2011, would result in hardship without a compensating increase in the level of quality and safety.
Enclosure 1
Accordingly, the NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in Title 10 of the Code of Federal Regulations, Section 50.55a(a)(3)(ii). Therefore, pursuant to that regulation, the NRC staff provides verbal authorization for the modified proposed alternative RR I3R-19 for VHP Nos. 31 and 64 for the remainder of the third 10-year inservice inspection interval, which is scheduled to end on July 15, 2016.
RETRACTION OF VERBAL AUTHORIZATION FOR RELIEF REQUEST I3R-19 RELIEF FOR REPAIR OF SEAL WELDS ASSOCIATED WITH REACTOR VESSEL HEAD PENETRATIONS NOS. 31 AND 64 BYRON STATION, UNIT NO. 1 TAC NO. ME6061 On April 12, 2011, U.S. Nuclear Regulatory Commission (NRC) staff held a teleconference with Exelon Generation Company, LLC (EGC, the licensee) staff to rescind verbal authorization of Exelons Relief Request (RR) I3R-19 as modified by letter dated April 8, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML111010578), and letters dated April 10, 2011 (ADAMS Accession Nos. ML111010202 and ML111010199, respectively).
The cause for rescinding the authorization was the NRC staff finding that the relief was no longer applicable. The licensee performed mechanical grindings and a surface examination on each indication in penetration nozzles Nos. 31 and 64. The NRC staff has no issues with these actions as they would be the initial steps of repair within the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code). However, the licensees dye penetration surface examination noted changes in the indications in which some may have grown in size. The NRC staff also considered the radiological dose for both of these evolutions that were part of the hardship for which the licensee identified as a basis for relief. Therefore, the hardship for relief authorization had changed. Additionally, there was new information about the types of indications which may have changed the initial characterization.
As such, the indications no longer meet the description provided for each as requested by the NRC staff to support the authorization of the licensees RR.
The Office of Nuclear Reactor Regulation (NRR) staff including the Divisions of Operating Reactor Licensing and Component Integrity, in coordination with NRC Region III staff and NRC onsite inspectors, noted the relief was no longer applicable to the April 12, 2011, indications in penetration nozzles Nos. 31 and 64 at the Byron Station, Unit No. 1.
The NRC staff notes that related verbal relief authorizations associated with the nozzle overlays documented by memorandums dated March 28, 2011 and April 10, 2011 are unaffected.