MONTHYEARPMNS20241276, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Alternative for Reactor Pressure Vessel Stud Examinations2024-10-0909 October 2024
[Table view]Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Alternative for Reactor Pressure Vessel Stud Examinations ML24149A1422024-05-29029 May 2024 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Byron Station, Units 1 and 2 Nuclear Plant for Performance for 2023 Calendar Year ML24127A2362024-05-0707 May 2024 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Braidwood Nuclear Plant for Performance for 2023 Calendar Year ML24100A0552024-04-15015 April 2024 Constellation - Closed Meeting Notice Regarding a Future Topical Report Submittal PMNS20240456, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Alternative to Implement Code Case OMN-322024-04-10010 April 2024 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Alternative to Implement Code Case OMN-32 ML24058A1042024-03-22022 March 2024 Closed Forthcoming Meeting with Constellation Energy Generation, LLC PMNS20240360, Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Hooded Masks2024-03-14014 March 2024 Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Hooded Masks ML24047A2592024-02-20020 February 2024 Public Meeting Notice for Regulatory Conference to Discuss Risk Associated with 2B Auxiliary Feedwater Pump Diesel Engine Fuel Oil Leak PMNS20231393, Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding a Future Amendment Request to Delete Byron and Braidwood Station Technical Specification 5.6.5.b.22024-01-0808 January 2024 Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding a Future Amendment Request to Delete Byron and Braidwood Station Technical Specification 5.6.5.b.2 PMNS20231313, Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding a Future Amendment Request to Delete Byron and Braidwood Station Technical Specification 5.6.5.b.52023-11-24024 November 2023 Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding a Future Amendment Request to Delete Byron and Braidwood Station Technical Specification 5.6.5.b.5 PMNS20231227, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-5912023-11-13013 November 2023 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-591 PMNS20230972, Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding a Future Amendment Request to Revise the Braidwood Station, Units 1 and 2, Technical Specification 3.7.9 for the Ultimate Heat Sink2023-10-0202 October 2023 Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding a Future Amendment Request to Revise the Braidwood Station, Units 1 and 2, Technical Specification 3.7.9 for the Ultimate Heat Sink PMNS20230952, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests for Alternatives for Certain Steam Generator Weld Inspections2023-09-13013 September 2023 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests for Alternatives for Certain Steam Generator Weld Inspections PMNS20230930, Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regardingbyron Station, Unit 2, Core Exit Thermocouple Penetration P-752023-08-29029 August 2023 Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regardingbyron Station, Unit 2, Core Exit Thermocouple Penetration P-75 PMNS20230931, Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regardingextension of Byron Station, Unit 1, Reactor Pressure Vessel (RPV) Inspections2023-08-29029 August 2023 Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regardingextension of Byron Station, Unit 1, Reactor Pressure Vessel (RPV) Inspections PMNS20230744, Notice of Meeting with Constellation Energy Generation, LLC, (Constellation) to Discuss the Denial of Its Requests for Alternatives for Certain Steam Generator Weld Inspections2023-06-22022 June 2023 Notice of Meeting with Constellation Energy Generation, LLC, (Constellation) to Discuss the Denial of Its Requests for Alternatives for Certain Steam Generator Weld Inspections ML23138A1892023-05-18018 May 2023 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Braidwood and Byron Nuclear Plants for Performance for 2022 Calendar Year PMNS20230225, Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Byron Station and Braidwood Station New Criticality Analysis for Spent Fuel Pools2023-03-0606 March 2023 Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Byron Station and Braidwood Station New Criticality Analysis for Spent Fuel Pools PMNS20230129, Pre-Application Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Revision of the Emergency Action Levels2023-02-22022 February 2023 Pre-Application Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Revision of the Emergency Action Levels PMNS20230063, Notice of Meeting with Constellation Energy Generation, LLC, (Constellation) to Discuss Its Requests for Alternatives for Certain Steam Generator Weld Inspections2023-01-19019 January 2023 Notice of Meeting with Constellation Energy Generation, LLC, (Constellation) to Discuss Its Requests for Alternatives for Certain Steam Generator Weld Inspections PMNS20220954, Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Byron Station and Braidwood Station Change to Framatome Nuclear Fuel2022-09-20020 September 2022 Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Byron Station and Braidwood Station Change to Framatome Nuclear Fuel PMNS20220805, Notice of Meeting with Constellation Energy Generation, LLC, to Discuss Its Performance Monitoring Plan for Certain Steam Generator Welds2022-08-22022 August 2022 Notice of Meeting with Constellation Energy Generation, LLC, to Discuss Its Performance Monitoring Plan for Certain Steam Generator Welds ML22136A1212022-05-17017 May 2022 Notice of Significant Public Meeting to Discuss NRC End of Cycle Performance Assessment of Braidwood and Byron Power Plants for Performance for 2021 Calendar Year ML22136A1312022-05-17017 May 2022 Notice of Information Meeting with a Question and Answer Session to Discuss NRC 2021 End of Cycle Plant Performance of Braidwood Station, Units 1 and 2 and Byron Station, Units 1 and 2 PMNS20220320, Pre-Application Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Placement of a Twice Burned Accident Tolerant Fuel (ATF) Lead Test Assembly (LTA) in a High Burnup Core Location in Byron, Unit 22022-04-10010 April 2022 Pre-Application Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Placement of a Twice Burned Accident Tolerant Fuel (ATF) Lead Test Assembly (LTA) in a High Burnup Core Location in Byron, Unit 2 PMNS20220359, Second Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Performance Monitoring of Pressurizer Welds at Byron Nuclear Station (Byron) and Braidwood Nuclear Station (Braidwood)2022-04-0707 April 2022 Second Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Performance Monitoring of Pressurizer Welds at Byron Nuclear Station (Byron) and Braidwood Nuclear Station (Braidwood) PMNS20220331, Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Performance Monitoring of Pressurizer Welds at Byron Nuclear Station (Byron) and Braidwood Nuclear Station (Braidwood)2022-03-31031 March 2022 Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Performance Monitoring of Pressurizer Welds at Byron Nuclear Station (Byron) and Braidwood Nuclear Station (Braidwood) PMNS20211388, Pre-application Meeting Regarding Removal of the License Condition 2.C.(12)(D) That Requires Repair of Stud Hole Number 35 Prior to the Period of Extended Operation from the Unit 2 License2021-11-16016 November 2021 Pre-application Meeting Regarding Removal of the License Condition 2.C.(12)(D) That Requires Repair of Stud Hole Number 35 Prior to the Period of Extended Operation from the Unit 2 License PMNS20211231, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding Extending Inservice Inspection Intervals2021-10-0505 October 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding Extending Inservice Inspection Intervals PMNS20210947, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a, Codes and Standards2021-07-13013 July 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a, Codes and Standards ML21145A1682021-05-25025 May 2021 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Braidwood Station and Byron Station for Performance for 2020 Calendar Year PMNS20210423, Notice of Meeting with Exelon Generation Company, LLC Regarding a Future Amendment Request to Revise Braidwood Station Ultimate Heat Sink Technical Specifications2021-05-11011 May 2021 Notice of Meeting with Exelon Generation Company, LLC Regarding a Future Amendment Request to Revise Braidwood Station Ultimate Heat Sink Technical Specifications PMNS20210550, Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards2021-04-28028 April 2021 Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards PMNS20201359, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Exemption from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards2020-12-14014 December 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Exemption from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards PMNS20201291, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards2020-10-30030 October 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards PMNS20201224, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a Codes and Standards2020-10-20020 October 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a Codes and Standards ML20183A1312020-06-30030 June 2020 7/14/2020 Notice of Significant Public Meeting to Discuss Nrc'S End of Cycle Assessment of Braidwood Station and Byron Station Performance for the 2019 Calendar Year ML19308A0512019-11-0404 November 2019 Pre-Application Meeting with Exelon Generation Company, LLC ML19158A3742019-06-0606 June 2019 7/2/2019 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of Braidwood Station Performance for the 2018 Calendar Year ML19133A1582019-05-13013 May 2019 5/28/2019 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Byron Station Performance for the 2018 Calendar Year ML18088A0522018-03-29029 March 2018 5/10/2018 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Braidwood Station Performance for the 2017 Calendar Year ML18067A2732018-03-0808 March 2018 4/18/2018 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of Byron Station, Units 1 and 2 Performance for the 2017 Calendar Year ML17335A0442017-12-0404 December 2017 Tvel Lead Test Assembly 3rd Closed Meeting ML17257A3762017-09-14014 September 2017 Public Meeting Notice of NRC Region III 2017 Operator Licensing Workshop ML17258A0222017-09-14014 September 2017 U.S. Nuclear Regulatory Commission Region III 2017 Operator Licensing Workshop (Public Meeting) for Exelon Sites (CMS) ML17072A2162017-03-0909 March 2017 3/09/2017 Notice of Meeting with Exelon Generation Company, LLC to Discuss Nrc'S End-of-Cycle Assessment of the Byron Station Performance for the 2016 Calendar Year ML17069A0702017-03-0707 March 2017 4/28/17 Notice of Significant Public Meeting with Braidwood Station to Discuss Nrc'S End-of-Cycle Assessment of the Braidwood Station Performance for the 2016 Calendar Year ML16209A3062016-08-0101 August 2016 Notice of Forthcoming Closed Meeting with Exelon Generation Company, LLC ML16172A2872016-06-20020 June 2016 7/12/16 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Byron Station Performance for the 2015 Calendar Year ML16172A2982016-06-20020 June 2016 7/14/16 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Braidwood Station Performance for the 2015 Calendar Year 2024-05-07 Category:Meeting Agenda MONTHYEARPMNS20241276, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Alternative for Reactor Pressure Vessel Stud Examinations2024-10-0909 October 2024
[Table view]Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Alternative for Reactor Pressure Vessel Stud Examinations PMNS20240456, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Alternative to Implement Code Case OMN-322024-04-10010 April 2024 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Alternative to Implement Code Case OMN-32 ML24058A1042024-03-22022 March 2024 Closed Forthcoming Meeting with Constellation Energy Generation, LLC PMNS20240360, Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Hooded Masks2024-03-14014 March 2024 Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Hooded Masks PMNS20231393, Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding a Future Amendment Request to Delete Byron and Braidwood Station Technical Specification 5.6.5.b.22024-01-0808 January 2024 Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding a Future Amendment Request to Delete Byron and Braidwood Station Technical Specification 5.6.5.b.2 ML23345A0362023-12-11011 December 2023 ATWS Uet December 11, 2023 Pre-submittal Meeting Slides PMNS20231313, Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding a Future Amendment Request to Delete Byron and Braidwood Station Technical Specification 5.6.5.b.52023-11-24024 November 2023 Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding a Future Amendment Request to Delete Byron and Braidwood Station Technical Specification 5.6.5.b.5 PMNS20231227, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-5912023-11-13013 November 2023 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-591 PMNS20230972, Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding a Future Amendment Request to Revise the Braidwood Station, Units 1 and 2, Technical Specification 3.7.9 for the Ultimate Heat Sink2023-10-0202 October 2023 Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding a Future Amendment Request to Revise the Braidwood Station, Units 1 and 2, Technical Specification 3.7.9 for the Ultimate Heat Sink PMNS20230952, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests for Alternatives for Certain Steam Generator Weld Inspections2023-09-13013 September 2023 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests for Alternatives for Certain Steam Generator Weld Inspections PMNS20230930, Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regardingbyron Station, Unit 2, Core Exit Thermocouple Penetration P-752023-08-29029 August 2023 Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regardingbyron Station, Unit 2, Core Exit Thermocouple Penetration P-75 PMNS20230931, Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regardingextension of Byron Station, Unit 1, Reactor Pressure Vessel (RPV) Inspections2023-08-29029 August 2023 Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regardingextension of Byron Station, Unit 1, Reactor Pressure Vessel (RPV) Inspections PMNS20230744, Notice of Meeting with Constellation Energy Generation, LLC, (Constellation) to Discuss the Denial of Its Requests for Alternatives for Certain Steam Generator Weld Inspections2023-06-22022 June 2023 Notice of Meeting with Constellation Energy Generation, LLC, (Constellation) to Discuss the Denial of Its Requests for Alternatives for Certain Steam Generator Weld Inspections PMNS20230225, Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Byron Station and Braidwood Station New Criticality Analysis for Spent Fuel Pools2023-03-0606 March 2023 Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Byron Station and Braidwood Station New Criticality Analysis for Spent Fuel Pools PMNS20230129, Pre-Application Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Revision of the Emergency Action Levels2023-02-22022 February 2023 Pre-Application Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Revision of the Emergency Action Levels PMNS20230063, Notice of Meeting with Constellation Energy Generation, LLC, (Constellation) to Discuss Its Requests for Alternatives for Certain Steam Generator Weld Inspections2023-01-19019 January 2023 Notice of Meeting with Constellation Energy Generation, LLC, (Constellation) to Discuss Its Requests for Alternatives for Certain Steam Generator Weld Inspections PMNS20220954, Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Byron Station and Braidwood Station Change to Framatome Nuclear Fuel2022-09-20020 September 2022 Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Byron Station and Braidwood Station Change to Framatome Nuclear Fuel PMNS20220805, Notice of Meeting with Constellation Energy Generation, LLC, to Discuss Its Performance Monitoring Plan for Certain Steam Generator Welds2022-08-22022 August 2022 Notice of Meeting with Constellation Energy Generation, LLC, to Discuss Its Performance Monitoring Plan for Certain Steam Generator Welds PMNS20220320, Pre-Application Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Placement of a Twice Burned Accident Tolerant Fuel (ATF) Lead Test Assembly (LTA) in a High Burnup Core Location in Byron, Unit 22022-04-10010 April 2022 Pre-Application Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Placement of a Twice Burned Accident Tolerant Fuel (ATF) Lead Test Assembly (LTA) in a High Burnup Core Location in Byron, Unit 2 PMNS20220359, Second Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Performance Monitoring of Pressurizer Welds at Byron Nuclear Station (Byron) and Braidwood Nuclear Station (Braidwood)2022-04-0707 April 2022 Second Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Performance Monitoring of Pressurizer Welds at Byron Nuclear Station (Byron) and Braidwood Nuclear Station (Braidwood) PMNS20220331, Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Performance Monitoring of Pressurizer Welds at Byron Nuclear Station (Byron) and Braidwood Nuclear Station (Braidwood)2022-03-31031 March 2022 Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Performance Monitoring of Pressurizer Welds at Byron Nuclear Station (Byron) and Braidwood Nuclear Station (Braidwood) PMNS20211388, Pre-application Meeting Regarding Removal of the License Condition 2.C.(12)(D) That Requires Repair of Stud Hole Number 35 Prior to the Period of Extended Operation from the Unit 2 License2021-11-16016 November 2021 Pre-application Meeting Regarding Removal of the License Condition 2.C.(12)(D) That Requires Repair of Stud Hole Number 35 Prior to the Period of Extended Operation from the Unit 2 License ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval PMNS20211231, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding Extending Inservice Inspection Intervals2021-10-0505 October 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding Extending Inservice Inspection Intervals PMNS20210947, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a, Codes and Standards2021-07-13013 July 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a, Codes and Standards PMNS20210423, Notice of Meeting with Exelon Generation Company, LLC Regarding a Future Amendment Request to Revise Braidwood Station Ultimate Heat Sink Technical Specifications2021-05-11011 May 2021 Notice of Meeting with Exelon Generation Company, LLC Regarding a Future Amendment Request to Revise Braidwood Station Ultimate Heat Sink Technical Specifications PMNS20210550, Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards2021-04-28028 April 2021 Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards PMNS20201359, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Exemption from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards2020-12-14014 December 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Exemption from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards PMNS20201291, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards2020-10-30030 October 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards PMNS20201224, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a Codes and Standards2020-10-20020 October 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a Codes and Standards ML20178A4282020-06-30030 June 2020 NEI Questions for June 30, 2020 Public Meeting ML19308A0512019-11-0404 November 2019 Pre-Application Meeting with Exelon Generation Company, LLC ML19151A6602019-05-31031 May 2019 BWR Fleet Mssv/Srv Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML16209A3062016-08-0101 August 2016 Notice of Forthcoming Closed Meeting with Exelon Generation Company, LLC ML16074A3232016-03-21021 March 2016 Forthcoming Meeting with Exelon Nuclear ML15183A4842015-07-0101 July 2015 Ltr. 07/01/15 Davis-Besse U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15182A4412015-07-0101 July 2015 Notice and Agenda - 2015 Operator Licensing Workshop ML15183A3862015-07-0101 July 2015 Ltr. 07/01/15 Prairie Island U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A3992015-07-0101 July 2015 Ltr. 07/01/15 Point Beach U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4452015-07-0101 July 2015 Ltr. 07/01/15 Perry U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4632015-07-0101 July 2015 Ltr. 07/01/15 Monticello U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15182A4292015-07-0101 July 2015 Bra BYR Cli DRE Lasa Qua Operator License Workshop Invitation ML15183A4722015-07-0101 July 2015 Ltr. 07/01/2015 Fermi U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4782015-07-0101 July 2015 Ltr. 07/01/15 Duane Arnold U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4792015-07-0101 July 2015 Ltr. 07/01/15 D.C. Cook U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting)(Drm) ML15168A4912015-06-16016 June 2015 Notice of Meeting on with Exelon Nuclear - Braidwood and Byron Stations (Msh) ML14169A4542014-06-13013 June 2014 Ltr 6/13/14 Bra BYR Cli DRE LAS Qua Operator License Workshop ML13241A4442013-09-0606 September 2013 Open House-Agenda-Websites Handout ML13246A0162013-09-0404 September 2013 Notice of Forthcoming Teleconference Meeting with Exelon Generation Company, LLC to Discuss Future Submittal of License Amendment Request to Clarify Braidwood Nuclear Station Technical Specification 5.5.16 ML13205A0452013-08-0707 August 2013 08/20/2013 Forthcoming Meeting to Discuss the License Renewal Process and Environmental Scoping for Exelon Generation Company, Llc(Exelon), Byron Nuclear Station, Units 1 and 2 2024-04-10 Category:Memoranda MONTHYEARML24152A1852024-06-0404 June 2024
[Table view]Summary of March 28, 2024, Closed Hybrid Pre-Submittal Meeting Between Constellation Energy Generation, LLC and the U.S. Nuclear Regulatory Commission Regarding a Future Amendment Request for Fuel Transition ML23044A3662023-02-15015 February 2023 Calendar Year 2022 Reactor Oversight Process Baseline Inspection Program Completion - Region III ML22300A0842022-11-10010 November 2022 Pressure and Temperature Limits Report (Ptlr), Revision 8 ML21349A1062021-12-15015 December 2021 Justification for the Deviation from MRP 2019-008, Technical Evaluation 635273 ML21277A2472021-11-0505 November 2021 Notification of Significant Licensing Action - Proposed Issuance of Order Approving the Transfer of Licenses for Which a Hearing Has Been Requested - Exelon Generation Company, LLC; Et. Al ML20155K6802020-11-23023 November 2020 Memo to File: Environmental Assessment and Finding of No Significant Impact and NRC Financial Analysis for Exelon Corporation, LLC, Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30(b) and (C) for Byron ISFSI ML20155K6862020-11-23023 November 2020 Memo to File: Environmental Assessment and Finding of No Significant Impact and NRC Financial Analysis for Exelon Corporation LLC Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30(b) and (C) for Braidwood ISFSI ML17335A0442017-12-0404 December 2017 Tvel Lead Test Assembly 3rd Closed Meeting ML17164A3302017-06-13013 June 2017 Safety Evaluation Regarding the Proposed License Amendment to Revise the Byron Licensing Bases for Protection from Tornado-Generated Missiles (CAC Number MF8446 and 8447) ML17142A2382017-05-25025 May 2017 OEDO-17-00280 - Briefing Package for Drop-In Visit on June 9, 2017, by Senior Management of Exelon Generation Company, LLC with Chairman Svinicki, Commissioner Baran, and Commissioner Burns ML16236A2022016-08-24024 August 2016 Backfit Appeal Review Panel Findings Associated with Byron and Braidwood Compliance ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML16082A5422016-03-25025 March 2016 Backfit Review Panel Recommendation Regarding Exelon Appeal of Backfit Affecting Braidwood and Byron Stations Regarding Compliance with 10 CFR 50.34(b), GDC 15, GDC 21, GDC 29, and the Licensing Basis ML16074A3232016-03-21021 March 2016 Forthcoming Meeting with Exelon Nuclear ML16075A3292016-03-16016 March 2016 OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for Operations ML16070A3622016-03-15015 March 2016 03/07/2016 Summary of Public Meeting Between U.S. Nuclear Regulatory Commission Staff and Exelon Generation Company, LLC to Discuss an Appeal of a Compliance Backfit ML15336A0172016-01-20020 January 2016 Renewal of Full-Power Operating License for Braidwood Station, Units 1 and 2 ML15355A0812016-01-12012 January 2016 Backfit Review Panel Charter Regarding December 8, 2015, Exelon Appeal of Imposed Backfit Affecting Braidwood and Byron Stations ML15267A7342015-11-10010 November 2015 Renewal of Full-Power Operating Licenses for Byron, Units 1 and 2 ML15253A9132015-09-11011 September 2015 ACRS Full Committee - Corrections to the Aging Management Programs Table ML15187A3272015-07-13013 July 2015 Request for ACRS Review of Byron Braidwood SER ML15051A3612015-03-0303 March 2015 02/05/2015 Summary of Telephone Conference Call No 2 Held Between the NRC and Exelon Generation Co., LLC Concerning Request for Additional Information, Set 45, Pertaining to the Byron, and Braidwood, License Renewal Application ML15016A4732015-01-15015 January 2015 Ltr 2014 Byron EP Annual Closeout (Rdj) ML14317A5432014-11-17017 November 2014 Federal Register Notice Regarding the ACRS Plant License Renewal Subcommittee Meeting (Braidwood/Byron), December 3, 2014 ML14205A5752014-08-11011 August 2014 Summary of Telephone Conference Call Held on June 10, 2014, Between U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Concerning Fire Water System Request for Additional Information Responses Pertaining to Byron Station. ML14227A1092014-07-0909 July 2014 Bryron, Units 1 & 2 - Imposition of Facility-Specific Baskfit Compliance with Licensing Basis Plant Design Requirements ML14177A4302014-07-0202 July 2014 06/23/2014 Summary of Telephone Conference Call Between NRC and Exelon Generation Co., LLC, Concerning the Byron and Braidwood, License Renewal Application (TAC Nos. MF1879, MF1880, MF1881 and MF1882) ML14148A3882014-06-0505 June 2014 Summary of Telephone Conference Call Held on May 19, 2014, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Concerning Draft Request for Additional Information, Set 28, Pertaining to the Byron Station and Br ML14126A5432014-05-19019 May 2014 Summary of Telephone Conference Call Held on April 22, 2014, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Concerning Draft Request for Additional Information, Set 24, Pertaining to the Byron Station and ML14107A2262014-05-14014 May 2014 Summary of Telephone Conference Call Held on March 26, 2014, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Concerning Draft Request for Additional Information, Set 21, Pertaining to the Byron Station and ML14092A4402014-05-14014 May 2014 Summary of Telephone Conference Call Held on March 19, 2014, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Concerning Draft Request for Additional Information, Set 18, Pertaining to the Byron Station and ML14085A1102014-04-30030 April 2014 Summary of Telephone Conference Call Held on March 24, 2014 Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC, Concerning Requests for Additional Information Pertaining to the Braidwood Station, License Renew ML14092A3562014-04-15015 April 2014 Summary of Telephone Conference Call Held on March 31, 2014 Between the U.S. NRC and Exelon Generation Company, LLC, Concerning Requests for Additional Information Pertaining to the Braidwood Station, License Renewal Application ML14069A3372014-04-0202 April 2014 Final Response to Task Interface Agreement 2012-13, Braidwood Station Technical Specification 3.6.3 Compliance with One or More Main Steam Isolation Valves Inoperable ML12194A5002014-03-31031 March 2014 Final TIA Response Byron Braidwood Single Spurious Assumption ML14058B1802014-03-11011 March 2014 Summary of Telephone Conference Call on February 18, 2014, Between U.S. Nuclear Regulatory Commission & Exelon Generation Company, LLC Concerning Draft Request for Additional Information Regarding Byron & Braidwood Stations, License Renewal ML14064A4032014-03-11011 March 2014 Summary of Telephone Conference Call on February 27, 2014, Between U.S. Nuclear Regulatory Commission & Exelon Generation Company, LLC Concerning Draft Request for Additional Information Re Byron Station & Braidwood Station License Renewal ML14036A3102014-03-0404 March 2014 Summary of Telephone Conference Call Held on January 28, 2014, Between NRC and Exelon, Concerning RAI Set 10, for the Byron and Braidwood Station, LRA ML14063A1742014-01-28028 January 2014 Making Non-Concurrence NCP-2013-014 Public Available ML13267A0802013-12-0909 December 2013 Reactor Systems Branch Safety Evaluation Input to Byron Station Units 1 and 2 and Braidwood Station Units 1 and 2 Measurement Uncertainty Recapture Power Update ML13303B4632013-11-25025 November 2013 Summary of Telephone Conference Call Held on October 22, 2013, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC, Concerning RAI Set 3 for the Byron-Braidwood LRA ML13240A2342013-10-0404 October 2013 8/10/2013 - Summary of Public Scoping Meetings Conducted Related to the Review of the Byron Nuclear Station, License Renewal Application(Tac Nos. MF1790 and MF1791) ML13246A4342013-09-27027 September 2013 09/28/2013 Meeting Summary of Public Scoping Meetings Conducted Related to the Review of the Braidwood Station, Unit 1 and 2, License Renewal Application ML13246A0162013-09-0404 September 2013 Notice of Forthcoming Teleconference Meeting with Exelon Generation Company, LLC to Discuss Future Submittal of License Amendment Request to Clarify Braidwood Nuclear Station Technical Specification 5.5.16 ML13205A0452013-08-0707 August 2013 08/20/2013 Forthcoming Meeting to Discuss the License Renewal Process and Environmental Scoping for Exelon Generation Company, Llc(Exelon), Byron Nuclear Station, Units 1 and 2 ML13193A3612013-08-0505 August 2013 08/21/2013 Forthcoming Meeting to Discuss the License Renewal Process and Environmental Scoping for Exelon Generation Company, LLC, Braidwood Nuclear Station Units 1 and 2 ML13190A3522013-07-10010 July 2013 Notice of Forthcoming Teleconference with Exelon Generation Company, LLC ML13094A0922013-04-0404 April 2013 Notice of Forthcoming Meeting with Exelon Generation Company, LLC to Discuss Future Submittal of a License Amendment Request to Modify Technical Specifications for the Main Steam Isolation Valves & Their Actuators ML13014A7652013-02-0404 February 2013 03/20/2013 Notice of Forthcoming Meeting with Exelon Corporation Regarding License Renewal Application for the Byron and Braidwood Nuclear Power Stations 2024-06-04 |
Contents
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 4, 2013 MEMORANDUM TO: Dennis Morey, Chief Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation FROM: John Daily, Senior Project Manager Projects Branch 1 J", ~ .l
......... ~\
Division of License Renewal Office of Nuclear Reactor Regulation
SUBJECT:
FORTHCOMING MEETING WITH EXELON CORPORATION REGARDING LICENSE RENEWAL APPLICATION FOR THE BYRON AND BRAIDWOOD NUCLEAR POWER STATIONS DATE AND TIME: Wednesday, March 20, 2013 9:00 a.m. to 11 :00 a.m.
LOCATION: U.S. Nuclear Regulatory Commission (NRC)
One White Flint, Room 07 -B04 11555 Rockville Pike Rockville, Maryland 20852 PURPOSE: To discuss Exelon Corporation's (Exelon's) plan for submitting a combined license renewal application for the Byron and Braidwood Nuclear Stations. A proposed agenda for the meeting is enclosed.
CATEGORY 1*: This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC staff after the business portion, but before the meeting is adjourned.
CONTACT: John Daily, NRR/DLR/RPB1 301-415-3873 john.daily@nrc.gov
- Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings,"
67 Federal Register 36920, May 28, 2002.
D. Morey - 2 PARTICIPANTS: Participants include members from the NRC's Office of Nuclear Reactor Regulation (NRR) and representatives from Exelon.
NRC/NRR Exelon John Lubinski Michael Gallagher Melanie Galloway AI Fulrio John Daily Donald Warfel Dennis Morey Albert Piha Christine Kinkead Don Brindle Ralph Wolen Nancy Ranek John Hufnagel The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in a meeting, or need a meeting notice or other information from a meeting, please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
Docket Nos. 50-454, 50-455, 50-456, and 50-457
Enclosure:
Agenda cc w/encl: Listserv
NUCLEAR REGULATORY COIVIIVIISSION:
FORTHCOMING MEETING WITH EXELON CORPORATION REGARDING LICENSE RENEWAL APPLICATION FOR THE BYRON AND BRAIDWOOD NUCLEAR POWER STATIONS AGENDA March 20, 2013 Topic Time (approximate)
I. Introduction, Purpose and Opening Remarks 09:00 - 09:10 II. Exelon presentation of plan for submittal 09:10 - 09:45
- a. Plant locations, descriptions.
- b. Commonality of design
- c. Overview of Application III. Discussion of LRA review and staff comments 09:45 - 10:45 IV. Public Comment 10:45 - 11 :00 L _V.__ Adjourn 11 :00 ENCLOSURE
Memorandum to D. Morey from J. Daily dated February 5, 2013
SUBJECT:
FORTHCOMING MEETING WITH EXELON CORPORATION REGARDING LICENSE RENEWAL APPLICATION FOR THE BYRON AND BRAIDWOOD NUCLEAR POWER STATIONS DISTRIBUTION:
E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRsrg Resource RidsOgcMailCenter
..IDaily TTran DMclntyre, OPA JWiebe, DORL EDuncan, Rill BBartlett, Rill JRobbins, Rill JBenjamin, Rill AGarmoe, Rill