ML070610496: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 5: Line 5:
| author name = Vanwyen T
| author name = Vanwyen T
| author affiliation = Exelon Generation Co, LLC
| author affiliation = Exelon Generation Co, LLC
| addressee name = Fish T H
| addressee name = Fish T
| addressee affiliation = NRC/RGN-I/DRS/OB
| addressee affiliation = NRC/RGN-I/DRS/OB
| docket = 05000277, 05000278
| docket = 05000277, 05000278
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:To: T. Fish Fm: M. Kelly, PBAPS Exam Author Subj.: Handouts provided to applicants for the written exam We provided the following materials to the applicants for administration of the written exam: RO Exam 1. Full set of TRIPS with entry conditions blanked out: 0 T-1 00 "Scram" (1 sheet) 0 T-101 "RPV Control" (1 sheet) 0 T-102 "Primary Containment Control" (3 sheets) 0 T-103 "Secondary Containment Control" (1 sheet) T-104 "Radioactivity Release" (1 sheet) 0 T-1 1 1 "Level Restoration" (1 sheet) T-112 "Emergency Blowdown" (1 sheet) 0 T-116 "RPV Flooding" (2 sheets) T-117 "LeveVPower Control" (1 sheet) 2. Steam Tables 3, Print E-1 (sheet 1 of 4) Single Line Diagram - Station 4. Table 2 "Cause & Corrective Action Trouble Shooting" of SO 62.1 .A "Withdrawing/lnserting a Control Rod" SRO Exam 1. 2. 3. 4. 5. Full set of Technical Specifications (without bases), with S.R. 3.6.4.1.4 (SBGT flow rate c 10,500 cfm) sanitized.
{{#Wiki_filter:To:   T. Fish Fm:   M. Kelly, PBAPS Exam Author Subj.: Handouts provided to applicants for the written exam We provided the following materials to the applicants for administration of the written exam:
Full set of Technical Requirements (without bases) SE-11 "Loss of Off-Site Power", Attachment C "Instrument List" Table PBAPS 3-1 : Emergency Action Level (EAL) Matrix of EP-AA-1007 "Radiological Emergency Plan Annex for Peach Bottom Atomic Power Station", Rev. 13 OT-1 10, "Reactor High Level' Figure 1}}
RO Exam
: 1. Full set of TRIPSwith entry conditions blanked out:
0 T-1 00 "Scram" (1 sheet) 0 T-101 "RPV Control" (1 sheet) 0 T-102 "Primary Containment Control" (3 sheets) 0 T-103 "Secondary Containment Control" (1 sheet)
T-104 "Radioactivity Release" (1 sheet) 0 T-1 11 "Level Restoration" (1 sheet)
T-112 "Emergency Blowdown" (1 sheet) 0 T-116 "RPV Flooding" (2 sheets)
T-117 "LeveVPower Control" (1 sheet)
: 2. Steam Tables 3, Print E-1 (sheet 1 of 4) Single Line Diagram - Station
: 4. Table 2 "Cause & Corrective Action Trouble Shooting" of SO 62.1.A "Withdrawing/lnsertinga Control Rod" SRO Exam
: 1. Full set of Technical Specifications (without bases), with S.R. 3.6.4.1.4 (SBGT flow rate c 10,500 cfm) sanitized.
: 2. Full set of Technical Requirements (without bases)
: 3. SE-11 "Loss of Off-Site Power", Attachment C "Instrument List"
: 4. Table PBAPS 3-1 : Emergency Action Level (EAL) Matrix of EP-AA-1007 "Radiological Emergency Plan Annex for Peach Bottom Atomic Power Station",
Rev. 13
: 5. OT-1 10, "Reactor High Level' Figure 1}}

Latest revision as of 08:57, 23 November 2019

Summary of Handouts to Applicants (Folder 3)
ML070610496
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 01/29/2007
From: Vanwyen T
Exelon Generation Co
To: Todd Fish
Operations Branch I
Sykes, Marvin D.
Shared Package
ML060800089 List:
References
Download: ML070610496 (1)


Text

To: T. Fish Fm: M. Kelly, PBAPS Exam Author Subj.: Handouts provided to applicants for the written exam We provided the following materials to the applicants for administration of the written exam:

RO Exam

1. Full set of TRIPSwith entry conditions blanked out:

0 T-1 00 "Scram" (1 sheet) 0 T-101 "RPV Control" (1 sheet) 0 T-102 "Primary Containment Control" (3 sheets) 0 T-103 "Secondary Containment Control" (1 sheet)

T-104 "Radioactivity Release" (1 sheet) 0 T-1 11 "Level Restoration" (1 sheet)

T-112 "Emergency Blowdown" (1 sheet) 0 T-116 "RPV Flooding" (2 sheets)

T-117 "LeveVPower Control" (1 sheet)

2. Steam Tables 3, Print E-1 (sheet 1 of 4) Single Line Diagram - Station
4. Table 2 "Cause & Corrective Action Trouble Shooting" of SO 62.1.A "Withdrawing/lnsertinga Control Rod" SRO Exam
1. Full set of Technical Specifications (without bases), with S.R. 3.6.4.1.4 (SBGT flow rate c 10,500 cfm) sanitized.
2. Full set of Technical Requirements (without bases)
3. SE-11 "Loss of Off-Site Power", Attachment C "Instrument List"
4. Table PBAPS 3-1 : Emergency Action Level (EAL) Matrix of EP-AA-1007 "Radiological Emergency Plan Annex for Peach Bottom Atomic Power Station",

Rev. 13

5. OT-1 10, "Reactor High Level' Figure 1