{{#Wiki_filter:March 26,2007Mr. Christopher M. CranePresident and Chief Nuclear Officer
{{#Wiki_filter:March 26,2007
Mr. Christopher M. Crane
President and Chief Nuclear Officer
Exelon Nuclear
Exelon Nuclear
Exelon Generation Company, LLC
Exelon Generation Company, LLC
4300 Winfield Road
4300 Winfield Road
Warrenville, IL 60555SUBJECT:LASALLE COUNTY STATION, UNITS 1 AND 2 - INFORMATION REQUESTFOR AN NRC BIENNIAL BASELINE COMPONENT DESIGN BASES
Warrenville, IL 60555
INSPECTION 05000373/2007009(DRS); 05000374/2007009(DRS)Dear Mr. Crane:
SUBJECT:         LASALLE COUNTY STATION, UNITS 1 AND 2 - INFORMATION REQUEST
On August 27, 2007, the NRC will begin a biennial baseline Component Design BasesInspection (CDBI) at the LaSalle County Station, Units 1 and 2. This inspection will be
                FOR AN NRC BIENNIAL BASELINE COMPONENT DESIGN BASES
                INSPECTION 05000373/2007009(DRS); 05000374/2007009(DRS)
Dear Mr. Crane:
On August 27, 2007, the NRC will begin a biennial baseline Component Design Bases
Inspection (CDBI) at the LaSalle County Station, Units 1 and 2. This inspection will be
performed in accordance with revised NRC Baseline Inspection Procedure (IP) 71111.21 and
performed in accordance with revised NRC Baseline Inspection Procedure (IP) 71111.21 and
replaces the biennial Safety System Design and Performance Capability Inspection. The CDBI inspection focuses on components which have high risk and low design margins. The components to be reviewed during this baseline inspection will be identified during an
replaces the biennial Safety System Design and Performance Capability Inspection.
in-office preparation week prior to the first week of the on-site inspection. In addition, a number
The CDBI inspection focuses on components which have high risk and low design margins.
The components to be reviewed during this baseline inspection will be identified during an
in-office preparation week prior to the first week of the on-site inspection. In addition, a number
of risk significant operator actions and operating experience issues, associated with the
of risk significant operator actions and operating experience issues, associated with the
component samples, will also be selected for review. The inspection will include 3 weeks on-site, including the information gathering during the firston-site week. The inspection team will consist of six NRC inspectors, of whom five will focus on
component samples, will also be selected for review.
engineering and one on operations. The current inspection schedule is as follows: *August 27 through August 31, 2007;*September 10 through September 14, 2007; and  
The inspection will include 3 weeks on-site, including the information gathering during the first
*September 24 through September 28, 2007.The team will be preparing for the inspection, mainly during the week of August 20, 2007, asdiscussed in the attached enclosure. A Region III Senior Reactor Analyst may accompany theinspection team during the week of August 27, 2007, to review probabilistic risk assessment
on-site week. The inspection team will consist of six NRC inspectors, of whom five will focus on
engineering and one on operations. The current inspection schedule is as follows:
        *       August 27 through August 31, 2007;
        *       September 10 through September 14, 2007; and
        *       September 24 through September 28, 2007.
The team will be preparing for the inspection, mainly during the week of August 20, 2007, as
discussed in the attached enclosure. A Region III Senior Reactor Analyst may accompany the
inspection team during the week of August 27, 2007, to review probabilistic risk assessment
data and assist in identifying risk significant components, which will be reviewed during the
data and assist in identifying risk significant components, which will be reviewed during the
inspection.Experience with previous baseline design inspections of similar depth and length has shownthat these type of inspections are extremely resource intensive, both for the NRC inspectors
inspection.
and the licensee staff. In order to minimize the inspection impact on the site and to ensure a  
Experience with previous baseline design inspections of similar depth and length has shown
that these type of inspections are extremely resource intensive, both for the NRC inspectors
and the licensee staff. In order to minimize the inspection impact on the site and to ensure a
productive inspection for both parties, we have enclosed a request for information needed for
productive inspection for both parties, we have enclosed a request for information needed for
the inspection.  
the inspection.
C. Crane-2-It is important that all of these documents are up to date and complete in order to minimize thenumber of additional documents requested during the preparation and/or the on-site portions of
 
the inspection. Insofar as possible, this information should be provided electronically to the
C. Crane                                           -2-
lead inspector. The information request has been divided into three groups:*The first group lists information necessary for our initial inspection scoping activities. This information should be available to the lead inspector no later than July 30, 2007.  
It is important that all of these documents are up to date and complete in order to minimize the
By August 10, 2007, the lead inspector will communicate the initial selected set of
number of additional documents requested during the preparation and/or the on-site portions of
approximately 30 high risk components. *The second group of documents requested are those items needed to support ourin-office preparation activities. This set of documents, including the calculations
the inspection. Insofar as possible, this information should be provided electronically to the
associated with the initial selected components, should be available at the Regional
lead inspector. The information request has been divided into three groups:
Office no later than August 17, 2007. During the in-office preparation activities, the
*       The first group lists information necessary for our initial inspection scoping activities.
team may identify additional information needed to support the inspection. *The last group includes the additional information above as well as plant specificreference material. This information should be available to the team on the first day of
        This information should be available to the lead inspector no later than July 30, 2007.
the inspection. It is also requested that corrective action documents and questions
        By August 10, 2007, the lead inspector will communicate the initial selected set of
developed during the inspection be provided to the inspectors throughout the inspection.The lead inspector for this inspection is Ms. Patricia Lougheed. We understand that ourlicensing contact for this inspection is Mr. P. Holland of your organization. If there are any
        approximately 30 high risk components.
*       The second group of documents requested are those items needed to support our
        in-office preparation activities. This set of documents, including the calculations
        associated with the initial selected components, should be available at the Regional
        Office no later than August 17, 2007. During the in-office preparation activities, the
        team may identify additional information needed to support the inspection.
*       The last group includes the additional information above as well as plant specific
        reference material. This information should be available to the team on the first day of
        the inspection. It is also requested that corrective action documents and questions
        developed during the inspection be provided to the inspectors throughout the inspection.
The lead inspector for this inspection is Ms. Patricia Lougheed. We understand that our
licensing contact for this inspection is Mr. P. Holland of your organization. If there are any
questions about the inspection or the material requested in the enclosure, please contact the
questions about the inspection or the material requested in the enclosure, please contact the
lead inspector at (630) 829-9760 or via e-mail at VPL@nrc.gov.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter andits enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system
lead inspector at (630) 829-9760 or via e-mail at VPL@nrc.gov.
(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (thePublic Electronic Reading Room).Sincerely,/RA/Ann Marie Stone, ChiefEngineering Branch 2
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and
Division of Reactor Safety Docket No. 50-373; 50-374License No. NPF-11; NPF-18Enclosure:Component Design Bases Inspection Document Request
its enclosure will be available electronically for public inspection in the NRC Public Document
See Attached Distribution  
Room or from the Publicly Available Records (PARS) component of NRC's document system
C. Crane-3-cc w/encl:Site Vice President - LaSalle County StationLaSalle County Station Plant Manager
(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the
Regulatory Assurance Manager - LaSalle County Station
Public Electronic Reading Room).
Chief Operating Officer
                                                Sincerely,
Senior Vice President - Nuclear Services
                                                  /RA/
Senior Vice President - Mid-West Regional
                                                Ann Marie Stone, Chief
  Operating Group
                                                Engineering Branch 2
Vice President - Mid-West Operations Support
                                                Division of Reactor Safety
Vice President - Licensing and Regulatory Affairs
Docket No. 50-373; 50-374
Director Licensing - Mid-West Regional
License No. NPF-11; NPF-18
  Operating Group
Enclosure:       Component Design Bases Inspection Document Request
Manager Licensing - Clinton and LaSalle
See Attached Distribution
Senior Counsel, Nuclear, Mid-West Regional
 
  Operating Group
C. Crane                                   -3-
Document Control Desk - Licensing
cc w/encl: Site Vice President - LaSalle County Station
Assistant Attorney General
          LaSalle County Station Plant Manager
Illinois Emergency Management Agency
          Regulatory Assurance Manager - LaSalle County Station
State Liaison Officer
          Chief Operating Officer
Chairman, Illinois Commerce Commission  
          Senior Vice President - Nuclear Services
C. Crane-2-It is important that all of these documents are up to date and complete in order to minimize thenumber of additional documents requested during the preparation and/or the on-site portions of
          Senior Vice President - Mid-West Regional
the inspection. Insofar as possible, this information should be provided electronically to the
            Operating Group
lead inspector. The information request has been divided into three groups:*The first group lists information necessary for our initial inspection scoping activities. This information should be available to the lead inspector no later than July 30, 2007.  
          Vice President - Mid-West Operations Support
By August 10, 2007, the lead inspector will communicate the initial selected set of
          Vice President - Licensing and Regulatory Affairs
approximately 30 high risk components. *The second group of documents requested are those items needed to support ourin-office preparation activities. This set of documents, including the calculations
          Director Licensing - Mid-West Regional
associated with the initial selected components, should be available at the Regional
            Operating Group
Office no later than August 17, 2007. During the in-office preparation activities, the
          Manager Licensing - Clinton and LaSalle
team may identify additional information needed to support the inspection. *The last group includes the additional information above as well as plant specificreference material. This information should be available to the team on the first day of
          Senior Counsel, Nuclear, Mid-West Regional
the inspection. It is also requested that corrective action documents and questions
            Operating Group
developed during the inspection be provided to the inspectors throughout the inspection.The lead inspector for this inspection is Ms. Patricia Lougheed. We understand that ourlicensing contact for this inspection is Mr. P. Holland of your organization. If there are any
          Document Control Desk - Licensing
          Assistant Attorney General
          Illinois Emergency Management Agency
          State Liaison Officer
          Chairman, Illinois Commerce Commission
 
C. Crane                                                                 -2-
It is important that all of these documents are up to date and complete in order to minimize the
number of additional documents requested during the preparation and/or the on-site portions of
the inspection. Insofar as possible, this information should be provided electronically to the
lead inspector. The information request has been divided into three groups:
*         The first group lists information necessary for our initial inspection scoping activities.
          This information should be available to the lead inspector no later than July 30, 2007.
          By August 10, 2007, the lead inspector will communicate the initial selected set of
          approximately 30 high risk components.
*         The second group of documents requested are those items needed to support our
          in-office preparation activities. This set of documents, including the calculations
          associated with the initial selected components, should be available at the Regional
          Office no later than August 17, 2007. During the in-office preparation activities, the
          team may identify additional information needed to support the inspection.
*         The last group includes the additional information above as well as plant specific
          reference material. This information should be available to the team on the first day of
          the inspection. It is also requested that corrective action documents and questions
          developed during the inspection be provided to the inspectors throughout the inspection.
The lead inspector for this inspection is Ms. Patricia Lougheed. We understand that our
licensing contact for this inspection is Mr. P. Holland of your organization. If there are any
questions about the inspection or the material requested in the enclosure, please contact the
questions about the inspection or the material requested in the enclosure, please contact the
lead inspector at (630) 829-9760 or via e-mail at VPL@nrc.gov.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter andits enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system
lead inspector at (630) 829-9760 or via e-mail at VPL@nrc.gov.
(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (thePublic Electronic Reading Room).Sincerely,/RA/Ann Marie Stone, ChiefEngineering Branch 2
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and
Division of Reactor Safety Docket No. 50-373; 50-374License No. NPF-11; NPF-18Enclosure:Component Design Bases Inspection Document Request
its enclosure will be available electronically for public inspection in the NRC Public Document
See Attached DistributionDOCUMENT NAME:C:\FileNet\ML070851385.wpd
Room or from the Publicly Available Records (PARS) component of NRC's document system
G Publicly Available
(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the
G Non-Publicly Available
Public Electronic Reading Room).
G Sensitive
                                                                      Sincerely,
G Non-SensitiveTo receive a copy of this document, indicate in the concurrence box " C" = Copy without attach/encl " E" = Copy with attach/encl " N = No copyOFFICERIIIRIIIRIIIRIIINAMEP. LougheedS. BurgessAM StoneDATE03/22/0703/23/0703/26/07OFFICIAL RECORD COPY  
                                                                        /RA/
C. Crane-4-cc w/encl:Site Vice President - LaSalle County StationLaSalle County Station Plant Manager
                                                                      Ann Marie Stone, Chief
Regulatory Assurance Manager - LaSalle County Station
                                                                      Engineering Branch 2
Chief Operating Officer
                                                                      Division of Reactor Safety
Senior Vice President - Nuclear Services
Docket No. 50-373; 50-374
Senior Vice President - Mid-West Regional
License No. NPF-11; NPF-18
  Operating Group
Enclosure:             Component Design Bases Inspection Document Request
Vice President - Mid-West Operations Support
See Attached Distribution
Vice President - Licensing and Regulatory Affairs
DOCUMENT NAME:C:\FileNet\ML070851385.wpd
Director Licensing - Mid-West Regional
G Publicly Available G Non-Publicly Available                                   G Sensitive             G Non-Sensitive
  Operating Group
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N = No copy
Manager Licensing - Clinton and LaSalle
  OFFICE RIII                                      RIII                            RIII                              RIII
Senior Counsel, Nuclear, Mid-West Regional
  NAME P. Lougheed                                  S. Burgess                      AM Stone
  Operating Group
  DATE          03/22/07                          03/23/07                        03/26/07
Document Control Desk - Licensing
                                                      OFFICIAL RECORD COPY
Assistant Attorney General
 
Illinois Emergency Management Agency
C. Crane                                     -4-
State Liaison Officer
cc w/encl:     Site Vice President - LaSalle County Station
Chairman, Illinois Commerce CommissionDISTRIBUTION
              LaSalle County Station Plant Manager
:DXC1
              Regulatory Assurance Manager - LaSalle County Station
              Chief Operating Officer
              Senior Vice President - Nuclear Services
              Senior Vice President - Mid-West Regional
                Operating Group
              Vice President - Mid-West Operations Support
              Vice President - Licensing and Regulatory Affairs
              Director Licensing - Mid-West Regional
                Operating Group
              Manager Licensing - Clinton and LaSalle
              Senior Counsel, Nuclear, Mid-West Regional
                Operating Group
              Document Control Desk - Licensing
              Assistant Attorney General
              Illinois Emergency Management Agency
              State Liaison Officer
              Chairman, Illinois Commerce Commission
DISTRIBUTION:
DXC1
TEB
TEB
DMS6
DMS6
Line 114: Line 185:
KGO
KGO
GLS
GLS
DEK
DEK
CAA1
CAA1
DRPIII
DRPIII
DRSIII
DRSIII
PLB1
PLB1
TXN
TXN
ROPreports@nrc.gov  
ROPreports@nrc.gov
COMPONENT DESIGN BASES INSPECTION
 
INFORMATION REQUESTEnclosure 1Site:LaSalle County Station, Units 1 and 2Inspection Report
                          COMPONENT DESIGN BASES INSPECTION
:05000373/2007009(DRS); 05000374/2007009(DRS)Inspection Dates
                                    INFORMATION REQUEST
:August 27 through August 31, September 10 throughSeptember 14; and September 24 through September 28, 2007Inspection Procedure
Site:                           LaSalle County Station, Units 1 and 2
:IP 71111.21, "Component Design Bases Inspection"Lead Inspector
Inspection Report:             05000373/2007009(DRS); 05000374/2007009(DRS)
:Patricia Lougheed, (630) 829-9760, (VPL@nrc.gov
Inspection Dates:               August 27 through August 31, September 10 through
)I. Information Requested Prior to the On-site Information Gathering/Inspection
                                September 14; and September 24 through September 28, 2007
WeekThe following information is requested by July 30, 2007, or sooner, to facilitateinspection preparation. If you have any questions regarding this information, please call
Inspection Procedure:           IP 71111.21, Component Design Bases Inspection
the lead inspector as soon as possible. (Please provide the information electronically in"pdf" files, Excel, or other searchable formats, preferably either through electronic mail
Lead Inspector:                 Patricia Lougheed, (630) 829-9760, (VPL@nrc.gov)
or on CDROM. The CDROM should contain descriptive names, and be indexed and
I.     Information Requested Prior to the On-site Information Gathering/Inspection
hyperlinked to facilitate ease of use. Information in "lists" should contain enough
      Week
information to be easily understood by someone who has a knowledge of light water
      The following information is requested by July 30, 2007, or sooner, to facilitate
reactor technology).1.Provide the risk ranking of top 150 components from your site specificprobabilistic safety analysis (PSA) sorted by Risk Achievement Worth (RAW).  
      inspection preparation. If you have any questions regarding this information, please call
Include values for Birnbaum Importance, Risk Reduction Worth (RRW), and
      the lead inspector as soon as possible. (Please provide the information electronically in
Fussell-Veseley (FV) (as applicable). If possible, list the system, train and PSA
      pdf files, Excel, or other searchable formats, preferably either through electronic mail
failure mode for each component.2.Provide a list of the top 200 cut-sets from your PSA.
      or on CDROM. The CDROM should contain descriptive names, and be indexed and
3.If you have an External Events or Fire PSA Model, provide the informationrequested in Items 1 and 2 for external events and fire. Provide narrative
      hyperlinked to facilitate ease of use. Information in lists should contain enough
description of each coded event (including fire, flood zone description.;4.Provide a risk ranking of operator actions from your site specific PSA sorted byRAW. Provide copies of your human reliability worksheets for these items.5Provide a list of PSA assumptions regarding operator actions.
      information to be easily understood by someone who has a knowledge of light water
6.Provide any pre-existing evaluation or list of components and associatedcalculations with low design margins, (i.e., pumps closest to the design limit for
      reactor technology).
flow or pressure, diesel generator close to design required output, heat
      1.       Provide the risk ranking of top 150 components from your site specific
exchangers close to rated design heat removal etc.).  
                probabilistic safety analysis (PSA) sorted by Risk Achievement Worth (RAW).
COMPONENT DESIGN BASES INSPECTION
                Include values for Birnbaum Importance, Risk Reduction Worth (RRW), and
INFORMATION REQUESTEnclosure 27.Provide a list of available design (setup) margins for valves in themotor-operated valve (MOV) and air-operated valve (AOV) programs.8.Provide a list of high risk Maintenance Rule systems/components based onengineering or expert panel judgement.9.Provide a list of structures, systems, or components (SSCs) in the MaintenanceRule (a)(1) category.10.Provide the site top ten issues list (if applicable).
                Fussell-Veseley (FV) (as applicable). If possible, list the system, train and PSA
11.Provide information on any common cause failure of components experienced inthe last five years at your facility.12.Provide a list of Root Cause Evaluations associated with component failures ordesign issues initiated or completed in the last five years.II.Information requested (for the approximately 30 selected components) to beavailable by August 17, 2007. This information should be separated for each
                failure mode for each component.
selected component, especially if provided electronically (e.g., folder with
      2.       Provide a list of the top 200 cut-sets from your PSA.
component name that includes calculations, condition reports, maintenance
      3.       If you have an External Events or Fire PSA Model, provide the information
history, etc).1.Provide a list and copies of condition reports (corrective action documents)associated with each of the selected components for the last four years.2.Provide the completed corrective maintenance history associated with each ofthe selected components for the last four years. Please ensure this list only
                requested in Items 1 and 2 for external events and fire. Provide narrative
includes completed activities and does not include routine surveillances.3.Provide copies of calculations associated with each of the selected components(if not previously provided), excluding data files. Please review the calculations
                description of each coded event (including fire, flood zone description.;
and provide copies of referenced material (such as drawings, engineering
      4.       Provide a risk ranking of operator actions from your site specific PSA sorted by
requests, or vendor letters).4.Provide a list of modifications associated with each of the selected components. This list should include a descriptive paragraph on the purpose of the
                RAW. Provide copies of your human reliability worksheets for these items.
modification. Please ensure this list only includes design completed (not
      5        Provide a list of PSA assumptions regarding operator actions.
canceled) modifications.5.Provide copies of electrical single-lines and mechanical piping andinstrumentation drawings.6.Provide copies of operability evaluations associated with each of the selectedcomponents and plans for restoring operability, if applicable.  
      6.       Provide any pre-existing evaluation or list of components and associated
COMPONENT DESIGN BASES INSPECTION
                calculations with low design margins, (i.e., pumps closest to the design limit for
INFORMATION REQUESTEnclosure 37.Provide copies of any operator work-around evaluations associated with each ofthe selected components and plans for resolution, if applicable.8.Provide copies of any open temporary modifications associated with each of theselected components, if applicable.9.Provide trend data on the selected electrical/mechanical components'performance for last three years (For example, pumps' performance including in-
                flow or pressure, diesel generator close to design required output, heat
service testing, other vibration monitoring, oil sample results, etc., as applicable).10.Provide System Health Reports, System Descriptions, and/or Design BasisDocuments that are associated with each of the selected components.11.Provide copies of operating experience evaluations associated with the selectedcomponents for the last three years.12.Provide copies of any simulator scenarios, lesson plans, or job performancemeasures for the selected operator actions.13.Provide copies of the emergency operating procedures, normal and abnormaloperating procedures and any alarm response procedures for the selected
                exchangers close to rated design heat removal etc.).
operator actions.14.Provide a copy of any engineering or operations related audits completed in thelast two years which addressed the selected components.15.Provide a copy of the current management and engineering organizational chart. Highlight or otherwise provide the names of any inspection contacts or inspector
                                                  1                                      Enclosure
shadows.16.Provide electronic copies of Updated Final Safety Analysis Report, TechnicalSpecifications, Technical Specifications Bases, and Technical RequirementsManual; if available.17.Provide a copy of any internal/external self-assessments and associatedcorrective action documents generated in preparation for the inspection.III.Additional Information to be Provided on August 27, 2007 On-site (for final 15 - 20selected components)1.A request for any additional information needed will be provided during the weekof August 20, 2007. The lead inspector will provide a list of added information.  
 
The lead inspectors may request hard copies of information provided
                      COMPONENT DESIGN BASES INSPECTION
electronically, especially drawings and calculations.  
                                INFORMATION REQUEST
Enclosusre
    7.     Provide a list of available design (setup) margins for valves in the
42.One complete set of piping and instrumentation drawings (P&IDs) and one-lineelectrical drawings (paper copies)3.The following background materials may be requested. It is recommended thatthese materials be identified and located prior to the inspection:*IPE/PRA report;*Procurement documents for components selected;
          motor-operated valve (MOV) and air-operated valve (AOV) programs.
*Plant procedures (normal, abnormal, emergency, surveillance, etc.); and
    8.     Provide a list of high risk Maintenance Rule systems/components based on
*Vendor manuals.4.Please arrange for an overview walkdown of the selected components. Thisshould include any required radiological briefings. For any components not
          engineering or expert panel judgement.
normally accessible, please arrange for a briefing on what conditions prevent
    9.     Provide a list of structures, systems, or components (SSCs) in the Maintenance
access to the components.5.If plant information, such as corrective action documents or procedures, isavailable electronically onsite, please consider providing access for the
          Rule (a)(1) category.
inspectors, along with simple instructions.IV.Information Requested to be provided throughout the inspection1Provide copies of any corrective action documents generated as a result ofthe team's questions or queries during this inspection. This includes and
    10.   Provide the site top ten issues list (if applicable).
licensee-identified corrective action documents generated while answering an
    11.   Provide information on any common cause failure of components experienced in
inspector question. Please provide two copies: one to the inspector and one to
          the last five years at your facility.
the lead inspector. At the end of the inspection, please provide the lead
    12.   Provide a list of Root Cause Evaluations associated with component failures or
inspector with a complete list of all corrective action documents generated as a
          design issues initiated or completed in the last five years.
result of the inspection.2Provide copies of the list of questions submitted by the team members and thestatus/resolution of the information requested. Each inspector should receive at
II. Information requested (for the approximately 30 selected components) to be
least a copy of his/her open questions, while the lead inspector should receive a
    available by August 17, 2007. This information should be separated for each
complete list. At the end of the inspection, please provide the lead inspector
    selected component, especially if provided electronically (e.g., folder with
with a complete electronic copy of the database.If you have questions regarding any of the information requested, please contact the leadinspector.
    component name that includes calculations, condition reports, maintenance
    history, etc).
    1.     Provide a list and copies of condition reports (corrective action documents)
          associated with each of the selected components for the last four years.
    2.     Provide the completed corrective maintenance history associated with each of
          the selected components for the last four years. Please ensure this list only
          includes completed activities and does not include routine surveillances.
    3.     Provide copies of calculations associated with each of the selected components
          (if not previously provided), excluding data files. Please review the calculations
          and provide copies of referenced material (such as drawings, engineering
          requests, or vendor letters).
    4.     Provide a list of modifications associated with each of the selected components.
          This list should include a descriptive paragraph on the purpose of the
          modification. Please ensure this list only includes design completed (not
          canceled) modifications.
    5.     Provide copies of electrical single-lines and mechanical piping and
          instrumentation drawings.
    6.     Provide copies of operability evaluations associated with each of the selected
          components and plans for restoring operability, if applicable.
                                                2                                    Enclosure
 
                      COMPONENT DESIGN BASES INSPECTION
                                INFORMATION REQUEST
    7.     Provide copies of any operator work-around evaluations associated with each of
            the selected components and plans for resolution, if applicable.
    8.     Provide copies of any open temporary modifications associated with each of the
            selected components, if applicable.
    9.     Provide trend data on the selected electrical/mechanical components
            performance for last three years (For example, pumps performance including in-
            service testing, other vibration monitoring, oil sample results, etc., as applicable).
    10.   Provide System Health Reports, System Descriptions, and/or Design Basis
            Documents that are associated with each of the selected components.
    11.   Provide copies of operating experience evaluations associated with the selected
            components for the last three years.
    12.   Provide copies of any simulator scenarios, lesson plans, or job performance
            measures for the selected operator actions.
    13.   Provide copies of the emergency operating procedures, normal and abnormal
            operating procedures and any alarm response procedures for the selected
            operator actions.
    14.   Provide a copy of any engineering or operations related audits completed in the
            last two years which addressed the selected components.
    15.   Provide a copy of the current management and engineering organizational chart.
            Highlight or otherwise provide the names of any inspection contacts or inspector
            shadows.
    16.   Provide electronic copies of Updated Final Safety Analysis Report, Technical
            Specifications, Technical Specifications Bases, and Technical Requirements
            Manual; if available.
    17.   Provide a copy of any internal/external self-assessments and associated
            corrective action documents generated in preparation for the inspection.
III. Additional Information to be Provided on August 27, 2007 On-site (for final 15 - 20
    selected components)
    1.     A request for any additional information needed will be provided during the week
            of August 20, 2007. The lead inspector will provide a list of added information.
            The lead inspectors may request hard copies of information provided
            electronically, especially drawings and calculations.
                                              3                                        Enclosure
 
        2.   One complete set of piping and instrumentation drawings (P&IDs) and one-line
              electrical drawings (paper copies)
        3.   The following background materials may be requested. It is recommended that
              these materials be identified and located prior to the inspection:
              *       IPE/PRA report;
              *       Procurement documents for components selected;
              *       Plant procedures (normal, abnormal, emergency, surveillance, etc.); and
              *       Vendor manuals.
        4.   Please arrange for an overview walkdown of the selected components. This
              should include any required radiological briefings. For any components not
              normally accessible, please arrange for a briefing on what conditions prevent
              access to the components.
        5.   If plant information, such as corrective action documents or procedures, is
              available electronically onsite, please consider providing access for the
              inspectors, along with simple instructions.
IV.     Information Requested to be provided throughout the inspection
        1    Provide copies of any corrective action documents generated as a result of
              the teams questions or queries during this inspection. This includes and
              licensee-identified corrective action documents generated while answering an
              inspector question. Please provide two copies: one to the inspector and one to
              the lead inspector. At the end of the inspection, please provide the lead
              inspector with a complete list of all corrective action documents generated as a
              result of the inspection.
        2    Provide copies of the list of questions submitted by the team members and the
              status/resolution of the information requested. Each inspector should receive at
              least a copy of his/her open questions, while the lead inspector should receive a
              complete list. At the end of the inspection, please provide the lead inspector
              with a complete electronic copy of the database.
If you have questions regarding any of the information requested, please contact the lead
inspector.
                                                4                                    Enclosusre
}}
}}

Latest revision as of 08:02, 23 November 2019

Information Request for NRC Biennial Baseline Component Design Bases Inspection 05000373-07-009 (Drs); 05000374-07-009 (DRS)
ML070851385
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 03/26/2007
From: Ann Marie Stone
NRC/RGN-III/DRS/EB2
To: Crane C
Exelon Generation Co, Exelon Nuclear
References
IR-07-009 IR-07-009
Download: ML070851385 (9)


See also: IR 05000373/2007009

Text

March 26,2007

Mr. Christopher M. Crane

President and Chief Nuclear Officer

Exelon Nuclear

Exelon Generation Company, LLC

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2 - INFORMATION REQUEST

FOR AN NRC BIENNIAL BASELINE COMPONENT DESIGN BASES

INSPECTION 05000373/2007009(DRS); 05000374/2007009(DRS)

Dear Mr. Crane:

On August 27, 2007, the NRC will begin a biennial baseline Component Design Bases

Inspection (CDBI) at the LaSalle County Station, Units 1 and 2. This inspection will be

performed in accordance with revised NRC Baseline Inspection Procedure (IP) 71111.21 and

replaces the biennial Safety System Design and Performance Capability Inspection.

The CDBI inspection focuses on components which have high risk and low design margins.

The components to be reviewed during this baseline inspection will be identified during an

in-office preparation week prior to the first week of the on-site inspection. In addition, a number

of risk significant operator actions and operating experience issues, associated with the

component samples, will also be selected for review.

The inspection will include 3 weeks on-site, including the information gathering during the first

on-site week. The inspection team will consist of six NRC inspectors, of whom five will focus on

engineering and one on operations. The current inspection schedule is as follows:

  • August 27 through August 31, 2007;
  • September 10 through September 14, 2007; and
  • September 24 through September 28, 2007.

The team will be preparing for the inspection, mainly during the week of August 20, 2007, as

discussed in the attached enclosure. A Region III Senior Reactor Analyst may accompany the

inspection team during the week of August 27, 2007, to review probabilistic risk assessment

data and assist in identifying risk significant components, which will be reviewed during the

inspection.

Experience with previous baseline design inspections of similar depth and length has shown

that these type of inspections are extremely resource intensive, both for the NRC inspectors

and the licensee staff. In order to minimize the inspection impact on the site and to ensure a

productive inspection for both parties, we have enclosed a request for information needed for

the inspection.

C. Crane -2-

It is important that all of these documents are up to date and complete in order to minimize the

number of additional documents requested during the preparation and/or the on-site portions of

the inspection. Insofar as possible, this information should be provided electronically to the

lead inspector. The information request has been divided into three groups:

  • The first group lists information necessary for our initial inspection scoping activities.

This information should be available to the lead inspector no later than July 30, 2007.

By August 10, 2007, the lead inspector will communicate the initial selected set of

approximately 30 high risk components.

  • The second group of documents requested are those items needed to support our

in-office preparation activities. This set of documents, including the calculations

associated with the initial selected components, should be available at the Regional

Office no later than August 17, 2007. During the in-office preparation activities, the

team may identify additional information needed to support the inspection.

  • The last group includes the additional information above as well as plant specific

reference material. This information should be available to the team on the first day of

the inspection. It is also requested that corrective action documents and questions

developed during the inspection be provided to the inspectors throughout the inspection.

The lead inspector for this inspection is Ms. Patricia Lougheed. We understand that our

licensing contact for this inspection is Mr. P. Holland of your organization. If there are any

questions about the inspection or the material requested in the enclosure, please contact the

lead inspector at (630) 829-9760 or via e-mail at VPL@nrc.gov.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and

its enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room).

Sincerely,

/RA/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-373; 50-374

License No. NPF-11; NPF-18

Enclosure: Component Design Bases Inspection Document Request

See Attached Distribution

C. Crane -3-

cc w/encl: Site Vice President - LaSalle County Station

LaSalle County Station Plant Manager

Regulatory Assurance Manager - LaSalle County Station

Chief Operating Officer

Senior Vice President - Nuclear Services

Senior Vice President - Mid-West Regional

Operating Group

Vice President - Mid-West Operations Support

Vice President - Licensing and Regulatory Affairs

Director Licensing - Mid-West Regional

Operating Group

Manager Licensing - Clinton and LaSalle

Senior Counsel, Nuclear, Mid-West Regional

Operating Group

Document Control Desk - Licensing

Assistant Attorney General

Illinois Emergency Management Agency

State Liaison Officer

Chairman, Illinois Commerce Commission

C. Crane -2-

It is important that all of these documents are up to date and complete in order to minimize the

number of additional documents requested during the preparation and/or the on-site portions of

the inspection. Insofar as possible, this information should be provided electronically to the

lead inspector. The information request has been divided into three groups:

  • The first group lists information necessary for our initial inspection scoping activities.

This information should be available to the lead inspector no later than July 30, 2007.

By August 10, 2007, the lead inspector will communicate the initial selected set of

approximately 30 high risk components.

  • The second group of documents requested are those items needed to support our

in-office preparation activities. This set of documents, including the calculations

associated with the initial selected components, should be available at the Regional

Office no later than August 17, 2007. During the in-office preparation activities, the

team may identify additional information needed to support the inspection.

  • The last group includes the additional information above as well as plant specific

reference material. This information should be available to the team on the first day of

the inspection. It is also requested that corrective action documents and questions

developed during the inspection be provided to the inspectors throughout the inspection.

The lead inspector for this inspection is Ms. Patricia Lougheed. We understand that our

licensing contact for this inspection is Mr. P. Holland of your organization. If there are any

questions about the inspection or the material requested in the enclosure, please contact the

lead inspector at (630) 829-9760 or via e-mail at VPL@nrc.gov.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and

its enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room).

Sincerely,

/RA/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-373; 50-374

License No. NPF-11; NPF-18

Enclosure: Component Design Bases Inspection Document Request

See Attached Distribution

DOCUMENT NAME:C:\FileNet\ML070851385.wpd

G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N = No copy

OFFICE RIII RIII RIII RIII

NAME P. Lougheed S. Burgess AM Stone

DATE 03/22/07 03/23/07 03/26/07

OFFICIAL RECORD COPY

C. Crane -4-

cc w/encl: Site Vice President - LaSalle County Station

LaSalle County Station Plant Manager

Regulatory Assurance Manager - LaSalle County Station

Chief Operating Officer

Senior Vice President - Nuclear Services

Senior Vice President - Mid-West Regional

Operating Group

Vice President - Mid-West Operations Support

Vice President - Licensing and Regulatory Affairs

Director Licensing - Mid-West Regional

Operating Group

Manager Licensing - Clinton and LaSalle

Senior Counsel, Nuclear, Mid-West Regional

Operating Group

Document Control Desk - Licensing

Assistant Attorney General

Illinois Emergency Management Agency

State Liaison Officer

Chairman, Illinois Commerce Commission

DISTRIBUTION:

DXC1

TEB

DMS6

RidsNrrDirsIrib

GEG

KGO

GLS

DEK

CAA1

DRPIII

DRSIII

PLB1

TXN

ROPreports@nrc.gov

COMPONENT DESIGN BASES INSPECTION

INFORMATION REQUEST

Site: LaSalle County Station, Units 1 and 2

Inspection Report: 05000373/2007009(DRS); 05000374/2007009(DRS)

Inspection Dates: August 27 through August 31, September 10 through

September 14; and September 24 through September 28, 2007

Inspection Procedure: IP 71111.21, Component Design Bases Inspection

Lead Inspector: Patricia Lougheed, (630) 829-9760, (VPL@nrc.gov)

I. Information Requested Prior to the On-site Information Gathering/Inspection

Week

The following information is requested by July 30, 2007, or sooner, to facilitate

inspection preparation. If you have any questions regarding this information, please call

the lead inspector as soon as possible. (Please provide the information electronically in

pdf files, Excel, or other searchable formats, preferably either through electronic mail

or on CDROM. The CDROM should contain descriptive names, and be indexed and

hyperlinked to facilitate ease of use. Information in lists should contain enough

information to be easily understood by someone who has a knowledge of light water

reactor technology).

1. Provide the risk ranking of top 150 components from your site specific

probabilistic safety analysis (PSA) sorted by Risk Achievement Worth (RAW).

Include values for Birnbaum Importance, Risk Reduction Worth (RRW), and

Fussell-Veseley (FV) (as applicable). If possible, list the system, train and PSA

failure mode for each component.

2. Provide a list of the top 200 cut-sets from your PSA.

3. If you have an External Events or Fire PSA Model, provide the information

requested in Items 1 and 2 for external events and fire. Provide narrative

description of each coded event (including fire, flood zone description.;

4. Provide a risk ranking of operator actions from your site specific PSA sorted by

RAW. Provide copies of your human reliability worksheets for these items.

5 Provide a list of PSA assumptions regarding operator actions.

6. Provide any pre-existing evaluation or list of components and associated

calculations with low design margins, (i.e., pumps closest to the design limit for

flow or pressure, diesel generator close to design required output, heat

exchangers close to rated design heat removal etc.).

1 Enclosure

COMPONENT DESIGN BASES INSPECTION

INFORMATION REQUEST

7. Provide a list of available design (setup) margins for valves in the

motor-operated valve (MOV) and air-operated valve (AOV) programs.

8. Provide a list of high risk Maintenance Rule systems/components based on

engineering or expert panel judgement.

9. Provide a list of structures, systems, or components (SSCs) in the Maintenance

Rule (a)(1) category.

10. Provide the site top ten issues list (if applicable).

11. Provide information on any common cause failure of components experienced in

the last five years at your facility.

12. Provide a list of Root Cause Evaluations associated with component failures or

design issues initiated or completed in the last five years.

II. Information requested (for the approximately 30 selected components) to be

available by August 17, 2007. This information should be separated for each

selected component, especially if provided electronically (e.g., folder with

component name that includes calculations, condition reports, maintenance

history, etc).

1. Provide a list and copies of condition reports (corrective action documents)

associated with each of the selected components for the last four years.

2. Provide the completed corrective maintenance history associated with each of

the selected components for the last four years. Please ensure this list only

includes completed activities and does not include routine surveillances.

3. Provide copies of calculations associated with each of the selected components

(if not previously provided), excluding data files. Please review the calculations

and provide copies of referenced material (such as drawings, engineering

requests, or vendor letters).

4. Provide a list of modifications associated with each of the selected components.

This list should include a descriptive paragraph on the purpose of the

modification. Please ensure this list only includes design completed (not

canceled) modifications.

5. Provide copies of electrical single-lines and mechanical piping and

instrumentation drawings.

6. Provide copies of operability evaluations associated with each of the selected

components and plans for restoring operability, if applicable.

2 Enclosure

COMPONENT DESIGN BASES INSPECTION

INFORMATION REQUEST

7. Provide copies of any operator work-around evaluations associated with each of

the selected components and plans for resolution, if applicable.

8. Provide copies of any open temporary modifications associated with each of the

selected components, if applicable.

9. Provide trend data on the selected electrical/mechanical components

performance for last three years (For example, pumps performance including in-

service testing, other vibration monitoring, oil sample results, etc., as applicable).

10. Provide System Health Reports, System Descriptions, and/or Design Basis

Documents that are associated with each of the selected components.

11. Provide copies of operating experience evaluations associated with the selected

components for the last three years.

12. Provide copies of any simulator scenarios, lesson plans, or job performance

measures for the selected operator actions.

13. Provide copies of the emergency operating procedures, normal and abnormal

operating procedures and any alarm response procedures for the selected

operator actions.

14. Provide a copy of any engineering or operations related audits completed in the

last two years which addressed the selected components.

15. Provide a copy of the current management and engineering organizational chart.

Highlight or otherwise provide the names of any inspection contacts or inspector

shadows.

16. Provide electronic copies of Updated Final Safety Analysis Report, Technical

Specifications, Technical Specifications Bases, and Technical Requirements

Manual; if available.

17. Provide a copy of any internal/external self-assessments and associated

corrective action documents generated in preparation for the inspection.

III. Additional Information to be Provided on August 27, 2007 On-site (for final 15 - 20

selected components)

1. A request for any additional information needed will be provided during the week

of August 20, 2007. The lead inspector will provide a list of added information.

The lead inspectors may request hard copies of information provided

electronically, especially drawings and calculations.

3 Enclosure

2. One complete set of piping and instrumentation drawings (P&IDs) and one-line

electrical drawings (paper copies)

3. The following background materials may be requested. It is recommended that

these materials be identified and located prior to the inspection:

  • IPE/PRA report;
  • Procurement documents for components selected;
  • Plant procedures (normal, abnormal, emergency, surveillance, etc.); and
  • Vendor manuals.

4. Please arrange for an overview walkdown of the selected components. This

should include any required radiological briefings. For any components not

normally accessible, please arrange for a briefing on what conditions prevent

access to the components.

5. If plant information, such as corrective action documents or procedures, is

available electronically onsite, please consider providing access for the

inspectors, along with simple instructions.

IV. Information Requested to be provided throughout the inspection

1 Provide copies of any corrective action documents generated as a result of

the teams questions or queries during this inspection. This includes and

licensee-identified corrective action documents generated while answering an

inspector question. Please provide two copies: one to the inspector and one to

the lead inspector. At the end of the inspection, please provide the lead

inspector with a complete list of all corrective action documents generated as a

result of the inspection.

2 Provide copies of the list of questions submitted by the team members and the

status/resolution of the information requested. Each inspector should receive at

least a copy of his/her open questions, while the lead inspector should receive a

complete list. At the end of the inspection, please provide the lead inspector

with a complete electronic copy of the database.

If you have questions regarding any of the information requested, please contact the lead

inspector.

4 Enclosusre