ML072000459: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:CLIIP Utilization 0%10%20%30%40%50%60%70%80%90%100%TS TF-3 6 6 (PASS) W & CE TS TF - 3 58 (M is se d SR's) A l l Plan t s TS TF - 4 13 (PASS) B W Rs TS TF-3 7 0 (Accum u l a t o r AOT) W TS TF - 3 59 (Fl exib l e Mod e Restr a i n t s) Al l Plan t s TS TF - 4 04 (SDI V) BWRs TS TF-4 4 2 (PASS) B&W TS TF - 4 47 (H2 Rec ombine r s) A l l Pl ants TS TF-4 2 1 (RCP Flywhe e l) W TS TF-3 7 3 (CIVs) CE TS TF-3 6 9 (MOR-ORER) All Pl ants TS TF - 4 60 (Scram Ti me Testing) B W Rs TS TF-3 7 2 (Sn ub bers) Al l P l ants TS TF-4 4 9 (SG T u be Ins p ec tion) P W Rs TS TF-4 2 2 (Pr e f e r r e d En d S t a t e s) CEEli mi n a t i o n o f L i c e ns e Co nd i ti on All Plan t s TS TF - 4 54 (PCI V CT s) B W Rs TS TF - 4 23 (End S t a tes) BWRs TS TF-3 7 4 (Fuel Oi l) A l l P l ants TS TF-4 2 7 (Ba r rier s) All Pl a n t s TS TF-4 8 4 (Sc r a m Ti me T esti n g) B W Rs TS TF-4 0 9 (Cont Sp r a y CT) C E TS TF-4 9 1 (MSI V I so Time) P W Rs TS TF-4 4 8 (Contr o l Ro o m H a b) A l l Pl a n t s TS TF-4 9 0 (De l e t i o n o f E Ba r) P W Rs TS TF-4 7 7 (Two Inop CR AC S ub s ys) BW Rs TS TF-4 7 6 (BWPS) BWRs Submitted & Adopted Planned, Submitted, and Adopted CLIIP ADOPTION STATUS 1 2ABCDEFGHPlantLast Update Plant Type TSTF-366 (PASS)W & CE TSTF - 358 (Missed SR's)
{{#Wiki_filter:TS TS                TF TF              -3 66
All Plants TSTF - 413 (PASS)BWRs TSTF-370 (Accumulator AOT)
                                                                -3                  (P 58                    AS (M
W TSTF - 359 (Flexible Mode Restraints)
is se S)
All Plants10/31/20009/28/20013/20/20023/12/20034/4/2003 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 Applicable Units3868252567 Responses3868252567 Adopted 3565231445 Submitted to NRC 00001 Planned/in site review 02137 Total Adopted / Will Adopt3567241753 Undecd/will not adopt310814 N/A30043431% CLIIP Usage (Adopted or Submitted)92%96%92%56%69%
W 0%   10%   20%   30%   40%   50%   60%   70%   80%   90%   100%
Planned, Adopted, Submitted, Approved92%99%96%68%79%
d                      &
Format Responses as:Adopted MM-DD-YY- The CLIIP amendment was approved for your plant on the given date (whether or not it's been implemented)Submitted MM-DD-YY- The CLIIP was submitted by your plant on the given date Planned MM-YY- The CLIIP is planned to be submitted in the given month and year (and may or not be under development). If the da tUndecided- It is unknown if the plant will submit this CLIIP.N/A- This CLIIP is not applicable to your plant either because of the plant design or the change was adopted prior to the CWill Not Adopt- This CLIIP is applicable to your plant but you have decided to not adopt it.
S  R                  C TS TS
Number of Sites *:
                                                                                            's)               E TF TF              TS                                          A l
68Update Round Started:3/5/2007 Number of Responses this Round64 Percent  Response:94.1%7/19/2007Page 7 of 12Technical Specification Task Force CLIIP ADOPTION STATUS 1 2ABCPlantLast Update Plant Type 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 Applicable Units Responses Adopted Submitted to NRC
                                        -3                TF
                                                                            -4                         l Pl 13                         an 59                  -3                      (P (F                  70                      AS                  ts le                    (A                        S xi                    cc                      )B bl e                      um                        W M                        ul                    R od                        at                  s e                        o R                      r AO es tra                      T) in                      W TS                       ts TF                     )
Al
                                                                              -4                       lP TS                                        04                     la nt TF                                        (S                      s TS                     D
                                                    -4                    TF                     IV 47                      -4                   )B (H                    42                    W 2                                           R R                    (P                    s ec                    AS om                      S)
TS                      bi                    B&
TF                    ne rs                  W
                                                                      -4                       )A 21 (R                    l l Pl C                      an P                      ts Fl TS                                           yw TF                   T ST                      he TS                -3                      F-                    el
                                                                                                              )W TF               69                      37 (M                      3
                                                  -4                     O                      ( C 60                     R                      IV (S                  -O                      s)
R                      C cr am                  ER                    E
                                                                                                )A Ti                       ll TS                     m TF                     e                    Pl an TS                  -3                   Te                      ts TF                   72                    st i n
                                                    -4 49                ( S                      g )B nu (S                      bb                    W G                                            R TS                     Tu er s)                s TF                     be                      Al
                                                        -4                       In                    lP El                  2 2                                             la Submitted & Adopted im                                        sp                        nt in                (P                      ec                      s at                  re                      tio io                  fe                        n n                    rre                      )
of                      d                     PW Li                      En                       R ce ns                    d                   s e                   St a
TS                  C                        te on                       s)
TF                     di                      C tio                  E CLIIP Utilization
                                                                    -4                       n 54                       Al TS                      (P                    lP TF                     C                      la
                                                                  -4                   IV                    nt s
23                   C Ts (E                      )B TS                       nd                      W TF                                             R
                                                                    -3 St at                  s 74                      es
( F                    )B TS                        ue                      W TS                 TF                      lO                    R TF                   -4                       il)                s
                                                    -4                  27                        Al 84                      (B                      lP (S                    ar                      la cr                    rie                    nt am                    rs                    s
                                                                                                )A TS Ti m                      l l TF                   e                    Pl an Te Planned, Submitted, and Adopted
                                                                    -4                     st                  ts 09                      in TS (C                    g )B TF TS                  -4                  on                        W tS                      R TF                 91 pr                  s
                                                  -4                   (M                        a 48                                            y SI V                      C (C
Is                  T  )C on tro                  o                        E Ti TS T                  lR                      m TS               F-                   oo                    e )P TF              49                      m                        W
                                            -4                 0                      H                      R 77                (D                      ab                    s (T
el et                  ) Al w                    io n                     l P o                                               la In                    of                      nt op                      E                       s C                      Ba R                        r)
AC                        PW Su                      R TS                       bs                  s TF                       ys
                                                                            -4 76                  )   BW (B                      R W                     s PS
                                                                                                      )B W
R s


Planned/in site review Total Adopted / Will Adopt Undecd/will not adopt N/A% CLIIP Usage (Adopted or Submitted)
CLIIP ADOPTION STATUS A                B      C                D                        E                              F                          G                            H TSTF-366                TSTF - 358                    TSTF - 413                  TSTF-370                    TSTF - 359 Plant            (PASS)              (Missed SR's)                      (PASS)              (Accumulator AOT)        (Flexible Mode Restraints) 1            Plant          Last Update Type            W & CE                All Plants                        BWRs                        W                        All Plants 2                                                      10/31/2000                9/28/2001                      3/20/2002                  3/12/2003                      4/4/2003 71 Applicable Units                                          38                      68                              25                          25                            67 72 Responses                                                38                      68                              25                          25                            67 73 Adopted                                                  35                      65                              23                          14                            45 74 Submitted to NRC                                          0                        0                              0                          0                            1 75 Planned/in site review                                     0                        2                              1                          3                            7 76 Total Adopted / Will Adopt                               35                      67                              24                          17                            53 77 Undecd/will not adopt                                     3                        1                              0                          8                            14 78 N/A                                                       30                        0                              43                          43                            1
Planned, Adopted, Submitted, Approved Format Responses as:
  % CLIIP Usage 79 (Adopted or Submitted)                                   92%                      96%                            92%                        56%                          69%
Number of Sites *:
Planned, Adopted, 80 Submitted, Approved                                     92%                      99%                            96%                        68%                          79%
Update Round Started:
81 Format Responses as:                         Adopted MM-DD-YY      - The CLIIP amendment was approved for your plant on the given date (whether or not it's been implemented) 82                                              Submitted MM-DD-YY    - The CLIIP was submitted by your plant on the given date 83                                              Planned MM-YY          - The CLIIP is planned to be submitted in the given month and year (and may or not be under development). If the dat 84                                              Undecided              - It is unknown if the plant will submit this CLIIP.
85                                              N/A                    - This CLIIP is not applicable to your plant either because of the plant design or the change was adopted prior to the C 86                                              Will Not Adopt        - This CLIIP is applicable to your plant but you have decided to not adopt it.
87 88 Number of Sites *:                                                                             68 89 Update Round Started:                                                                   3/5/2007 90 Number of Responses this Round                                                                  64 91 Percent Response:                                                                          94.1%
92 7/19/2007                                                                      Page 7 of 12                                                            Technical Specification Task Force


Number of Responses this Round
CLIIP ADOPTION STATUS A                B      C                  I                        J              K              L                      M TSTF - 404                TSTF-442        TSTF - 447      TSTF-421              TSTF-373 Plant            (SDIV)                  (PASS)      (H2 Recombiners) (RCP Flywheel)            (CIVs) 1            Plant          Last Update Type              BWRs                      B&W          All Plants        W                      CE 2                                                        4/15/2003                5/6/2003        09-25-03      10/22/2003            2/20/2004 71 Applicable Units                                          24                        5              68            27                      9 72 Responses                                                  24                        5              68            27                      9 73 Adopted                                                    21                        5              58            16                      0 74 Submitted to NRC                                            1                        0                1              0                      0 75 Planned/in site review                                      0                        0                6              4                      4 76 Total Adopted / Will Adopt                                22                        5              65            20                      4 77 Undecd/will not adopt                                      2                        0                3              7                      5 78 N/A                                                        44                      63                0            41                    59
  % CLIIP Usage 79 (Adopted or Submitted)                                    92%                    100%            87%            59%                    0%
Planned, Adopted, 80 Submitted, Approved                                      92%                    100%            96%            74%                    44%
81 Format Responses as:
82 83                                              e is unknown, leave the date blank 84 85                                              LIIP 86 87 88 Number of Sites *:
89 Update Round Started:
90 Number of Responses this Round 91 Percent Response:
92 7/19/2007                                                                      Page 8 of 12                              Technical Specification Task Force


Percent  Response:IJKLM TSTF - 404 (SDIV)BWRs TSTF-442 (PASS)B&W TSTF - 447 (H2 Recombiners)
CLIIP ADOPTION STATUS A                B      C          N                    O                P              Q                        R TSTF-369            TSTF - 460      TSTF-372        TSTF-449                TSTF-422 Plant (MOR-ORER)       (Scram Time Testing) (Snubbers) (SG Tube Inspection)   (Preferred End States) 1            Plant          Last Update Type    All Plants              BWRs          All Plants        PWRs                      CE 2                                                6/23/2004            8/23/2004        5/4/2005        5/6/2005                7/13/2005 71 Applicable Units                                  68                  24              61              42                        9 72 Responses                                          68                  24              60              41                        9 73 Adopted                                            68                    9              18              22                       0 74 Submitted to NRC                                    0                    3                7              15                        0 75 Planned/in site review                              0                    5              16              3                        4 76 Total Adopted / Will Adopt                        68                  17              41              40                        4 77 Undecd/will not adopt                              0                    7              19              1                        5 78 N/A                                                0                  44                7              26                      59
All Plants TSTF-421 (RCP Flywheel)
  % CLIIP Usage 79 (Adopted or Submitted)                          100%                   50%              41%             88%                       0%
W TSTF-373 (CIVs)CE4/15/20035/6/2003 09-25-0310/22/20032/20/20042456827924568279 21558160 10100 0064422565204 2037544630415992%100%87%59%0%
Planned, Adopted, 80 Submitted, Approved                            100%                   71%             67%             95%                     44%
92%100%96%74%44%
81 Format Responses as:
e is unknown, leave the date blank LII P7/19/2007Page 8 of 12Technical Specification Task Force CLIIP ADOPTION STATUS 1 2ABCPlantLast Update Plant Type 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 Applicable Units Responses Adopted Submitted to NRC
82 83 84 85 86 87 88 Number of Sites *:
89 Update Round Started:
90 Number of Responses this Round 91 Percent Response:
92 7/19/2007                                                          Page 9 of 12                                Technical Specification Task Force


Planned/in site review Total Adopted / Will Adopt Undecd/will not adopt N/A% CLIIP Usage (Adopted or Submitted)
CLIIP ADOPTION STATUS A                B      C              S                    T              U          V                      W Elimination of License    TSTF - 454      TSTF - 423  TSTF-374              TSTF-427 Plant      Condition            (PCIV CTs)    (End States) (Fuel Oil)            (Barriers) 1            Plant          Last Update Type        All Plants            BWRs            BWRs    All Plants            All Plants 2                                                    11/4/2005            12/13/2005      3/23/2006  4/21/2006              10/3/2006 71 Applicable Units                                      33                  25              25          62                    67 72 Responses                                              30                  25              25          60                    54 73 Adopted                                                15                    0              0          6                      0 74 Submitted to NRC                                        2                    0              2          2                      1 75 Planned/in site review                                 3                    7              14          13                    18 76 Total Adopted / Will Adopt                             20                    7              16          21                    19 77 Undecd/will not adopt                                   7                  17              8          37                    34 78 N/A                                                   35                  43              43          6                      1
Planned, Adopted, Submitted, Approved Format Responses as:
  % CLIIP Usage 79 (Adopted or Submitted)                               52%                  0%              8%        13%                    1%
Number of Sites *:
Planned, Adopted, 80 Submitted, Approved                                   61%                  28%            64%        34%                    28%
Update Round Started:
81 Format Responses as:
82 83 84 85 86 87 88 Number of Sites *:
89 Update Round Started:
90 Number of Responses this Round 91 Percent Response:
92 7/19/2007                                                              Page 10 of 12                        Technical Specification Task Force


Number of Responses this Round
CLIIP ADOPTION STATUS A                B      C            X                    Y              Z                AA                        AB TSTF-484              TSTF-409        TSTF-491          TSTF-448                  TSTF-490 Plant (Scram Time Testing)    (Cont Spray CT) (MSIV Iso Time) (Control Room Hab)          (Deletion of E Bar) 1            Plant          Last Update Type        BWRs                  CE            PWRs            All Plants                    PWRs 2                                                  10/27/2006            11/7/2006      12/29/2006        1/17/2007                  3/15/2007 71 Applicable Units                                      24                    9              41                68                        44 72 Responses                                            22                    8              32                58                          1 73 Adopted                                                3                    0              1                  1                          1 74 Submitted to NRC                                      4                    0              1                  0                          0 75 Planned/in site review                                10                    3              11                55                          0 76 Total Adopted / Will Adopt                            17                    3              13                56                          1 77 Undecd/will not adopt                                  5                    5              19                  2                          0 78 N/A                                                  44                  59              27                  0                        24
  % CLIIP Usage 79 (Adopted or Submitted)                              29%                  0%              5%                1%                          2%
Planned, Adopted, 80 Submitted, Approved                                  71%                  33%            32%              82%                          2%
81 Format Responses as:
82 83 84 85 86 87 88 Number of Sites *:
89 Update Round Started:
90 Number of Responses this Round 91 Percent Response:
92 7/19/2007                                                            Page 11 of 12                                Technical Specification Task Force


Percent  Response:NOPQR TSTF-369 (MOR-ORER)
CLIIP ADOPTION STATUS A                B      C          AC                AD TSTF-477 (Two Inop CR AC      TSTF-476 Plant    Subsys)           (BWPS) 1            Plant          Last Update Type      BWRs              BWRs 2                                                3/26/2007          5/23/2007 71 Applicable Units                                   26                26 72 Responses                                           0                0 73 Adopted                                             0                0 74 Submitted to NRC                                     0                0 75 Planned/in site review                               0                0 76 Total Adopted / Will Adopt                           0                0 77 Undecd/will not adopt                               0                0 78 N/A                                                 42                42
All Plants TSTF - 460 (Scram Time Testing)
  % CLIIP Usage 79 (Adopted or Submitted)                             0%                0%
BWRs TSTF-372 (Snubbers)
Planned, Adopted, 80 Submitted, Approved                                 0%               0%
All Plants TSTF-449 (SG Tube Inspection)
81 Format Responses as:
PWRs TSTF-422 (Preferred End States)
82 83 84 85 86 87 88 Number of Sites *:
CE6/23/20048/23/20045/4/20055/6/20057/13/2005682461429682460419 68918220037150 051634681741404071915 04472659100%50%41%88%0%
89 Update Round Started:
100%71%67%95%44%7/19/2007Page 9 of 12Technical Specification Task Force CLIIP ADOPTION STATUS 1 2ABCPlantLast Update Plant Type 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 Applicable Units Responses Adopted Submitted to NRC
90 Number of Responses this Round 91 Percent Response:
 
92 7/19/2007                                                            Page 12 of 12 Technical Specification Task Force}}
Planned/in site review Total Adopted / Will Adopt Undecd/will not adopt N/A% CLIIP Usage (Adopted or Submitted)
Planned, Adopted, Submitted, Approved Format Responses as:
Number of Sites *:
Update Round Started:
 
Number of Responses this Round
 
Percent  Response:STUVW Elimination of License Condition All Plants TSTF - 454 (PCIV CTs)
BWRs TSTF - 423 (End States)
BWRs TSTF-374 (Fuel Oil)
All Plants TSTF-427 (Barriers)
All Plants11/4/200512/13/20053/23/20064/21/200610/3/200633252562673025256054 150060 20221 37141318207162119717837343543436152%0%8%13%1%
61%28%64%34%28%7/19/2007Page 10 of 12Technical Specification Task Force CLIIP ADOPTION STATUS 1 2ABCPlantLast Update Plant Type 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 Applicable Units Responses Adopted Submitted to NRC
 
Planned/in site review Total Adopted / Will Adopt Undecd/will not adopt N/A% CLIIP Usage (Adopted or Submitted)
Planned, Adopted, Submitted, Approved Format Responses as:
Number of Sites *:
Update Round Started:
 
Number of Responses this Round
 
Percent  Response:XYZAAAB TSTF-484 (Scram Time Testing)
BWRs TSTF-409 (Cont Spray CT)
CE TSTF-491 (MSIV Iso Time)
PWRs TSTF-448 (Control Room Hab)
All Plants TSTF-490 (Deletion of E Bar)
PWRs10/27/200611/7/200612/29/20061/17/20073/15/20072494168442283258130111 40100103115501731356155192044592702429%0%5%1%2%
71%33%32%82%2%7/19/2007Page 11 of 12Technical Specification Task Force CLIIP ADOPTION STATUS 1 2ABCPlantLast Update Plant Type 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 Applicable Units Responses Adopted Submitted to NRC
 
Planned/in site review Total Adopted / Will Adopt Undecd/will not adopt N/A% CLIIP Usage (Adopted or Submitted)
Planned, Adopted, Submitted, Approved Format Responses as:
Number of Sites *:
Update Round Started:
 
Number of Responses this Round
 
Percent Response:ACAD TSTF-477 (Two Inop CR AC Subsys)BWRs TSTF-476 (BWPS)BWRs3/26/20075/23/20072626 00 00 00 00 00 0042420%0%
0%0%7/19/2007Page 12 of 12Technical Specification Task Force}}

Latest revision as of 05:28, 23 November 2019

Industry CLIIP Status 2007
ML072000459
Person / Time
Site: Technical Specifications Task Force
Issue date: 07/19/2007
From:
Technical Specifications Task Force
To:
Office of Nuclear Reactor Regulation
Hamm, Matthew DIRS/ITSB 415-1472
References
Download: ML072000459 (7)


Text

TS TS TF TF -3 66

-3 (P 58 AS (M

is se S)

W 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

d &

S R C TS TS

's) E TF TF TS A l

-3 TF

-4 l Pl 13 an 59 -3 (P (F 70 AS ts le (A S xi cc )B bl e um W M ul R od at s e o R r AO es tra T) in W TS ts TF )

Al

-4 lP TS 04 la nt TF (S s TS D

-4 TF IV 47 -4 )B (H 42 W 2 R R (P s ec AS om S)

TS bi B&

TF ne rs W

-4 )A 21 (R l l Pl C an P ts Fl TS yw TF T ST he TS -3 F- el

)W TF 69 37 (M 3

-4 O ( C 60 R IV (S -O s)

R C cr am ER E

)A Ti ll TS m TF e Pl an TS -3 Te ts TF 72 st i n

-4 49 ( S g )B nu (S bb W G R TS Tu er s) s TF be Al

-4 In lP El 2 2 la Submitted & Adopted im sp nt in (P ec s at re tio io fe n n rre )

of d PW Li En R ce ns d s e St a

TS C te on s)

TF di C tio E CLIIP Utilization

-4 n 54 Al TS (P lP TF C la

-4 IV nt s

23 C Ts (E )B TS nd W TF R

-3 St at s 74 es

( F )B TS ue W TS TF lO R TF -4 il) s

-4 27 Al 84 (B lP (S ar la cr rie nt am rs s

)A TS Ti m l l TF e Pl an Te Planned, Submitted, and Adopted

-4 st ts 09 in TS (C g )B TF TS -4 on W tS R TF 91 pr s

-4 (M a 48 y SI V C (C

Is T )C on tro o E Ti TS T lR m TS F- oo e )P TF 49 m W

-4 0 H R 77 (D ab s (T

el et ) Al w io n l P o la In of nt op E s C Ba R r)

AC PW Su R TS bs s TF ys

-4 76 ) BW (B R W s PS

)B W

R s

CLIIP ADOPTION STATUS A B C D E F G H TSTF-366 TSTF - 358 TSTF - 413 TSTF-370 TSTF - 359 Plant (PASS) (Missed SR's) (PASS) (Accumulator AOT) (Flexible Mode Restraints) 1 Plant Last Update Type W & CE All Plants BWRs W All Plants 2 10/31/2000 9/28/2001 3/20/2002 3/12/2003 4/4/2003 71 Applicable Units 38 68 25 25 67 72 Responses 38 68 25 25 67 73 Adopted 35 65 23 14 45 74 Submitted to NRC 0 0 0 0 1 75 Planned/in site review 0 2 1 3 7 76 Total Adopted / Will Adopt 35 67 24 17 53 77 Undecd/will not adopt 3 1 0 8 14 78 N/A 30 0 43 43 1

% CLIIP Usage 79 (Adopted or Submitted) 92% 96% 92% 56% 69%

Planned, Adopted, 80 Submitted, Approved 92% 99% 96% 68% 79%

81 Format Responses as: Adopted MM-DD-YY - The CLIIP amendment was approved for your plant on the given date (whether or not it's been implemented) 82 Submitted MM-DD-YY - The CLIIP was submitted by your plant on the given date 83 Planned MM-YY - The CLIIP is planned to be submitted in the given month and year (and may or not be under development). If the dat 84 Undecided - It is unknown if the plant will submit this CLIIP.

85 N/A - This CLIIP is not applicable to your plant either because of the plant design or the change was adopted prior to the C 86 Will Not Adopt - This CLIIP is applicable to your plant but you have decided to not adopt it.

87 88 Number of Sites *: 68 89 Update Round Started: 3/5/2007 90 Number of Responses this Round 64 91 Percent Response: 94.1%

92 7/19/2007 Page 7 of 12 Technical Specification Task Force

CLIIP ADOPTION STATUS A B C I J K L M TSTF - 404 TSTF-442 TSTF - 447 TSTF-421 TSTF-373 Plant (SDIV) (PASS) (H2 Recombiners) (RCP Flywheel) (CIVs) 1 Plant Last Update Type BWRs B&W All Plants W CE 2 4/15/2003 5/6/2003 09-25-03 10/22/2003 2/20/2004 71 Applicable Units 24 5 68 27 9 72 Responses 24 5 68 27 9 73 Adopted 21 5 58 16 0 74 Submitted to NRC 1 0 1 0 0 75 Planned/in site review 0 0 6 4 4 76 Total Adopted / Will Adopt 22 5 65 20 4 77 Undecd/will not adopt 2 0 3 7 5 78 N/A 44 63 0 41 59

% CLIIP Usage 79 (Adopted or Submitted) 92% 100% 87% 59% 0%

Planned, Adopted, 80 Submitted, Approved 92% 100% 96% 74% 44%

81 Format Responses as:

82 83 e is unknown, leave the date blank 84 85 LIIP 86 87 88 Number of Sites *:

89 Update Round Started:

90 Number of Responses this Round 91 Percent Response:

92 7/19/2007 Page 8 of 12 Technical Specification Task Force

CLIIP ADOPTION STATUS A B C N O P Q R TSTF-369 TSTF - 460 TSTF-372 TSTF-449 TSTF-422 Plant (MOR-ORER) (Scram Time Testing) (Snubbers) (SG Tube Inspection) (Preferred End States) 1 Plant Last Update Type All Plants BWRs All Plants PWRs CE 2 6/23/2004 8/23/2004 5/4/2005 5/6/2005 7/13/2005 71 Applicable Units 68 24 61 42 9 72 Responses 68 24 60 41 9 73 Adopted 68 9 18 22 0 74 Submitted to NRC 0 3 7 15 0 75 Planned/in site review 0 5 16 3 4 76 Total Adopted / Will Adopt 68 17 41 40 4 77 Undecd/will not adopt 0 7 19 1 5 78 N/A 0 44 7 26 59

% CLIIP Usage 79 (Adopted or Submitted) 100% 50% 41% 88% 0%

Planned, Adopted, 80 Submitted, Approved 100% 71% 67% 95% 44%

81 Format Responses as:

82 83 84 85 86 87 88 Number of Sites *:

89 Update Round Started:

90 Number of Responses this Round 91 Percent Response:

92 7/19/2007 Page 9 of 12 Technical Specification Task Force

CLIIP ADOPTION STATUS A B C S T U V W Elimination of License TSTF - 454 TSTF - 423 TSTF-374 TSTF-427 Plant Condition (PCIV CTs) (End States) (Fuel Oil) (Barriers) 1 Plant Last Update Type All Plants BWRs BWRs All Plants All Plants 2 11/4/2005 12/13/2005 3/23/2006 4/21/2006 10/3/2006 71 Applicable Units 33 25 25 62 67 72 Responses 30 25 25 60 54 73 Adopted 15 0 0 6 0 74 Submitted to NRC 2 0 2 2 1 75 Planned/in site review 3 7 14 13 18 76 Total Adopted / Will Adopt 20 7 16 21 19 77 Undecd/will not adopt 7 17 8 37 34 78 N/A 35 43 43 6 1

% CLIIP Usage 79 (Adopted or Submitted) 52% 0% 8% 13% 1%

Planned, Adopted, 80 Submitted, Approved 61% 28% 64% 34% 28%

81 Format Responses as:

82 83 84 85 86 87 88 Number of Sites *:

89 Update Round Started:

90 Number of Responses this Round 91 Percent Response:

92 7/19/2007 Page 10 of 12 Technical Specification Task Force

CLIIP ADOPTION STATUS A B C X Y Z AA AB TSTF-484 TSTF-409 TSTF-491 TSTF-448 TSTF-490 Plant (Scram Time Testing) (Cont Spray CT) (MSIV Iso Time) (Control Room Hab) (Deletion of E Bar) 1 Plant Last Update Type BWRs CE PWRs All Plants PWRs 2 10/27/2006 11/7/2006 12/29/2006 1/17/2007 3/15/2007 71 Applicable Units 24 9 41 68 44 72 Responses 22 8 32 58 1 73 Adopted 3 0 1 1 1 74 Submitted to NRC 4 0 1 0 0 75 Planned/in site review 10 3 11 55 0 76 Total Adopted / Will Adopt 17 3 13 56 1 77 Undecd/will not adopt 5 5 19 2 0 78 N/A 44 59 27 0 24

% CLIIP Usage 79 (Adopted or Submitted) 29% 0% 5% 1% 2%

Planned, Adopted, 80 Submitted, Approved 71% 33% 32% 82% 2%

81 Format Responses as:

82 83 84 85 86 87 88 Number of Sites *:

89 Update Round Started:

90 Number of Responses this Round 91 Percent Response:

92 7/19/2007 Page 11 of 12 Technical Specification Task Force

CLIIP ADOPTION STATUS A B C AC AD TSTF-477 (Two Inop CR AC TSTF-476 Plant Subsys) (BWPS) 1 Plant Last Update Type BWRs BWRs 2 3/26/2007 5/23/2007 71 Applicable Units 26 26 72 Responses 0 0 73 Adopted 0 0 74 Submitted to NRC 0 0 75 Planned/in site review 0 0 76 Total Adopted / Will Adopt 0 0 77 Undecd/will not adopt 0 0 78 N/A 42 42

% CLIIP Usage 79 (Adopted or Submitted) 0% 0%

Planned, Adopted, 80 Submitted, Approved 0% 0%

81 Format Responses as:

82 83 84 85 86 87 88 Number of Sites *:

89 Update Round Started:

90 Number of Responses this Round 91 Percent Response:

92 7/19/2007 Page 12 of 12 Technical Specification Task Force