ML073180716: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML073180716
| number = ML073180716
| issue date = 11/14/2007
| issue date = 11/14/2007
| title = Byron Units 1 and 2 Request for Information MOD/50.59 Baseline Inspection and Temporary Instruction 2515/166, Pressurized Water Reactor Containment Sump Blockage.
| title = Request for Information MOD/50.59 Baseline Inspection and Temporary Instruction 2515/166, Pressurized Water Reactor Containment Sump Blockage.
| author name = Hills D E
| author name = Hills D
| author affiliation = NRC/RGN-III/DRS/EB1
| author affiliation = NRC/RGN-III/DRS/EB1
| addressee name = Crane C M
| addressee name = Crane C
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| docket = 05000454, 05000455
| docket = 05000454, 05000455
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:November 14, 2007 Mr. Christopher M. Crane  
{{#Wiki_filter:November 14, 2007 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
 
President and Chief Nuclear Officer  
 
Exelon Nuclear  
 
Exelon Generation Company, LLC  
 
4300 Winfield Road  
 
Warrenville, IL 60555  


==SUBJECT:==
==SUBJECT:==
BYRON STATION, UNITS 1 AND 2 INFORMATION REQUEST FOR AN NRC TRIENNIAL PERMANENT  
BYRON STATION, UNITS 1 AND 2 INFORMATION REQUEST FOR AN NRC TRIENNIAL PERMANENT MODIFICATIONS, 10 CFR 50.59 (MOD/50.59) BASELINE INSPECTION AND TEMPORARY INSTRUCTION 2515/166, PRESSURIZED WATER REACTOR CONTAINMENT SUMP BLOCKAGE
 
MODIFICATIONS, 10 CFR 50.59 (MOD/50.59) BASELINE INSPECTION AND  
 
TEMPORARY INSTRUCTION 2515/166, "PRESSURIZED WATER REACTOR  
 
CONTAINMENT SUMP BLOCKAGE"


==Dear Mr. Crane:==
==Dear Mr. Crane:==


On January 14, 2008, the NRC will begin a Modifications, 10 CFR 50.59 (MOD/50.59) baseline  
On January 14, 2008, the NRC will begin a Modifications, 10 CFR 50.59 (MOD/50.59) baseline inspection at the Byron Station, Units 1 and 2. In addition, we intend to complete Temporary Instruction (TI) 2515/166, Pressurized Water Reactor Containment Sump Blockage. This inspection will be performed in accordance with the NRC baseline Inspection Procedures (IP) 71111.02, IP 71111.17 and TI 2515/166. However, please note that in accordance with recent Reactor Oversight Process inspection program realignment results, IP 71111.02 and IP 71111.17 are planned to be combined into a new revised procedure. This procedure is currently under development, but will likely be issued in time for implementation for this inspection. The on-site portions of the inspection will take place on January 14 through January 18, 2008 and January 28 through February 1, 2008.
 
Experience has shown that these baseline inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have been divided into four groups. The first group is necessary to ensure that the inspection team is adequately prepared for the inspection. This information should be available to the Regional Office no later than December 10, 2007. The inspection team will review this information and, by December 21, 2007, will request specific items that should be available for review by January 7, 2008, i.e., the second group of documents. The third group of requested documents contains items that the team will review, or need access to, during the inspection and should be available by the first day of the on-site inspection, January 14, 2008. The fourth group lists information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection.
inspection at the Byron Station, Units 1 and 2. In addition, we intend to complete Temporary  
The lead inspector for this inspection is Mr. Langstaff. We understand that our contacts with your organization for this inspection are Mr. Perchiazzi and Ms. Hubert, for technical and regulatory areas, respectively. If there are any questions about the inspection or the material
 
Instruction (TI) 2515/166, "Pressurized Water Reactor Containment Sump Blockage.This  
 
inspection will be performed in accordance with the NRC baseline Inspection Procedures (IP) 71111.02, IP 71111.17 and TI 2515/166. However, please note that in accordance with  
 
recent Reactor Oversight Process inspection program realignment results, IP 71111.02 and  
 
IP 71111.17 are planned to be combined into a new revised procedure. This procedure is  
 
currently under development, but will likely be i ssued in time for implementation for this inspection. The on-site portions of the inspection will take place on January 14 through  
 
January 18, 2008 and January 28 through February 1, 2008.
Experience has shown that these baseline ins pections are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection  
 
impact on the site and to ensure a productive inspection for both parties, we have enclosed  
 
a request for documents needed for the inspection. These documents have been divided  
 
into four groups. The first group is necessary to ensure that the inspection team is  
 
adequately prepared for the inspection. This information should be available to the Regional  
 
Office no later than December 10, 2007. The inspection team will review this information and, by December 21, 2007, will request specific items that should be available for review by January 7, 2008, i.e., the second group of documents. The third group of requested documents contains  
 
items that the team will review, or need access to, during the inspection and should be available  
 
by the first day of the on-site inspection, January 14, 2008. The fourth group lists information  
 
necessary to aid the inspection team in tracking issues identified as a result of the inspection. It  
 
is requested that this information be provided to the lead inspector as the information is  
 
generated during the inspection. It is important that all of these documents are up to date and  
 
complete in order to minimize the number of additional documents requested during the  
 
preparation and/or the on-site portions of the inspection.
The lead inspector for this inspection is Mr. Langstaff. We understand that our contacts with  
 
your organization for this inspection are Mr. Perchiazzi and Ms. Hubert, for technical and  
 
regulatory areas, respectively. If there are any questions about the inspection or the material  
 
C. Crane   
 
requested, please contact the lead inspector at (301) 415-1082 (through December 7, 2007, or
 
at (630) 829-9747 thereafter) or via e-mail at RAL4@nrc.gov.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and
 
its enclosure will be available electronically for public inspection in the NRC Public Document
 
Room or from the Publicly Available Record s System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS
), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Sincerely,
      /RA/
David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety 


Docket Nos. 50-454; 50-455  
C. Crane                                        requested, please contact the lead inspector at (301) 415-1082 (through December 7, 2007, or at (630) 829-9747 thereafter) or via e-mail at RAL4@nrc.gov.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
License Nos. NPF-37; NPF-66  
Sincerely,
                                                /RA/
David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66


==Enclosure:==
==Enclosure:==
Modification and 50.59 Inspection Document Request (Information for Preparation Week and Information
Modification and 50.59 Inspection Document Request (Information for Preparation Week and Information Available On-site During Inspection) cc w/encl:    Site Vice President - Byron Station Plant Manager - Byron Station Regulatory Assurance Manager - Byron Station Chief Operating Officer Senior Vice President - Nuclear Services Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing Manager Licensing - Braidwood and Byron Senior Counsel, Nuclear Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer, State of Illinois State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission B. Quigley, Byron Station


Available On-site During Inspection)
C. Crane                                                                             In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Sincerely,
cc w/encl: Site Vice President - Byron Station Plant Manager - Byron Station
                                                                          /RA/
 
David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66
Regulatory Assurance Manager - Byron Station
 
Chief Operating Officer
 
Senior Vice President - Nuclear Services
 
Vice President - Operations Support
 
Vice President - Licensing and Regulatory Affairs
 
Director Licensing
 
Manager Licensing - Braidwood and Byron
 
Senior Counsel, Nuclear
 
Document Control Desk - Licensing  Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer, State of Illinois State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission B. Quigley, Byron Station C. Crane    
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and  
 
its enclosure will be available electronically for public inspection in the NRC Public Document  
 
Room or from the Publicly Available Record s System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS
), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
 
Sincerely,  
      /RA/
David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety
 
Docket Nos. 50-454; 50-455  
 
License Nos. NPF-37; NPF-66  


==Enclosure:==
==Enclosure:==
Modification and 50.59 Inspection Document Request (Information for Preparation Week and Information
Modification and 50.59 Inspection Document Request (Information for Preparation Week and Information Available On-site During Inspection) cc w/encl:               Site Vice President - Byron Station Plant Manager - Byron Station Regulatory Assurance Manager - Byron Station Chief Operating Officer Senior Vice President - Nuclear Services Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing Manager Licensing - Braidwood and Byron Senior Counsel, Nuclear Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer, State of Illinois State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission B. Quigley, Byron Station DOCUMENT NAME: G:\DRS\Work in Progress\Ltr. 11__07 Byron RFI RAL.doc Publicly Available                         Non-Publicly Available                   Sensitive               Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE             RIII                                       RIII                     RIII NAME               DEH for RLangstaff: ls RSkokowski DHills DATE               11/14/07                                   11/14/07                 11/14/07 OFFICIAL RECORD COPY
 
Available On-site During Inspection)  
 
cc w/encl: Site Vice President - Byron Station Plant Manager - Byron Station  
 
Regulatory Assurance Manager - Byron Station  
 
Chief Operating Officer  
 
Senior Vice President - Nuclear Services  
 
Vice President - Operations Support  
 
Vice President - Licensing and Regulatory Affairs  
 
Director Licensing  
 
Manager Licensing - Braidwood and Byron  
 
Senior Counsel, Nuclear  
 
Document Control Desk - Licensing   Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer, State of Illinois State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission B. Quigley, Byron Station  
 
DOCUMENT NAME:
G:\DRS\Work in Progress\
Ltr. 11__07 Byron RFI RAL.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII   NAME DEH for RLangstaff: ls RSkokowski DHills DATE 11/14/07 11/14/07 11/14/07 OFFICIAL RECORD COPY


Letter to Mr. C. Crane from Mr. J. Lara dated November 14, 2007.  
Letter to Mr. C. Crane from Mr. J. Lara dated November 14, 2007.


==SUBJECT:==
==SUBJECT:==
BYRON STATION, UNITS 1 AND 2 INFORMATION REQUEST FOR AN NRC BIENNIAL PERMANENT  
BYRON STATION, UNITS 1 AND 2 INFORMATION REQUEST FOR AN NRC BIENNIAL PERMANENT MODIFICATIONS, 10 CFR 50.59 (MOD/50.59) BASELINE INSPECTION AND TEMPORARY INSTRUCTION 2515/166, PRESSURIZED WATER REACTOR CONTAINMENT SUMP BLOCKAGE DISTRIBUTION:
 
RAG1 TEB RFK RidsNrrDirsIrib MAS KGO JKH3 RML2 SAM9 SRI Byron CAA1 LSL CDP1 DRPIII DRSIII PLB1 TXN
MODIFICATIONS, 10 CFR 50.59 (MOD/50.59) BASELINE INSPECTION AND  
 
TEMPORARY INSTRUCTION 2515/166, "PRESSURIZED WATER REACTOR  
 
CONTAINMENT SUMP BLOCKAGE"
 
DISTRIBUTION
: RAG1 TEB RFK RidsNrrDirsIrib  
 
MAS KGO JKH3 RML2 SAM9 SRI Byron
 
CAA1 LSL CDP1 DRPIII DRSIII PLB1 TXN  
 
INITIAL DOCUMENT REQUEST Enclosure 1 MODIFICATIONS AND 50.59 INSPECTION DOCUMENT REQUEST Inspection Reports
:  05000454/2008006; 05000455/2008006
 
Inspection Dates
:  January 14 through February 1, 2008
 
Inspection Procedures
:  IP 71111- 02, "Changes, Tests, or Experiments" IP 71111- 17, "Permanent Plant Modifications"
 
TI 2515/166, "Pressurized Water Reactor Containment Sump
 
Blockage (NRC Generic Letter 2004-02)"
Lead Inspector
:  R. Langstaff, Reactor Inspector (301) 415-1082 through December 7, 2007
 
(630) 829-9747 after December 7, 2007
 
I. Information Requested for In-Office Preparation Week The following information is requested by December 10, 2007, or sooner, to facilitate the
 
selection of specific items that will be reviewed during the on-site inspection week. The team
 
will select specific items from the information requested below and submit a list to your staff by December 21, 2007. We will request that certain items be made available to the regional office during the week prior to the inspection (by January 7, 2008). We request that the remaining
 
items selected from the lists be available and ready for review on the first day of inspection. All requested information should cover the time frame from the receipt of information from the last
 
Permanent Modification inspection (February 1, 2006) to the present. If you have any questions regarding this information, please call the lead inspector as soon as possible.
 
(1) List of "permanent plant modifications" to systems, structures or components that are field work complete (For the purpose of this inspection, permanent plant modifications
 
include permanent:  plant changes, design changes, set point changes, equivalency
 
evaluations, suitability analyses, and commercial grade dedications.)
 
The list should contain the number of each document, the title, the revision (or date), and the affected system. In addition to the list, please provide a
 
description of each modification and a list of associated calculations and affected
 
procedures. 
 
(2) List of all 10 CFR 50.59 completed evaluations involving:  (a) calculations;  (b) procedure revisions; (c) changes to the facility (modifications); (d) non-routine
 
operating configurations; or (e) departures in methods of analyses. This list should be
 
limited to calculations, procedure changes, and departures in methods of analysis which
 
have been approved for use; and changes to the facility which are field work complete.
The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document INITIAL DOCUMENT REQUEST Enclosure 2 (i.e., the modification or procedure to which the evaluation applies). The list should NOT include any evaluations in which prior NRC approval was sought
 
and obtained.
 
(3) List of all 10 CFR 50.59 changes that have been screened out as not requiring a full evaluation involving:  (a) calculations; (b) procedure revisions; (c) changes to the facility (modifications); (d) non-routine operating configurations; or (e) departures in methods of
 
analyses. 
 
The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies).
 
(4) List of calculation changes that have been issued for use.
 
(5) List of corrective action documents (open and closed) that address plant permanent modification or 10 CFR 50.59 issues, concerns, or processes. These documents should
 
also include corrective action documents associated with modification and 50.59 change
 
implementation.
 
The list should contain the number, title and revision (or date) of each document, the affected system and corresponding documentation (if applicable), and should
 
be sorted in order of significance.
 
(6) Copies of procedures addressing the following:  modifications, design changes, set point changes, equivalency evaluations or suitab ility analyses, commercial grade dedications, post-modification testing, 10 CFR 50.59 evaluation and screenings, and Updated Final
 
Safety Analysis Report (UFSAR) updates.
 
(7) UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide copies of the complete submittal.
 
(8) Changes including any modification, procedure changes, training, and UFSAR changes that resulted from commitments made in response to Generic Letter (GL) 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis
 
Accidents at Pressurized-Water Reactors."
 
(9) Names and phone numbers for the regulatory and technical contacts. 
 
(10) Description of system designators/
abbreviations used in lists provided.
 
INITIAL DOCUMENT REQUEST Enclosure 3  II. Information Requested to be Available the Week Prior to Inspection (January 14, 2007 - Request will be made by December 21, 2007)
(1) Copies of all selected items from Section I. This includes copies of associated documents such as calculations, post-modification test packages, 10 CFR 50.59
 
evaluations or screenings, and any corrective action documents.
 
III. Information Requested to be Available on First Day of Inspection (January 14, 2008)
(1) Copies of these documents do not need to be solely available to the team as long as the inspectors have easy and unrestrained access to them.
: a. UFSAR;
: b. Original Final Safety Analysis Report (FSAR) Volumes;
: c. Original SER and Supplements (for Original FSAR);
: d. FSAR Question and Answers;
: e. Quality Assurance Plan;
: f. Technical Specifications;
: g. Latest IPE/PRA Report; and
: h. Vendor Manuals.
 
(2) Please ensure that other supporting documents for the selected items have been located and are readily retrievable as the team will likely be requesting these documents during
 
the inspections. Examples of supporting documents are:
: a. Drawings supporting the modifications;
: b. Procedures affected by the modifications; and c. UFSAR change papers generated due to a 10 CFR 50.59  evaluation.
 
(3) Current management and engineering organizational chart.
 
(4) Site phone list.


IV. Information Requested to be provided throughout the inspection (1) Copies of any corrective action documents generated as a result of the team's questions or queries during this inspection.  
INITIAL DOCUMENT REQUEST MODIFICATIONS AND 50.59 INSPECTION DOCUMENT REQUEST Inspection Reports:              05000454/2008006; 05000455/2008006 Inspection Dates:                January 14 through February 1, 2008 Inspection Procedures:            IP 71111- 02, Changes, Tests, or Experiments IP 71111- 17, Permanent Plant Modifications TI 2515/166, Pressurized Water Reactor Containment Sump Blockage (NRC Generic Letter 2004-02)
Lead Inspector:                  R. Langstaff, Reactor Inspector (301) 415-1082 through December 7, 2007 (630) 829-9747 after December 7, 2007 I.      Information Requested for In-Office Preparation Week The following information is requested by December 10, 2007, or sooner, to facilitate the selection of specific items that will be reviewed during the on-site inspection week. The team will select specific items from the information requested below and submit a list to your staff by December 21, 2007. We will request that certain items be made available to the regional office during the week prior to the inspection (by January 7, 2008). We request that the remaining items selected from the lists be available and ready for review on the first day of inspection. All requested information should cover the time frame from the receipt of information from the last Permanent Modification inspection (February 1, 2006) to the present. If you have any questions regarding this information, please call the lead inspector as soon as possible.
(1)      List of permanent plant modifications to systems, structures or components that are field work complete (For the purpose of this inspection, permanent plant modifications include permanent: plant changes, design changes, set point changes, equivalency evaluations, suitability analyses, and commercial grade dedications.)
The list should contain the number of each document, the title, the revision (or date), and the affected system. In addition to the list, please provide a description of each modification and a list of associated calculations and affected procedures.
(2)      List of all 10 CFR 50.59 completed evaluations involving: (a) calculations; (b) procedure revisions; (c) changes to the facility (modifications); (d) non-routine operating configurations; or (e) departures in methods of analyses. This list should be limited to calculations, procedure changes, and departures in methods of analysis which have been approved for use; and changes to the facility which are field work complete.
The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document 1
Enclosure


(2) Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the inspection to each team member).  
INITIAL DOCUMENT REQUEST (i.e., the modification or procedure to which the evaluation applies). The list should NOT include any evaluations in which prior NRC approval was sought and obtained.
(3) List of all 10 CFR 50.59 changes that have been screened out as not requiring a full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes to the facility (modifications); (d) non-routine operating configurations; or (e) departures in methods of analyses.
The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies).
(4)  List of calculation changes that have been issued for use.
(5)  List of corrective action documents (open and closed) that address plant permanent modification or 10 CFR 50.59 issues, concerns, or processes. These documents should also include corrective action documents associated with modification and 50.59 change implementation.
The list should contain the number, title and revision (or date) of each document, the affected system and corresponding documentation (if applicable), and should be sorted in order of significance.
(6)  Copies of procedures addressing the following: modifications, design changes, set point changes, equivalency evaluations or suitability analyses, commercial grade dedications, post-modification testing, 10 CFR 50.59 evaluation and screenings, and Updated Final Safety Analysis Report (UFSAR) updates.
(7)  UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide copies of the complete submittal.
(8)  Changes including any modification, procedure changes, training, and UFSAR changes that resulted from commitments made in response to Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.
(9)  Names and phone numbers for the regulatory and technical contacts.
(10) Description of system designators/abbreviations used in lists provided.
2 Enclosure


If you have questions regarding the information requested, please contact the lead inspector.}}
INITIAL DOCUMENT REQUEST II. Information Requested to be Available the Week Prior to Inspection (January 14, 2007 - Request will be made by December 21, 2007)
(1)    Copies of all selected items from Section I. This includes copies of associated documents such as calculations, post-modification test packages, 10 CFR 50.59 evaluations or screenings, and any corrective action documents.
III. Information Requested to be Available on First Day of Inspection (January 14, 2008)
(1)    Copies of these documents do not need to be solely available to the team as long as the inspectors have easy and unrestrained access to them.
: a. UFSAR;
: b. Original Final Safety Analysis Report (FSAR) Volumes;
: c. Original SER and Supplements (for Original FSAR);
: d. FSAR Question and Answers;
: e. Quality Assurance Plan;
: f. Technical Specifications;
: g. Latest IPE/PRA Report; and
: h. Vendor Manuals.
(2)    Please ensure that other supporting documents for the selected items have been located and are readily retrievable as the team will likely be requesting these documents during the inspections. Examples of supporting documents are:
: a. Drawings supporting the modifications;
: b. Procedures affected by the modifications; and
: c. UFSAR change papers generated due to a 10 CFR 50.59 evaluation.
(3)    Current management and engineering organizational chart.
(4)    Site phone list.
IV. Information Requested to be provided throughout the inspection (1)    Copies of any corrective action documents generated as a result of the teams questions or queries during this inspection.
(2)    Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the inspection to each team member).
If you have questions regarding the information requested, please contact the lead inspector.
3 Enclosure}}

Latest revision as of 01:39, 23 November 2019

Request for Information MOD/50.59 Baseline Inspection and Temporary Instruction 2515/166, Pressurized Water Reactor Containment Sump Blockage.
ML073180716
Person / Time
Site: Byron  Constellation icon.png
Issue date: 11/14/2007
From: Dave Hills
NRC/RGN-III/DRS/EB1
To: Crane C
Exelon Generation Co, Exelon Nuclear
References
IR-08-006
Download: ML073180716 (5)


Text

November 14, 2007 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

BYRON STATION, UNITS 1 AND 2 INFORMATION REQUEST FOR AN NRC TRIENNIAL PERMANENT MODIFICATIONS, 10 CFR 50.59 (MOD/50.59) BASELINE INSPECTION AND TEMPORARY INSTRUCTION 2515/166, PRESSURIZED WATER REACTOR CONTAINMENT SUMP BLOCKAGE

Dear Mr. Crane:

On January 14, 2008, the NRC will begin a Modifications, 10 CFR 50.59 (MOD/50.59) baseline inspection at the Byron Station, Units 1 and 2. In addition, we intend to complete Temporary Instruction (TI) 2515/166, Pressurized Water Reactor Containment Sump Blockage. This inspection will be performed in accordance with the NRC baseline Inspection Procedures (IP) 71111.02, IP 71111.17 and TI 2515/166. However, please note that in accordance with recent Reactor Oversight Process inspection program realignment results, IP 71111.02 and IP 71111.17 are planned to be combined into a new revised procedure. This procedure is currently under development, but will likely be issued in time for implementation for this inspection. The on-site portions of the inspection will take place on January 14 through January 18, 2008 and January 28 through February 1, 2008.

Experience has shown that these baseline inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have been divided into four groups. The first group is necessary to ensure that the inspection team is adequately prepared for the inspection. This information should be available to the Regional Office no later than December 10, 2007. The inspection team will review this information and, by December 21, 2007, will request specific items that should be available for review by January 7, 2008, i.e., the second group of documents. The third group of requested documents contains items that the team will review, or need access to, during the inspection and should be available by the first day of the on-site inspection, January 14, 2008. The fourth group lists information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection.

The lead inspector for this inspection is Mr. Langstaff. We understand that our contacts with your organization for this inspection are Mr. Perchiazzi and Ms. Hubert, for technical and regulatory areas, respectively. If there are any questions about the inspection or the material

C. Crane requested, please contact the lead inspector at (301) 415-1082 (through December 7, 2007, or at (630) 829-9747 thereafter) or via e-mail at RAL4@nrc.gov.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66

Enclosure:

Modification and 50.59 Inspection Document Request (Information for Preparation Week and Information Available On-site During Inspection) cc w/encl: Site Vice President - Byron Station Plant Manager - Byron Station Regulatory Assurance Manager - Byron Station Chief Operating Officer Senior Vice President - Nuclear Services Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing Manager Licensing - Braidwood and Byron Senior Counsel, Nuclear Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer, State of Illinois State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission B. Quigley, Byron Station

C. Crane In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66

Enclosure:

Modification and 50.59 Inspection Document Request (Information for Preparation Week and Information Available On-site During Inspection) cc w/encl: Site Vice President - Byron Station Plant Manager - Byron Station Regulatory Assurance Manager - Byron Station Chief Operating Officer Senior Vice President - Nuclear Services Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing Manager Licensing - Braidwood and Byron Senior Counsel, Nuclear Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer, State of Illinois State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission B. Quigley, Byron Station DOCUMENT NAME: G:\DRS\Work in Progress\Ltr. 11__07 Byron RFI RAL.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII NAME DEH for RLangstaff: ls RSkokowski DHills DATE 11/14/07 11/14/07 11/14/07 OFFICIAL RECORD COPY

Letter to Mr. C. Crane from Mr. J. Lara dated November 14, 2007.

SUBJECT:

BYRON STATION, UNITS 1 AND 2 INFORMATION REQUEST FOR AN NRC BIENNIAL PERMANENT MODIFICATIONS, 10 CFR 50.59 (MOD/50.59) BASELINE INSPECTION AND TEMPORARY INSTRUCTION 2515/166, PRESSURIZED WATER REACTOR CONTAINMENT SUMP BLOCKAGE DISTRIBUTION:

RAG1 TEB RFK RidsNrrDirsIrib MAS KGO JKH3 RML2 SAM9 SRI Byron CAA1 LSL CDP1 DRPIII DRSIII PLB1 TXN

INITIAL DOCUMENT REQUEST MODIFICATIONS AND 50.59 INSPECTION DOCUMENT REQUEST Inspection Reports: 05000454/2008006; 05000455/2008006 Inspection Dates: January 14 through February 1, 2008 Inspection Procedures: IP 71111- 02, Changes, Tests, or Experiments IP 71111- 17, Permanent Plant Modifications TI 2515/166, Pressurized Water Reactor Containment Sump Blockage (NRC Generic Letter 2004-02)

Lead Inspector: R. Langstaff, Reactor Inspector (301) 415-1082 through December 7, 2007 (630) 829-9747 after December 7, 2007 I. Information Requested for In-Office Preparation Week The following information is requested by December 10, 2007, or sooner, to facilitate the selection of specific items that will be reviewed during the on-site inspection week. The team will select specific items from the information requested below and submit a list to your staff by December 21, 2007. We will request that certain items be made available to the regional office during the week prior to the inspection (by January 7, 2008). We request that the remaining items selected from the lists be available and ready for review on the first day of inspection. All requested information should cover the time frame from the receipt of information from the last Permanent Modification inspection (February 1, 2006) to the present. If you have any questions regarding this information, please call the lead inspector as soon as possible.

(1) List of permanent plant modifications to systems, structures or components that are field work complete (For the purpose of this inspection, permanent plant modifications include permanent: plant changes, design changes, set point changes, equivalency evaluations, suitability analyses, and commercial grade dedications.)

The list should contain the number of each document, the title, the revision (or date), and the affected system. In addition to the list, please provide a description of each modification and a list of associated calculations and affected procedures.

(2) List of all 10 CFR 50.59 completed evaluations involving: (a) calculations; (b) procedure revisions; (c) changes to the facility (modifications); (d) non-routine operating configurations; or (e) departures in methods of analyses. This list should be limited to calculations, procedure changes, and departures in methods of analysis which have been approved for use; and changes to the facility which are field work complete.

The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document 1

Enclosure

INITIAL DOCUMENT REQUEST (i.e., the modification or procedure to which the evaluation applies). The list should NOT include any evaluations in which prior NRC approval was sought and obtained.

(3) List of all 10 CFR 50.59 changes that have been screened out as not requiring a full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes to the facility (modifications); (d) non-routine operating configurations; or (e) departures in methods of analyses.

The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies).

(4) List of calculation changes that have been issued for use.

(5) List of corrective action documents (open and closed) that address plant permanent modification or 10 CFR 50.59 issues, concerns, or processes. These documents should also include corrective action documents associated with modification and 50.59 change implementation.

The list should contain the number, title and revision (or date) of each document, the affected system and corresponding documentation (if applicable), and should be sorted in order of significance.

(6) Copies of procedures addressing the following: modifications, design changes, set point changes, equivalency evaluations or suitability analyses, commercial grade dedications, post-modification testing, 10 CFR 50.59 evaluation and screenings, and Updated Final Safety Analysis Report (UFSAR) updates.

(7) UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide copies of the complete submittal.

(8) Changes including any modification, procedure changes, training, and UFSAR changes that resulted from commitments made in response to Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.

(9) Names and phone numbers for the regulatory and technical contacts.

(10) Description of system designators/abbreviations used in lists provided.

2 Enclosure

INITIAL DOCUMENT REQUEST II. Information Requested to be Available the Week Prior to Inspection (January 14, 2007 - Request will be made by December 21, 2007)

(1) Copies of all selected items from Section I. This includes copies of associated documents such as calculations, post-modification test packages, 10 CFR 50.59 evaluations or screenings, and any corrective action documents.

III. Information Requested to be Available on First Day of Inspection (January 14, 2008)

(1) Copies of these documents do not need to be solely available to the team as long as the inspectors have easy and unrestrained access to them.

a. UFSAR;
b. Original Final Safety Analysis Report (FSAR) Volumes;
c. Original SER and Supplements (for Original FSAR);
d. FSAR Question and Answers;
e. Quality Assurance Plan;
f. Technical Specifications;
g. Latest IPE/PRA Report; and
h. Vendor Manuals.

(2) Please ensure that other supporting documents for the selected items have been located and are readily retrievable as the team will likely be requesting these documents during the inspections. Examples of supporting documents are:

a. Drawings supporting the modifications;
b. Procedures affected by the modifications; and
c. UFSAR change papers generated due to a 10 CFR 50.59 evaluation.

(3) Current management and engineering organizational chart.

(4) Site phone list.

IV. Information Requested to be provided throughout the inspection (1) Copies of any corrective action documents generated as a result of the teams questions or queries during this inspection.

(2) Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the inspection to each team member).

If you have questions regarding the information requested, please contact the lead inspector.

3 Enclosure