ML15301A814: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML15301A814
| number = ML15301A814
| issue date = 10/28/2015
| issue date = 10/28/2015
| title = Ltr 10/28/15 Monticello Nuclear Generating Plant Acknowledgment of Disputed Violation of NRC Inspection Report 05000263/2015007 (Bxj)
| title = Acknowledgment of Disputed Violation of NRC Inspection Report 05000263/2015007 (Bxj)
| author name = Lipa C A
| author name = Lipa C
| author affiliation = NRC/RGN-III/DRS/EB2
| author affiliation = NRC/RGN-III/DRS/EB2
| addressee name = Gardner P A
| addressee name = Gardner P
| addressee affiliation = Northern States Power Co
| addressee affiliation = Northern States Power Co
| docket = 05000263
| docket = 05000263
Line 14: Line 14:
| page count = 3
| page count = 3
}}
}}
See also: [[followed by::IR 05000263/2015007]]
See also: [[see also::IR 05000263/2015007]]


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES
[[Issue date::October 28, 2015]]
                              NUCLEAR REGULATORY COMMISSION
 
                                                  REGION III
EA-15-206 Mr. Peter Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362-9637
                                      2443 WARRENVILLE RD. SUITE 210
 
                                            LISLE, IL 60532-4352
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT ACKNOWLEDGMENT OF DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007
                                              October 28, 2015
EA-15-206
Mr. Peter A. Gardner
Site Vice President
Monticello Nuclear Generating Plant
Northern States Power Company, Minnesota
2807 West County Road 75
Monticello, MN 55362-9637
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT ACKNOWLEDGMENT OF
              DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007
Dear Mr. Gardner:
This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC),
dated October 2, 2015, that provided a response to our inspection report issued on
September 2, 2015, concerning activities conducted at your Monticello Nuclear Generating Plant.
The letter we received contested a Non-Cited Violation (NCV) documented in Monticello
Inspection Report 2015007. The contested NCV is Failure to Review for Suitability of
Application Safety-Related Relays Installed Beyond Their Service Life.
We are currently reviewing your basis for contesting the above NCV. The NRC seeks to be
thorough and timely in the review of licensee responses. Accordingly, we will inform you as soon
as we complete our evaluation.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
of this letter will be available electronically for public inspection in the NRCs Public Document
Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC
Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
                                                  Sincerely,
                                                  /RA/
                                                  Christine A. Lipa, Chief
                                                  Engineering Branch 2
                                                  Division of Reactor Safety
Docket No. 50-263
License No. DPR-22
cc: Distribution via LISTSERV


==Dear Mr. Gardner:==
EA-15-206
Mr. Peter A. Gardner
Site Vice President
Monticello Nuclear Generating Plant
Northern States Power Company, Minnesota
2807 West County Road 75
Monticello, MN 55362-9637
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT ACKNOWLEDGMENT OF
                    DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007
Dear Mr. Gardner:
This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC),
This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC),
dated October 2, 2015, that provided a response to our inspection report issued on September 2, 2015, concerning activities conducted at your Monticello Nuclear Generating Plant. The letter we received contested a Non-Cited Violation (NCV) documented in Monticello Inspection Report 2015007. The contested NCV is "Failure to Review for Suitability of Application Safety-Related Relays Installed Beyond Their Service Life." We are currently reviewing your basis for contesting the above NCV. The NRC seeks to be thorough and timely in the review of licensee responses. Accordingly, we will inform you as soon as we complete our evaluation.
dated October 2, 2015, that provided a response to our inspection report issued on
 
September 2, 2015, concerning activities conducted at your Monticello Nuclear Generating Plant.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
The letter we received contested a Non-Cited Violation (NCV) documented in Monticello
 
Inspection Report 2015007. The contested NCV is Failure to Review for Suitability of
Sincerely,/RA/ Christine A. Lipa, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-263 License No. DPR-22 cc: Distribution via LISTSERV EA-15-206 Mr. Peter Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362-9637
Application Safety-Related Relays Installed Beyond Their Service Life.
 
We are currently reviewing your basis for contesting the above NCV. The NRC seeks to be
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT ACKNOWLEDGMENT OF DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007
thorough and timely in the review of licensee responses. Accordingly, we will inform you as soon
 
as we complete our evaluation.
==Dear Mr. Gardner:==
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC), dated October 2, 2015, that provided a response to our inspection report issued on September 2, 2015, concerning activities conducted at your Monticello Nuclear Generating Plant. The letter we received contested a Non-Cited Violation (NCV) documented in Monticello Inspection Report 2015007. The contested NCV is "Failure to Review for Suitability of Application Safety-Related Relays Installed Beyond Their Service Life." We are currently reviewing your basis for contesting the above NCV. The NRC seeks to be thorough and timely in the review of licensee responses. Accordingly, we will inform you as soon as we complete our evaluation. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
 
of this letter will be available electronically for public inspection in the NRCs Public Document
Sincerely,/RA/ Christine A. Lipa, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-263 License No. DPR-22 cc: Distribution via LISTSERV DISTRIBUTION: See next page ADAMS Accession Number ML15301A814 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME ADunlop RSkokowski CLipa DATE 10/26/15 10/26/15 10/28/15 OFFICIAL RECORD COPY Letter to Mr. Peter from Ms. Christine A. Lipa dated October 28, 2015.
Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC
Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
                                                                          Sincerely,
                                                                          /RA/
                                                                          Christine A. Lipa, Chief
                                                                          Engineering Branch 2
                                                                          Division of Reactor Safety
Docket No. 50-263
License No. DPR-22
cc: Distribution via LISTSERV
DISTRIBUTION:
See next page
ADAMS Accession Number ML15301A814
    Publicly Available                           Non-Publicly Available                     Sensitive               Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
  OFFICE             RIII                               RIII                           RIII                               RIII
  NAME               ADunlop                             RSkokowski                     CLipa
  DATE               10/26/15                           10/26/15                       10/28/15
                                                              OFFICIAL RECORD COPY


SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT ACKNOWLEDGMENT OF DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007 DISTRIBUTION: Janelle Jessie RidsNrrDorlLpl3-1 Resource RidsNrrPMMonticello RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Jim Clay Carmen Olteanu ROPreports.Resource@nrc.gov
Letter to Mr. Peter A. Gardner from Ms. Christine A. Lipa dated October 28, 2015.
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT ACKNOWLEDGMENT OF
            DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007
DISTRIBUTION:
Janelle Jessie
RidsNrrDorlLpl3-1 Resource
RidsNrrPMMonticello
RidsNrrDirsIrib Resource
Cynthia Pederson
Darrell Roberts
Richard Skokowski
Allan Barker
Carole Ariano
Linda Linn
DRPIII
DRSIII
Jim Clay
Carmen Olteanu
ROPreports.Resource@nrc.gov
}}
}}

Latest revision as of 22:45, 16 November 2019

Acknowledgment of Disputed Violation of NRC Inspection Report 05000263/2015007 (Bxj)
ML15301A814
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 10/28/2015
From: Christine Lipa
NRC/RGN-III/DRS/EB2
To: Gardner P
Northern States Power Co
References
EA-15-206, IR 2015007
Download: ML15301A814 (3)


See also: IR 05000263/2015007

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, IL 60532-4352

October 28, 2015

EA-15-206

Mr. Peter A. Gardner

Site Vice President

Monticello Nuclear Generating Plant

Northern States Power Company, Minnesota

2807 West County Road 75

Monticello, MN 55362-9637

SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT ACKNOWLEDGMENT OF

DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007

Dear Mr. Gardner:

This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC),

dated October 2, 2015, that provided a response to our inspection report issued on

September 2, 2015, concerning activities conducted at your Monticello Nuclear Generating Plant.

The letter we received contested a Non-Cited Violation (NCV) documented in Monticello

Inspection Report 2015007. The contested NCV is Failure to Review for Suitability of

Application Safety-Related Relays Installed Beyond Their Service Life.

We are currently reviewing your basis for contesting the above NCV. The NRC seeks to be

thorough and timely in the review of licensee responses. Accordingly, we will inform you as soon

as we complete our evaluation.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy

of this letter will be available electronically for public inspection in the NRCs Public Document

Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC

Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Christine A. Lipa, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-263

License No. DPR-22

cc: Distribution via LISTSERV

EA-15-206

Mr. Peter A. Gardner

Site Vice President

Monticello Nuclear Generating Plant

Northern States Power Company, Minnesota

2807 West County Road 75

Monticello, MN 55362-9637

SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT ACKNOWLEDGMENT OF

DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007

Dear Mr. Gardner:

This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC),

dated October 2, 2015, that provided a response to our inspection report issued on

September 2, 2015, concerning activities conducted at your Monticello Nuclear Generating Plant.

The letter we received contested a Non-Cited Violation (NCV) documented in Monticello

Inspection Report 2015007. The contested NCV is Failure to Review for Suitability of

Application Safety-Related Relays Installed Beyond Their Service Life.

We are currently reviewing your basis for contesting the above NCV. The NRC seeks to be

thorough and timely in the review of licensee responses. Accordingly, we will inform you as soon

as we complete our evaluation.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy

of this letter will be available electronically for public inspection in the NRCs Public Document

Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC

Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Christine A. Lipa, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-263

License No. DPR-22

cc: Distribution via LISTSERV

DISTRIBUTION:

See next page

ADAMS Accession Number ML15301A814

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE RIII RIII RIII RIII

NAME ADunlop RSkokowski CLipa

DATE 10/26/15 10/26/15 10/28/15

OFFICIAL RECORD COPY

Letter to Mr. Peter A. Gardner from Ms. Christine A. Lipa dated October 28, 2015.

SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT ACKNOWLEDGMENT OF

DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007

DISTRIBUTION:

Janelle Jessie

RidsNrrDorlLpl3-1 Resource

RidsNrrPMMonticello

RidsNrrDirsIrib Resource

Cynthia Pederson

Darrell Roberts

Richard Skokowski

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

Jim Clay

Carmen Olteanu

ROPreports.Resource@nrc.gov