ML080080049: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML080080049
| number = ML080080049
| issue date = 01/04/2008
| issue date = 01/04/2008
| title = Donald C. Cook Nuclear Plant, Unit 2, Technical Specifications, Correction of Amendment No. 282 Containment Sump Modifications Per Generic Letter 2004-02 (TAC No. MD5902)
| title = Technical Specifications, Correction of Amendment No. 282 Containment Sump Modifications Per Generic Letter 2004-02
| author name = Tam P S
| author name = Tam P
| author affiliation = NRC/NRR/ADRO/DORL/LPLIII-1
| author affiliation = NRC/NRR/ADRO/DORL/LPLIII-1
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000316
| docket = 05000316
| license number = DPR-074
| license number = DPR-074
| contact person = tam P S, NRR/ADRO/DORL, 415-1451
| contact person = tam P, NRR/ADRO/DORL, 415-1451
| case reference number = TAC MD5902
| case reference number = TAC MD5902
| package number = ML080080045
| package number = ML080080045
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:Containment Recirculation Drains 3.6.14 3.6 CONTAINMENT SYSTEMS 3.6.14 Containment Recirculation Drains LCQ .61 APPLICABILITY:
{{#Wiki_filter:Containment Recirculation Drains 3.6.14 3.6 CONTAINMENT SYSTEMS 3.6.14     Containment Recirculation Drains LCQ     .61           The ice condenser floor drains, two refueling canal drains, one drain in each Containment Air Recirculation/Hydrogen Skimmer System (CEQ) fan room, and the flood-up overflow wall flow paths shall be OPERABLE.
The ice condenser floor drains, two refueling canal drains, one drain in each Containment Air Recirculation/Hydrogen Skimmer System (CEQ)fan room, and the flood-up overflow wall flow paths shall be OPERABLE.MODES 1, 2, 3, and 4.ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One ice'condenser floorý A. 1 Restore ice condenser floor 1 hour drain inoperable,.
APPLICABILITY:        MODES 1, 2, 3, and 4.
drain to OPERABLE status.B. One required refueling B.1 Restore required refueling 1 hour canal drain inoperable.
ACTIONS CONDITION                     REQUIRED ACTION                 COMPLETION TIME A. One ice'condenser floorý     A.1     Restore ice condenser floor     1 hour drain inoperable,.                   drain to OPERABLE status.
canal drain to OPERABLE status.C. One required CEQ fan C. 1 Restore required CEO fan 1 hour room drain inoperable, room drain to OPERABLE*status.D. One flood-up overflow D. 1 Restore flood-up overflow 1 hour waillflow path wail TIOW-path to inoperable.
B. One required refueling       B.1     Restore required refueling     1 hour canal drain inoperable.             canal drain to OPERABLE status.
OPERABLE status.E. Required Action and E. 1 Be in MODE 3. 6 hours associated Completion Time not met. AND E.2 Be in MODE 5. 36 hours Cook Nuclear Plant Unit 2 361- mnmn o ~ 8 3.6.14-1 Amendment No. 2-6.9, 282}}
C. One required CEQ fan         C.1   Restore required CEO fan         1 hour room drain inoperable,             room drain to OPERABLE*
status.
D. One flood-up overflow       D.1     Restore flood-up overflow       1 hour waillflow path                     wail TIOW-path to inoperable.                         OPERABLE status.
E. Required Action and         E.1     Be in MODE 3.                   6 hours associated Completion Time not met.               AND E.2     Be in MODE 5.                   36 hours Cook Nuclear Plant Unit 2                   361-3.6.14-1                   mnmn No.
Amendment      o 2-6.9,
                                                                                          ~ 282 8}}

Latest revision as of 21:40, 14 November 2019

Technical Specifications, Correction of Amendment No. 282 Containment Sump Modifications Per Generic Letter 2004-02
ML080080049
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 01/04/2008
From: Tam P
NRC/NRR/ADRO/DORL/LPLIII-1
To:
tam P, NRR/ADRO/DORL, 415-1451
Shared Package
ML080080045 List:
References
TAC MD5902
Download: ML080080049 (1)


Text

Containment Recirculation Drains 3.6.14 3.6 CONTAINMENT SYSTEMS 3.6.14 Containment Recirculation Drains LCQ .61 The ice condenser floor drains, two refueling canal drains, one drain in each Containment Air Recirculation/Hydrogen Skimmer System (CEQ) fan room, and the flood-up overflow wall flow paths shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One ice'condenser floorý A.1 Restore ice condenser floor 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> drain inoperable,. drain to OPERABLE status.

B. One required refueling B.1 Restore required refueling 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> canal drain inoperable. canal drain to OPERABLE status.

C. One required CEQ fan C.1 Restore required CEO fan 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> room drain inoperable, room drain to OPERABLE*

status.

D. One flood-up overflow D.1 Restore flood-up overflow 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> waillflow path wail TIOW-path to inoperable. OPERABLE status.

E. Required Action and E.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND E.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Cook Nuclear Plant Unit 2 361-3.6.14-1 mnmn No.

Amendment o 2-6.9,

~ 282 8