ML080360457: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 01/15/2008
| issue date = 01/15/2008
| title = NRC Final Exam Results Ltr. W/O Enclosure Dated 01/15/2008 (Folder 1)
| title = NRC Final Exam Results Ltr. W/O Enclosure Dated 01/15/2008 (Folder 1)
| author name = Hansell S L
| author name = Hansell S
| author affiliation = NRC/RGN-I/DRS/OB
| author affiliation = NRC/RGN-I/DRS/OB
| addressee name = Peal R M
| addressee name = Peal R
| addressee affiliation = PPL Susquehanna, LLC
| addressee affiliation = PPL Susquehanna, LLC
| docket = 05000387, 05000388
| docket = 05000387, 05000388
Line 14: Line 14:
| document type = Letter, License-Operator, Other HQ and Regional Correspondence
| document type = Letter, License-Operator, Other HQ and Regional Correspondence
| page count = 3
| page count = 3
| project = TAC:U01629
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:January 15, 2008  
{{#Wiki_filter:January 15, 2008 Mr. Robert M. Peal Manager, Nuclear Training PPL Susquehanna, LLC Susquehanna Steam Electric Station 769 Salem Boulevard Berwick, PA 18603-0467
 
Mr. Robert M. Peal Manager, Nuclear Training PPL Susquehanna, LLC Susquehanna Steam Electric Station 769 Salem Boulevard Berwick, PA 18603-0467  


==Dear Mr. Peal:==
==Dear Mr. Peal:==


The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on December 7, 2007, and the walk-through (overall) and/or simulato r operating tests administe red December 10 - 18, 2007 at your facility. This meets the intent of Section E.1 of the Examination Standards (ES 501) in NUREG 1021.
The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on December 7, 2007, and the walk-through (overall) and/or simulator operating tests administered December 10 - 18, 2007 at your facility.
Fifteen individuals were administered the examination and twelve passed. However, we will not be issuing licenses for two of the applicants who passed - as explained in Section ES-501, paragraph D.3.c. - because any written examination with a passing grade of 82 percent or below is normally held for review until those applicants who failed the examination have had an opportunity to appeal their license denials.) This information is considered to be "proprietary" in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly.
This meets the intent of Section E.1 of the Examination Standards (ES 501) in NUREG 1021.
is the completed ES-501-2, Power Plant Licensing Examination Results Summary, and is a summary of overall examination results.  
Fifteen individuals were administered the examination and twelve passed. However, we will not be issuing licenses for two of the applicants who passed - as explained in Section ES-501, paragraph D.3.c. - because any written examination with a passing grade of 82 percent or below is normally held for review until those applicants who failed the examination have had an opportunity to appeal their license denials.) This information is considered to be "proprietary" in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly. is the completed ES-501-2, Power Plant Licensing Examination Results Summary, and is a summary of overall examination results. contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicants have authorized the release of this information to your facility by signing Block 19A of NRC Form 398. is a copy of the licenses.
 
Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.
contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicants have authorized the release of this information to your facility by signing Block 19A of NRC Form 398.
Sincerely,
is a copy of the licenses.  
                                                /RA/
 
Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety
Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.  


Sincerely,        /RA/
Mr. R. Peal                                  Docket Nos. 050-387/050-388 License Nos. NPF-14, NPF-22
Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Mr. Docket Nos. 050-387/050-388 License Nos. NPF-14, NPF-22  


==Enclosures:==
==Enclosures:==
: 1. ES-501-2, Power Plant Licensing Examination Results Summary  
: 1. ES-501-2, Power Plant Licensing Examination Results Summary
: 2. ES-303-1 and 303-2, Individual Examination Results  
: 2. ES-303-1 and 303-2, Individual Examination Results
: 3. Licenses
: 3. Licenses cc w/licenses:
Mr. Cornelius J. Gannon Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem Blvd. - NUCSB3 Berwick, PA 18603-0467


cc w/licenses:
Mr. Robert M. Peal Manager, Nuclear Training PPL Susquehanna, LLC Susquehanna Steam Electric Station 769 Salem Boulevard Berwick, PA 18603-0467
 
Mr. Cornelius J. Gannon Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem Blvd. - NUCSB3 Berwick, PA 18603-0467 Mr. Robert M. Peal Manager, Nuclear Training PPL Susquehanna, LLC Susquehanna Steam Electric Station 769 Salem Boulevard Berwick, PA 18603-0467  


==Dear Mr. Peal:==
==Dear Mr. Peal:==


The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on December 7, 2007, and the walk-through (overall) and/or simulato r operating tests administe red December 10 - 18, 2007 at your facility. This meets the intent of Section E.1 of the Examination Standards (ES 501) in NUREG 1021.
The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on December 7, 2007, and the walk-through (overall) and/or simulator operating tests administered December 10 - 18, 2007 at your facility.
Fifteen individuals were administered the examination and twelve passed. However, we will not be issuing licenses for two of the applicants who passed - as explained in Section ES-501, paragraph D.3.c. - because any written examination with a passing grade of 82 percent or below is normally held for review until those applicants who failed the examination have had an opportunity to appeal their license denials.) This information is considered to be "proprietary" in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly.
This meets the intent of Section E.1 of the Examination Standards (ES 501) in NUREG 1021.
is the completed ES-501-2, Power Plant Licensing Examination Results Summary, and is a summary of overall examination results.  
Fifteen individuals were administered the examination and twelve passed. However, we will not be issuing licenses for two of the applicants who passed - as explained in Section ES-501, paragraph D.3.c. - because any written examination with a passing grade of 82 percent or below is normally held for review until those applicants who failed the examination have had an opportunity to appeal their license denials.) This information is considered to be "proprietary" in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly.
 
Enclosure 1 is the completed ES-501-2, Power Plant Licensing Examination Results Summary, and is a summary of overall examination results.
contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicants have authorized the release of this information to your facility by signing Block 19A of NRC Form 398.
Enclosure 2 contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicants have authorized the release of this information to your facility by signing Block 19A of NRC Form 398.
is a copy of the licenses.  
Enclosure 3 is a copy of the licenses.
 
Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.
Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.  
Sincerely,
 
                                                                                /RA/
Sincerely,       /RA/
Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Distribution: w/o enclosures:
Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Distribution: w/o enclosures:
Master Exam File SUNSI Review Complete:           cjb1                (Reviewer
Master Exam File SUNSI Review Complete:                   cjb1                (Reviewer=s Initials)
=s Initials) DOCUMENT NAME:   G:\DRS\Operations Branch\CARUSO\Exam 08-Susq Dec 07 (U01639)\ExamNotificationLtr.doc After declaring this document AAn Official Agency Record
DOCUMENT NAME: G:\DRS\Operations Branch\CARUSO\Exam 08-Susq Dec 07 (U01639)\ExamNotificationLtr.doc After declaring this document AAn Official Agency Record@ it will be released to the Public. ADAMS PKG NO.: ML072140644 OFFICE                 RI/DRS/OB                   RI/DRS/OB                     RI/DRS/OB NAME                   CJBixler/CJB               JGCaruso/SLH for             SLHansell/SLH DATE                   01/15/08                   01/ 15/08                     01/ 15/08 OFFICIAL RECORD COPY}}
@ it will be released to the Public.       ADAMS PKG NO.:
ML072140644 OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB     NAME CJBixler/CJB JGCaruso/SLH for SLHansell/SLH   DATE 01/15/08 01/ 15/08 01/ 15/08   OFFICIAL RECORD COPY}}

Latest revision as of 19:49, 14 November 2019

NRC Final Exam Results Ltr. W/O Enclosure Dated 01/15/2008 (Folder 1)
ML080360457
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 01/15/2008
From: Hansell S
Operations Branch I
To: Peal R
Susquehanna
Hansell S
Shared Package
ML072140644 List:
References
TAC U01629
Download: ML080360457 (3)


Text

January 15, 2008 Mr. Robert M. Peal Manager, Nuclear Training PPL Susquehanna, LLC Susquehanna Steam Electric Station 769 Salem Boulevard Berwick, PA 18603-0467

Dear Mr. Peal:

The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on December 7, 2007, and the walk-through (overall) and/or simulator operating tests administered December 10 - 18, 2007 at your facility.

This meets the intent of Section E.1 of the Examination Standards (ES 501) in NUREG 1021.

Fifteen individuals were administered the examination and twelve passed. However, we will not be issuing licenses for two of the applicants who passed - as explained in Section ES-501, paragraph D.3.c. - because any written examination with a passing grade of 82 percent or below is normally held for review until those applicants who failed the examination have had an opportunity to appeal their license denials.) This information is considered to be "proprietary" in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly. is the completed ES-501-2, Power Plant Licensing Examination Results Summary, and is a summary of overall examination results. contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicants have authorized the release of this information to your facility by signing Block 19A of NRC Form 398. is a copy of the licenses.

Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.

Sincerely,

/RA/

Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety

Mr. R. Peal Docket Nos. 050-387/050-388 License Nos. NPF-14, NPF-22

Enclosures:

1. ES-501-2, Power Plant Licensing Examination Results Summary
2. ES-303-1 and 303-2, Individual Examination Results
3. Licenses cc w/licenses:

Mr. Cornelius J. Gannon Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem Blvd. - NUCSB3 Berwick, PA 18603-0467

Mr. Robert M. Peal Manager, Nuclear Training PPL Susquehanna, LLC Susquehanna Steam Electric Station 769 Salem Boulevard Berwick, PA 18603-0467

Dear Mr. Peal:

The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on December 7, 2007, and the walk-through (overall) and/or simulator operating tests administered December 10 - 18, 2007 at your facility.

This meets the intent of Section E.1 of the Examination Standards (ES 501) in NUREG 1021.

Fifteen individuals were administered the examination and twelve passed. However, we will not be issuing licenses for two of the applicants who passed - as explained in Section ES-501, paragraph D.3.c. - because any written examination with a passing grade of 82 percent or below is normally held for review until those applicants who failed the examination have had an opportunity to appeal their license denials.) This information is considered to be "proprietary" in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly.

Enclosure 1 is the completed ES-501-2, Power Plant Licensing Examination Results Summary, and is a summary of overall examination results.

Enclosure 2 contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicants have authorized the release of this information to your facility by signing Block 19A of NRC Form 398.

Enclosure 3 is a copy of the licenses.

Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.

Sincerely,

/RA/

Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Distribution: w/o enclosures:

Master Exam File SUNSI Review Complete: cjb1 (Reviewer=s Initials)

DOCUMENT NAME: G:\DRS\Operations Branch\CARUSO\Exam 08-Susq Dec 07 (U01639)\ExamNotificationLtr.doc After declaring this document AAn Official Agency Record@ it will be released to the Public. ADAMS PKG NO.: ML072140644 OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CJBixler/CJB JGCaruso/SLH for SLHansell/SLH DATE 01/15/08 01/ 15/08 01/ 15/08 OFFICIAL RECORD COPY