ML080870395: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 03/26/2008 | | issue date = 03/26/2008 | ||
| title = IR 05000315-08-003 and 05000316-08-003, on 05/12/2008, D.C. Cook Nuclear Power Plant, TI-166 Request for Information NRC Inspection of Temporary Instruction 2515-166 | | title = IR 05000315-08-003 and 05000316-08-003, on 05/12/2008, D.C. Cook Nuclear Power Plant, TI-166 Request for Information NRC Inspection of Temporary Instruction 2515-166 | ||
| author name = Stone A | | author name = Stone A | ||
| author affiliation = NRC/RGN-III/DRS/EB2 | | author affiliation = NRC/RGN-III/DRS/EB2 | ||
| addressee name = Rencheck M | | addressee name = Rencheck M | ||
| addressee affiliation = Indiana Michigan Power Co | | addressee affiliation = Indiana Michigan Power Co | ||
| docket = 05000315, 05000316 | | docket = 05000315, 05000316 | ||
Line 14: | Line 14: | ||
| page count = 5 | | page count = 5 | ||
}} | }} | ||
See also: [[ | See also: [[see also::IR 05000315/2008003]] | ||
=Text= | =Text= | ||
{{#Wiki_filter:March 26, 2008 | {{#Wiki_filter:March 26, 2008 | ||
Mr. Michael W. Rencheck | |||
Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI | Senior Vice President and | ||
documents have been divided into two groups. | Chief Nuclear Officer | ||
on-site inspection. | Indiana Michigan Power Company | ||
e-mail at caroline.acosta@nrc.gov. | Nuclear Generation Group | ||
One Cook Place | |||
Bridgman, MI 49106 | |||
SUBJECT: D.C. COOK NUCLEAR POWER PLANT | |||
REQUEST FOR INFORMATION NRC INSPECTION OF TEMPORARY | |||
INSTRUCTION 2515/166 05000315/2008003(DRS); 05000316/2008003(DRS) | |||
Dear Mr. Rencheck: | |||
On May 12, 2008, the NRC will begin an inspection at the D.C. Cook Nuclear Power Plant. One | |||
inspector will perform this 1-week inspection in accordance with NRC Temporary Instruction | |||
(TI) 2525/166, Pressurized Water Reactor Containment Sump Blockage. This inspection | |||
focuses on commitments made by D.C. Cook Nuclear Power Plant in response to Generic Letter | |||
(GL) 2004-02, Potential Impact of Debris Blockage on Emergency Sump Recirculation at | |||
Pressurized Water Reactors (PWRs). | |||
In order to minimize the inspection impact on the site and to ensure a productive inspection for | |||
both parties, we have enclosed a request for documents needed for the inspection. These | |||
documents have been divided into two groups. The first group of documents are required prior | |||
to the inspection to ensure that the inspector is adequately prepared. This information should be | |||
provided to the Regional Office no later than April 28, 2008. | |||
The second group of requested documents contains additional items that the inspector will | |||
review, or need access to, during the inspection, and should be available by the first day of the | |||
on-site inspection. It is important that all of these documents are up to date and complete in | |||
order to minimize the number of additional documents requested during the preparation and/or | |||
the on-site portions of the inspection. | |||
The inspector for this inspection is Caroline E. Acosta Acevedo. If there are any questions about | |||
the inspection or the material requested, please contact the inspector at (630) 829-9718 or via | |||
e-mail at caroline.acosta@nrc.gov. | |||
MAS KGO JKH3 BJK1 CAA1 | M. Rencheck -2- | ||
DRPIII DRSIII PLB1 TXN ROPreports@nrc.gov | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and | ||
its enclosure will be available electronically for public inspection in the NRC Public Document | |||
Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide | |||
Documents Access and Management System (ADAMS), accessible from the NRC Web site at | |||
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA/ | |||
during the inspections. | Ann Marie Stone, Chief | ||
Engineering Branch 2 | |||
Division of Reactor Safety | |||
Docket Nos. 50-315; 50-316 | |||
c. Procedures affected by the modifications; and d. UFSAR change papers generated due to a 10 CFR 50.59 evaluation. 3. List of related calculation changes that have been issued for use. 4. List of any related corrective action documents (open and closed). | License Nos. DPR-58; DPR-74 | ||
Enclosure: Temporary Instruction (TI) 2525/166 Document Request | |||
cc w/encl: M. Peifer, Site Vice President | |||
J. Gebbie, Plant Manager | |||
G. White, Michigan Public Service Commission | |||
L. Brandon, Michigan Department of Environmental Quality - | |||
Waste and Hazardous Materials Division | |||
Emergency Management Division | |||
MI Department of State Police | |||
T. Strong, Chief, State Liaison Officer, State of Michigan | |||
M. Rencheck -2- | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and | |||
its enclosure will be available electronically for public inspection in the NRC Public Document | |||
Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide | |||
Documents Access and Management System (ADAMS), accessible from the NRC Web site at | |||
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
Ann Marie Stone, Chief | |||
Engineering Branch 2 | |||
Division of Reactor Safety | |||
Docket Nos. 50-315; 50-316 | |||
License Nos. DPR-58; DPR-74 | |||
Enclosure: Temporary Instruction (TI) 2525/166 Document Request | |||
cc w/encl: M. Peifer, Site Vice President | |||
J. Gebbie, Plant Manager | |||
G. White, Michigan Public Service Commission | |||
L. Brandon, Michigan Department of Environmental Quality - | |||
Waste and Hazardous Materials Division | |||
Emergency Management Division | |||
MI Department of State Police | |||
T. Strong, Chief, State Liaison Officer, State of Michigan | |||
DISTRIBUTION: | |||
TEB | |||
RidsNrrDirsIrib | |||
MAS | |||
KGO | |||
JKH3 | |||
BJK1 | |||
CAA1 | |||
DRPIII | |||
DRSIII | |||
PLB1 | |||
TXN | |||
ROPreports@nrc.gov | |||
DOCUMENT NAME: G:\DRS\Work in Progress\Ltr. 03__08 DCCOOK TI166 RFI CEA.doc | |||
9 Publicly Available 9 Non-Publicly Available 9 Sensitive 9 Non-Sensitive | |||
To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy | |||
OFFICE RIII RIII | |||
NAME CAcosta: ls AMStone | |||
DATE 03/25/08 03/26/08 | |||
OFFICIAL RECORD COPY | |||
INFORMATION REQUEST FOR GENERIC NUCLEAR POWER PLANT | |||
TEMPORARY INSTRUCTION (TI) 2525/166 INSPECTION | |||
Inspection Report: 05000315/2008003(DRS); 0500316/2008003(DRS) | |||
Inspection Dates: May 12, 2008 - May 16, 2008 | |||
Inspection Procedures: TI 2525/166, Pressurized Water Reactor Containment Sump Blockage | |||
IP 71111.02, Changes, Tests, or Experiments (reference) | |||
IP 71111.17, Permanent Plant Modifications (reference) | |||
Inspector: Caroline E Acosta Acevedo, Reactor Engineer | |||
(630) 829-9718 (caroline.acosta@nrc.gov) | |||
I. Information Requested for Our In-office Preparation Week | |||
The following information is requested by April 28, 2008, or sooner, to facilitate inspection | |||
preparation. If you have any questions regarding this information, please call the inspector | |||
as soon as possible. (Please provide the information electronically in pdf files, Excel, or | |||
other searchable formats, preferably on CDROM. The CDROM should contain descriptive | |||
names to facilitate ease of use.) | |||
1. A list of all correspondences to/from the site related to GL 2004-02. This list should | |||
include the addressor, addressee, subject matter, and date of correspondence. | |||
2. A list of modifications, procedure changes or other commitments made in response to | |||
GL 2004-02 as documented in the Item I responses. (For the purpose of this inspection, | |||
modifications include permanent plant changes, design changes, set point changes, | |||
equivalency evaluations, suitability analyses, and commercial grade dedications.) | |||
3. Name(s) and phone numbers for the regulatory and technical contacts. | |||
II. Information Requested to be Available on First Day of Inspection (May 12, 2008) | |||
1. Copies of the modifications and procedure changes made in response to GL 2004-02 or | |||
committed to in the documents from Item I. Modification documents should include a | |||
design description, records showing date of completion and 10 CFR 50.59 applicability | |||
determination, screening, or evaluation. | |||
2. Please ensure that other supporting documents for the selected items have been located | |||
and are readily retrievable as the inspector will likely be requesting these documents | |||
during the inspections. Examples of supporting documents are: | |||
1 Enclosure | |||
INFORMATION REQUEST FOR GENERIC NUCLEAR POWER PLANT | |||
TEMPORARY INSTRUCTION (TI) 2525/166 INSPECTION | |||
a. Drawings supporting the modifications; | |||
b. Calculations related to the modifications; | |||
c. Procedures affected by the modifications; and | |||
d. UFSAR change papers generated due to a 10 CFR 50.59 evaluation. | |||
3. List of related calculation changes that have been issued for use. | |||
4. List of any related corrective action documents (open and closed). | |||
5. Copies of procedures addressing the following: modifications, design changes, set point | |||
changes, equivalency evaluations or suitability analyses, commercial grade dedications, | |||
post-modification testing, 10 CFR 50.59 evaluation and screenings, and UFSAR | |||
updates. | |||
6. Copy of the UFSAR change log (or a synopsis of changes). This should include all of | |||
the changes made to the UFSAR that were incorporated in the last 10 CFR 50.71(e)(4) | |||
submittal and any approved changes to the current UFSAR. | |||
If you have questions regarding the information requested, please contact the lead inspector. | |||
2 Enclosure | |||
}} | }} |
Latest revision as of 19:22, 14 November 2019
ML080870395 | |
Person / Time | |
---|---|
Site: | Cook ![]() |
Issue date: | 03/26/2008 |
From: | Ann Marie Stone NRC/RGN-III/DRS/EB2 |
To: | Rencheck M Indiana Michigan Power Co |
References | |
IR-08-003 | |
Download: ML080870395 (5) | |
See also: IR 05000315/2008003
Text
March 26, 2008
Mr. Michael W. Rencheck
Senior Vice President and
Chief Nuclear Officer
Indiana Michigan Power Company
Nuclear Generation Group
One Cook Place
Bridgman, MI 49106
SUBJECT: D.C. COOK NUCLEAR POWER PLANT
REQUEST FOR INFORMATION NRC INSPECTION OF TEMPORARY
INSTRUCTION 2515/166 05000315/2008003(DRS); 05000316/2008003(DRS)
Dear Mr. Rencheck:
On May 12, 2008, the NRC will begin an inspection at the D.C. Cook Nuclear Power Plant. One
inspector will perform this 1-week inspection in accordance with NRC Temporary Instruction
(TI) 2525/166, Pressurized Water Reactor Containment Sump Blockage. This inspection
focuses on commitments made by D.C. Cook Nuclear Power Plant in response to Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Sump Recirculation at
Pressurized Water Reactors (PWRs).
In order to minimize the inspection impact on the site and to ensure a productive inspection for
both parties, we have enclosed a request for documents needed for the inspection. These
documents have been divided into two groups. The first group of documents are required prior
to the inspection to ensure that the inspector is adequately prepared. This information should be
provided to the Regional Office no later than April 28, 2008.
The second group of requested documents contains additional items that the inspector will
review, or need access to, during the inspection, and should be available by the first day of the
on-site inspection. It is important that all of these documents are up to date and complete in
order to minimize the number of additional documents requested during the preparation and/or
the on-site portions of the inspection.
The inspector for this inspection is Caroline E. Acosta Acevedo. If there are any questions about
the inspection or the material requested, please contact the inspector at (630) 829-9718 or via
e-mail at caroline.acosta@nrc.gov.
M. Rencheck -2-
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and
its enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide
Documents Access and Management System (ADAMS), accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Ann Marie Stone, Chief
Engineering Branch 2
Division of Reactor Safety
Docket Nos. 50-315; 50-316
Enclosure: Temporary Instruction (TI) 2525/166 Document Request
cc w/encl: M. Peifer, Site Vice President
J. Gebbie, Plant Manager
G. White, Michigan Public Service Commission
L. Brandon, Michigan Department of Environmental Quality -
Waste and Hazardous Materials Division
Emergency Management Division
MI Department of State Police
T. Strong, Chief, State Liaison Officer, State of Michigan
M. Rencheck -2-
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and
its enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide
Documents Access and Management System (ADAMS), accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
Ann Marie Stone, Chief
Engineering Branch 2
Division of Reactor Safety
Docket Nos. 50-315; 50-316
Enclosure: Temporary Instruction (TI) 2525/166 Document Request
cc w/encl: M. Peifer, Site Vice President
J. Gebbie, Plant Manager
G. White, Michigan Public Service Commission
L. Brandon, Michigan Department of Environmental Quality -
Waste and Hazardous Materials Division
Emergency Management Division
MI Department of State Police
T. Strong, Chief, State Liaison Officer, State of Michigan
DISTRIBUTION:
TEB
RidsNrrDirsIrib
MAS
KGO
JKH3
BJK1
CAA1
DRPIII
DRSIII
PLB1
TXN
ROPreports@nrc.gov
DOCUMENT NAME: G:\DRS\Work in Progress\Ltr. 03__08 DCCOOK TI166 RFI CEA.doc
9 Publicly Available 9 Non-Publicly Available 9 Sensitive 9 Non-Sensitive
To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy
OFFICE RIII RIII
NAME CAcosta: ls AMStone
DATE 03/25/08 03/26/08
OFFICIAL RECORD COPY
INFORMATION REQUEST FOR GENERIC NUCLEAR POWER PLANT
TEMPORARY INSTRUCTION (TI) 2525/166 INSPECTION
Inspection Report: 05000315/2008003(DRS); 0500316/2008003(DRS)
Inspection Dates: May 12, 2008 - May 16, 2008
Inspection Procedures: TI 2525/166, Pressurized Water Reactor Containment Sump Blockage
IP 71111.02, Changes, Tests, or Experiments (reference)
IP 71111.17, Permanent Plant Modifications (reference)
Inspector: Caroline E Acosta Acevedo, Reactor Engineer
(630) 829-9718 (caroline.acosta@nrc.gov)
I. Information Requested for Our In-office Preparation Week
The following information is requested by April 28, 2008, or sooner, to facilitate inspection
preparation. If you have any questions regarding this information, please call the inspector
as soon as possible. (Please provide the information electronically in pdf files, Excel, or
other searchable formats, preferably on CDROM. The CDROM should contain descriptive
names to facilitate ease of use.)
1. A list of all correspondences to/from the site related to GL 2004-02. This list should
include the addressor, addressee, subject matter, and date of correspondence.
2. A list of modifications, procedure changes or other commitments made in response to
GL 2004-02 as documented in the Item I responses. (For the purpose of this inspection,
modifications include permanent plant changes, design changes, set point changes,
equivalency evaluations, suitability analyses, and commercial grade dedications.)
3. Name(s) and phone numbers for the regulatory and technical contacts.
II. Information Requested to be Available on First Day of Inspection (May 12, 2008)
1. Copies of the modifications and procedure changes made in response to GL 2004-02 or
committed to in the documents from Item I. Modification documents should include a
design description, records showing date of completion and 10 CFR 50.59 applicability
determination, screening, or evaluation.
2. Please ensure that other supporting documents for the selected items have been located
and are readily retrievable as the inspector will likely be requesting these documents
during the inspections. Examples of supporting documents are:
1 Enclosure
INFORMATION REQUEST FOR GENERIC NUCLEAR POWER PLANT
TEMPORARY INSTRUCTION (TI) 2525/166 INSPECTION
a. Drawings supporting the modifications;
b. Calculations related to the modifications;
c. Procedures affected by the modifications; and
d. UFSAR change papers generated due to a 10 CFR 50.59 evaluation.
3. List of related calculation changes that have been issued for use.
4. List of any related corrective action documents (open and closed).
5. Copies of procedures addressing the following: modifications, design changes, set point
changes, equivalency evaluations or suitability analyses, commercial grade dedications,
post-modification testing, 10 CFR 50.59 evaluation and screenings, and UFSAR
updates.
6. Copy of the UFSAR change log (or a synopsis of changes). This should include all of
the changes made to the UFSAR that were incorporated in the last 10 CFR 50.71(e)(4)
submittal and any approved changes to the current UFSAR.
If you have questions regarding the information requested, please contact the lead inspector.
2 Enclosure