IR 05000338/2008401: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 06/16/2008
| issue date = 06/16/2008
| title = IR 05000338-08-401 and 05000339-08-401, on 05/22/2008, North Anna, Units 1 an D 2, Security Inspection, Cover Letter
| title = IR 05000338-08-401 and 05000339-08-401, on 05/22/2008, North Anna, Units 1 an D 2, Security Inspection, Cover Letter
| author name = Munday J T
| author name = Munday J
| author affiliation = NRC/RGN-II/DRS/PSB2
| author affiliation = NRC/RGN-II/DRS/PSB2
| addressee name = Christian D A
| addressee name = Christian D
| addressee affiliation = Virginia Electric & Power Co (VEPCO)
| addressee affiliation = Virginia Electric & Power Co (VEPCO)
| docket = 05000338, 05000339
| docket = 05000338, 05000339
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION
[[Issue date::June 16, 2008]]


Mr. David Vice President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060
==REGION II==
SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 June 16, 2008 Mr. David Vice President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060 SUBJECT: NORTH ANNA POWER STATION - NRC SECURITY INSPECTION REPORT 05000338/2008401 AND 05000339/2008401


SUBJECT: NORTH ANNA POWER STATION - NRC SECURITY INSPECTION REPORT 05000338/2008401 AND 05000339/2008401
==Dear Mr. Christian:==
On May 22, 2008, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your North Anna Power Station, Units 1 and 2. Portions of the inspection were conducted at the corporate office from April 28 through May 1, 2008. The inspection covered one or more of the key attributes of the security cornerstone of the NRC=s Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed on May 1, 2008, with Ms. L. Hartz, at the corporate office, and on May 22, 2008, with Mr. L. Lane, at the North Anna Power Station.


==Dear Mr. Christian:==
This inspection examined activities conducted under your license as they relate to security and compliance with the Commission=s rules and regulations and with the conditions of your license.
On May 22, 2008, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your North Anna Power Station, Units 1 and 2. Portions of the inspection were conducted at the corporate office from April 28 through May 1, 2008. The inspection covered one or more of the key attributes of the security cornerstone of the NRC
=s Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed on May 1, 2008, with Ms. L. Hartz, at the corporate office, and on May 22, 2008, with Mr. L. Lane, at the North Anna Power Station.


This inspection examined activities conducted under your license as they relate to security and compliance with the Commission
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
=s rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.


No findings of significance were identified.
No findings of significance were identified.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). VEPCO 2 However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS.
=s enclosure will not be available for public inspection. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any.
 
If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity-Related Information BWithhold Under 10 CFR 2.390
@ and follow the instructions for withholding in 10 CFR 2.390(b)(1).
 
Sincerely,/RA/ Joel T. Munday, Chief Plant Support Branch 2 Division of Reactor Safety Docket No.: 50-338, 50-339 License No.: NPF-4, NPF-7
 
===Enclosure:===
Inspection Report 05000338/2008401 and 05000339/2008401
 
===w/Attachment:===
Supplemental Information
 
cc w/encl.: (See page 3) VEPCO 3 cc w/Encl:
Mr. Timothy Maddy Manager Nuclear Protection Services North Anna Power Station 1022 Haley Drive Mineral, VA 23117


cc w/o
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). VEPCO  2 However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any.


===Enclosure:===
If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity-Related InformationBWithhold Under 10 CFR 2.390@ and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Ms. Leslie N Harz Vice-President Nuclear Support Services Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711


Lillian M. Cuoco, Esq.
Sincerely,
/RA/
Joel T. Munday, Chief Plant Support Branch 2 Division of Reactor Safety Docket No.: 50-338, 50-339 License No.: NPF-4, NPF-7 Enclosure: Inspection Report 05000338/2008401 and 05000339/2008401 w/Attachment: Supplemental Information cc w/encl.: (See page 3) VEPCO  3 cc w/Encl:
Mr. Timothy Maddy Manager Nuclear Protection Services North Anna Power Station 1022 Haley Drive Mineral, VA 23117 cc w/o Enclosure:
Ms. Leslie N Harz Vice-President Nuclear Support Services Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Lillian M. Cuoco, Esq.


Senior Counsel Dominion Resources Services, Inc.
Senior Counsel Dominion Resources Services, Inc.


Millstone Power Station Building 475, 5th Floor Rope Ferry Road Rt. 156 Waterford, CT 06385  
Millstone Power Station Building 475, 5th Floor Rope Ferry Road Rt. 156 Waterford, CT 06385 Mr. Page Kemp Supervisor Nuclear Engineering North Anna Power Station 1022 Haley Drive Mineral, VA 23117 Mr. Daniel G. Stoddard Site Vice President North Anna Power Station P.O. Box 402 Mineral, VA 23117 Chris L. Funderburk Director Nuclear Licensing and Operations Support Virginia Electric and Power Company 5000 Dominion Boulevard Glen Allen, VA 23060 Mr. Nelson K. Martin Manger Nuclear Fleet Protection Services Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 _________________________
 
OFFICE RII:DRS RII:DRS RII:DRS RII:DRP RII:DRS SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/
Mr. Page Kemp Supervisor Nuclear Engineering North Anna Power Station 1022 Haley Drive Mineral, VA 23117  
NAME K. Davis J. Shehee J. Munday J. Dodson Randy Patterson DATE 6/11/2008 6/12/2008 6/16/2008 6/ 6/13/2008 6/ /2008 6/ /2008 E-MAIL COPY? YES NO YES NO YES /20086/12/2008 NO YES NO YES NO YES NO YES N
 
Mr. Daniel G. Stoddard Site Vice President North Anna Power Station P.O. Box 402 Mineral, VA 23117  
 
Chris L. Funderburk Director Nuclear Licensing and Operations Support Virginia Electric and Power Company 5000 Dominion Boulevard Glen Allen, VA 23060  
 
Mr. Nelson K. Martin Manger Nuclear Fleet Protection Services Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711  
 
_________________________ OFFICE RII:DRS RII:DRS RII:DRS RII:DRP RII:DRS SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/ NAME K. Davis J. Shehee J. Munday J. Dodson Randy Patterson DATE 6/11/2008 6/12/2008 6/16/2008 6/ /20086/12/20086/13/2008 6/ /2008 6/ /2008E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES N
}}
}}

Latest revision as of 15:46, 14 November 2019

IR 05000338-08-401 and 05000339-08-401, on 05/22/2008, North Anna, Units 1 an D 2, Security Inspection, Cover Letter
ML081690052
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 06/16/2008
From: Joel Munday
NRC/RGN-II/DRS/PSB2
To: Christian D
Virginia Electric & Power Co (VEPCO)
References
IR-08-401
Download: ML081690052 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II

SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 June 16, 2008 Mr. David Vice President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060 SUBJECT: NORTH ANNA POWER STATION - NRC SECURITY INSPECTION REPORT 05000338/2008401 AND 05000339/2008401

Dear Mr. Christian:

On May 22, 2008, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your North Anna Power Station, Units 1 and 2. Portions of the inspection were conducted at the corporate office from April 28 through May 1, 2008. The inspection covered one or more of the key attributes of the security cornerstone of the NRC=s Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed on May 1, 2008, with Ms. L. Hartz, at the corporate office, and on May 22, 2008, with Mr. L. Lane, at the North Anna Power Station.

This inspection examined activities conducted under your license as they relate to security and compliance with the Commission=s rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS.

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). VEPCO 2 However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any.

If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity-Related InformationBWithhold Under 10 CFR 2.390@ and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

Joel T. Munday, Chief Plant Support Branch 2 Division of Reactor Safety Docket No.: 50-338, 50-339 License No.: NPF-4, NPF-7 Enclosure: Inspection Report 05000338/2008401 and 05000339/2008401 w/Attachment: Supplemental Information cc w/encl.: (See page 3) VEPCO 3 cc w/Encl:

Mr. Timothy Maddy Manager Nuclear Protection Services North Anna Power Station 1022 Haley Drive Mineral, VA 23117 cc w/o Enclosure:

Ms. Leslie N Harz Vice-President Nuclear Support Services Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Lillian M. Cuoco, Esq.

Senior Counsel Dominion Resources Services, Inc.

Millstone Power Station Building 475, 5th Floor Rope Ferry Road Rt. 156 Waterford, CT 06385 Mr. Page Kemp Supervisor Nuclear Engineering North Anna Power Station 1022 Haley Drive Mineral, VA 23117 Mr. Daniel G. Stoddard Site Vice President North Anna Power Station P.O. Box 402 Mineral, VA 23117 Chris L. Funderburk Director Nuclear Licensing and Operations Support Virginia Electric and Power Company 5000 Dominion Boulevard Glen Allen, VA 23060 Mr. Nelson K. Martin Manger Nuclear Fleet Protection Services Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 _________________________

OFFICE RII:DRS RII:DRS RII:DRS RII:DRP RII:DRS SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/

NAME K. Davis J. Shehee J. Munday J. Dodson Randy Patterson DATE 6/11/2008 6/12/2008 6/16/2008 6/ 6/13/2008 6/ /2008 6/ /2008 E-MAIL COPY? YES NO YES NO YES /20086/12/2008 NO YES NO YES NO YES NO YES N