IR 05000338/2008008

From kanterella
Jump to navigation Jump to search
Ti 2515/171 Verification of Site Specific Implementation of B.5.b Phase 2 and 3 Mitigating Strategies Inspection Report 05000338-08-008 & 05000339-08-008
ML090140588
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 01/14/2009
From: Gerald Mccoy
NRC/RGN-II/DRP/RPB5
To: Christian D
Virginia Electric & Power Co (VEPCO)
References
IR-08-008
Download: ML090140588 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II

SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 January 14, 2009 Virginia Electric and Power Company Mr. David President and Chief Nuclear Officer Innsbrook Technical Center - 2SW 5000 Dominion Boulevard Glen Allen, VA 23060-6711 SUBJECT: NORTH ANNA POWER STATION - TI 2515/171 VERIFICATION OF SITE SPECIFIC IMPLEMENTATION OF B.5.b PHASE 2 AND 3 MITIGATING STRATEGIES INSPECTION REPORT NOS. 05000338/2008008 and 05000339/2008008.

Dear Mr. Christian:

On December 11, 2008, the United States Nuclear Regulatory Commission (NRC) completed a team inspection at your North Anna Power Station, Units 1 and 2. The enclosed report documents the inspection results, which were discussed with Mr. Daniel Stoddard and other members of your staff on December 11, 2008.

The inspection examined activities conducted under your license as they relate to the implementation of B.5.b Phase 2 and 3 mitigating strategies, your compliance with the Commissions rules and regulations, and with the conditions of your operating license. Within these areas, the inspection involved examination of selected procedures and representative records, observations of activities, and interviews with personnel.

Based on the results of this inspection, no findings of significance were identified. The team concluded that, in general, you had implemented the Site Specific B.5.b Phase 2 and 3 Mitigating Strategies as described in your submittals and the associated Safety Evaluation Report.

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRCs Agency wide Documents Access and Management System (ADAMS), accessible from the NRCs Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). VEPCO 2 However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

Sincerely,

/RA/

Gerald J. McCoy, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos. 50-338, 50-339 License Nos. NPF-4, NPF-7 Nonpublic Enclosure: Inspection Report 05000338 and 339/2008008 w/Attachment: Supplemental Information cc w/encl: (See next page) _________________________ x SUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP RII:DRS HQ:NRR SIGNATURE /RA via email/ /RA via email/ /RA via email/ /RA via email/

NAME J. Reece J. Dodson L. Suggs D. Nelson DATE 1/ /2009 1/ /2009 1/ /2009 1/ /2009 1/ /2009 1/ /2009 1/ /2009 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO VEPCO 3 cc w/encl:

Timothy R. Maddy Manager Nuclear Protection Services North Anna Power Station 1022 Haley Drive Mineral, VA 23117 Daniel G. Stoddard Site Vice President Virginia Electric and Power Company North Anna Power Station P.O. Box 402 Mineral, VA 23117 Page A. Kemp Supervisor Nuclear Engineering North Anna Power Station 1022 Haley Drive Mineral, VA 23117 Leslie N. Hartz Vice President - Nuclear Support Services Dominion Resources Services, Inc.

5000 Dominion Boulevard Glen Allen, VA 23061 Nelson K. Martin Manager Nuclear Fleet Protection Services Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Lillian M. Cuoco, Esq.

Senior Counsel Dominion Resources Services, Inc.

120 Tredegar Street, RS-2 Richmond, VA 23219 Chris L. Funderburk Director, Nuclear Licensing & Operations Support Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 VEPCO 4 Letter to David from Gerald J. McCoy dated January 14, 2009 SUBJECT: NORTH ANNA POWER STATION - TI 2515/171 VERIFICATION OF SITE SPECIFIC IMPLEMENTATION OF B.5.b PHASE 2 AND 3 MITIGATING STRATEGIES INSPECTION REPORT NOS. 05000338/2008008 and 05000339/2008008.

Distribution w/encl:

L. Reyes, RA V. McCree, DRA L. Wert, DRP J. Munday, DRP K. Kennedy, DRS R. Croteau, DRS H. Christensen, DRS G. McCoy, DRP J. Dodson, DRP D. Nelson, NRR E. Bowman, NRR J. Stang, NRR PM (Acting)

S. P. Lingam, NRR (PM: NA, SUR)

Richard Jervey, NRR C. Evans, RII EICS (Part 72 Only)

L. Slack, RII EICS (Linda Slack)

B. Westreich, NSIR (hard copy w/ encl)

E. McNiel, NSIR (hard copy w/ encl)

RIDSNRRDIRS OE Mail (email address if applicable)

Distribution w/o encl:

PUBLIC