IR 05000338/2008401: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
{{Adams|number = ML081690052}} | {{Adams | ||
| number = ML081690052 | |||
| issue date = 06/16/2008 | |||
| title = IR 05000338-08-401 and 05000339-08-401, on 05/22/2008, North Anna, Units 1 an D 2, Security Inspection, Cover Letter | |||
| author name = Munday J | |||
| author affiliation = NRC/RGN-II/DRS/PSB2 | |||
| addressee name = Christian D | |||
| addressee affiliation = Virginia Electric & Power Co (VEPCO) | |||
| docket = 05000338, 05000339 | |||
| license number = NPF-004, NPF-007 | |||
| contact person = | |||
| document report number = IR-08-401 | |||
| document type = Letter | |||
| page count = 4 | |||
}} | |||
{{IR-Nav| site = 05000338 | year = 2008 | report number = 401 }} | {{IR-Nav| site = 05000338 | year = 2008 | report number = 401 }} | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION | ||
Mr. David Vice President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060 | ==REGION II== | ||
SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 June 16, 2008 Mr. David Vice President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060 SUBJECT: NORTH ANNA POWER STATION - NRC SECURITY INSPECTION REPORT 05000338/2008401 AND 05000339/2008401 | |||
SUBJECT: NORTH ANNA POWER STATION - NRC SECURITY INSPECTION REPORT 05000338/2008401 AND 05000339/2008401 | |||
==Dear Mr. Christian:== | ==Dear Mr. Christian:== | ||
On May 22, 2008, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your North Anna Power Station, Units 1 and 2. Portions of the inspection were conducted at the corporate office from April 28 through May 1, 2008. The inspection covered one or more of the key attributes of the security cornerstone of the NRC=s Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed on May 1, 2008, with Ms. L. Hartz, at the corporate office, and on May 22, 2008, with Mr. L. Lane, at the North Anna Power Station. | On May 22, 2008, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your North Anna Power Station, Units 1 and 2. Portions of the inspection were conducted at the corporate office from April 28 through May 1, 2008. The inspection covered one or more of the key attributes of the security cornerstone of the NRC=s Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed on May 1, 2008, with Ms. L. Hartz, at the corporate office, and on May 22, 2008, with Mr. L. Lane, at the North Anna Power Station. | ||
This inspection examined activities conducted under your license as they relate to security and compliance with the Commission=s rules and regulations and with the conditions of your license | This inspection examined activities conducted under your license as they relate to security and compliance with the Commission=s rules and regulations and with the conditions of your license. | ||
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. | |||
No findings of significance were identified. | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. | |||
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). VEPCO 2 However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. | |||
If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity-Related InformationBWithhold Under 10 CFR 2.390@ and follow the instructions for withholding in 10 CFR 2.390(b)(1). | |||
Sincerely, | |||
Ms. Leslie N Harz Vice-President Nuclear Support Services Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 | /RA/ | ||
Joel T. Munday, Chief Plant Support Branch 2 Division of Reactor Safety Docket No.: 50-338, 50-339 License No.: NPF-4, NPF-7 Enclosure: Inspection Report 05000338/2008401 and 05000339/2008401 w/Attachment: Supplemental Information cc w/encl.: (See page 3) VEPCO 3 cc w/Encl: | |||
Lillian M. Cuoco, Esq. | Mr. Timothy Maddy Manager Nuclear Protection Services North Anna Power Station 1022 Haley Drive Mineral, VA 23117 cc w/o Enclosure: | ||
Ms. Leslie N Harz Vice-President Nuclear Support Services Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Lillian M. Cuoco, Esq. | |||
Senior Counsel Dominion Resources Services, Inc. | Senior Counsel Dominion Resources Services, Inc. | ||
Millstone Power Station Building 475, 5th Floor Rope Ferry Road Rt. 156 Waterford, CT 06385 | Millstone Power Station Building 475, 5th Floor Rope Ferry Road Rt. 156 Waterford, CT 06385 Mr. Page Kemp Supervisor Nuclear Engineering North Anna Power Station 1022 Haley Drive Mineral, VA 23117 Mr. Daniel G. Stoddard Site Vice President North Anna Power Station P.O. Box 402 Mineral, VA 23117 Chris L. Funderburk Director Nuclear Licensing and Operations Support Virginia Electric and Power Company 5000 Dominion Boulevard Glen Allen, VA 23060 Mr. Nelson K. Martin Manger Nuclear Fleet Protection Services Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 _________________________ | ||
OFFICE RII:DRS RII:DRS RII:DRS RII:DRP RII:DRS SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/ | |||
Mr. Page Kemp Supervisor Nuclear Engineering North Anna Power Station 1022 Haley Drive Mineral, VA 23117 | NAME K. Davis J. Shehee J. Munday J. Dodson Randy Patterson DATE 6/11/2008 6/12/2008 6/16/2008 6/ 6/13/2008 6/ /2008 6/ /2008 E-MAIL COPY? YES NO YES NO YES /20086/12/2008 NO YES NO YES NO YES NO YES N | ||
Mr. Daniel G. Stoddard Site Vice President North Anna Power Station P.O. Box 402 Mineral, VA 23117 | |||
Chris L. Funderburk Director Nuclear Licensing and Operations Support Virginia Electric and Power Company 5000 Dominion Boulevard Glen Allen, VA 23060 | |||
Mr. Nelson K. Martin Manger Nuclear Fleet Protection Services Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 | |||
}} | }} |
Latest revision as of 15:46, 14 November 2019
ML081690052 | |
Person / Time | |
---|---|
Site: | North Anna |
Issue date: | 06/16/2008 |
From: | Joel Munday NRC/RGN-II/DRS/PSB2 |
To: | Christian D Virginia Electric & Power Co (VEPCO) |
References | |
IR-08-401 | |
Download: ML081690052 (4) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION II
SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 June 16, 2008 Mr. David Vice President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060 SUBJECT: NORTH ANNA POWER STATION - NRC SECURITY INSPECTION REPORT 05000338/2008401 AND 05000339/2008401
Dear Mr. Christian:
On May 22, 2008, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your North Anna Power Station, Units 1 and 2. Portions of the inspection were conducted at the corporate office from April 28 through May 1, 2008. The inspection covered one or more of the key attributes of the security cornerstone of the NRC=s Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed on May 1, 2008, with Ms. L. Hartz, at the corporate office, and on May 22, 2008, with Mr. L. Lane, at the North Anna Power Station.
This inspection examined activities conducted under your license as they relate to security and compliance with the Commission=s rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
No findings of significance were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS.
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). VEPCO 2 However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any.
If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity-Related InformationBWithhold Under 10 CFR 2.390@ and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,
/RA/
Joel T. Munday, Chief Plant Support Branch 2 Division of Reactor Safety Docket No.: 50-338, 50-339 License No.: NPF-4, NPF-7 Enclosure: Inspection Report 05000338/2008401 and 05000339/2008401 w/Attachment: Supplemental Information cc w/encl.: (See page 3) VEPCO 3 cc w/Encl:
Mr. Timothy Maddy Manager Nuclear Protection Services North Anna Power Station 1022 Haley Drive Mineral, VA 23117 cc w/o Enclosure:
Ms. Leslie N Harz Vice-President Nuclear Support Services Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Lillian M. Cuoco, Esq.
Senior Counsel Dominion Resources Services, Inc.
Millstone Power Station Building 475, 5th Floor Rope Ferry Road Rt. 156 Waterford, CT 06385 Mr. Page Kemp Supervisor Nuclear Engineering North Anna Power Station 1022 Haley Drive Mineral, VA 23117 Mr. Daniel G. Stoddard Site Vice President North Anna Power Station P.O. Box 402 Mineral, VA 23117 Chris L. Funderburk Director Nuclear Licensing and Operations Support Virginia Electric and Power Company 5000 Dominion Boulevard Glen Allen, VA 23060 Mr. Nelson K. Martin Manger Nuclear Fleet Protection Services Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 _________________________
OFFICE RII:DRS RII:DRS RII:DRS RII:DRP RII:DRS SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/
NAME K. Davis J. Shehee J. Munday J. Dodson Randy Patterson DATE 6/11/2008 6/12/2008 6/16/2008 6/ 6/13/2008 6/ /2008 6/ /2008 E-MAIL COPY? YES NO YES NO YES /20086/12/2008 NO YES NO YES NO YES NO YES N