ML082460588: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML082460588
| number = ML082460588
| issue date = 09/02/2008
| issue date = 09/02/2008
| title = St. Lucie Report 22 - Inspection/Activity Plan 08/01/08 - 12/31/09
| title = Report 22 - Inspection/Activity Plan 08/01/08 - 12/31/09
| author name =  
| author name =  
| author affiliation = NRC/RGN-II/DRP/RPB3
| author affiliation = NRC/RGN-II/DRP/RPB3
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Saint Lucie Inspection / Activity Plan 09/01/2008
{{#Wiki_filter:Page 1 of 2                                                                                    Saint Lucie 09/02/2008      11:54:37                                                              Inspection / Activity Plan Report 22 09/01/2008 - 12/31/2009 Unit                                                                                                                          No. of Staff   Planned Dates        Inspection Number        Inspection Activity                                                  Title                                          on Site       Start    End            Type PSB1-RP         - RADIATION PROTECTION PUBLIC BASELINE                                                                     3 1, 2            IP 7112101              Access Control to Radiologically Significant Areas                                                   09/08/2008 09/12/2008 Baseline Inspections 1, 2           IP 7112103              Radiation Monitoring Instrumentation and Protective Equipment                                         09/08/2008 09/12/2008 Baseline Inspections 1, 2           IP 7112203              Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program         09/08/2008 09/12/2008 Baseline Inspections 1, 2           IP 71151-OR01          Occupational Exposure Control Effectiveness                                                           09/08/2008 09/12/2008 Baseline Inspections 1, 2           IP 71151-PR01          RETS/ODCM Radiological Effluent                                                                       09/08/2008 09/12/2008 Baseline Inspections EB3ISI         - UNIT 1 INSERVICE INSPECTION                                                                             1 1              IP 7111108P            Inservice Inspection Activities - PWR                                                                 10/27/2008 10/31/2008 Baseline Inspections EB3SGISI       - UNIT 1 STEAM GENERATOR INSERVICE INSP                                                                   2 1              IP 7111108P            Inservice Inspection Activities - PWR                                                                 11/03/2008 11/07/2008 Baseline Inspections EB3TI172       - TI-172                                                                                                   1 1, 2            IP 2515/172            Reactor Coolant System Dissimiliar Metal Butt Welds                                                   12/08/2008 12/12/2008 Generic Safety Inspectio STL TFPI       - TRIENNIEL FIRE PROTECTION INSPECTION                                                                     7 1, 2            IP 7111105P            Fire Protection-NFPA 805 Transition Period [Triennial]                                               01/26/2009 01/30/2009 Baseline Inspections 1, 2           IP 7111105P             Fire Protection-NFPA 805 Transition Period [Triennial]                                               02/09/2009 02/13/2009 Baseline Inspections PSB1EP         - EMERGENCY PREPAREDNESS PROTECTION                                                                       1 1, 2            IP 2515/175            Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review                 02/09/2009 02/13/2009 Baseline Inspections 1, 2           IP 7111402              Alert and Notification System Testing                                                                 02/09/2009 02/13/2009 EP Baseline Inspection 1, 2           IP 7111403              Emergency Response Organization Augmentation Testing                                                 02/09/2009 02/13/2009 EP Baseline Inspection 1, 2           IP 7111404              Emergency Action Level and Emergency Plan Changes                                                     02/09/2009 02/13/2009 EP Baseline Inspection 1, 2           IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies                                     02/09/2009 02/13/2009 EP Baseline Inspection 1, 2           IP 71151                Performance Indicator Verification                                                                   02/09/2009 02/13/2009 Baseline Inspections PSB1-RP         - RP OCCUPATIONAL PREINSPECTION VISIT                                                                     1 1, 2            IP 7112101              Access Control to Radiologically Significant Areas                                                   03/30/2009 04/03/2009 Baseline Inspections EB3ISI         - UNIT 2 INSERVICE INSPECTION                                                                             2 2            IP 7111108P            Inservice Inspection Activities - PWR                                                                 04/27/2009 05/01/2009 Baseline Inspections EB3TI172       - TI-172 RCS DM BUTT WELDS                                                                                 1 2            IP 2515/172            Reactor Coolant System Dissimiliar Metal Butt Welds                                                   04/27/2009 05/01/2009 Generic Safety Inspectio PSB1-RP         - RP OCCUPATIONAL INSPECTION WK1 (OUTAGE)                                                                 2 1, 2            IP 7112101              Access Control to Radiologically Significant Areas                                                   04/27/2009 05/01/2009 Baseline Inspections 1, 2           IP 7112102              ALARA Planning and Controls                                                                           04/27/2009 05/01/2009 Baseline Inspections 1, 2           IP 7112202              Radioactive Material Processing and Transportation                                                   04/27/2009 05/01/2009 Baseline Inspections 1, 2           IP 71151                Performance Indicator Verification                                                                   04/27/2009 05/01/2009 Baseline Inspections EB3SGISI       - UNIT 2 STEAM GENERATOR INSERVICE INSP                                                                   1 2            IP 7111108P            Inservice Inspection Activities - PWR                                                                 05/04/2009 05/08/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.
-12/31/2009 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 1 of 2 09/02/2008 11:54:37 Report 22 3 PSB1-RP-RADIATION PROTECTION PUBLIC BASELINE Baseline Inspections A ccess Control to Radiologically Significant Areas 09/08/2008 09/12/2008 1, 2   7112101 IP Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 09/08/2008 09/12/2008 1, 2   7112103 IP Baseline Inspections Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 09/08/2008 09/12/2008 1, 2   7112203 IP Baseline Inspections Occupational Exposure Control Effectiveness 09/08/2008 09/12/2008 1, 2   71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 09/08/2008 09/12/2008 1, 2  71151-PR01 IP 1 EB3ISI-UNIT 1 INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 10/27/2008 10/31/2008 1    7111108P IP 2 EB3SGISI-UNIT 1 STEAM GENERATOR INSERVICE INSP Baseline Inspections Inservice Inspection Activities - PWR 11/03/2008 11/07/2008 1    7111108P IP 1 EB3TI172-TI-172 Generic Safety Inspecti o Reactor Coolant System Dissimiliar Metal Butt Welds 12/08/2008 12/12/2008 1, 2  2515/172 IP 7 STL TFPI-TRIENNIEL FIRE PROTECTION INSPECTION Baseline Inspections Fire Protection-NFPA 805 Transition Period [Triennial]
01/26/2009 01/30/2009 1, 2   7111105P IP Baseline Inspections Fire Protection-NFPA 805 Transition Period [Triennial]
02/09/2009 02/13/2009 1, 2  7111105P IP 1 PSB1EP-EMERGENCY PREPAREDNESS PROTECTION Baseline Inspections Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 02/09/2009 02/13/2009 1, 2   2515/175 IP EP Baseline Inspection A lert and Notification System Testing 02/09/2009 02/13/2009 1, 2   7111402 IP EP Baseline Inspection Emergency Response Organization Augmentation Testing 02/09/2009 02/13/2009 1, 2   7111403 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 02/09/2009 02/13/2009 1, 2   7111404 IP EP Baseline Inspection Correction of Emergency Preparedness Weaknesses and Deficiencies 02/09/2009 02/13/2009 1, 2   7111405 IP Baseline Inspections Performance Indicator Verification 02/09/2009 02/13/2009 1, 2  71151 IP 1 PSB1-RP-RP OCCUPATIONAL PREINSPECTION VISIT Baseline Inspections A ccess Control to Radiologically Significant Areas 03/30/2009 04/03/2009 1, 2  7112101 IP 2 EB3ISI-UNIT 2 INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 04/27/2009 05/01/2009 2  7111108P IP 1 EB3TI172-TI-172 RCS DM BUTT WELDS Generic Safety Inspecti o Reactor Coolant System Dissimiliar Metal Butt Welds 04/27/2009 05/01/2009 2  2515/172 IP 2 PSB1-RP-RP OCCUPATIONAL INSPECTION WK1 (OUTAGE)
Baseline Inspections A ccess Control to Radiologically Significant Areas 04/27/2009 05/01/2009 1, 2   7112101 IP Baseline Inspections A LARA Planning and Controls 04/27/2009 05/01/2009 1, 2   7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 04/27/2009 05/01/2009 1, 2   7112202 IP Baseline Inspections Performance Indicator Verification 04/27/2009 05/01/2009 1, 2  71151 IP 1 EB3SGISI-UNIT 2 STEAM GENERATOR INSERVICE INSP Baseline Inspections Inservice Inspection Activities - PWR 05/04/2009 05/08/2009 2  7111108P IP This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
Saint Lucie Inspection / Activity Plan 09/01/2008
 
-12/31/2009 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 2 of 2 09/02/2008 11:54:37 Report 22 3 PSB1-RP-RP OCCUPATIONAL INSPECTION WK2 (OUTAGE)
Page 2 of 2                                                                                    Saint Lucie 09/02/2008      11:54:37                                                              Inspection / Activity Plan Report 22 09/01/2008 - 12/31/2009 Unit                                                                                                          No. of Staff   Planned Dates          Inspection Number        Inspection Activity                                                  Title                        on Site       Start    End            Type PSB1-RP         - RP OCCUPATIONAL INSPECTION WK2 (OUTAGE)                                                 3 1, 2            IP 7112101              Access Control to Radiologically Significant Areas                                   05/11/2009 05/15/2009 Baseline Inspections 1, 2           IP 7112102              ALARA Planning and Controls                                                           05/11/2009 05/15/2009 Baseline Inspections 1, 2           IP 7112202              Radioactive Material Processing and Transportation                                   05/11/2009 05/15/2009 Baseline Inspections INSP           - COMPONENT DESIGN BASIS INSPECTION (CDBI)                                                 5 1, 2            IP 7111121              Component Design Bases Inspection                                                     07/13/2009 07/17/2009 Baseline Inspections 1, 2           IP 7111121             Component Design Bases Inspection                                                     07/27/2009 07/31/2009 Baseline Inspections 1, 2           IP 7111121             Component Design Bases Inspection                                                     08/10/2009 08/14/2009 Baseline Inspections 1, 2           IP 7111121             Component Design Bases Inspection                                                     08/24/2009 08/28/2009 Baseline Inspections OL EXAM         - INITIAL EXAM PREP                                                                       3 1                  V23284              ST LUCIE/JULY 2008 EXAM AT POWER FACILITIES                                           09/14/2009 09/18/2009 Not Applicable OL EXAM         - INITIAL EXAM - WEEK 1                                                                   3 1                  V23284              ST LUCIE/JULY 2008 EXAM AT POWER FACILITIES                                           10/05/2009 10/09/2009 Not Applicable OL EXAM         - INITIAL EXAM - WEEK 2                                                                   3 1                  V23284              ST LUCIE/JULY 2008 EXAM AT POWER FACILITIES                                           10/19/2009 10/23/2009 Not Applicable OL RQ           - REQUAL INSPECTION                                                                       2 1, 2            IP 7111111B            Licensed Operator Requalification Program                                             11/16/2009 11/20/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.
Baseline Inspections A ccess Control to Radiologically Significant Areas 05/11/2009 05/15/2009 1, 2   7112101 IP Baseline Inspections A LARA Planning and Controls 05/11/2009 05/15/2009 1, 2   7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 05/11/2009 05/15/2009 1, 2  7112202 IP 5 INSP-COMPONENT DESIGN BASIS INSPECTION (CDBI)
Baseline Inspections Component Design Bases Inspection 07/13/2009 07/17/2009 1, 2   7111121 IP Baseline Inspections Component Design Bases Inspection 07/27/2009 07/31/2009 1, 2   7111121 IP Baseline Inspections Component Design Bases Inspection 08/10/2009 08/14/2009 1, 2   7111121 IP Baseline Inspections Component Design Bases Inspection 08/24/2009 08/28/2009 1, 2  7111121 IP 3 OL EXAM-INITIAL EXAM PREP Not Applicable ST LUCIE/JULY 2008 EXAM AT POWER FACILITIES 09/14/2009 09/18/2009 1    V23284 3 OL EXAM-INITIAL EXAM - WEEK 1 Not Applicable ST LUCIE/JULY 2008 EXAM AT POWER FACILITIES 10/05/2009 10/09/2009 1    V23284 3 OL EXAM-INITIAL EXAM - WEEK 2 Not Applicable ST LUCIE/JULY 2008 EXAM AT POWER FACILITIES 10/19/2009 10/23/2009 1    V23284 2 OL RQ-REQUAL INSPECTION Baseline Inspections Licensed Operator Requalification Program 11/16/2009 11/20/2009 1, 2  7111111B IP This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 14:28, 14 November 2019

Report 22 - Inspection/Activity Plan 08/01/08 - 12/31/09
ML082460588
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 09/02/2008
From:
NRC/RGN-II/DRP/RPB3
To:
Shared Package
ML082460584 List:
References
Download: ML082460588 (2)


Text

Page 1 of 2 Saint Lucie 09/02/2008 11:54:37 Inspection / Activity Plan Report 22 09/01/2008 - 12/31/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PSB1-RP - RADIATION PROTECTION PUBLIC BASELINE 3 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 09/08/2008 09/12/2008 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 09/08/2008 09/12/2008 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 09/08/2008 09/12/2008 Baseline Inspections 1, 2 IP 71151-OR01 Occupational Exposure Control Effectiveness 09/08/2008 09/12/2008 Baseline Inspections 1, 2 IP 71151-PR01 RETS/ODCM Radiological Effluent 09/08/2008 09/12/2008 Baseline Inspections EB3ISI - UNIT 1 INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 10/27/2008 10/31/2008 Baseline Inspections EB3SGISI - UNIT 1 STEAM GENERATOR INSERVICE INSP 2 1 IP 7111108P Inservice Inspection Activities - PWR 11/03/2008 11/07/2008 Baseline Inspections EB3TI172 - TI-172 1 1, 2 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 12/08/2008 12/12/2008 Generic Safety Inspectio STL TFPI - TRIENNIEL FIRE PROTECTION INSPECTION 7 1, 2 IP 7111105P Fire Protection-NFPA 805 Transition Period [Triennial] 01/26/2009 01/30/2009 Baseline Inspections 1, 2 IP 7111105P Fire Protection-NFPA 805 Transition Period [Triennial] 02/09/2009 02/13/2009 Baseline Inspections PSB1EP - EMERGENCY PREPAREDNESS PROTECTION 1 1, 2 IP 2515/175 Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 02/09/2009 02/13/2009 Baseline Inspections 1, 2 IP 7111402 Alert and Notification System Testing 02/09/2009 02/13/2009 EP Baseline Inspection 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 02/09/2009 02/13/2009 EP Baseline Inspection 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 02/09/2009 02/13/2009 EP Baseline Inspection 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 02/09/2009 02/13/2009 EP Baseline Inspection 1, 2 IP 71151 Performance Indicator Verification 02/09/2009 02/13/2009 Baseline Inspections PSB1-RP - RP OCCUPATIONAL PREINSPECTION VISIT 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 03/30/2009 04/03/2009 Baseline Inspections EB3ISI - UNIT 2 INSERVICE INSPECTION 2 2 IP 7111108P Inservice Inspection Activities - PWR 04/27/2009 05/01/2009 Baseline Inspections EB3TI172 - TI-172 RCS DM BUTT WELDS 1 2 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 04/27/2009 05/01/2009 Generic Safety Inspectio PSB1-RP - RP OCCUPATIONAL INSPECTION WK1 (OUTAGE) 2 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 04/27/2009 05/01/2009 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 04/27/2009 05/01/2009 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 04/27/2009 05/01/2009 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 04/27/2009 05/01/2009 Baseline Inspections EB3SGISI - UNIT 2 STEAM GENERATOR INSERVICE INSP 1 2 IP 7111108P Inservice Inspection Activities - PWR 05/04/2009 05/08/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Saint Lucie 09/02/2008 11:54:37 Inspection / Activity Plan Report 22 09/01/2008 - 12/31/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PSB1-RP - RP OCCUPATIONAL INSPECTION WK2 (OUTAGE) 3 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 05/11/2009 05/15/2009 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 05/11/2009 05/15/2009 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 05/11/2009 05/15/2009 Baseline Inspections INSP - COMPONENT DESIGN BASIS INSPECTION (CDBI) 5 1, 2 IP 7111121 Component Design Bases Inspection 07/13/2009 07/17/2009 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 07/27/2009 07/31/2009 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 08/10/2009 08/14/2009 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 08/24/2009 08/28/2009 Baseline Inspections OL EXAM - INITIAL EXAM PREP 3 1 V23284 ST LUCIE/JULY 2008 EXAM AT POWER FACILITIES 09/14/2009 09/18/2009 Not Applicable OL EXAM - INITIAL EXAM - WEEK 1 3 1 V23284 ST LUCIE/JULY 2008 EXAM AT POWER FACILITIES 10/05/2009 10/09/2009 Not Applicable OL EXAM - INITIAL EXAM - WEEK 2 3 1 V23284 ST LUCIE/JULY 2008 EXAM AT POWER FACILITIES 10/19/2009 10/23/2009 Not Applicable OL RQ - REQUAL INSPECTION 2 1, 2 IP 7111111B Licensed Operator Requalification Program 11/16/2009 11/20/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.