Line 2: |
Line 2: |
| | number = ML082550561 | | | number = ML082550561 |
| | issue date = 09/24/2008 | | | issue date = 09/24/2008 |
| | title = Point Beach Nuclear Plant, Unit 1- Notice of Issuance of Amendment to Renewed Facility Operating License and Final Determination of No Significant Hazard Consideration | | | title = Notice of Issuance of Amendment to Renewed Facility Operating License and Final Determination of No Significant Hazard Consideration |
| | author name = Cushing J S | | | author name = Cushing J |
| | author affiliation = NRC/NRR/DORL/LPLIII-1 | | | author affiliation = NRC/NRR/DORL/LPLIII-1 |
| | addressee name = Meyer L | | | addressee name = Meyer L |
Line 15: |
Line 15: |
| | page count = 3 | | | page count = 3 |
| | project = TAC:MD8800 | | | project = TAC:MD8800 |
| | stage = Approval | | | stage = Other |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:September 24, 2008 | | {{#Wiki_filter:September 24, 2008 Mr. Larry Meyer Site Vice President Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, WI 54241 |
| | |
| Mr. Larry Meyer Site Vice President Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, WI 54241 | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| POINT BEACH NUCLEAR PLANT, UNIT 1-NOTICE OF ISSUANCE OF AMENDMENT TO RENEWED FACILITY OPERATING LICENSE AND FINAL DETERMINATION OF NO SIGNIFICANT HAZARD CONSIDERATION (TAC NO. | | POINT BEACH NUCLEAR PLANT, UNIT 1-NOTICE OF ISSUANCE OF AMENDMENT TO RENEWED FACILITY OPERATING LICENSE AND FINAL DETERMINATION OF NO SIGNIFICANT HAZARD CONSIDERATION (TAC NO. |
| MD8800) | | MD8800) |
|
| |
|
| ==Dear Mr.Meyer:== | | ==Dear Mr.Meyer:== |
|
| |
|
| Enclosed is a copy of a "Notice of Issuance of Amendment to Renewed Facility Operating License and Final Determination of No Significant Hazards Determination related to the application dated May 28, 2008, filed by FPL Energy Point Beach, LLC (the licensee), for the Point Beach Nuclear Plant, Unit No. 1. The notice is being forwarded to the Office of the Federal Register for publication. | | Enclosed is a copy of a "Notice of Issuance of Amendment to Renewed Facility Operating License and Final Determination of No Significant Hazards Determination related to the application dated May 28, 2008, filed by FPL Energy Point Beach, LLC (the licensee), for the Point Beach Nuclear Plant, Unit No. 1. The notice is being forwarded to the Office of the Federal Register for publication. |
| Sincerely, /RA/ Jack Cushing, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation | | Sincerely, |
| | | /RA/ |
| Docket No. 50-266 | | Jack Cushing, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-266 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
|
| |
|
| Notice | | Notice cc w/encl: See next page |
|
| |
|
| cc w/encl: See next page Mr. Larry Meyer Site Vice President Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, WI 54241
| | Mr. Larry Meyer Site Vice President Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, WI 54241 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| POINT BEACH NUCLEAR PLANT, UNIT 1-NOTICE OF ISSUANCE OF AMENDMENT TO RENEWED FACILITY OPERATING LICENSE AND FINAL DETERMINATION OF NO SIGNIFICANT HAZARD CONSIDERATION (TAC NO. | | POINT BEACH NUCLEAR PLANT, UNIT 1-NOTICE OF ISSUANCE OF AMENDMENT TO RENEWED FACILITY OPERATING LICENSE AND FINAL DETERMINATION OF NO SIGNIFICANT HAZARD CONSIDERATION (TAC NO. |
| MD8800) | | MD8800) |
|
| |
|
| ==Dear Mr. Meyer:== | | ==Dear Mr. Meyer:== |
|
| |
|
| Enclosed is a copy of a "Notice of Issuance of Amendment to Renewed Facility Operating License and Final Determination of No Significant Hazards Determination related to the application dated May 28, 2008, filed by FPL Energy Point Beach, LLC (the licensee), for the Point Beach Nuclear Plant, Unit No. 1. The notice is being forwarded to the Office of the Federal Register for publication. | | Enclosed is a copy of a "Notice of Issuance of Amendment to Renewed Facility Operating License and Final Determination of No Significant Hazards Determination related to the application dated May 28, 2008, filed by FPL Energy Point Beach, LLC (the licensee), for the Point Beach Nuclear Plant, Unit No. 1. The notice is being forwarded to the Office of the Federal Register for publication. |
| | | Sincerely, |
| Sincerely, /RA/ Jack Cushing, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation | | /RA/ |
| | | Jack Cushing, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-266 |
| Docket No. 50-266 | |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
|
| |
|
| Notice cc w/encl: See next page | | Notice cc w/encl: See next page DISTRIBUTION PUBLIC LPL3-1 Reading File RidsRgn3MailCenter Resource RidsNrrDorl Resource RidsOpaMailCenter RidsNrrDorlLpl3-I Resource RidsAcrsAcnw_MailCTR Resource RidsNrrPMJCushing Resource RidsNrrDprPfpb RidsNrrLATHarris Resource L.Subin, OGC RidsOgcMailCenter RidsNrrLABTully Resource RidsNrrDorlDpr Resource RidsOgcRp Resource Accession Number: ML082550561 Pkg: ML082550552 FRN: ML082550582 OFFICE NRR/LPL3-1\PM NRR/LPL3-1\LA OGC NRR/LPL3-1\BC NAME JCushing THarris/BT for LSubin LJames DATE 09/23/08 09/23 /08 09/23/08 09/ 24 /08 OFFICIAL RECORD COPY |
| | |
| DISTRIBUTION PUBLIC LPL3-1 Reading File RidsRgn3MailCenter Resource RidsNrrDorl Resource RidsOpaMailCenter RidsNrrDorlLpl3-I Resource RidsAcrsAcnw_MailCTR Resource RidsNrrPMJCushing Resource RidsNrrDprPfpb RidsNrrLATHarris Resource L.Subin, OGC RidsOgcMailCenter RidsNrrLABTully Resource RidsNrrDorlDpr Resource RidsOgcRp Resource | |
| | |
| Accession Number: ML082550561 Pkg: ML082550552 FRN: ML082550582 OFFICE NRR/LPL3-1\PM NRR/LPL3-1\LA OGC NRR/LPL3-1\BC NAME JCushing THarris/BT for LSubin LJames DATE 09/23/08 09/23 /08 09/23/08 09/ 24 /08 OFFICIAL RECORD COPY Point Beach Nuclear Plant, Units 1 and 2 | |
| | |
| cc:
| |
| | |
| Licensing Manager FPL Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241
| |
| | |
| Mr. Ken Duveneck Town Chairman Town of Two Creeks 13017 State Highway 42 Mishicot, WI 54228
| |
| | |
| Resident Inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road Two Rivers, WI 54241
| |
| | |
| Chairman Public Service Commission of Wisconsin P.O. Box 7854 Madison, WI 53707-7854
| |
| | |
| Mr. J. A. Stall Executive Vice President, Nuclear and Chief Nuclear Officer FPL Group P. O. Box 14000 Juno Beach, FL 33408-0420
| |
| | |
| T. O. Jones Vice President, Nuclear Operations Mid-West Region Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420
| |
| | |
| Peter Wells Acting Vice President, Nuclear Training and Performance Improvement Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420
| |
| | |
| John Bjorseth Plant General Manager Point Beach Nuclear Plant 6610 Nuclear Road
| |
| | |
| Mark E. Warner Vice President, Nuclear Plant Support Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420
| |
| | |
| Mr. Antonio Fernandez Senior Attorney FPL Energy , LLC P. O. Box 14000 Juno Beach, FL 33408-0420
| |
| | |
| Mr. Mano Nazar Senior Vice President and Nuclear Chief Operating Officer FPL Energy, LLC P. O. Box 14000 Juno Beach, FL 33408-0420
| |
| | |
| Abdy Khanpour Vice President Engineering Support FPL Energy, LLC P. O. Box 14000 Juno Beach, FL 33408-0420
| |
| | |
| J. Kitsembel Electric Division Public Service Commission of Wisconsin P. O. Box 7854 Madison, WI 53707-7854
| |
| | |
| Mr. M. S. Ross Managing Attorney FPL Energy, LLC P. O. Box 14000 Juno Beach, FL 33408-0420
| |
|
| |
|
| Mr. Larry Meyer Site Vice President Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, WI 54241 Two Rivers, WI 54241}} | | Point Beach Nuclear Plant, Units 1 and 2 cc: |
| | Licensing Manager Mark E. Warner FPL Energy Point Beach, LLC Vice President, Nuclear Plant Support 6610 Nuclear Road Florida Power & Light Company Two Rivers, WI 54241 P. O. Box 14000 Juno Beach, FL 33408-0420 Mr. Ken Duveneck Town Chairman Mr. Antonio Fernandez Town of Two Creeks Senior Attorney 13017 State Highway 42 FPL Energy , LLC Mishicot, WI 54228 P. O. Box 14000 Juno Beach, FL 33408-0420 Resident Inspector's Office U.S. Nuclear Regulatory Commission Mr. Mano Nazar 6612 Nuclear Road Senior Vice President and Two Rivers, WI 54241 Nuclear Chief Operating Officer FPL Energy, LLC Chairman P. O. Box 14000 Public Service Commission of Wisconsin Juno Beach, FL 33408-0420 P.O. Box 7854 Madison, WI 53707-7854 Abdy Khanpour Vice President Mr. J. A. Stall Engineering Support Executive Vice President, Nuclear and FPL Energy, LLC Chief Nuclear Officer P. O. Box 14000 FPL Group Juno Beach, FL 33408-0420 P. O. Box 14000 Juno Beach, FL 33408-0420 J. Kitsembel Electric Division T. O. Jones Public Service Commission of Wisconsin Vice President, Nuclear Operations P. O. Box 7854 Mid-West Region Madison, WI 53707-7854 Florida Power & Light Company P. O. Box 14000 Mr. M. S. Ross Juno Beach, FL 33408-0420 Managing Attorney FPL Energy, LLC Peter Wells P. O. Box 14000 Acting Vice President, Nuclear Juno Beach, FL 33408-0420 Training and Performance Improvement Florida Power & Light Company Mr. Larry Meyer P. O. Box 14000 Site Vice President Juno Beach, FL 33408-0420 Point Beach Nuclear Plant 6610 Nuclear Road John Bjorseth Two Rivers, WI 54241 Plant General Manager Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, WI 54241}} |
Letter Sequence Other |
---|
TAC:MD8800, Steam Generator Tube Integrity (Approved, Closed) |
|
MONTHYEARET 08-0009, Revision to Technical Specification (TS) 5.5.9, Steam Generator (SG) Program for Interim Alternate Repair Criteria2008-02-0808 February 2008 Revision to Technical Specification (TS) 5.5.9, Steam Generator (SG) Program for Interim Alternate Repair Criteria Project stage: Request ML0805002232008-02-13013 February 2008 License Amendment Request to Revise Technical Specification (TS) Sections 5.5.9, Steam Generator (SG) Program and TS 5.6.10, Steam Generator Tube Inspection Report for Interim Alternate Repair Criterion Project stage: Other RS-08-016, Application for Steam Generator Tube Interim Alternate Repair Criteria Technical Specification Amendment2008-02-25025 February 2008 Application for Steam Generator Tube Interim Alternate Repair Criteria Technical Specification Amendment Project stage: Request ML0808502562008-03-21021 March 2008 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification (TS) Sections 5.5.9, Steam Generator Program and TS 5.6.10, Steam Generator Tube Inspection Report, For.. Project stage: Response to RAI ML0808602482008-03-21021 March 2008 Response to Request for Additional Information Related to License Amendment Request for an Interim Alternate Repair Criterion to Technical Specification 5.5.9, Steam Generator (SG) Program Project stage: Response to RAI RS-08-031, Response to Request for Additional Information Regarding Application for Steam Generator Tube Interim Alternate Repair Criteria Technical Specification2008-03-27027 March 2008 Response to Request for Additional Information Regarding Application for Steam Generator Tube Interim Alternate Repair Criteria Technical Specification Project stage: Response to RAI NRC 2008-0034, License Amendment Request 257, Technical Specifications 5.5.8 and 5.6.8, Steam Generator Program & Steam Generator Tube Inspection Report, Interim Alternate Repair Criteria (Iarc) for Steam Generator Tube Repair2008-05-28028 May 2008 License Amendment Request 257, Technical Specifications 5.5.8 and 5.6.8, Steam Generator Program & Steam Generator Tube Inspection Report, Interim Alternate Repair Criteria (Iarc) for Steam Generator Tube Repair Project stage: Request NRC 2008-0056, Transmittal of Supplement to License Amendment Request 257 to Revise Technical Specifications 5.5.8 and 5.6.8 to Incorporate an Interim Alternate Repair Criterion2008-07-18018 July 2008 Transmittal of Supplement to License Amendment Request 257 to Revise Technical Specifications 5.5.8 and 5.6.8 to Incorporate an Interim Alternate Repair Criterion Project stage: Supplement ML0823409242008-08-20020 August 2008 Request for Hearing and Leave to Intervene, Point Beach Nuclear Plant Project stage: Request ML0825505612008-09-24024 September 2008 Notice of Issuance of Amendment to Renewed Facility Operating License and Final Determination of No Significant Hazard Consideration Project stage: Other ML0825408582008-09-25025 September 2008 Request for Withholding Information from Public Disclosure for Point Beach Nuclear Plant, Unit 1 (Tac No. MD8800) Project stage: Withholding Request Acceptance ML0827605182008-09-29029 September 2008 Notification of Significant Licensing Action Re Amendment Application Dated May 28, 2008 Project stage: Other ML0825408832008-10-0707 October 2008 Issuance of License Amendment, Technical Specification 5.5.8 and 5.6.8 Project stage: Approval 2008-03-27
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000266/20244022024-11-14014 November 2024 Security Baseline Inspection Report 05000266/2024402 and 05000301/2024402 IR 05000266/20240032024-11-0505 November 2024 Integrated Inspection Report 05000266/2024003 and 05000301/2024003 ML24295A1142024-10-31031 October 2024 Suppl Env Audit Summary Letter W/Enclosure 1 L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums ML24295A0862024-10-21021 October 2024 Notification of NRC Baseline Inspection and Request for Information Inspection Report 0500026/2025002 L-2024-160, Core Operating Limits Report (COLR) Unit 2 Reload Cycle 41 (U2C41)2024-10-21021 October 2024 Core Operating Limits Report (COLR) Unit 2 Reload Cycle 41 (U2C41) L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-120, LAR 301 - Revise Renewed Facility Operating Licenses to Adopt an Alternative Approach for Addressing Seismic Risk in 10 CFR 50.69 Risk-Informed Categorization2024-10-0808 October 2024 LAR 301 - Revise Renewed Facility Operating Licenses to Adopt an Alternative Approach for Addressing Seismic Risk in 10 CFR 50.69 Risk-Informed Categorization L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000266/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000266/2024011 and 05000301/2024011 L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-145, Notification of Deviation from EPRI MRP-227, Revision 1-A Baffle Bolt Inspection Frequency2024-09-0909 September 2024 Notification of Deviation from EPRI MRP-227, Revision 1-A Baffle Bolt Inspection Frequency ML24207A0202024-08-28028 August 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Point Beach Nuclear Plant, Units 1 and 2 (Docket Numbers: 50-0266 and 50-0301) IR 05000266/20240052024-08-21021 August 2024 Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2024005 and 05000301/2024005) IR 05000266/20240022024-08-13013 August 2024 Integrated Inspection Report 05000266/2024002 and 05000301/2024002 L-2024-131, Response to Request for Additional Information Regarding License Amendment Request 300, Modify Containment Average Air Temperature Requirements2024-08-0909 August 2024 Response to Request for Additional Information Regarding License Amendment Request 300, Modify Containment Average Air Temperature Requirements ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review ML24214A3092024-08-0202 August 2024 Confirmation of Initial License Examination L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24194A1802024-07-24024 July 2024 – Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule L-2024-113, License Amendment Request 294, Application to Revise Technical Specifications to Adopt TSTF- 577, Revised Frequencies for Steam Generator Tube Inspections2024-07-24024 July 2024 License Amendment Request 294, Application to Revise Technical Specifications to Adopt TSTF- 577, Revised Frequencies for Steam Generator Tube Inspections IR 05000266/20244012024-07-23023 July 2024 Public - Point Beach Nuclear Plant Cyber Security Inspection Report 05000266/2024401 and 05000301/2024401 ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-116, Preparation and Scheduling of Operator Licensing Examinations2024-07-11011 July 2024 Preparation and Scheduling of Operator Licensing Examinations IR 05000266/20240102024-07-10010 July 2024 Age-Related Degradation Inspection Report 05000266/2024010 and 05000301/2024010 L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-105, License Amendment Request 300, Modify Containment Average Air Temperature Requirements2024-06-26026 June 2024 License Amendment Request 300, Modify Containment Average Air Temperature Requirements L-2024-107, Schedule for Subsequent License Renewal Environmental Review2024-06-25025 June 2024 Schedule for Subsequent License Renewal Environmental Review ML24176A2242024-06-24024 June 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-093, Steam Generator Divider Plate Assemblies Bounding Analysis Evaluation for Aging Management Commitment 14 Revision2024-06-10010 June 2024 Steam Generator Divider Plate Assemblies Bounding Analysis Evaluation for Aging Management Commitment 14 Revision IR 05000266/20244202024-06-0505 June 2024 Security Baseline Inspection Report 05000266/2024420 and 05000301/2024420 ML24149A1922024-05-28028 May 2024 Notification of NRC Baseline Inspection and Request for Information ML24141A1382024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection.Docx ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000266/20243012024-04-29029 April 2024 NRC Initial License Examination Report 05000266/2024301; 05000301/2024301 L-2024-067, Annual Monitoring Report2024-04-26026 April 2024 Annual Monitoring Report ML24116A0402024-04-23023 April 2024 Periodic Update of the Updated Final Safety Analysis Report ML24071A0912024-04-22022 April 2024 Issuance of Relief Request I6-RR-03 - Extension of the Unit 2 Steam Generator Primary Nozzle Dissimilar Metal Welds Sixth 10-Year Inservice Inspection Program Interval IR 05000266/20240012024-04-11011 April 2024 Integrated Inspection Report 05000266/2024001 and 05000301/2024001 L-2024-030, Supplement to Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements2024-03-27027 March 2024 Supplement to Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements L-2024-043, Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules2024-03-25025 March 2024 Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules L-2024-011, And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications IR 05000266/20230062024-02-28028 February 2024 Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2023006 and 05000301/2023006) ML24053A3732024-02-22022 February 2024 Operator Licensing Examination Approval Point Beach, March 2024 L-2024-020, Refueling Outage Owners Activity Report (OAR-1) Unit 1 for Inservice Inspections2024-02-22022 February 2024 Refueling Outage Owners Activity Report (OAR-1) Unit 1 for Inservice Inspections ML24036A2652024-02-0505 February 2024 Notice of Inspection and Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000266/2024010 and 05000301/2024010 IR 05000266/20230042024-02-0101 February 2024 Integrated Inspection Report 05000266/2023004 and 05000301/2023004 2024-09-09
[Table view] |
Text
September 24, 2008 Mr. Larry Meyer Site Vice President Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, WI 54241
SUBJECT:
POINT BEACH NUCLEAR PLANT, UNIT 1-NOTICE OF ISSUANCE OF AMENDMENT TO RENEWED FACILITY OPERATING LICENSE AND FINAL DETERMINATION OF NO SIGNIFICANT HAZARD CONSIDERATION (TAC NO.
MD8800)
Dear Mr.Meyer:
Enclosed is a copy of a "Notice of Issuance of Amendment to Renewed Facility Operating License and Final Determination of No Significant Hazards Determination related to the application dated May 28, 2008, filed by FPL Energy Point Beach, LLC (the licensee), for the Point Beach Nuclear Plant, Unit No. 1. The notice is being forwarded to the Office of the Federal Register for publication.
Sincerely,
/RA/
Jack Cushing, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-266
Enclosure:
Notice cc w/encl: See next page
Mr. Larry Meyer Site Vice President Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, WI 54241
SUBJECT:
POINT BEACH NUCLEAR PLANT, UNIT 1-NOTICE OF ISSUANCE OF AMENDMENT TO RENEWED FACILITY OPERATING LICENSE AND FINAL DETERMINATION OF NO SIGNIFICANT HAZARD CONSIDERATION (TAC NO.
MD8800)
Dear Mr. Meyer:
Enclosed is a copy of a "Notice of Issuance of Amendment to Renewed Facility Operating License and Final Determination of No Significant Hazards Determination related to the application dated May 28, 2008, filed by FPL Energy Point Beach, LLC (the licensee), for the Point Beach Nuclear Plant, Unit No. 1. The notice is being forwarded to the Office of the Federal Register for publication.
Sincerely,
/RA/
Jack Cushing, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-266
Enclosure:
Notice cc w/encl: See next page DISTRIBUTION PUBLIC LPL3-1 Reading File RidsRgn3MailCenter Resource RidsNrrDorl Resource RidsOpaMailCenter RidsNrrDorlLpl3-I Resource RidsAcrsAcnw_MailCTR Resource RidsNrrPMJCushing Resource RidsNrrDprPfpb RidsNrrLATHarris Resource L.Subin, OGC RidsOgcMailCenter RidsNrrLABTully Resource RidsNrrDorlDpr Resource RidsOgcRp Resource Accession Number: ML082550561 Pkg: ML082550552 FRN: ML082550582 OFFICE NRR/LPL3-1\PM NRR/LPL3-1\LA OGC NRR/LPL3-1\BC NAME JCushing THarris/BT for LSubin LJames DATE 09/23/08 09/23 /08 09/23/08 09/ 24 /08 OFFICIAL RECORD COPY
Point Beach Nuclear Plant, Units 1 and 2 cc:
Licensing Manager Mark E. Warner FPL Energy Point Beach, LLC Vice President, Nuclear Plant Support 6610 Nuclear Road Florida Power & Light Company Two Rivers, WI 54241 P. O. Box 14000 Juno Beach, FL 33408-0420 Mr. Ken Duveneck Town Chairman Mr. Antonio Fernandez Town of Two Creeks Senior Attorney 13017 State Highway 42 FPL Energy , LLC Mishicot, WI 54228 P. O. Box 14000 Juno Beach, FL 33408-0420 Resident Inspector's Office U.S. Nuclear Regulatory Commission Mr. Mano Nazar 6612 Nuclear Road Senior Vice President and Two Rivers, WI 54241 Nuclear Chief Operating Officer FPL Energy, LLC Chairman P. O. Box 14000 Public Service Commission of Wisconsin Juno Beach, FL 33408-0420 P.O. Box 7854 Madison, WI 53707-7854 Abdy Khanpour Vice President Mr. J. A. Stall Engineering Support Executive Vice President, Nuclear and FPL Energy, LLC Chief Nuclear Officer P. O. Box 14000 FPL Group Juno Beach, FL 33408-0420 P. O. Box 14000 Juno Beach, FL 33408-0420 J. Kitsembel Electric Division T. O. Jones Public Service Commission of Wisconsin Vice President, Nuclear Operations P. O. Box 7854 Mid-West Region Madison, WI 53707-7854 Florida Power & Light Company P. O. Box 14000 Mr. M. S. Ross Juno Beach, FL 33408-0420 Managing Attorney FPL Energy, LLC Peter Wells P. O. Box 14000 Acting Vice President, Nuclear Juno Beach, FL 33408-0420 Training and Performance Improvement Florida Power & Light Company Mr. Larry Meyer P. O. Box 14000 Site Vice President Juno Beach, FL 33408-0420 Point Beach Nuclear Plant 6610 Nuclear Road John Bjorseth Two Rivers, WI 54241 Plant General Manager Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, WI 54241