ML082740360: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML082740360
| number = ML082740360
| issue date = 10/20/2008
| issue date = 10/20/2008
| title = Correction to RAI Response Date Regarding Request for Relief from ASME Code, Section Xi
| title = Correction to RAI Response Date Regarding Request for Relief from ASME Code, Section XI
| author name = Vaaler M
| author name = Vaaler M
| author affiliation = NRC/NRR/DORL/LPLII-2
| author affiliation = NRC/NRR/DORL/LPLII-2
| addressee name = Walt T D
| addressee name = Walt T
| addressee affiliation = Carolina Power & Light Co
| addressee affiliation = Carolina Power & Light Co
| docket = 05000261
| docket = 05000261
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 October 20, 2008 Mr. Thomas D. Walt, Vice President H. B. Robinson Steam Electric Plant, Unit NO.2 Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina 29550-0790 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO.2 -CORRECTION TO REQUEST FOR ADDITIONAL INFORMATION RESPONSE DATE REGARDING REQUEST FOR RELIEF FROM ASME CODE, SECTION XI, SUBSECTIONS IWE AND IWL REQUIREMENTS (TAC NO. MD8509)  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 20, 2008 Mr. Thomas D. Walt, Vice President H. B. Robinson Steam Electric Plant, Unit NO.2 Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina 29550-0790
 
==SUBJECT:==
H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO.2 - CORRECTION TO REQUEST FOR ADDITIONAL INFORMATION RESPONSE DATE REGARDING REQUEST FOR RELIEF FROM ASME CODE, SECTION XI, SUBSECTIONS IWE AND IWL REQUIREMENTS (TAC NO. MD8509)


==Dear Mr. Walt:==
==Dear Mr. Walt:==


On September 4,2008, the Nuclear Regulatory Commission issued a request for additional information (RAI) regarding an application dated April 4, 2008, from Carolina Power and Light Company, the licensee for the H.B. Robinson Steam Electric Plant, Unit NO.2 (HBRSEP). The submittal contained a request for relief from the requirements of the American Society of Mechanical Engineers (ASME) Code, Section XI, Subsections IWE and IWL.
On September 4,2008, the Nuclear Regulatory Commission issued a request for additional information (RAI) regarding an application dated April 4, 2008, from Carolina Power and Light Company, the licensee for the H.B. Robinson Steam Electric Plant, Unit NO.2 (HBRSEP). The submittal contained a request for relief from the requirements of the American Society of Mechanical Engineers (ASME) Code, Section XI, Subsections IWE and IWL.
The proposed relief requests (RRs)
The proposed relief requests (RRs) IWElIWL-RR-01, IWElIWL-RR-02 and IWElIWL-RR-03 pertain to certain requirements of the ASME Code, Section XI, Subsections IWE and IWL, 2001 Edition through 2003 Addenda, with regard to containment inspection examinations for the second 1O-year containment inservice inspection interval at HBRSEP. These RRs relate to visual examination of the insulated containment liner, visual examination of moisture barriers, and successive examinations following a repair, respectively.
IWElIWL-RR-01, IWElIWL-RR-02 and IWElIWL-RR-03 pertain to certain requirements of the ASME Code, Section XI, Subsections IWE and IWL, 2001 Edition through 2003 Addenda, with regard to containment inspection examinations for the second 1O-year containment inservice inspection interval at HBRSEP. These RRs relate to visual examination of the insulated containment liner, visual examination of moisture barriers, and successive examinations following a repair, respectively. Prior to issuance of the RAI, a discussion was held with members of the HBRSEP staff to discuss extending the originally proposed response deadline from October 10, 2008, until January 30, 2009, in order to avoid potential conflicts with the fall 2008 refueling outage. The NRC staff agreed with the proposed extension. However, the original date of October 10, 2008, was inadvertently retained in the document, and subsequently contained in the RAI as issued. Please disregard the date listed in the September 4, 2008, letter and consider January 30, 2009 as the response deadline for the subject RAI. We regret any inconvenience this may have caused. If you have any questions regarding this matter, please call me at (301) 415-3178. Marlayna Vaaler, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegUlation Docket No. 50-261 cc: See next page October 20, 2008 Mr. Thomas D. Walt, Vice President H. B. Robinson Steam Electric Plant, Unit NO.2 Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina 29550-0790 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO.2 -CORRECTION TO REQUEST FOR ADDITIONAL INFORMATION RESPONSE DATE REGARDING REQUEST FOR RELIEF FROM ASME CODE, SECTION XI, SUBSECTIONS IWE AND IWL REQUIREMENTS (TAC NO. MD8509)  
Prior to issuance of the RAI, a discussion was held with members of the HBRSEP staff to discuss extending the originally proposed response deadline from October 10, 2008, until January 30, 2009, in order to avoid potential conflicts with the fall 2008 refueling outage. The NRC staff agreed with the proposed extension. However, the original date of October 10, 2008, was inadvertently retained in the document, and subsequently contained in the RAI as issued.
Please disregard the date listed in the September 4, 2008, letter and consider January 30, 2009 as the response deadline for the subject RAI. We regret any inconvenience this may have caused. If you have any questions regarding this matter, please call me at (301) 415-3178.
Marlayna Vaaler, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegUlation Docket No. 50-261 cc: See next page
 
October 20, 2008 Mr. Thomas D. Walt, Vice President H. B. Robinson Steam Electric Plant, Unit NO.2 Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina 29550-0790
 
==SUBJECT:==
H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO.2 - CORRECTION TO REQUEST FOR ADDITIONAL INFORMATION RESPONSE DATE REGARDING REQUEST FOR RELIEF FROM ASME CODE, SECTION XI, SUBSECTIONS IWE AND IWL REQUIREMENTS (TAC NO. MD8509)


==Dear Mr. Walt:==
==Dear Mr. Walt:==


On September 4,2008, the Nuclear Regulatory Commission issued a request for additional information (RAI) regarding an application dated April 4, 2008, from Carolina Power and Light Company, the licensee for the H.B. Robinson Steam Electric Plant, Unit NO.2 (HBRSEP). The submittal contained a request for relief from the requirements of the American Society of Mechanical Engineers (ASME) Code, Section XI, Subsections IWE and IWL. The proposed relief requests (RRs)
On September 4,2008, the Nuclear Regulatory Commission issued a request for additional information (RAI) regarding an application dated April 4, 2008, from Carolina Power and Light Company, the licensee for the H.B. Robinson Steam Electric Plant, Unit NO.2 (HBRSEP). The submittal contained a request for relief from the requirements of the American Society of Mechanical Engineers (ASME) Code, Section XI, Subsections IWE and IWL.
IWElIWL-RR-01, IWElIWL-RR-02 and IWE/IWL-RR-03 pertain to certain requirements of the ASME Code, Section XI, Subsections IWE and IWL, 2001 Edition through 2003 Addenda, with regard to containment inspection examinations for the second 1O-year containment inservice inspection interval at HBRSEP. These RRs relate to visual examination of the insulated containment liner, visual examination of moisture barriers, and successive examinations following a repair, respectively. Prior to issuance of the RAI, a discussion was held with members of the HBRSEP staff to discuss extending the originally proposed response deadline from October 10, 2008, until January 30, 2009, in order to avoid potential conflicts with the fall 2008 refueling outage. The NRC staff agreed with the proposed extension. However, the original date of October 10, 2008, was inadvertently retained in the document, and subsequently contained in the RAI as issued.
The proposed relief requests (RRs) IWElIWL-RR-01, IWElIWL-RR-02 and IWE/IWL-RR-03 pertain to certain requirements of the ASME Code, Section XI, Subsections IWE and IWL, 2001 Edition through 2003 Addenda, with regard to containment inspection examinations for the second 1O-year containment inservice inspection interval at HBRSEP. These RRs relate to visual examination of the insulated containment liner, visual examination of moisture barriers, and successive examinations following a repair, respectively.
Prior to issuance of the RAI, a discussion was held with members of the HBRSEP staff to discuss extending the originally proposed response deadline from October 10, 2008, until January 30, 2009, in order to avoid potential conflicts with the fall 2008 refueling outage. The NRC staff agreed with the proposed extension. However, the original date of October 10, 2008, was inadvertently retained in the document, and subsequently contained in the RAI as issued.
Please disregard the date listed in the September 4, 2008, letter and consider January 30, 2009 as the response deadline for the subject RAI. We regret any inconvenience this may have caused. If you have any questions regarding this matter, please call me at (301) 415-3178.
Please disregard the date listed in the September 4, 2008, letter and consider January 30, 2009 as the response deadline for the subject RAI. We regret any inconvenience this may have caused. If you have any questions regarding this matter, please call me at (301) 415-3178.
Sincerely, IRA! IVlarlayna Vaaler, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-261 cc: See next page DISTRIBUTION:
Sincerely, IRA!
PUBLIC LPL2-2 RlF RidsNrrPMMVaaler RidsNrrLACSola RidsNrrDorlLpl2-2 RidsOgcRp RidsAcrsAcnw_MailCTR RidsRgn2MailCenter (RMusser) ADAMS Accession Number' ML082740360 NRR-106 OFFICE LPL2-2/PM LPL2-2/LA LPL2-2/BC NAME MVaaler CSoia TBoyce DATE 10/20/08 10/20/08 10/20/08 OFFICIAL RECORD COPY Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No.2 cc: Ms. Margaret A. Force Assistant Attorney General State of North Carolina Post Office Box 629 Raleigh, North Carolina 27602 Mr. Robert P. Gruber Executive Director Public Staff -
IVlarlayna Vaaler, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-261 cc: See next page DISTRIBUTION:
NCUC 4326 Mail Service Center Raleigh, North Carolina 27699-4326 Additional Distribution via ListServ}}
PUBLIC                   LPL2-2 RlF           RidsNrrPMMVaaler               RidsNrrLACSola RidsNrrDorlLpl2-2       RidsOgcRp             RidsAcrsAcnw_MailCTR RidsRgn2MailCenter (RMusser)
ADAMS Accession Number' ML082740360                                                         NRR-106 OFFICE                     LPL2-2/PM               LPL2-2/LA               LPL2-2/BC NAME                       MVaaler                 CSoia                   TBoyce DATE                       10/20/08               10/20/08                 10/20/08 OFFICIAL RECORD COPY
 
Carolina Power & Light Company       H. B. Robinson Steam Electric Plant, Unit No.2 cc:
Ms. Margaret A. Force Assistant Attorney General State of North Carolina Post Office Box 629 Raleigh, North Carolina 27602 Mr. Robert P. Gruber Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, North Carolina 27699-4326 Additional Distribution via ListServ}}

Latest revision as of 13:28, 14 November 2019

Correction to RAI Response Date Regarding Request for Relief from ASME Code,Section XI
ML082740360
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 10/20/2008
From: Vaaler M
Plant Licensing Branch II
To: Walt T
Carolina Power & Light Co
Vaaler, Marlayna, NRO/DNRL 415-3178
References
TAC MD8509
Download: ML082740360 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 20, 2008 Mr. Thomas D. Walt, Vice President H. B. Robinson Steam Electric Plant, Unit NO.2 Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina 29550-0790

SUBJECT:

H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO.2 - CORRECTION TO REQUEST FOR ADDITIONAL INFORMATION RESPONSE DATE REGARDING REQUEST FOR RELIEF FROM ASME CODE, SECTION XI, SUBSECTIONS IWE AND IWL REQUIREMENTS (TAC NO. MD8509)

Dear Mr. Walt:

On September 4,2008, the Nuclear Regulatory Commission issued a request for additional information (RAI) regarding an application dated April 4, 2008, from Carolina Power and Light Company, the licensee for the H.B. Robinson Steam Electric Plant, Unit NO.2 (HBRSEP). The submittal contained a request for relief from the requirements of the American Society of Mechanical Engineers (ASME) Code,Section XI, Subsections IWE and IWL.

The proposed relief requests (RRs) IWElIWL-RR-01, IWElIWL-RR-02 and IWElIWL-RR-03 pertain to certain requirements of the ASME Code,Section XI, Subsections IWE and IWL, 2001 Edition through 2003 Addenda, with regard to containment inspection examinations for the second 1O-year containment inservice inspection interval at HBRSEP. These RRs relate to visual examination of the insulated containment liner, visual examination of moisture barriers, and successive examinations following a repair, respectively.

Prior to issuance of the RAI, a discussion was held with members of the HBRSEP staff to discuss extending the originally proposed response deadline from October 10, 2008, until January 30, 2009, in order to avoid potential conflicts with the fall 2008 refueling outage. The NRC staff agreed with the proposed extension. However, the original date of October 10, 2008, was inadvertently retained in the document, and subsequently contained in the RAI as issued.

Please disregard the date listed in the September 4, 2008, letter and consider January 30, 2009 as the response deadline for the subject RAI. We regret any inconvenience this may have caused. If you have any questions regarding this matter, please call me at (301) 415-3178.

Marlayna Vaaler, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegUlation Docket No. 50-261 cc: See next page

October 20, 2008 Mr. Thomas D. Walt, Vice President H. B. Robinson Steam Electric Plant, Unit NO.2 Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina 29550-0790

SUBJECT:

H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO.2 - CORRECTION TO REQUEST FOR ADDITIONAL INFORMATION RESPONSE DATE REGARDING REQUEST FOR RELIEF FROM ASME CODE, SECTION XI, SUBSECTIONS IWE AND IWL REQUIREMENTS (TAC NO. MD8509)

Dear Mr. Walt:

On September 4,2008, the Nuclear Regulatory Commission issued a request for additional information (RAI) regarding an application dated April 4, 2008, from Carolina Power and Light Company, the licensee for the H.B. Robinson Steam Electric Plant, Unit NO.2 (HBRSEP). The submittal contained a request for relief from the requirements of the American Society of Mechanical Engineers (ASME) Code,Section XI, Subsections IWE and IWL.

The proposed relief requests (RRs) IWElIWL-RR-01, IWElIWL-RR-02 and IWE/IWL-RR-03 pertain to certain requirements of the ASME Code,Section XI, Subsections IWE and IWL, 2001 Edition through 2003 Addenda, with regard to containment inspection examinations for the second 1O-year containment inservice inspection interval at HBRSEP. These RRs relate to visual examination of the insulated containment liner, visual examination of moisture barriers, and successive examinations following a repair, respectively.

Prior to issuance of the RAI, a discussion was held with members of the HBRSEP staff to discuss extending the originally proposed response deadline from October 10, 2008, until January 30, 2009, in order to avoid potential conflicts with the fall 2008 refueling outage. The NRC staff agreed with the proposed extension. However, the original date of October 10, 2008, was inadvertently retained in the document, and subsequently contained in the RAI as issued.

Please disregard the date listed in the September 4, 2008, letter and consider January 30, 2009 as the response deadline for the subject RAI. We regret any inconvenience this may have caused. If you have any questions regarding this matter, please call me at (301) 415-3178.

Sincerely, IRA!

IVlarlayna Vaaler, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-261 cc: See next page DISTRIBUTION:

PUBLIC LPL2-2 RlF RidsNrrPMMVaaler RidsNrrLACSola RidsNrrDorlLpl2-2 RidsOgcRp RidsAcrsAcnw_MailCTR RidsRgn2MailCenter (RMusser)

ADAMS Accession Number' ML082740360 NRR-106 OFFICE LPL2-2/PM LPL2-2/LA LPL2-2/BC NAME MVaaler CSoia TBoyce DATE 10/20/08 10/20/08 10/20/08 OFFICIAL RECORD COPY

Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No.2 cc:

Ms. Margaret A. Force Assistant Attorney General State of North Carolina Post Office Box 629 Raleigh, North Carolina 27602 Mr. Robert P. Gruber Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, North Carolina 27699-4326 Additional Distribution via ListServ