CP-200900355, CP-2009-03 - Final Exam Submittal Letter: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Rafael Flores Luminant Power Senior VIC. Preside nt P O B-J X 1002 & Chie f Nuclear Officer 6322 North FM 56  
{{#Wiki_filter:Rafael Flores                           Luminant Power Senior VIC. Preside nt                 P O B-J X 1002
'afiwl.llores@ lurlllni1nl tom Glen Rose TX 76043 Luminant T 254 89 7 55 c ,0 C 8175 <}0403 F 25 ; 3;-66S;2 c Ref: 10 CFR 55.40 TXX-09041 March 4, 2009 u.s. Nuclear Regulatory Regional Admini strator, Region 612 East Lamar Boulevard, Suite Arlington, Texas ATTN: Mr. T.
                                                                & Chie f Nuclear Officer               6322 North FM 56
COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445  
                                                                'afiwl.llores@ lurlllni1nl tom         Glen Rose TX 76043 Luminant                                                                                                 T 254 897 55 c,0 C 8175 <} 0403 F 25 ; 3 66S;2 c ;-
& 50-446 TRANSMITIAL OF LICENSED OPERATOR EXAMINATION MATERIALS REFERENCE1) NRC letter from R yan Lantz to M. R. Blevins dated December 8,2008 2) NUREG-I021, Revision 9, Examiner Standard ES-201  
CP-200900355                                                                                Ref: 10 CFR 55.40 TXX-09041 March 4, 2009 u.s. Nuclear Regulatory Commission Regional Administrator, Region IV 612 East Lamar Boulevard, Suite 400 Arlington, Texas 76011-8064 ATTN : Mr. T. McKernon
 
==SUBJECT:==
COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445 & 50-446 TRANSMITIAL OF LICENSED OPERATOR EXAMINATION MATERIALS
 
==REFERENCE:==
: 1) NRC letter from Ryan Lantz to M. R. Blevins dated December 8,2008
: 2) NUREG-I021, Revision 9, Examiner Standard ES-201


==Dear Mr. McKernon:==
==Dear Mr. McKernon:==
Enclosed please find the written and operational examinations for the initial operator licensing e xaminations scheduled for the week of March 30, 2009 at Comanche Peak Nuclear Power Plant (CPNPP) as reque sted in Reference
 
: 1. These examinations were developed based on the guidance in Reference 2. The enclo sures with this letter contain sensitive information which should be withh eld from public disclosure until after the examinations are complete.
Enclosed please find the written and operational examinations for the initial operator licensing examinations sched u led for the week of March 30, 2009 at Comanche Peak Nuclear Power Plant (CPNPP) as requested in Reference 1. These examinations were developed based on the guidance in Reference 2. The enclosures with this letter contain sensitive information which should be withheld from public disclosure until after the examinations are complete.
Signed reactor operator and senior operator license applications certifying the completion of all required training will be submitted by March 13, 2009. If there are any question s concerning this submittal, contact Mr. Garry W. Struble at (254) 897-6628 or Mr. Eldon Thomas at (254) 897-5276.
Signed reactor operator and senior operator license applications certifying the completion of all required training will be submitted by March 13, 2009.
A member of the STARS (Strateg ic Teaming and R es ource Sharing) AlliancCallaway ' Comanche Peak
If there are any questions concerning this submittal, contact Mr. Garry W. Struble at (254) 897-6628 or Mr . Eldon Thomas at (254) 897-5276.
* Diablo Cany on
A member of the STARS (Strategic Teaming and Resource Sharing) Allianc e Callaway ' Com anch e Peak
* Palo Verde* SanOn ofre
* Diablo Canyon
* South Texas Project* Wolf U.S. Nuclear Regulatory Commi ssion T XX-09041 Page 2 JRW Enclosures c -B.S. Mallett , Region IV clo R. Lantz, Region IV clo B. Singal, NRR clo Resident Inspectors, CPSES clo Luminant Generation Company Rafael Flores By    , Director, Oversight
* Palo Verde* San On ofre
& Regulatory Affairs}}
* South Texas Project* Wolf Creek
 
U.S. Nuclear Regulatory Commi ssion TXX-09041 Page 2 Sincerely, Luminant Generation Company LLC Rafael Flores By      1fd1fm~
                                                      /~. Madden
                                                    ,    Director, Oversight & Regulatory Affairs JRW Enclosures c-         B. S. Mallett, Region IV clo R. Lantz, Region IV clo B. Singal, NRR clo Resident Inspectors, CPSES clo}}

Latest revision as of 08:06, 14 November 2019

CP-2009-03 - Final Exam Submittal Letter
ML091050283
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/04/2009
From: Flores R, Madden F
Luminant Generation Co, Luminant Power
To: Mckernon T
NRC Region 4
References
50-445/09-301, 50-446/09-301, CP-200900355, TXX-09041
Download: ML091050283 (2)


Text

Rafael Flores Luminant Power Senior VIC. Preside nt P O B-J X 1002

& Chie f Nuclear Officer 6322 North FM 56

'afiwl.llores@ lurlllni1nl tom Glen Rose TX 76043 Luminant T 254 897 55 c,0 C 8175 <} 0403 F 25 ; 3 66S;2 c ;-

CP-200900355 Ref: 10 CFR 55.40 TXX-09041 March 4, 2009 u.s. Nuclear Regulatory Commission Regional Administrator, Region IV 612 East Lamar Boulevard, Suite 400 Arlington, Texas 76011-8064 ATTN : Mr. T. McKernon

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445 & 50-446 TRANSMITIAL OF LICENSED OPERATOR EXAMINATION MATERIALS

REFERENCE:

1) NRC letter from Ryan Lantz to M. R. Blevins dated December 8,2008
2) NUREG-I021, Revision 9, Examiner Standard ES-201

Dear Mr. McKernon:

Enclosed please find the written and operational examinations for the initial operator licensing examinations sched u led for the week of March 30, 2009 at Comanche Peak Nuclear Power Plant (CPNPP) as requested in Reference 1. These examinations were developed based on the guidance in Reference 2. The enclosures with this letter contain sensitive information which should be withheld from public disclosure until after the examinations are complete.

Signed reactor operator and senior operator license applications certifying the completion of all required training will be submitted by March 13, 2009.

If there are any questions concerning this submittal, contact Mr. Garry W. Struble at (254) 897-6628 or Mr . Eldon Thomas at (254) 897-5276.

A member of the STARS (Strategic Teaming and Resource Sharing) Allianc e Callaway ' Com anch e Peak

  • Diablo Canyon
  • Palo Verde* San On ofre
  • South Texas Project* Wolf Creek

U.S. Nuclear Regulatory Commi ssion TXX-09041 Page 2 Sincerely, Luminant Generation Company LLC Rafael Flores By 1fd1fm~

/~. Madden

, Director, Oversight & Regulatory Affairs JRW Enclosures c- B. S. Mallett, Region IV clo R. Lantz, Region IV clo B. Singal, NRR clo Resident Inspectors, CPSES clo