| issue date = 05/05/2010
| issue date = 05/05/2010
| title = Letter Enrico Fermi Atomic Power Plant Unit 1- Exemption from Certain Low-Level Waste Shipment Tracking Requirements of 10 CFR Part 20, Appendix G, Section Iii.E (Tac No. J00334)
| title = Letter Enrico Fermi Atomic Power Plant Unit 1- Exemption from Certain Low-Level Waste Shipment Tracking Requirements of 10 CFR Part 20, Appendix G, Section Iii.E (Tac No. J00334)
| author name = Smith T B
| author name = Smith T
| author affiliation = NRC/FSME/DWMEP/DURLD/RDB
| author affiliation = NRC/FSME/DWMEP/DURLD/RDB
| addressee name = Plona J H
| addressee name = Plona J
| addressee affiliation = DTE Energy
| addressee affiliation = DTE Energy
| docket = 05000016
| docket = 05000016
Line 14: Line 14:
| document type = Letter
| document type = Letter
| page count = 3
| page count = 3
| project =
| stage = Approval
}}
}}


=Text=
=Text=
{{#Wiki_filter:May 5, 2010 Mr. Joseph H. Plona Site Vice President, Nuclear Generation DTE Energy 6400 N. Dixie Highway, Newport, MI 48166  
{{#Wiki_filter:May 5, 2010 Mr. Joseph H. Plona Site Vice President, Nuclear Generation DTE Energy 6400 N. Dixie Highway, Newport, MI 48166


==SUBJECT:==
==SUBJECT:==
ENRICO FERMI ATOMIC POWER PLANT UNIT 1 - EXEMPTION FROM CERTAIN LOW-LEVEL WASTE SHIPMENT TRACKING REQUIREMENTS OF 10 CFR PART 20, APPENDIX G, SECTION III.E (TAC NO. J00334)  
ENRICO FERMI ATOMIC POWER PLANT UNIT 1 - EXEMPTION FROM CERTAIN LOW-LEVEL WASTE SHIPMENT TRACKING REQUIREMENTS OF 10 CFR PART 20, APPENDIX G, SECTION III.E (TAC NO. J00334)


==Dear Mr. Plona:==
==Dear Mr. Plona:==


The Commission has granted Enrico Fermi Atomic Power Plant, Unit 1, the enclosed exemption from certain requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 20, Appendix G, Section III.E, for tracking shipments of low-level radioactive wastes that are not acknowledged by the recipient within 20 days after transfer to the shipper. The exemption extends the receipt acknowledgment 20-day time period to 35 days before DTE Energy will have to investigate and report on the status of a low-level radioactive waste shipment.  
The Commission has granted Enrico Fermi Atomic Power Plant, Unit 1, the enclosed exemption from certain requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 20, Appendix G, Section III.E, for tracking shipments of low-level radioactive wastes that are not acknowledged by the recipient within 20 days after transfer to the shipper. The exemption extends the receipt acknowledgment 20-day time period to 35 days before DTE Energy will have to investigate and report on the status of a low-level radioactive waste shipment.
 
A copy of the exemption is enclosed and has been forwarded to the Office of the Federal Register for publication.
A copy of the exemption is enclosed and has been forwarded to the Office of the Federal Register for publication.
Sincerely,  
Sincerely,
  /RA/ Theodore B. Smith, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery   Licensing Directorate Division of Waste Management   and Environmental Protection Office of Federal and State Materials   and Environmental Management Programs Docket No.: 50-16  
                                              /RA/
Theodore B. Smith, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No.: 50-16


==Enclosure:==
==Enclosure:==
Exemption cc w/enclosure:
Exemption cc w/enclosure:
Fermi-1 Service List Mr. Joseph H. Plona Site Vice President, Nuclear Generation DTE Energy 6400 N. Dixie Highway, Newport, MI 48166  
Fermi-1 Service List
 
Mr. Joseph H. Plona Site Vice President, Nuclear Generation DTE Energy 6400 N. Dixie Highway, Newport, MI 48166


==SUBJECT:==
==SUBJECT:==
ENRICO FERMI ATOMIC POWER PLANT UNIT 1 - EXEMPTION FROM CERTAIN LOW-LEVEL WASTE SHIPMENT TRACKING REQUIREMENTS OF 10 CFR PART 20, APPENDIX G, SECTION III.E (TAC NO. J00334)  
ENRICO FERMI ATOMIC POWER PLANT UNIT 1 - EXEMPTION FROM CERTAIN LOW-LEVEL WASTE SHIPMENT TRACKING REQUIREMENTS OF 10 CFR PART 20, APPENDIX G, SECTION III.E (TAC NO. J00334)


==Dear Mr. Plona:==
==Dear Mr. Plona:==
Line 41: Line 45:
The Commission has granted Enrico Fermi Atomic Power Plant, Unit 1, the enclosed exemption from certain requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 20, Appendix G, Section III.E, for tracking shipments of low-level radioactive wastes that are not acknowledged by the recipient within 20 days after transfer to the shipper. The exemption extends the receipt acknowledgment 20-day time period to 35 days before DTE Energy will have to investigate and report on the status of a low-level radioactive waste shipment.
The Commission has granted Enrico Fermi Atomic Power Plant, Unit 1, the enclosed exemption from certain requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 20, Appendix G, Section III.E, for tracking shipments of low-level radioactive wastes that are not acknowledged by the recipient within 20 days after transfer to the shipper. The exemption extends the receipt acknowledgment 20-day time period to 35 days before DTE Energy will have to investigate and report on the status of a low-level radioactive waste shipment.
A copy of the exemption is enclosed and has been forwarded to the Office of the Federal Register for publication.
A copy of the exemption is enclosed and has been forwarded to the Office of the Federal Register for publication.
Sincerely, /RA/ Theodore B. Smith, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery   Licensing Directorate Division of Waste Management   and Environmental Protection Office of Federal and State Materials and   Environmental Management Programs Docket No. 50-16  
Sincerely,
                                                /RA/
Theodore B. Smith, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No. 50-16


==Enclosure:==
==Enclosure:==
Exemption  
Exemption cc w/enclosure:
 
Fermi-1 Service List DISTRIBUTION:
cc w/enclosure: Fermi-1 Service List DISTRIBUTION
DCD r/f       OGC ACRS/ACNW                 Christine Lipa ML100690223 OFFICE     DWMEP:PM         DWMEP:LA       DWMEP:BC           OGC         DWMEP:DD       DWMEP NAME         TSmith         CHolston       BWatson           JHull       KMcConnell     TSmith DATE         3/10/10         3/16/10         3/23 /10       3/24/10       4/22/10     5/5/10 OFFICIAL RECORD COPY
: DCD r/f OGC ACRS/ACNW Christine Lipa ML100690223 OFFICE DWMEP:PM DWMEP:LA DWMEP:BC OGC DWMEP:DD DWMEP  
 
NAME TSmith CHolston BWatson JHull KMcConnell TSmith  
 
DATE 3/10/10 3/16/10 3/23 /10 3/24/10 4/22/10 5/5/10 OFFICIAL RECORD COPY Enrico Fermi Atomic Power Plant, Unit 1 Service List cc:
Ms. Lynne Goodman Manager - Fermi1 Detroit Edison Company 6400 North Dixie Highway Newport, MI  48166 Mr. Richard Whale Michigan Public Service Commission 6545 Mercantile Way PO Box 30221 Lansing, MI  48909 John Flynn Esq. Senior Attorney Detroit Edison Company 2000 Second Avenue Detroit, MI  48226 Mr. Thor Strong    Radiological Protection Section Michigan Department of Environmental Quality PO Box 30630 Lansing, MI  48909 - 8130 U.S. Nuclear Regulatory Commission Resident Inspector's Office 6450 W. Dixie Highway Newport, MI 48166 Monroe County Office of Civil Preparedness 963 South Raisinville Monroe, MI  48161 Flint Watt, P.E., Chief Bureau of Environmental and    Occupational Health Michigan Department of Public Health 3423 N Logan Street PO Box 30195 Lansing, MI  48909


Christine Lipa, Chief Decommissioning Branch Division of Nuclear Material Safety U.S. NRC/Region}}
Enrico Fermi Atomic Power Plant, Unit 1 Service List cc:
Ms. Lynne Goodman Manager - Fermi1 Detroit Edison Company 6400 North Dixie Highway Newport, MI 48166 Mr. Richard Whale Michigan Public Service Commission 6545 Mercantile Way PO Box 30221 Lansing, MI 48909 John Flynn Esq.
Senior Attorney Detroit Edison Company 2000 Second Avenue Detroit, MI 48226 Mr. Thor Strong Radiological Protection Section Michigan Department of Environmental Quality PO Box 30630 Lansing, MI 48909 - 8130 U.S. Nuclear Regulatory Commission Resident Inspectors Office 6450 W. Dixie Highway Newport, MI 48166 Monroe County Office of Civil Preparedness 963 South Raisinville Monroe, MI 48161 Flint Watt, P.E., Chief Bureau of Environmental and Occupational Health Michigan Department of Public Health 3423 N Logan Street PO Box 30195 Lansing, MI 48909 Christine Lipa, Chief Decommissioning Branch Division of Nuclear Material Safety U.S. NRC/Region}}

Latest revision as of 22:03, 13 November 2019

Letter Enrico Fermi Atomic Power Plant Unit 1- Exemption from Certain Low-Level Waste Shipment Tracking Requirements of 10 CFR Part 20, Appendix G, Section Iii.E (Tac No. J00334)
ML100690224
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 05/05/2010
From: Tanya Smith
NRC/FSME/DWMEP/DURLD/RDB
To: Plona J
DTE Energy
Shared Package
ML100690223 List:
References
TAC J00334
Download: ML100690224 (3)


Text

May 5, 2010 Mr. Joseph H. Plona Site Vice President, Nuclear Generation DTE Energy 6400 N. Dixie Highway, Newport, MI 48166

SUBJECT:

ENRICO FERMI ATOMIC POWER PLANT UNIT 1 - EXEMPTION FROM CERTAIN LOW-LEVEL WASTE SHIPMENT TRACKING REQUIREMENTS OF 10 CFR PART 20, APPENDIX G, SECTION III.E (TAC NO. J00334)

Dear Mr. Plona:

The Commission has granted Enrico Fermi Atomic Power Plant, Unit 1, the enclosed exemption from certain requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 20, Appendix G,Section III.E, for tracking shipments of low-level radioactive wastes that are not acknowledged by the recipient within 20 days after transfer to the shipper. The exemption extends the receipt acknowledgment 20-day time period to 35 days before DTE Energy will have to investigate and report on the status of a low-level radioactive waste shipment.

A copy of the exemption is enclosed and has been forwarded to the Office of the Federal Register for publication.

Sincerely,

/RA/

Theodore B. Smith, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No.: 50-16

Enclosure:

Exemption cc w/enclosure:

Fermi-1 Service List

Mr. Joseph H. Plona Site Vice President, Nuclear Generation DTE Energy 6400 N. Dixie Highway, Newport, MI 48166

SUBJECT:

ENRICO FERMI ATOMIC POWER PLANT UNIT 1 - EXEMPTION FROM CERTAIN LOW-LEVEL WASTE SHIPMENT TRACKING REQUIREMENTS OF 10 CFR PART 20, APPENDIX G, SECTION III.E (TAC NO. J00334)

Dear Mr. Plona:

The Commission has granted Enrico Fermi Atomic Power Plant, Unit 1, the enclosed exemption from certain requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 20, Appendix G,Section III.E, for tracking shipments of low-level radioactive wastes that are not acknowledged by the recipient within 20 days after transfer to the shipper. The exemption extends the receipt acknowledgment 20-day time period to 35 days before DTE Energy will have to investigate and report on the status of a low-level radioactive waste shipment.

A copy of the exemption is enclosed and has been forwarded to the Office of the Federal Register for publication.

Sincerely,

/RA/

Theodore B. Smith, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No. 50-16

Enclosure:

Exemption cc w/enclosure:

Fermi-1 Service List DISTRIBUTION:

DCD r/f OGC ACRS/ACNW Christine Lipa ML100690223 OFFICE DWMEP:PM DWMEP:LA DWMEP:BC OGC DWMEP:DD DWMEP NAME TSmith CHolston BWatson JHull KMcConnell TSmith DATE 3/10/10 3/16/10 3/23 /10 3/24/10 4/22/10 5/5/10 OFFICIAL RECORD COPY

Enrico Fermi Atomic Power Plant, Unit 1 Service List cc:

Ms. Lynne Goodman Manager - Fermi1 Detroit Edison Company 6400 North Dixie Highway Newport, MI 48166 Mr. Richard Whale Michigan Public Service Commission 6545 Mercantile Way PO Box 30221 Lansing, MI 48909 John Flynn Esq.

Senior Attorney Detroit Edison Company 2000 Second Avenue Detroit, MI 48226 Mr. Thor Strong Radiological Protection Section Michigan Department of Environmental Quality PO Box 30630 Lansing, MI 48909 - 8130 U.S. Nuclear Regulatory Commission Resident Inspectors Office 6450 W. Dixie Highway Newport, MI 48166 Monroe County Office of Civil Preparedness 963 South Raisinville Monroe, MI 48161 Flint Watt, P.E., Chief Bureau of Environmental and Occupational Health Michigan Department of Public Health 3423 N Logan Street PO Box 30195 Lansing, MI 48909 Christine Lipa, Chief Decommissioning Branch Division of Nuclear Material Safety U.S. NRC/Region