ML101670178: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 06/08/2010
| issue date = 06/08/2010
| title = G20100389/LTR-10-0270/EDATS: SECY-2010-0313 - Ltr, Senator John F. Kerry Update on Status of the License Renewal Application for the Pilgrim Nuclear Power Plant
| title = G20100389/LTR-10-0270/EDATS: SECY-2010-0313 - Ltr, Senator John F. Kerry Update on Status of the License Renewal Application for the Pilgrim Nuclear Power Plant
| author name = Kerry J F
| author name = Kerry J
| author affiliation = US Congress, US SEN (Senate)
| author affiliation = US Congress, US SEN (Senate)
| addressee name = Jaczko G B
| addressee name = Jaczko G
| addressee affiliation = NRC/Chairman
| addressee affiliation = NRC/Chairman
| docket = 05000293
| docket = 05000293
| license number =  
| license number =  
| contact person = rihm R S, 415-1717
| contact person = rihm R, 415-1717
| case reference number = CORR-10-0060, G20100389, LTR-10-0270, SECY-2010-0313
| case reference number = CORR-10-0060, G20100389, LTR-10-0270, SECY-2010-0313
| package number = ML101790351
| package number = ML101790351
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:EDO Principal Correspondence Control FROM: DUE: 07/02/10 EDO CONTROL: G20100389 DOC DT: 06/08/10 FINAL REPLY: Senator John F. Kerry TO: Chairman Jaczko FOR SIGNATURE OF :** PRI **CRC NO: 10-0270 Chairman Jaczko DESC: ROUTING: Update on Status of the License Renewal Application for the Pilgrim Nuclear Power Plant (EDATS: SECY-2010-0313)
{{#Wiki_filter:EDO Principal Correspondence Control FROM:                 DUE: 07/02/10               EDO CONTROL:   G20100389 DOC DT: 06/08/10 FINAL REPLY:
DATE: 06/15/10 Borchardt Weber Virgilio Ash Mamish OGC/GC Leeds, NRR Collins, RI Burns, OGC Schmidt, OCA ASSIGNED TO: EDO CONTACT: Rihm SPECIAL INSTRUCTIONS OR REMARKS: Please prepare response in accordance with OEDO Notice 2009-0441-02 (ML093291079).
Senator John F. Kerry TO:
NRR and Region I to provide input to Roger Rihm, OEDO, if required.
Chairman Jaczko FOR SIGNATURE OF :               ** PRI **             CRC NO: 10-0270 Chairman Jaczko DESC:                                                     ROUTING:
Roger Rihm will coordinate response with OGC and OGC.'-R ýq I ale- 11 1ý1ý E clý -6 ý -?&g/bjS.' 56EýCY-OI EDATS Number: SECY-2010-0313 Source: SECY Genera In f'o n Assigned To: OEDO OEDO Due Date: 7/2/2010 Other Assignees:
Update on Status of the License Renewal                   Borchardt Application for the Pilgrim Nuclear Power                 Weber Plant (EDATS: SECY-2010-0313)                           Virgilio Ash Mamish OGC/GC DATE: 06/15/10                                             Leeds, NRR Collins, RI ASSIGNED TO:            CONTACT:                            Burns, OGC Schmidt, OCA EDO             Rihm SPECIAL INSTRUCTIONS   OR REMARKS:
SECY Due Date: 7/7/20 10 11:00 PM  
Please prepare response in   accordance with OEDO Notice 2009-0441-02     (ML093291079). NRR and Region I to provide input to Roger Rihm, OEDO, if required. Roger Rihm will coordinate response with OGC and OGC.
'-R ýq Iale-111ý1ý E clý -6 ý-?                                     &g/bjS.' 56EýCY-OI
 
EDATS Number: SECY-2010-0313                                                                     Source: SECY Genera In       f'o n Assigned To: OEDO                                                                       OEDO Due Date: 7/2/2010 Other Assignees:                                                               SECY Due Date: 7/7/20 10 11:00 PM


==Subject:==
==Subject:==
Update on Status of the License Renewal Application for the Pilgrim Nuclear Power Plant
Update on Status of the License Renewal Application for the Pilgrim Nuclear Power Plant


== Description:==
==
Description:==


CC Routing: NRR; Regionl; OGC; OCA ADAMS Accession Numbers -Incoming:
CC Routing: NRR; Regionl; OGC; OCA ADAMS Accession Numbers - Incoming: NONE                                                 Response/Package: NONE OhrInforatio Cross Reference Number: G20100389, LTR- 10-0270                                                   Staff Initiated: NO Related Task:                                                                                    Recurring Item:   NO File Routing: EDATS                                                                    Agency Lesson Learned:     NO OEDO Monthly Report Item:       NO Prcs     Informaion Action Type: Letter                                                                               Priority: Medium Sensitivity: None Signature Level: Chairman Jaczko                                                                       Urgency: N( )
NONE Response/Package:
Approval Level: No Approval Required OEDO Concurrence: YES OCM Concurrence: NO OCA Concurrence: NO Special Instructions: Please prepare response in accordance with OEDO Notice 2009-0441-02 (ML093291079). NRR and Region I to provide input to Roger Rihm, OEDO, if required. Roger Rihm will coordinate response with OGC and OCA.
NONE OhrInforatio Cross Reference Number: G20100389, LTR- 10-0270 Related Task: File Routing: EDATS Staff Initiated:
Docmen Infrmaio               I                                                                             I Originator Name: Senator John F. Kerry                                                 Date of Incoming: 6/8/2010 Originating Organization: Congress                                    Document Received by SECY Date: 6/15/2010 Addressee: Chairman Jaczko                                          Date Response Requested by Originator: NONE Incoming Task Received: Letter Page 1 of 1
NO Recurring Item: NO Agency Lesson Learned: NO OEDO Monthly Report Item: NO Prcs Informaion Action Type: Letter Priority:
 
Medium Sensitivity:
OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed:Jun 15, 2010 12:12 PAPER NUMBER:     LTR- 10-0270                                 LOGGING DATE:         06/14/2010 ACTION OFFICE:
None Signature Level: Chairman Jaczko Urgency: N(Approval Level: No Approval Required OEDO Concurrence:
AUTHOR:           SEN John Kerry AFFILIATION:     CONG ADDRESSEE:       Gregory Jaczko
YES OCM Concurrence:
NO OCA Concurrence:
NO Special Instructions:
Please prepare response in accordance with OEDO Notice 2009-0441-02 (ML093291079).
NRR and Region I to provide input to Roger Rihm, OEDO, if required.
Roger Rihm will coordinate response with OGC and OCA.)Docmen Infrmaio I I Originator Name: Senator John F. Kerry Originating Organization:
Congress Addressee:
Chairman Jaczko Incoming Task Received:
Letter Date of Incoming:
6/8/2010 Document Received by SECY Date: 6/15/2010 Date Response Requested by Originator:
NONE Page 1 of 1 OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed: Jun 15, 2010 12:12 PAPER NUMBER: ACTION OFFICE: LTR- 10-0270 LOGGING DATE: 06/14/2010 AUTHOR: AFFILIATION:
ADDRESSEE:


==SUBJECT:==
==SUBJECT:==
ACTION: DISTRIBUTION:
Request an update on the status of the license renewal application for the Pilgrim Nuclear Power Plant ACTION:          Signature of Chairman DISTRIBUTION:    RF, OCA to Ack LETTER DATE:      06/08/2010 ACKNOWLEDGED      No SPECIAL HANDLING: Commission Correspondence NOTES:
LETTER DATE: ACKNOWLEDGED SPECIAL HANDLING: SEN John Kerry CONG Gregory Jaczko Request an update on the status of the license renewal application for the Pilgrim Nuclear Power Plant Signature of Chairman RF, OCA to Ack 06/08/2010 No Commission Correspondence NOTES: FILE LOCATION: ADAMS DATE DUE: 07/07/2010 DATE SIGNED: EDO --
FILE LOCATION:   ADAMS DATE DUE:         07/07/2010                         DATE SIGNED:
JOHN kERRY COMMITTEES:
EDO   -- G201003*
MASSACHUSETTS COMMERCE, SCIENCE, AND TRANSPORTATION
 
-FINANCE LtfFOREIGN RELATIONS WASHINGTON, DC020510-2102 , SMALL BUSINESS June 8, 2010 Gregory B-. Jaczko Chairman United States Nuclear Regulatory Commission, Mail Stop 0-1 Washington, DC 20555  
JOHN kERRY                                                                                                 COMMITTEES:
MASSACHUSETTS                                                                                           COMMERCE, SCIENCE, AND TRANSPORTATION
                                                                                -                           FINANCE LtfFOREIGN           RELATIONS WASHINGTON, DC020510-2102     ,                         SMALL BUSINESS June 8, 2010 Gregory B-. Jaczko Chairman United States Nuclear Regulatory Commission, Mail Stop 0-1 Washington, DC 20555


==Dear Chairman Jaczko:==
==Dear Chairman Jaczko:==
I am writing to request an update on the status of the license renewal application for the Pilgrim Nuclear Power Plant located in Plymouth, Massachusetts, which is currently pending before the Commission.
I am writing to request an update on the status of the license renewal application for the Pilgrim Nuclear Power Plant located in Plymouth, Massachusetts, which is currently pending before the Commission.
It is my understanding that this application was submitted in January 2006, making this one of the longer reviews undertaken by the Commission:-I greatly appreciate the thorough, comprehensive efforts by the Commission to ensue& the public's health and safety is protected and commend your efforts to conduct Commission business in a transparent manner.However, a number of stakeholders are anxious to know when a final decision might be reached on the two outstanding issues concerning this relicensing application.
It is my understanding that this application was submitted in January 2006, making this one of the longer reviews undertaken by the Commission:-I greatly appreciate the thorough, comprehensive efforts by the Commission to ensue&th*t the public's health and safety is protected and commend your efforts to conduct Commission business in a transparent manner.
I respectfully request that you provide me and my staff with an update on the status of the application and a realistic timeframe for completion of the review of this pending application.
However, a number of stakeholders are anxious to know when a final decision might be reached on the two outstanding issues concerning this relicensing application.
If you have any questions or concerns, please do not hesitate to contact Karena Neubauer on my staff at 202-224-2742.
I respectfully request that you provide me and my staff with an update on the status of the application and a realistic timeframe for completion of the review of this pending application. If you have any questions or concerns, please do not hesitate to contact Karena Neubauer on my staff at 202-224-2742.
Sincerely, 1:7 John F. Kerry PRINTED ON RECYCLED PAPER ianited 5tatts .tnate WASHINGTON, DC 20510-2102 OFFICIAL BUSINESS U/.S Gregory B. Jaczko Chairman United States Nuclear Regulatory Commission Mail Stop 0- 1 Washington, DC 20555 I 1 1}}
1:7 Sincerely, John F. Kerry PRINTED ON RECYCLED PAPER
 
ianited 5tatts .tnate WASHINGTON, DC 20510-2102 OFFICIAL BUSINESS U/.S Gregory B. Jaczko Chairman United States Nuclear Regulatory Commission Mail Stop 0- 1 Washington, DC 20555 I11}}

Latest revision as of 18:01, 13 November 2019

G20100389/LTR-10-0270/EDATS: SECY-2010-0313 - Ltr, Senator John F. Kerry Update on Status of the License Renewal Application for the Pilgrim Nuclear Power Plant
ML101670178
Person / Time
Site: Pilgrim
Issue date: 06/08/2010
From: Kerry J
US Congress, US SEN (Senate)
To: Jaczko G
NRC/Chairman
rihm R, 415-1717
Shared Package
ML101790351 List:
References
CORR-10-0060, G20100389, LTR-10-0270, SECY-2010-0313
Download: ML101670178 (5)


Text

EDO Principal Correspondence Control FROM: DUE: 07/02/10 EDO CONTROL: G20100389 DOC DT: 06/08/10 FINAL REPLY:

Senator John F. Kerry TO:

Chairman Jaczko FOR SIGNATURE OF : ** PRI ** CRC NO: 10-0270 Chairman Jaczko DESC: ROUTING:

Update on Status of the License Renewal Borchardt Application for the Pilgrim Nuclear Power Weber Plant (EDATS: SECY-2010-0313) Virgilio Ash Mamish OGC/GC DATE: 06/15/10 Leeds, NRR Collins, RI ASSIGNED TO: CONTACT: Burns, OGC Schmidt, OCA EDO Rihm SPECIAL INSTRUCTIONS OR REMARKS:

Please prepare response in accordance with OEDO Notice 2009-0441-02 (ML093291079). NRR and Region I to provide input to Roger Rihm, OEDO, if required. Roger Rihm will coordinate response with OGC and OGC.

'-R ýq Iale-111ý1ý E clý -6 ý-? &g/bjS.' 56EýCY-OI

EDATS Number: SECY-2010-0313 Source: SECY Genera In f'o n Assigned To: OEDO OEDO Due Date: 7/2/2010 Other Assignees: SECY Due Date: 7/7/20 10 11:00 PM

Subject:

Update on Status of the License Renewal Application for the Pilgrim Nuclear Power Plant

==

Description:==

CC Routing: NRR; Regionl; OGC; OCA ADAMS Accession Numbers - Incoming: NONE Response/Package: NONE OhrInforatio Cross Reference Number: G20100389, LTR- 10-0270 Staff Initiated: NO Related Task: Recurring Item: NO File Routing: EDATS Agency Lesson Learned: NO OEDO Monthly Report Item: NO Prcs Informaion Action Type: Letter Priority: Medium Sensitivity: None Signature Level: Chairman Jaczko Urgency: N( )

Approval Level: No Approval Required OEDO Concurrence: YES OCM Concurrence: NO OCA Concurrence: NO Special Instructions: Please prepare response in accordance with OEDO Notice 2009-0441-02 (ML093291079). NRR and Region I to provide input to Roger Rihm, OEDO, if required. Roger Rihm will coordinate response with OGC and OCA.

Docmen Infrmaio I I Originator Name: Senator John F. Kerry Date of Incoming: 6/8/2010 Originating Organization: Congress Document Received by SECY Date: 6/15/2010 Addressee: Chairman Jaczko Date Response Requested by Originator: NONE Incoming Task Received: Letter Page 1 of 1

OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed:Jun 15, 2010 12:12 PAPER NUMBER: LTR- 10-0270 LOGGING DATE: 06/14/2010 ACTION OFFICE:

AUTHOR: SEN John Kerry AFFILIATION: CONG ADDRESSEE: Gregory Jaczko

SUBJECT:

Request an update on the status of the license renewal application for the Pilgrim Nuclear Power Plant ACTION: Signature of Chairman DISTRIBUTION: RF, OCA to Ack LETTER DATE: 06/08/2010 ACKNOWLEDGED No SPECIAL HANDLING: Commission Correspondence NOTES:

FILE LOCATION: ADAMS DATE DUE: 07/07/2010 DATE SIGNED:

EDO -- G201003*

JOHN kERRY COMMITTEES:

MASSACHUSETTS COMMERCE, SCIENCE, AND TRANSPORTATION

- FINANCE LtfFOREIGN RELATIONS WASHINGTON, DC020510-2102 , SMALL BUSINESS June 8, 2010 Gregory B-. Jaczko Chairman United States Nuclear Regulatory Commission, Mail Stop 0-1 Washington, DC 20555

Dear Chairman Jaczko:

I am writing to request an update on the status of the license renewal application for the Pilgrim Nuclear Power Plant located in Plymouth, Massachusetts, which is currently pending before the Commission.

It is my understanding that this application was submitted in January 2006, making this one of the longer reviews undertaken by the Commission:-I greatly appreciate the thorough, comprehensive efforts by the Commission to ensue&th*t the public's health and safety is protected and commend your efforts to conduct Commission business in a transparent manner.

However, a number of stakeholders are anxious to know when a final decision might be reached on the two outstanding issues concerning this relicensing application.

I respectfully request that you provide me and my staff with an update on the status of the application and a realistic timeframe for completion of the review of this pending application. If you have any questions or concerns, please do not hesitate to contact Karena Neubauer on my staff at 202-224-2742.

1:7 Sincerely, John F. Kerry PRINTED ON RECYCLED PAPER

ianited 5tatts .tnate WASHINGTON, DC 20510-2102 OFFICIAL BUSINESS U/.S Gregory B. Jaczko Chairman United States Nuclear Regulatory Commission Mail Stop 0- 1 Washington, DC 20555 I11