{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 November 3, 2010 Mr. Regis T. Repko Vice President McGuire Nuclear Station Duke Energy Carolinas, LLC 12700 Hagers Ferry Road Huntersville.
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2010 Mr. Regis T. Repko Vice President McGuire Nuclear Station Duke Energy Carolinas, LLC 12700 Hagers Ferry Road Huntersville. NC 28078
NC 28078 MCGUIRE NUCLEAR STATION, UNITS 1 AND 2 -WITHDRAWAL OF AMENDMENT REQUESTS REGARDING TECHNICAL SPECIFICATION 3.8.1 "AC SOURCES -OPERATING" (TAC NOS. ME3985 AND ME3986)  
 
==SUBJECT:==
MCGUIRE NUCLEAR STATION, UNITS 1 AND 2 - WITHDRAWAL OF AMENDMENT REQUESTS REGARDING TECHNICAL SPECIFICATION 3.8.1 "AC SOURCES - OPERATING" (TAC NOS. ME3985 AND ME3986)


==Dear Mr. Repko:==
==Dear Mr. Repko:==
By letter dated April 26, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML101250044), you applied for amendments to the McGuire Nuclear Station, Units 1 and 2, Renewed Facility Operating Licenses NPF-9 and NPF-17. The proposed change would have modified the facility technical specifications by modifying the 24-hour emergency diesel generator (EDG) endurance test whereby the two hours at 105-110 percent of continuous duty rating test (two-hour margin test) would no longer be required to be performed on a routine (18-month) basis as long as the maximum EDG loading remains at or below the machine's continuous duty rating of 4000 kilowatt.
 
This modification would have differed from the approach outlined in Regulatory Guide 1.9, Revision 3, Regulatory Position 2.2.9. Subsequently, by letter dated September 15,2010 (ADAMS Accession No. ML102710267), you withdrew the amendment requests.
By letter dated April 26, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML101250044), you applied for amendments to the McGuire Nuclear Station, Units 1 and 2, Renewed Facility Operating Licenses NPF-9 and NPF-17. The proposed change would have modified the facility technical specifications by modifying the 24-hour emergency diesel generator (EDG) endurance test whereby the two hours at 105-110 percent of continuous duty rating test (two-hour margin test) would no longer be required to be performed on a routine (18-month) basis as long as the maximum EDG loading remains at or below the machine's continuous duty rating of 4000 kilowatt. This modification would have differed from the approach outlined in Regulatory Guide 1.9, Revision 3, Regulatory Position 2.2.9.
The purpose of this letter is to advise that the above-cited application is being treated as withdrawn.
Subsequently, by letter dated September 15,2010 (ADAMS Accession No. ML102710267), you withdrew the amendment requests.
Notice of Consideration of Issuance of the proposed amendments had not been published in the Federal Register.
The purpose of this letter is to advise that the above-cited application is being treated as withdrawn. Notice of Consideration of Issuance of the proposed amendments had not been published in the Federal Register.
If you have any questions, please call me at 301-415-1119.
If you have any questions, please call me at 301-415-1119.
Sincerely, Jon Thompson, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegUlation Docket Nos. 50-369 and 50-370 cc: Distribution via Listserv November 3, 2010 Mr. Regis 1. Repko Vice President McGuire Nuclear Station Duke Energy Carolinas, LLC 12700 Hagers Ferry Road Huntersville, NC 28078 MCGUIRE NUCLEAR STATION, UNITS 1 AND 2 -WITHDRAWAL OF AMENDMENT REQUESTS REGARDING TECHNICAL SPECIFICATION 3.8.1 "AC SOURCES -OPERATING" (TAC NOS. ME3985 AND ME3986)  
Sincerely, Jon Thompson, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegUlation Docket Nos. 50-369 and 50-370 cc: Distribution via Listserv
 
November 3, 2010 Mr. Regis 1. Repko Vice President McGuire Nuclear Station Duke Energy Carolinas, LLC 12700 Hagers Ferry Road Huntersville, NC 28078
 
==SUBJECT:==
MCGUIRE NUCLEAR STATION, UNITS 1 AND 2 - WITHDRAWAL OF AMENDMENT REQUESTS REGARDING TECHNICAL SPECIFICATION 3.8.1 "AC SOURCES - OPERATING" (TAC NOS. ME3985 AND ME3986)


==Dear Mr. Repko:==
==Dear Mr. Repko:==
By letter dated April 26, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML101250044), you applied for amendments to the McGuire Nuclear Station, Units 1 and 2, Renewed Facility Operating Licenses NPF-9 and NPF-17. The proposed change would have modified the facility technical specifications by modifying the 24-hour emergency diesel generator (EDG) endurance test whereby the two hours at 105-110 percent of continuous duty rating test (two-hour margin test) would no longer be required to be performed on a routine (18-month) basis as long as the maximum EDG loading remains at or below the machine's continuous duty rating of 4000 kilowatt.
 
This modification would have differed from the approach outlined in Regulatory Guide 1.9, Revision 3, Regulatory Position 2.2.9. Subsequently, by letter dated September 15,2010 (ADAMS Accession No. ML102710267), you withdrew the amendment requests.
By letter dated April 26, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML101250044), you applied for amendments to the McGuire Nuclear Station, Units 1 and 2, Renewed Facility Operating Licenses NPF-9 and NPF-17. The proposed change would have modified the facility technical specifications by modifying the 24-hour emergency diesel generator (EDG) endurance test whereby the two hours at 105-110 percent of continuous duty rating test (two-hour margin test) would no longer be required to be performed on a routine (18-month) basis as long as the maximum EDG loading remains at or below the machine's continuous duty rating of 4000 kilowatt. This modification would have differed from the approach outlined in Regulatory Guide 1.9, Revision 3, Regulatory Position 2.2.9.
The purpose of this letter is to advise that the above-cited application is being treated as withdrawn.
Subsequently, by letter dated September 15,2010 (ADAMS Accession No. ML102710267), you withdrew the amendment requests.
Notice of Consideration of Issuance of the proposed amendments had not been published in the Federal Register.
The purpose of this letter is to advise that the above-cited application is being treated as withdrawn. Notice of Consideration of Issuance of the proposed amendments had not been published in the Federal Register.
If you have any questions, please call me at 301-415-1119.
If you have any questions, please call me at 301-415-1119.
Sincerely, IRA! Jon Thompson, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-369 and 50-370 cc: Distribution via Listserv DISTRIBUTION:
Sincerely, IRA!
PUBLIC RidsAcrsAcnw_MailCTR Resource LPL2-1 R/F RidsNrrDorlDpr Resource RidsNrrDorlLpl2-1 Resource RidsOgcRp Resource RidsNrrPMMcGuire Resource (hard copy) RidsRgn2MailCenter Resource RidsNrrLAMOBrien Resource (hard copy) ADAMS Accession No ML102870025 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/LPL2-1/BC NRR/LPL2-1/PM NAME JThompson SRohrer GKulesa JThompson DATE 10/18/10 10/18/10 11/03/10 11/03/10 OFFICIAL AGENCY RECORD}}
Jon Thompson, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-369 and 50-370 cc: Distribution via Listserv DISTRIBUTION:
PUBLIC                                 RidsAcrsAcnw_MailCTR Resource LPL2-1 R/F                             RidsNrrDorlDpr Resource RidsNrrDorlLpl2-1 Resource             RidsOgcRp Resource RidsNrrPMMcGuire Resource (hard copy)   RidsRgn2MailCenter Resource RidsNrrLAMOBrien Resource (hard copy)
ADAMS Accession No ML102870025 OFFICE   NRR/LPL2-1/PM         NRR/LPL2-1/LA           NRR/LPL2-1/BC       NRR/LPL2-1/PM NAME     JThompson             SRohrer                 GKulesa             JThompson DATE     10/18/10               10/18/10               11/03/10             11/03/10 OFFICIAL AGENCY RECORD}}

Revision as of 08:05, 13 November 2019

Withdrawal of Amendment Requests Regarding Technical Specification 3.8.1 AC Sources - Operating (TAC Nos. ME3985 and ME3986)
ML102870025
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 11/03/2010
From: Jacqueline Thompson
Plant Licensing Branch II
To: Repko R
Duke Energy Carolinas
Thompson Jon, NRR/DORL/LPL 2-1, 415-1119
References
TAC ME3985, TAC ME3986
Download: ML102870025 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2010 Mr. Regis T. Repko Vice President McGuire Nuclear Station Duke Energy Carolinas, LLC 12700 Hagers Ferry Road Huntersville. NC 28078

SUBJECT:

MCGUIRE NUCLEAR STATION, UNITS 1 AND 2 - WITHDRAWAL OF AMENDMENT REQUESTS REGARDING TECHNICAL SPECIFICATION 3.8.1 "AC SOURCES - OPERATING" (TAC NOS. ME3985 AND ME3986)

Dear Mr. Repko:

By letter dated April 26, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML101250044), you applied for amendments to the McGuire Nuclear Station, Units 1 and 2, Renewed Facility Operating Licenses NPF-9 and NPF-17. The proposed change would have modified the facility technical specifications by modifying the 24-hour emergency diesel generator (EDG) endurance test whereby the two hours at 105-110 percent of continuous duty rating test (two-hour margin test) would no longer be required to be performed on a routine (18-month) basis as long as the maximum EDG loading remains at or below the machine's continuous duty rating of 4000 kilowatt. This modification would have differed from the approach outlined in Regulatory Guide 1.9, Revision 3, Regulatory Position 2.2.9.

Subsequently, by letter dated September 15,2010 (ADAMS Accession No. ML102710267), you withdrew the amendment requests.

The purpose of this letter is to advise that the above-cited application is being treated as withdrawn. Notice of Consideration of Issuance of the proposed amendments had not been published in the Federal Register.

If you have any questions, please call me at 301-415-1119.

Sincerely, Jon Thompson, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegUlation Docket Nos. 50-369 and 50-370 cc: Distribution via Listserv

November 3, 2010 Mr. Regis 1. Repko Vice President McGuire Nuclear Station Duke Energy Carolinas, LLC 12700 Hagers Ferry Road Huntersville, NC 28078

SUBJECT:

MCGUIRE NUCLEAR STATION, UNITS 1 AND 2 - WITHDRAWAL OF AMENDMENT REQUESTS REGARDING TECHNICAL SPECIFICATION 3.8.1 "AC SOURCES - OPERATING" (TAC NOS. ME3985 AND ME3986)

Dear Mr. Repko:

By letter dated April 26, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML101250044), you applied for amendments to the McGuire Nuclear Station, Units 1 and 2, Renewed Facility Operating Licenses NPF-9 and NPF-17. The proposed change would have modified the facility technical specifications by modifying the 24-hour emergency diesel generator (EDG) endurance test whereby the two hours at 105-110 percent of continuous duty rating test (two-hour margin test) would no longer be required to be performed on a routine (18-month) basis as long as the maximum EDG loading remains at or below the machine's continuous duty rating of 4000 kilowatt. This modification would have differed from the approach outlined in Regulatory Guide 1.9, Revision 3, Regulatory Position 2.2.9.

Subsequently, by letter dated September 15,2010 (ADAMS Accession No. ML102710267), you withdrew the amendment requests.

The purpose of this letter is to advise that the above-cited application is being treated as withdrawn. Notice of Consideration of Issuance of the proposed amendments had not been published in the Federal Register.

If you have any questions, please call me at 301-415-1119.

Sincerely, IRA!

Jon Thompson, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-369 and 50-370 cc: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsAcrsAcnw_MailCTR Resource LPL2-1 R/F RidsNrrDorlDpr Resource RidsNrrDorlLpl2-1 Resource RidsOgcRp Resource RidsNrrPMMcGuire Resource (hard copy) RidsRgn2MailCenter Resource RidsNrrLAMOBrien Resource (hard copy)

ADAMS Accession No ML102870025 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/LPL2-1/BC NRR/LPL2-1/PM NAME JThompson SRohrer GKulesa JThompson DATE 10/18/10 10/18/10 11/03/10 11/03/10 OFFICIAL AGENCY RECORD