(One intermediate revision by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 02/11/2011 | | | issue date = 02/11/2011 |
| | title = IR 05000280-10-004, 05000281-10-004, 05000280-10-501, and 05000281-10-501, on 10/29/10, Surry Power Station - Errata | | | title = IR 05000280-10-004, 05000281-10-004, 05000280-10-501, and 05000281-10-501, on 10/29/10, Surry Power Station - Errata |
| | author name = McCoy G J | | | author name = Mccoy G |
| | author affiliation = NRC/RGN-II/DRP/RPB5 | | | author affiliation = NRC/RGN-II/DRP/RPB5 |
| | addressee name = Heacock D A | | | addressee name = Heacock D |
| | addressee affiliation = Virginia Electric & Power Co (VEPCO) | | | addressee affiliation = Virginia Electric & Power Co (VEPCO) |
| | docket = 05000280, 05000281 | | | docket = 05000280, 05000281 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter:UNITED STATES ary 11, 2011 |
| [[Issue date::February 11, 2011]]
| |
|
| |
|
| Mr. David President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
| | ==SUBJECT:== |
| | | SURRY POWER STATION - NRC INTEGRATED INSPECTION REPORT 05000280/2010004, 05000281/2010004, 05000280/2010501 and 05000281/2010501 ERRATA |
| SUBJECT: SURRY POWER STATION - NRC INTEGRATED INSPECTION REPORT 05000280/2010004, 05000281/2010004, 05000280/2010501 and 05000281/2010501 ERRATA | |
|
| |
|
| ==Dear Mr. Heacock:== | | ==Dear Mr. Heacock:== |
| On October 29, 2010, the United States Nuclear Regulatory Commission (NRC) issued the subject NRC Integrated Inspection Report 05000280/2010004, 05000281/2010004, 05000280/2010501 and 05000281/2010501 for Surry Power Station, Units 1 and 2, ADAMS ML103020186. In reviewing this report it was noted that in Section 4OA7, the reported time period of reduced staffing for mechanical maintenance and electrical maintenance personnel between December 2006, and January 2010, was incorrect. The correct reported time period was between October 2009, and January 2010. Accordingly, we are providing a revised version of the inspection report that includes the correct time period. | | On October 29, 2010, the United States Nuclear Regulatory Commission (NRC) issued the subject NRC Integrated Inspection Report 05000280/2010004, 05000281/2010004, 05000280/2010501 and 05000281/2010501 for Surry Power Station, Units 1 and 2, ADAMS ML103020186. In reviewing this report it was noted that in Section 4OA7, the reported time period of reduced staffing for mechanical maintenance and electrical maintenance personnel between December 2006, and January 2010, was incorrect. The correct reported time period was between October 2009, and January 2010. Accordingly, we are providing a revised version of the inspection report that includes the correct time period. |
|
| |
|
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| | |
| Sincerely,/RA/
| |
| Gerald J. McCoy, Chief Reactor Projects Branch 5 Division of Reactor Projects
| |
| | |
| Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37
| |
| | |
| ===Enclosure:===
| |
| As stated
| |
| | |
| cc: See page 2
| |
|
| |
|
| _________________________ X SUNSI REVIEW COMPLETE OFFICE RII: DRS RII: DRP SIGNATURE RA RA NAME BONSER MCCOY DATE 2/11/2011 2/11/2011 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO VEPCO 2 cc w/encl: Gerald T. Bischof Site Vice President Surry Power Station Virginia Electric and Power Company Electronic Mail Distribution B. L. (Sonny) Stanley Director, Nuclear Safety and Licensing Virginia Electric and Power Company Electronic Mail Distribution Lillian M. Cuoco, Esq. Senior Counsel Dominion Resources Services, Inc. Electronic Mail Distribution
| | Sincerely, |
| | /RA/ |
| | Gerald J. McCoy, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37 Enclosure: As stated cc: See page 2 |
|
| |
|
| Chris L. Funderburk Director, Nuclear Licensing & Operations Support Virginia Electric and Power Company Electronic Mail Distribution
| | _________________________ X SUNSI REVIEW COMPLETE OFFICE RII: DRS RII: DRP SIGNATURE RA RA NAME BONSER MCCOY DATE 2/11/2011 2/11/2011 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO |
|
| |
|
| Ginger L. Melton Virginia Electric and Power Company Electronic Mail Distribution
| | VEPCO 2 cc w/encl: |
| | Gerald T. Bischof Site Vice President Surry Power Station Virginia Electric and Power Company Electronic Mail Distribution B. L. (Sonny) Stanley Director, Nuclear Safety and Licensing Virginia Electric and Power Company Electronic Mail Distribution Lillian M. Cuoco, Esq. |
|
| |
|
| Virginia State Corporation Commission Division of Energy Regulation P.O. Box 1197 Richmond, VA 23209
| | Senior Counsel Dominion Resources Services, Inc. |
|
| |
|
| Attorney General Supreme Court Building 900 East Main Street Richmond, VA 23219 | | Electronic Mail Distribution Chris L. Funderburk Director, Nuclear Licensing & Operations Support Virginia Electric and Power Company Electronic Mail Distribution Ginger L. Melton Virginia Electric and Power Company Electronic Mail Distribution Virginia State Corporation Commission Division of Energy Regulation P.O. Box 1197 Richmond, VA 23209 Attorney General Supreme Court Building 900 East Main Street Richmond, VA 23219 Senior Resident Inspector Surry Power Station U.S. Nuclear Regulatory Commission 5850 Hog Island Rd Surry, VA 23883 Michael M. Cline Director Virginia Department of Emergency Services Management Electronic Mail Distribution |
|
| |
|
| Senior Resident Inspector Surry Power Station U.S. Nuclear Regulatory Commission 5850 Hog Island Rd Surry, VA 23883 Michael M. Cline Director Virginia Department of Emergency Services Management Electronic Mail Distribution
| | VEPCO 5 On September 29, 2010, the lead inspector re-exited with Mr. K. Sloane, Plant Manager, and other members of the Surry staff via teleconference. The closure of Unresolved Item (URI) 05000280, 281/2010002-01, Emergency Plan Minimum Staffing was discussed. |
|
| |
|
| VEPCO 5 Enclosure On September 29, 2010, the lead inspector re-exited with Mr. K. Sloane, Plant Manager, and other members of the Surry staff via teleconference. The closure of Unresolved Item (URI) 05000280, 281/2010002-01, Emergency Plan Minimum Staffing was discussed.
| | 4OA7 Licensee-Identified Violation The following finding of very low significance was identified by the licensee and is a violation of NRC requirements which meets the criteria of Section 2.3.2 of the NRC Enforcement Policy, NUREG-1600, for characterization as a Green Non-Cited Violation (NCV). |
|
| |
|
| 4OA7 Licensee-Identified Violation The following finding of very low significance was identified by the licensee and is a violation of NRC requirements which meets the criteria of Section 2.3.2 of the NRC Enforcement Policy, NUREG-1600, for characterization as a Green Non-Cited Violation (NCV). * 10 CFR 50.54(q) states in part that a licensee authorized to possess and operate a nuclear power reactor shall follow and maintain in effect emergency plans which meet the standards in 10 CFR 50.47(b) and the requirements in appendix E of this part. Contrary to this, between October 2009, and January 2010, the licensee identified that the staffing was reduced for mechanical maintenance and electrical maintenance personnel on shift to below the minimum shift staffing requirements of the Emergency Plan without a 50.54(q) review. The violation was determined to be of very low safety significance because, the licensee demonstrated non-designated coincidental coverage for the shift staffing positions in question, no degradation of the planning standard existed and the criteria for a white finding was not met. The licensee corrected the deficiency when it was discovered and entered it into the corrective action program as condition report CR364194.
| | * 10 CFR 50.54(q) states in part that a licensee authorized to possess and operate a nuclear power reactor shall follow and maintain in effect emergency plans which meet the standards in 10 CFR 50.47(b) and the requirements in appendix E of this part. Contrary to this, between October 2009, and January 2010, the licensee identified that the staffing was reduced for mechanical maintenance and electrical maintenance personnel on shift to below the minimum shift staffing requirements of the Emergency Plan without a 50.54(q) review. The violation was determined to be of very low safety significance because, the licensee demonstrated non-designated coincidental coverage for the shift staffing positions in question, no degradation of the planning standard existed and the criteria for a white finding was not met. The licensee corrected the deficiency when it was discovered and entered it into the corrective action program as condition report CR364194. |
|
| |
|
| ATTACHMENT: SUPPPLEMENTAL INFORMATION | | ATTACHMENT: SUPPPLEMENTAL INFORMATION Enclosure |
|
| |
|
| VEPCO 5 Enclosure On September 29, 2010, the lead inspector re-exited with Mr. G. Sloane and other members of the Surry staff via teleconference. The closure of Unresolved Item (URI) 05000280, 281/2010002-01, Emergency Plan Minimum Staffing was discussed | | VEPCO 5 On September 29, 2010, the lead inspector re-exited with Mr. G. Sloane and other members of the Surry staff via teleconference. The closure of Unresolved Item (URI) |
| | 05000280, 281/2010002-01, Emergency Plan Minimum Staffing was discussed 4OA7 Licensee-Identified Violation The following finding of very low significance was identified by the licensee and is a violation of NRC requirements which meets the criteria of Section 2.3.2 of the NRC Enforcement Policy, NUREG-1600, for characterization as a Green Non-Cited Violation (NCV). |
|
| |
|
| 4OA7 Licensee-Identified Violation The following finding of very low significance was identified by the licensee and is a violation of NRC requirements which meets the criteria of Section 2.3.2 of the NRC Enforcement Policy, NUREG-1600, for characterization as a Green Non-Cited Violation (NCV). * 10 CFR 50.54(q) states in part that a licensee authorized to possess and operate a nuclear power reactor shall follow and maintain in effect emergency plans which meet the standards in 10 CFR 50.47(b) and the requirements in appendix E of this part. Contrary to this, between December 2006 and January 2010, the licensee identified that the staffing was reduced for mechanical maintenance and electrical maintenance personnel on shift to below the minimum shift staffing requirements of the Emergency Plan without a 50.54(q) review. The violation was determined to be of very low safety significance because, the licensee demonstrated non-designated coincidental coverage for the shift staffing positions in question, no degradation of the planning standard existed and the criteria for a white finding was not met. The licensee corrected the deficiency when it was discovered and entered it into the corrective action program as condition report CR364194.
| | * 10 CFR 50.54(q) states in part that a licensee authorized to possess and operate a nuclear power reactor shall follow and maintain in effect emergency plans which meet the standards in 10 CFR 50.47(b) and the requirements in appendix E of this part. Contrary to this, between December 2006 and January 2010, the licensee identified that the staffing was reduced for mechanical maintenance and electrical maintenance personnel on shift to below the minimum shift staffing requirements of the Emergency Plan without a 50.54(q) review. The violation was determined to be of very low safety significance because, the licensee demonstrated non-designated coincidental coverage for the shift staffing positions in question, no degradation of the planning standard existed and the criteria for a white finding was not met. The licensee corrected the deficiency when it was discovered and entered it into the corrective action program as condition report CR364194. |
|
| |
|
| ATTACHMENT: SUPPPLEMENTAL INFORMATION | | ATTACHMENT: SUPPPLEMENTAL INFORMATION Enclosure |
| }} | | }} |
Similar Documents at Surry |
---|
Category:Letter
MONTHYEARML24283A0702024-10-0707 October 2024 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J IR 05000280/20244032024-10-0303 October 2024 Cyber Security Inspection Report 05000280-2024403 and 05000281-2024403 Cover Letter (Public) IR 05000280/20240102024-10-0202 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000280/2024010 and 05000281/2024010 ML24270A0022024-09-25025 September 2024 Inservice Inspection Owners Activity Report (OAR) ML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance IR 05000280/20240112024-08-13013 August 2024 Comprehensive Engineering Team Inspection Report 05000280/2024011 and 05000281/2024011 ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 05000280/LER-2024-001, Troubleshooting Initiated Unknown Turbine Trip Feature in Control System2024-07-30030 July 2024 Troubleshooting Initiated Unknown Turbine Trip Feature in Control System ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24190A4192024-07-0808 July 2024 Inservice Testing (IST) Program for Pumps and Valves Revised Sixth IST Interval Start Date and Updated Technical Specifications References for Alternative Request V-1 ML24179A2932024-07-0101 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML24157A0542024-06-13013 June 2024 Audit Summary in Support of License Amendment Request for Proposed Reclassification of Low Head Safety Injection Flow Instrumentation Related to Regulatory Guide 1.97 ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24141A2862024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2512024-05-20020 May 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable - Supplemental Information ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2302024-05-13013 May 2024 Core 1 Cycle 33 Pattern Mdr Revision 0 ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24130A2032024-05-0909 May 2024 Proposed License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Supplemental Information ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 ML24142A3852024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report IR 05000280/20240012024-04-30030 April 2024 Integrated Inspection Report 05000280-2024001 and 05000281-2024001 ML24122C6522024-04-30030 April 2024 Annual Radiological Environmental Operating Report ML24122B3032024-04-29029 April 2024 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change IR 05000280/20244022024-04-29029 April 2024 Security Baseline Inspection Report 05000280/2024402 and 05000281/2024402 ML24115A1952024-04-24024 April 2024 Notification of Surry Power Station Comprehensive Engineering Team Inspection - U.S. NRC Inspection Report 05000280/2024011 and 05000281/2024011 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24108A1812024-04-15015 April 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable Supplemental Information ML24095A2172024-04-12012 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report ML24088A2482024-03-26026 March 2024 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests- Response to Request for Additional Information ML24087A2082024-03-22022 March 2024 Proposed License Amendment Request Addition of Containment Limiting Condition for Operation and Surveillance Requirements ML24078A2642024-03-21021 March 2024 – Regulatory Audit in Support of License Amendment Request to Proposed Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML24087A1522024-03-18018 March 2024 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML24023A5762024-03-0808 March 2024 Correction to Issuance of Amendment Nos. 315 and 315, Regarding Revised Emergency Plan for Relocation of the Technical Support Center IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 ML24032A4712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24051A1782024-02-19019 February 2024 Proposed License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML24057A0612024-02-19019 February 2024 and Virgil C. Summer Power Nuclear Stations - Nuclear Property Insurance Coverage IR 05000280/20230042024-02-0909 February 2024 Integrated Inspection Report 05000280/2023004 and 05000281/2023004 IR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 – Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 2024-09-03
[Table view] Category:Inspection Report Correspondence
MONTHYEARML18222A3472018-08-10010 August 2018 Notification of Inspection and Request for Information for Nuclear Regulatory Commission Problem Identification and Resolution Inspection IR 05000280/20100042011-02-11011 February 2011 IR 05000280-10-004, 05000281-10-004, 05000280-10-501, and 05000281-10-501, on 10/29/10, Surry Power Station - Errata IR 05000280/20092012009-05-21021 May 2009 IR 05000280-09-201, and IR 05000281-09-201, on 03/27/2009, Surry Nuclear Power Plant - Security Inspection ML0711400732007-06-0606 June 2007 Ltr. to Mr. David A. Christian Surry Nuclear Power Station - Material Control and Accounting Program Inspection IR 05000280/20060092006-08-11011 August 2006 IR 05000280-06-009, IR 05000281-06-009, on 06/12-16/2006 & 06/26-30/2006 for Surry, Units 1 and 2; Triennial Fire Protection Inspection IR 05000280/20040042004-11-24024 November 2004 Errata Surry Power Station - NRC Integrated Inspection Report Nos. 5000280/2004004 and 5000281/2004004 - and Office of Investigations Case Number 2-2003-075 IR 05000280/20010052002-04-25025 April 2002 IR 05000280/2001-005, 05000281/2001-005, Surry Nuclear Power Station, Inspection on 12/30/2001 - 03/30/2002. No Findings of Significance Identified IR 05000280/20010072002-01-18018 January 2002 IR 05000280/2001-007, IR 05000281/2001-007, on 11/26-30 and 12/10-14/2001; Virginia Electric and Power Co., Surry Power Station, Units 1 & 2. Annual Baseline Inspection of the Identification and Resolution of Problems. No Violations Noted ML19095A2711978-04-0606 April 1978 Provide Information on Steam Generator Inspection on Unit 2, Which Supplement to Vepco'S Submittal of 4/4/1978 ML19093B0331977-11-30030 November 1977 Enclosed Justification for Tube Inspection Program & Plugging Criteria, Results of Completed Surry Unit No. 1 Inspection Program with Small Change in Denting ML19095A5231977-09-0202 September 1977 Response to Non-Compliance Item Reported in IE Inspection Reports 50/280/77-20 & 50/281/77-20, & Determined No Proprietary Information Is Contained ML19098B4291977-05-26026 May 1977 Response to Letter of 5/6/1977, in Reference to IE Inspection Reports 50-280/77-7 & 50-281/77-7, Advising No Proprietary Information Is Contained in Reports ML19098B4281977-05-16016 May 1977 Response to Letter of 4/21/1977, in Reference to IE Inspection Reports 50-280/77-4 & 50-281/77-4, Advising No Proprietary Information Is Contained in Reports ML19098B4271977-05-16016 May 1977 Response to Letter of 4/22/1977, in Reference to IE Inspection Reports 50-280/77-5 & 50-281/77-5, Advising No Proprietary Information Is Contained in Reports ML19098B4261977-04-29029 April 1977 Advising Completeness of Unit 1 Steam Generator Inspection Program & Presenting Results of Program in Attachment 1 ML19105A1821975-07-0909 July 1975 Report No. ISI 75-3, Preliminary Results of Inservice Inspection Program Refueling Outage No. 1, Surry Power Station Unit No. 2. 2018-08-10
[Table view] |
Inspection Report - Surry - 2010004 |
---|
|
|
|
Text
UNITED STATES ary 11, 2011
SUBJECT:
SURRY POWER STATION - NRC INTEGRATED INSPECTION REPORT 05000280/2010004, 05000281/2010004, 05000280/2010501 and 05000281/2010501 ERRATA
Dear Mr. Heacock:
On October 29, 2010, the United States Nuclear Regulatory Commission (NRC) issued the subject NRC Integrated Inspection Report 05000280/2010004, 05000281/2010004, 05000280/2010501 and 05000281/2010501 for Surry Power Station, Units 1 and 2, ADAMS ML103020186. In reviewing this report it was noted that in Section 4OA7, the reported time period of reduced staffing for mechanical maintenance and electrical maintenance personnel between December 2006, and January 2010, was incorrect. The correct reported time period was between October 2009, and January 2010. Accordingly, we are providing a revised version of the inspection report that includes the correct time period.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Gerald J. McCoy, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37 Enclosure: As stated cc: See page 2
_________________________ X SUNSI REVIEW COMPLETE OFFICE RII: DRS RII: DRP SIGNATURE RA RA NAME BONSER MCCOY DATE 2/11/2011 2/11/2011 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
VEPCO 2 cc w/encl:
Gerald T. Bischof Site Vice President Surry Power Station Virginia Electric and Power Company Electronic Mail Distribution B. L. (Sonny) Stanley Director, Nuclear Safety and Licensing Virginia Electric and Power Company Electronic Mail Distribution Lillian M. Cuoco, Esq.
Senior Counsel Dominion Resources Services, Inc.
Electronic Mail Distribution Chris L. Funderburk Director, Nuclear Licensing & Operations Support Virginia Electric and Power Company Electronic Mail Distribution Ginger L. Melton Virginia Electric and Power Company Electronic Mail Distribution Virginia State Corporation Commission Division of Energy Regulation P.O. Box 1197 Richmond, VA 23209 Attorney General Supreme Court Building 900 East Main Street Richmond, VA 23219 Senior Resident Inspector Surry Power Station U.S. Nuclear Regulatory Commission 5850 Hog Island Rd Surry, VA 23883 Michael M. Cline Director Virginia Department of Emergency Services Management Electronic Mail Distribution
VEPCO 5 On September 29, 2010, the lead inspector re-exited with Mr. K. Sloane, Plant Manager, and other members of the Surry staff via teleconference. The closure of Unresolved Item (URI) 05000280, 281/2010002-01, Emergency Plan Minimum Staffing was discussed.
4OA7 Licensee-Identified Violation The following finding of very low significance was identified by the licensee and is a violation of NRC requirements which meets the criteria of Section 2.3.2 of the NRC Enforcement Policy, NUREG-1600, for characterization as a Green Non-Cited Violation (NCV).
- 10 CFR 50.54(q) states in part that a licensee authorized to possess and operate a nuclear power reactor shall follow and maintain in effect emergency plans which meet the standards in 10 CFR 50.47(b) and the requirements in appendix E of this part. Contrary to this, between October 2009, and January 2010, the licensee identified that the staffing was reduced for mechanical maintenance and electrical maintenance personnel on shift to below the minimum shift staffing requirements of the Emergency Plan without a 50.54(q) review. The violation was determined to be of very low safety significance because, the licensee demonstrated non-designated coincidental coverage for the shift staffing positions in question, no degradation of the planning standard existed and the criteria for a white finding was not met. The licensee corrected the deficiency when it was discovered and entered it into the corrective action program as condition report CR364194.
ATTACHMENT: SUPPPLEMENTAL INFORMATION Enclosure
VEPCO 5 On September 29, 2010, the lead inspector re-exited with Mr. G. Sloane and other members of the Surry staff via teleconference. The closure of Unresolved Item (URI)
05000280, 281/2010002-01, Emergency Plan Minimum Staffing was discussed 4OA7 Licensee-Identified Violation The following finding of very low significance was identified by the licensee and is a violation of NRC requirements which meets the criteria of Section 2.3.2 of the NRC Enforcement Policy, NUREG-1600, for characterization as a Green Non-Cited Violation (NCV).
- 10 CFR 50.54(q) states in part that a licensee authorized to possess and operate a nuclear power reactor shall follow and maintain in effect emergency plans which meet the standards in 10 CFR 50.47(b) and the requirements in appendix E of this part. Contrary to this, between December 2006 and January 2010, the licensee identified that the staffing was reduced for mechanical maintenance and electrical maintenance personnel on shift to below the minimum shift staffing requirements of the Emergency Plan without a 50.54(q) review. The violation was determined to be of very low safety significance because, the licensee demonstrated non-designated coincidental coverage for the shift staffing positions in question, no degradation of the planning standard existed and the criteria for a white finding was not met. The licensee corrected the deficiency when it was discovered and entered it into the corrective action program as condition report CR364194.
ATTACHMENT: SUPPPLEMENTAL INFORMATION Enclosure