{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C.
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 29, 2011 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
March 29, Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 LASALLE COUNTY STATION, UNITS 1 AND 2-CORRECTION TO ISSUANCE OF LICENSE AMENDMENTS REGARDING RISK-INFORMED JUSTIFICATION FOR THE RELOCATION OF SPECIFIC SURVEILLANCE FREQUENCY REQUIREMENTS TO A LICENSEE-CONTROLLED PROGRAM (TAC NOS. ME3363 AND ME3364)  
 
==SUBJECT:==
LASALLE COUNTY STATION, UNITS 1 AND 2- CORRECTION TO ISSUANCE OF LICENSE AMENDMENTS REGARDING RISK-INFORMED JUSTIFICATION FOR THE RELOCATION OF SPECIFIC SURVEILLANCE FREQUENCY REQUIREMENTS TO A LICENSEE-CONTROLLED PROGRAM (TAC NOS.
ME3363 AND ME3364)


==Dear Mr. Pacilio:==
==Dear Mr. Pacilio:==
By letter dated February 24, 2011, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML110200143), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 200 to Facility Operating License No. NPF-11 and Amendment No. 187 to Facility Operating License No. NPF-18 for the LaSalle County Station, Units 1 and 2, respectively.
 
The amendment adopted the NRC-approved Technical Specification Task Force (TSTF-425), Revision 3, "Relocate Surveillance Frequencies to Licensee Control-RITSTF Initiative 5b" in response to your application dated February 15, 2010 (ADAMS) Accession No. ML100480009), as supplemented by letter dated April 26, June 23, and August 3, 2010 (ADAMS Accession No. ML101160374, ML101750102, and ML110390169, respectively).
By letter dated February 24, 2011, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML110200143), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 200 to Facility Operating License No. NPF-11 and Amendment No. 187 to Facility Operating License No. NPF-18 for the LaSalle County Station, Units 1 and 2, respectively. The amendment adopted the NRC-approved Technical Specification Task Force (TSTF-425), Revision 3, "Relocate Surveillance Frequencies to Licensee Control-RITSTF Initiative 5b" in response to your application dated February 15, 2010 (ADAMS) Accession No.
The TSTF-425 relocates most periodic frequencies of Technical Specifications (TS) surveillances to a licensee-controlled program, the Surveillance Frequency Control Program, and provides requirements for the new program in the Administrative Controls section of the TS. After issuance, it became apparent that page 3 of the Facility Operating Licenses NPF-11 and NPF-18 were not correct. Please remove page 3 for Facility Operating Licenses NPF-11 and NPF-18 issued on February 24,2001, and replace it with the enclosed corrected versions.
ML100480009), as supplemented by letter dated April 26, June 23, and August 3, 2010 (ADAMS Accession No. ML101160374, ML101750102, and ML110390169, respectively).
The TSTF-425 relocates most periodic frequencies of Technical Specifications (TS) surveillances to a licensee-controlled program, the Surveillance Frequency Control Program, and provides requirements for the new program in the Administrative Controls section of the TS.
After issuance, it became apparent that page 3 of the Facility Operating Licenses NPF-11 and NPF-18 were not correct. Please remove page 3 for Facility Operating Licenses NPF-11 and NPF-18 issued on February 24,2001, and replace it with the enclosed corrected versions.
This error did not impact Amendments No. 200 and No. 187 and does not change the NRC staff conclusions.
This error did not impact Amendments No. 200 and No. 187 and does not change the NRC staff conclusions.
M. Pacilio -2 We regret any inconvenience this may have caused. Should you have any questions regarding this matter, please call me at (301) 415-2315.
 
Sincerely, IRA! Eva A. Brown, Senior Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374 cc: Distribution via Listserv License No. NPF-11 (4) Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of LaSalle County Station, Units 1 and 2. C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: (1) Maximum Power Level The licensee is authorized to operate the facility at reactor core power levels not in excess of full power (3546 megawatts thermal).
M. Pacilio                                   -2 We regret any inconvenience this may have caused. Should you have any questions regarding this matter, please call me at (301) 415-2315.
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.2001, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan. Am. 194 08/28/09 (3) DELETED Am. 194 08/28/09 (4) DELETED Am. 194 08/28/09 (5) DELETED Am. 194 08/28/09 (6) DELETED Am. 194 08/28/09 (7) DELETED Amendment N0200 License No. NPF-18 (5) Pursuant to the Act and 10 CFR Parts 30, 40, and 70 possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of LaSalle County Station Units 1 and 2. C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: (1) Maximum Power Level The licensee is authorized to operate the facility at reactor core power levels not in excess of full power (3546 megawatts thermal), Items in Attachment 1 shall be completed as specified.
Sincerely, IRA!
Attachment 1 is hereby incorporated into this license. (2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment NO.187 , and the Environmental Protection Plan contained in I Appendix B, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan. Am. 181 08/28/09 (3) DELETED Am. 181 08/28/09 (4) DELETED Am. 181 08/28/09 (5) DELETED Am. 181 08/28109 (6) DELETED Am. 181 08/28/09 (7) DELETED Am. 181 08/28109 (8) DELETED Am. 181 08/28/09 (9) DELETED Amendment NO.'187 M. Pacilio -2 We regret any inconvenience this may have caused. Should you have any questions regarding this matter, please call me at (301) 415-2315.
Eva A. Brown, Senior Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374 cc: Distribution via Listserv
Sincerely, IRA! Eva A. Brown, Senior Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374 cc: Distribution via Listserv DISTRIBUTION:
 
PUBLIC LPLlII-2 Reading RidsNrrDraAadb Resource RidsDorl DprResource RidsAcrsAcnw_MailCTR Resource RidsOgcRp Resource RidsNrrPMLaSalle Resource RidsNrrDorlLpl3-2 Resource RidsNrrLASRohrer Resource RidsRgn3MailCenter Resource ADAMS Accession No'.. ML110831025 NRR-106 OFFICE LPLlII-2/PM LPLlII-2/LA LPLlII-2/BC NAME EBrown SRohrer RCarlson DATE 03/29/11 03/29/11 03/29/11 OFFICIAL RECORD COPY}}
                                          -3                          License No. NPF-11 (4)     Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)     Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of LaSalle County Station, Units 1 and 2.
C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)     Maximum Power Level The licensee is authorized to operate the facility at reactor core power levels not in excess of full power (3546 megawatts thermal).
(2)     Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.2001, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
Am. 194     (3)     DELETED 08/28/09 Am. 194    (4)     DELETED 08/28/09 Am. 194    (5)     DELETED 08/28/09 Am. 194    (6)     DELETED 08/28/09 Am. 194    (7)     DELETED 08/28/09 Amendment N0200
 
                                              -3 License No. NPF-18 (5)   Pursuant to the Act and 10 CFR Parts 30, 40, and 70 possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of LaSalle County Station Units 1 and 2.
C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)     Maximum Power Level The licensee is authorized to operate the facility at reactor core power levels not in excess of full power (3546 megawatts thermal), Items in Attachment 1 shall be completed as specified. Attachment 1 is hereby incorporated into this license.
(2)     Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment NO.187 , and the Environmental Protection Plan contained in       I Appendix B, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
Am. 181     (3)     DELETED 08/28/09 Am. 181    (4)     DELETED 08/28/09 Am. 181    (5)     DELETED 08/28/09 Am. 181     (6)     DELETED 08/28109 Am. 181     (7)    DELETED 08/28/09 Am. 181     (8)     DELETED 08/28109 Am. 181     (9)    DELETED 08/28/09 Amendment NO.'187
 
'.. ML110831025           NRR-106 OFFICE     LPLlII-2/PM         LPLlII-2/LA     LPLlII-2/BC NAME       EBrown             SRohrer         RCarlson DATE       03/29/11           03/29/11       03/29/11}}

Revision as of 01:45, 13 November 2019

Correction to Issuance of License Amendments Regarding Risk-informed Justification for Relocation of Specific Surveillance Frequency Requirements to a Licensee-controlled Program
ML110831025
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 03/29/2011
From: Ellen Brown
Plant Licensing Branch III
To: Pacilio M
Exelon Nuclear
Brown Eva, NRR/DORL, 415-2315
References
TAC ME3363, TAC ME3364
Download: ML110831025 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 29, 2011 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

LASALLE COUNTY STATION, UNITS 1 AND 2- CORRECTION TO ISSUANCE OF LICENSE AMENDMENTS REGARDING RISK-INFORMED JUSTIFICATION FOR THE RELOCATION OF SPECIFIC SURVEILLANCE FREQUENCY REQUIREMENTS TO A LICENSEE-CONTROLLED PROGRAM (TAC NOS.

ME3363 AND ME3364)

Dear Mr. Pacilio:

By letter dated February 24, 2011, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML110200143), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 200 to Facility Operating License No. NPF-11 and Amendment No. 187 to Facility Operating License No. NPF-18 for the LaSalle County Station, Units 1 and 2, respectively. The amendment adopted the NRC-approved Technical Specification Task Force (TSTF-425), Revision 3, "Relocate Surveillance Frequencies to Licensee Control-RITSTF Initiative 5b" in response to your application dated February 15, 2010 (ADAMS) Accession No.

ML100480009), as supplemented by letter dated April 26, June 23, and August 3, 2010 (ADAMS Accession No. ML101160374, ML101750102, and ML110390169, respectively).

The TSTF-425 relocates most periodic frequencies of Technical Specifications (TS) surveillances to a licensee-controlled program, the Surveillance Frequency Control Program, and provides requirements for the new program in the Administrative Controls section of the TS.

After issuance, it became apparent that page 3 of the Facility Operating Licenses NPF-11 and NPF-18 were not correct. Please remove page 3 for Facility Operating Licenses NPF-11 and NPF-18 issued on February 24,2001, and replace it with the enclosed corrected versions.

This error did not impact Amendments No. 200 and No. 187 and does not change the NRC staff conclusions.

M. Pacilio -2 We regret any inconvenience this may have caused. Should you have any questions regarding this matter, please call me at (301) 415-2315.

Sincerely, IRA!

Eva A. Brown, Senior Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374 cc: Distribution via Listserv

-3 License No. NPF-11 (4) Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of LaSalle County Station, Units 1 and 2.

C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level The licensee is authorized to operate the facility at reactor core power levels not in excess of full power (3546 megawatts thermal).

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.2001, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

Am. 194 (3) DELETED 08/28/09 Am. 194 (4) DELETED 08/28/09 Am. 194 (5) DELETED 08/28/09 Am. 194 (6) DELETED 08/28/09 Am. 194 (7) DELETED 08/28/09 Amendment N0200

-3 License No. NPF-18 (5) Pursuant to the Act and 10 CFR Parts 30, 40, and 70 possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of LaSalle County Station Units 1 and 2.

C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level The licensee is authorized to operate the facility at reactor core power levels not in excess of full power (3546 megawatts thermal), Items in Attachment 1 shall be completed as specified. Attachment 1 is hereby incorporated into this license.

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment NO.187 , and the Environmental Protection Plan contained in I Appendix B, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

Am. 181 (3) DELETED 08/28/09 Am. 181 (4) DELETED 08/28/09 Am. 181 (5) DELETED 08/28/09 Am. 181 (6) DELETED 08/28109 Am. 181 (7) DELETED 08/28/09 Am. 181 (8) DELETED 08/28109 Am. 181 (9) DELETED 08/28/09 Amendment NO.'187

'.. ML110831025 NRR-106 OFFICE LPLlII-2/PM LPLlII-2/LA LPLlII-2/BC NAME EBrown SRohrer RCarlson DATE 03/29/11 03/29/11 03/29/11