(2 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 05/24/2011 | | | issue date = 05/24/2011 |
| | title = Letter Only - IR 05000293-11-011, 04/11/2011 - 04/15/2011, Pilgrim Nuclear Power Station, Temporary Instruction 2515/183, Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event. | | | title = Letter Only - IR 05000293-11-011, 04/11/2011 - 04/15/2011, Pilgrim Nuclear Power Station, Temporary Instruction 2515/183, Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event. |
| | author name = Rogge J F | | | author name = Rogge J |
| | author affiliation = NRC/RGN-I/DRS/EB3 | | | author affiliation = NRC/RGN-I/DRS/EB3 |
| | addressee name = Smith R | | | addressee name = Smith R |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:OFFICITT USE ONIY - StrEURITY RETATEB INFORII,I '\TIONMay 24,2011Mr. Robert SmithSite Vice PresidentEntergy Nuclear Operations, lnc.Pilgrim Nuclear Power Station600 Rocky Hill RoadPlymouth, MA 02360-5508 | | {{#Wiki_filter:==SUBJECT:== |
| | PILGRIM NUCLEAR POWER STATION - NRC INSPECTION REPORT 05000293t2011011 |
|
| |
|
| SUBJECT: PILGRIM NUCLEAR POWER STATION - NRC INSPECTION REPORT05000293t2011011
| | ==Dear Mr. Smith:== |
| | On April 15,2011, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Pilgrim Nuclear Power Station (PNPS), using Temporary Instruction 2515/183, "Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event." The enclosed inspection report documents the inspection results which were discussed on April 15, 2011, with you and other members of your staff. |
| | |
| | The inspection examined activities conducted under 10 CFR 50.54 (hh) and your License Condition 3.L(b)7 relative to the implementation of 8.5.b mitigating strategies. The inspection involved examination of selected procedures and records, observation of activities, and interviews with station personnel. |
| | |
| | This report documents one NRC identified finding of very low safety significance (Green). The finding was determined to involve a violation of NRC requirements. However, because of its very low safety significance and because it was entered into your Corrective Action Program, the NRC is treating this finding as a non-cited violation (NCV), consistent with Section2.3.2.a of the NRC's Enforcement Policy. lf you contest the NCV in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U. S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. |
| | |
| | 20555-0001, with copies to the Regional Administrator, Region l; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001; and the NRC Resident lnspector at Pilgrim. In addition, if you disagree with the cross-cutting aspect assigned to the finding in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the RegionalAdministrator, Region I and the NRC Resident Inspector at Pilgrim. |
|
| |
|
| ==Dear Mr. Smith:==
| | Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from the Enclosure, this document is DECONTROLLED. |
| On April 15,2011, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection atyour Pilgrim Nuclear Power Station (PNPS), using Temporary Instruction 2515/183, "Followupto the Fukushima Daiichi Nuclear Station Fuel Damage Event." The enclosed inspection reportdocuments the inspection results which were discussed on April 15, 2011, with you and othermembers of your staff.The inspection examined activities conducted under 10 CFR 50.54 (hh) and your LicenseCondition 3.L(b)7 relative to the implementation of 8.5.b mitigating strategies. The inspectioninvolved examination of selected procedures and records, observation of activities, andinterviews with station personnel.This report documents one NRC identified finding of very low safety significance (Green). Thefinding was determined to involve a violation of NRC requirements. However, because of itsvery low safety significance and because it was entered into your Corrective Action Program,the NRC is treating this finding as a non-cited violation (NCV), consistent with Section2.3.2.a ofthe NRC's Enforcement Policy. lf you contest the NCV in this report, you should provide aresponse within 30 days of the date of this inspection report, with the basis for your denial, tothe U. S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C.20555-0001, with copies to the Regional Administrator, Region l; the Director, Office ofEnforcement, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001; and theNRC Resident lnspector at Pilgrim. In addition, if you disagree with the cross-cutting aspectassigned to the finding in this report, you should provide a response within 30 days of the dateof this inspection report, with the basis for your disagreement, to the RegionalAdministrator,Region I and the NRC Resident Inspector at Pilgrim.Enclosure contains Sensitive UnclassifiedNon-Safeguards Information. Whenseparated from the Enclosure, thisdocument is DECONTROLLED.EFFICIALUSE ONtY SECURITY RETATED Ii.lFORMANEN OFFIGIAT USE ENIY SEEURITY RETATEB INFORMATIEN In accordance with 10 CFR 2.390 of the NRC "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room and from thePublicly Available Records System (PARS) component of the NRC Agencywide DocumentsAccess and Management System (ADAMS), accessible from the NRC Web site athttp://wrrvw.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room). However,because of the sensitive information contained in the enclosure, and in accordance with 10 CFR2.390, a copy of this letter's enclosure will not be available for public inspection.
| | |
| | EFFICIALUSE ONtY SECURITY RETATED Ii.lFORMANEN |
|
| |
|
| Sincerely,/RNJohn F. Rogge, ChiefEngineering Branch 3Division of Reactor SafetyDocket No.: 50-293License No.: DPR-35
| | OFFIGIAT USE ENIY SEEURITY RETATEB INFORMATIEN In accordance with 10 CFR 2.390 of the NRC "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room and from the Publicly Available Records System (PARS) component of the NRC Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://wrrvw.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection. |
|
| |
|
| ===Enclosure:===
| | Sincerely, |
| lnspection Report 05000293/201 101 1 | | /RN John F. Rogge, Chief Engineering Branch 3 Division of Reactor Safety Docket No.: 50-293 License No.: DPR-35 Enclosure: lnspection Report 05000293/201 101 1 w/Attachment: Supplemental Information cc: Wencl: w/ OUO-SRI: |
| | D. Burke, Security Manager J. Giarrussio, SLO, Massachusetts Emergency Management Agency cc: Wo encl: w/o OUO-SRI: |
| | Distribution via ListServ OFFICIAT USE ONIY SECURITY RETATED INFERM\TIEN |
|
| |
|
| ===w/Attachment:===
| | OFFICIAT USE ONIY SEGURITY RETATED INFORMATION |
| Supplemental Informationcc: Wencl: w/ OUO-SRI:D. Burke, Security ManagerJ. Giarrussio, SLO, Massachusetts Emergency Management Agencycc: Wo encl: w/o OUO-SRI:Distribution via ListServOFFICIAT USE ONIY SECURITY RETATED INFERM\TIEN
| |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000293/20240022024-08-21021 August 2024 NRC Inspection Report No. 05000293/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24129A1042024-05-26026 May 2024 Preapplication Readiness Assessment Plan for the Holtec Decommissioning International License Termination Plan ML24136A2382024-05-14014 May 2024 Annual Radiological Environmental Operating Report for 2023 ML24135A3212024-05-14014 May 2024 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2023 IR 05000293/20240012024-05-0707 May 2024 NRC Inspection Report No. 05000293/2024001 L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 L-24-010, Request for Preapplication Readiness Assessment of the Draft License Termination Plan2024-04-22022 April 2024 Request for Preapplication Readiness Assessment of the Draft License Termination Plan L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) IR 05000293/20230032024-02-29029 February 2024 NRC Inspection Report Nos. 05000293/2023003 and 05000293/2023004 L-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2024-02-0202 February 2024 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23334A1822023-11-30030 November 2023 Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary – November 2021 Through October 2023 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) IR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 L-23-008, Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI)2023-05-23023 May 2023 Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI) ML23135A2152023-05-15015 May 2023 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2022 ML23136A7792023-05-15015 May 2023 Annual Radiological Environmental Operating Report, January 1 Through December 31, 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML23069A2782023-03-13013 March 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1 Subsequent License Renewal Application ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000293/20220042023-02-15015 February 2023 NRC Inspection Report No. 05000293/2022004 ML22356A0712023-01-31031 January 2023 Issuance of Exemption for Pilgrim Nuclear Power Station ISFSI Regarding Annual Radioactive Effluent Release Report - Cover Letter ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 L-22-041, Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension2022-12-0909 December 2022 Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension IR 05000293/20220032022-11-18018 November 2022 NRC Inspection Report No. 05000293/2022003 L-22-036, Decommissioning Trust Fund Agreement2022-11-0808 November 2022 Decommissioning Trust Fund Agreement ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22266A1922022-09-23023 September 2022 and Pilgrim Nuclear Power Station - Request to Withdraw Prior Submissions from NRC Consideration ML22272A0352022-09-22022 September 2022 S. Lynch-Benttinen Letter Regarding U.S. Citizen Intent to Sue U.S. Fish and Wildlife and NOAA Fisheries Representing the Endangered Species (Na Right Whale) Which Will Be Adversely Affected by Holtec International Potential Actions ML22269A4202022-09-22022 September 2022 Citizen Lawsuit ML22241A1122022-08-29029 August 2022 Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release Report IR 05000293/20220022022-08-12012 August 2022 NRC Inspection Report No. 05000293/2022002 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22221A2592022-08-0101 August 2022 LTR-22-0217-1-NMSS - Town of Duxbury Letter Opposing the Irradiated Water Release from Pilgrim (Docket No. 05000293) ML22206A1512022-08-0101 August 2022 NRC Office of Investigations Case Nos. 1-2022-002 & 1-2022-006 ML22175A1732022-07-28028 July 2022 LTR-22-0153-1 - Response Letter to D. Turco, Cape Downwinders, from A. Roberts, NRC, Regarding Holtec-Pilgrim Plans to Dump One Million Gallons of Radioactive Waste Into Cape Cod Bay ML22193A1662022-07-28028 July 2022 LTR-22-0154-1 - Heather Govern, VP, Clean Air and Water Program, Et Al., Letter Regarding Radioactive Wastewater Disposal from the Pilgrim Nuclear Power Station (Docket No. 05000293) ML22154A4882022-06-0101 June 2022 Letter from Conservation Law Foundation Regarding Irradiated Water Release from Pilgrim ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22136A2602022-05-16016 May 2022 Submittal of Annual Radiological Environmental Operating Report for January 1 Through December 31, 2021 ML22136A2572022-05-16016 May 2022 Submittal of Annual Radioactive Effluent Release Report for January 1 Through December 31, 2021 2024-09-18
[Table view] |
Inspection Report - Pilgrim - 2011011 |
---|
|
|
|
Text
SUBJECT:
PILGRIM NUCLEAR POWER STATION - NRC INSPECTION REPORT 05000293t2011011
Dear Mr. Smith:
On April 15,2011, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Pilgrim Nuclear Power Station (PNPS), using Temporary Instruction 2515/183, "Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event." The enclosed inspection report documents the inspection results which were discussed on April 15, 2011, with you and other members of your staff.
The inspection examined activities conducted under 10 CFR 50.54 (hh) and your License Condition 3.L(b)7 relative to the implementation of 8.5.b mitigating strategies. The inspection involved examination of selected procedures and records, observation of activities, and interviews with station personnel.
This report documents one NRC identified finding of very low safety significance (Green). The finding was determined to involve a violation of NRC requirements. However, because of its very low safety significance and because it was entered into your Corrective Action Program, the NRC is treating this finding as a non-cited violation (NCV), consistent with Section2.3.2.a of the NRC's Enforcement Policy. lf you contest the NCV in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U. S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C.
20555-0001, with copies to the Regional Administrator, Region l; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001; and the NRC Resident lnspector at Pilgrim. In addition, if you disagree with the cross-cutting aspect assigned to the finding in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the RegionalAdministrator, Region I and the NRC Resident Inspector at Pilgrim.
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from the Enclosure, this document is DECONTROLLED.
EFFICIALUSE ONtY SECURITY RETATED Ii.lFORMANEN
OFFIGIAT USE ENIY SEEURITY RETATEB INFORMATIEN In accordance with 10 CFR 2.390 of the NRC "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room and from the Publicly Available Records System (PARS) component of the NRC Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://wrrvw.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
Sincerely,
/RN John F. Rogge, Chief Engineering Branch 3 Division of Reactor Safety Docket No.: 50-293 License No.: DPR-35 Enclosure: lnspection Report 05000293/201 101 1 w/Attachment: Supplemental Information cc: Wencl: w/ OUO-SRI:
D. Burke, Security Manager J. Giarrussio, SLO, Massachusetts Emergency Management Agency cc: Wo encl: w/o OUO-SRI:
Distribution via ListServ OFFICIAT USE ONIY SECURITY RETATED INFERM\TIEN
OFFICIAT USE ONIY SEGURITY RETATED INFORMATION