{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES
NUCLEAR REGULATORY COMMISSION
                            NUCLEAR REGULATORY COMMISSION
REGION III
                                                REGION III
2443 WARRENVILLE ROAD, SUITE 210
                                  2443 WARRENVILLE ROAD, SUITE 210
LISLE, IL 60532
                                          LISLE, IL 60532-4352
-4352   August 31, 2011
                                            August 31, 2011
  Mr. Mark A. Schimmel
Mr. Mark A. Schimmel
Site Vice President
Site Vice President
Prairie Island Nuclear Generating Plant
Prairie Island Nuclear Generating Plant
Northern States Power Company, Minnesota
Northern States Power Company, Minnesota
1717 Wakonade Drive East
1717 Wakonade Drive East
Welch, MN 55089
Welch, MN 55089
SUBJECT: PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS
SUBJECT:         PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 -
1 AND 2 - INFORMATION REQUEST FOR THE TRIENNIAL PERMANENT PLANT MODIFICATIONS AND EVALUATIONS OF CHANGES, TESTS, OR EXPERIMENTS (MOD/50.59)
                INFORMATION REQUEST FOR THE TRIENNIAL PERMANENT PLANT
BASELINE INSPECTION
                MODIFICATIONS AND EVALUATIONS OF CHANGES, TESTS, OR
05000282/2011012(DRS); 05000306/2011012(DRS) Dear Mr. Schimmel: On October 31, 2011 , the U.S. Nuclear Regulatory Commission (NRC) will begin a MOD/50.59
                EXPERIMENTS (MOD/50.59) BASELINE INSPECTION
baseline inspection at the Prairie Island Nuclear Generating Plant, Units
                05000282/2011012(DRS); 05000306/2011012(DRS)
1 and 2. This inspection  
Dear Mr. Schimmel:
will be performed in accordance with the NRC baseline Inspection Procedure  
On October 31, 2011, the U.S. Nuclear Regulatory Commission (NRC) will begin a MOD/50.59
(IP) 71111.17. The  
baseline inspection at the Prairie Island Nuclear Generating Plant, Units 1 and 2. This inspection
on-sit e portion of the inspection will take place on October 31 - November 4, 2011, and November 14 - 18, 2011. Experience has shown that these baseline inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the
will be performed in accordance with the NRC baseline Inspection Procedure (IP) 71111.17. The
site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for th
on-site portion of the inspection will take place on October 31 - November 4, 2011, and
e inspection. These documents have been divided into
November 14 - 18, 2011.
three groups.
Experience has shown that these baseline inspections are extremely resource intensive, both for
The first group of information is necessary to ensure that the inspection team
the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site
is adequately prepared for the inspection. This information should be made available via compact disc and delivered to the regional office no later than September  
and to ensure a productive inspection for both parties, we have enclosed a request for documents
26, 2011. The inspection team will review this information
needed for the inspection. These documents have been divided into three groups.
and, by September 30, 2011, will request specific items that should be provided for review in the regional office by October 14, 2011. The second group of requested documents contains additional items that the inspection team will  
The first group of information is necessary to ensure that the inspection team is adequately
review, or need access to, during the inspection. Certain documents contained within this group, i.e., Item (1), will be requested for review in the regional office prior to the inspection by October 14, 2011, as identified above. The remaining documents should be available by the first day of the on
prepared for the inspection. This information should be made available via compact disc and
-site inspection, October 31, 2011.  
delivered to the regional office no later than September 26, 2011. The inspection team will review
  M. Schimmel     -2- The third group
this information and, by September 30, 2011, will request specific items that should be provided for
lists information necessary to aid the inspection team in tracking issues identified as a result of the inspection.
review in the regional office by October 14, 2011.
  The remaining documents in group three should be
The second group of requested documents contains additional items that the inspection team will
available by the first day of the on
review, or need access to, during the inspection. Certain documents contained within this group,
-site inspection, October 31, 2011. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or
i.e., Item (1), will be requested for review in the regional office prior to the inspection by
the on-site portions of the
October 14, 2011, as identified above. The remaining documents should be available by the first
inspection.
day of the on-site inspection, October 31, 2011.
The lead inspector for this inspection is
 
Mr. George M. Hausman. We understand that our
M. Schimmel                                   -2-
regulatory contact for this inspection is Mr.
The third group lists information necessary to aid the inspection team in tracking issues identified
Sam J. DiPasquale of your organization.
as a result of the inspection. The remaining documents in group three should be available by the
If there are any questions about the inspection or the material requested, please contact the  
first day of the on-site inspection, October 31, 2011. It is requested that this information be
lead inspector at
provided to the lead inspector as the information is generated during the inspection. It is important
(630) 829-9743 or via e-mail at George.Hausman@nrc.gov
that all of these documents are up to date and complete in order to minimize the number of
. This letter does not contain new or amended information collection requirements subject to the  
additional documents requested during the preparation and/or the on-site portions of the
Paperwork Reduction Act of 1995 (44
inspection.
U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150
The lead inspector for this inspection is Mr. George M. Hausman. We understand that our
-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for  
regulatory contact for this inspection is Mr. Sam J. DiPasquale of your organization. If there are
information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
any questions about the inspection or the material requested, please contact the lead inspector at
In accordance with 10
(630) 829-9743 or via e-mail at George.Hausman@nrc.gov.
CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),  
This letter does not contain new or amended information collection requirements subject to the
accessible from the NRC Web site at http://www.nrc.gov/reading
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
-rm/adams.html
requirements were approved by the Office of Management and Budget, control number 3150-0011.
(the Public Electronic Reading Room).
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for
Sincerely, /RA by G. M. Hausman for/
information or an information collection requirement unless the requesting document displays a
  Robert C. Daley, Chief Engineering Branch
currently valid Office of Management and Budget control number.
3 Division of Reactor Safety  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
Docket Nos.
enclosure will be available electronically for public inspection in the NRC Public Document Room
: 50-282; 50-306 License Nos.
or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS),
: DPR-42; DPR-60 Enclosure:
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public
MODIFICATION 50.59 BASELINE INSPECTION INITIAL DOCUMENT REQUEST
Electronic Reading Room).
cc w/encl:
                                              Sincerely,
Distribution via ListServ
                                              /RA by G. M. Hausman for/
 
                                              Robert C. Daley, Chief
MODIFICATION 50.59 BASELINE INSPECTION
                                              Engineering Branch 3
INITIAL DOCUMENT REQUEST
                                              Division of Reactor Safety
Enclosure 1 Inspection Report
Docket Nos.: 50-282; 50-306
: 05000282/2011012(DRS); 05000306/2011012(DRS) Inspection Dates
License Nos.: DPR-42; DPR-60
: October 31 - November 4, 2011, and November
Enclosure:       MODIFICATION 50.59 BASELINE INSPECTION INITIAL DOCUMENT REQUEST
14 - 18, 2011 Inspection ProcedureInspect i on Team Leade
cc w/encl:       Distribution via ListServ
r: George M. Hausman
 
: IP 71111.17 , "Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications" (630) 829-9 7 43 George.Hausman@nrc.gov I. Information Requested for In-Office Preparation Week
                          MODIFICATION 50.59 BASELINE INSPECTION
The following information is requested by September 26, 2011, or sooner, to facilitate the selection of
                                  INITIAL DOCUMENT REQUEST
specific items that will be reviewed during the on
Inspection Report:             05000282/2011012(DRS); 05000306/2011012(DRS)
-site inspection week. The inspection team will select
Inspection Dates:             October 31 - November 4, 2011, and November 14 - 18, 2011
specific items from the information requested below and submit a list to your staff by September 30, 2011. We will request that certain items be made available to the regional office
Inspection Procedure:         IP 71111.17, Evaluations of Changes, Tests, or Experiments and
prior to the inspection by October 14, 2011. We request that the remaining items selected from the lists be available and ready for review on the first day of inspection
                              Permanent Plant Modifications"
(i.e., January 10, 2011). All requested information should identify the associated system and cover the time frame from the receipt of information for the last MOD/50.59 Inspection on December 5, 2008 , to the present.
Inspection Team Leader:        George M. Hausman
The required information identified below should be provided on compact disc
                              (630) 829-9743
(CD). Please provide three copies of each CD
                              George.Hausman@nrc.gov
submitted (i.e., one for each inspector).
I.   Information Requested for In-Office Preparation Week
  The preferred file format is a searchable "pdf" file. The CD
      The following information is requested by September 26, 2011, or sooner, to facilitate the
s should be indexed and hyper
      selection of specific items that will be reviewed during the on-site inspection week. The
-linked to facilitate ease of use, if possible.
      inspection team will select specific items from the information requested below and submit
If you have any questions regarding this information, please call the inspection team leader as soon as possible.
      a list to your staff by September 30, 2011. We will request that certain items be made
(1) List of "permanent plant modifications" to systems, structures, or components that are field work complete. (For the purpose of this inspection, permanent plant modifications include permanent: plant changes, design changes, set
      available to the regional office prior to the inspection by October 14, 2011. We request that
point changes, equivalency evaluations, suitability analyses, and commercial grade dedications.)
      the remaining items selected from the lists be available and ready for review on the first day
The list should contain the number of each document, the title, the revision (or
      of inspection (i.e., January 10, 2011). All requested information should identify the
date), and the affected system. In addition to the list, please provide a description of each modification and a list of associated calculations and affected procedures.  
      associated system and cover the time frame from the receipt of information for the last
MODIFICATION 50.59 BASELINE INSPECTION
      MOD/50.59 Inspection on December 5, 2008, to the present.
INITIAL DOCUMENT REQUEST
      The required information identified below should be provided on compact disc (CD). Please
Enclosure 2 (2) List of all 10
      provide three copies of each CD submitted (i.e., one for each inspector). The preferred file
CFR 50.59 completed evaluations involving (a)
      format is a searchable pdf file. The CDs should be indexed and hyper-linked to facilitate
calculations
      ease of use, if possible. If you have any questions regarding this information, please call
, (b) procedure revisions
      the inspection team leader as soon as possible.
, (c) changes to the facility (modifications)
      (1)     List of permanent plant modifications to systems, structures, or components that
, (d) non-routine operating configurations
              are field work complete. (For the purpose of this inspection, permanent plant
, or (e) departures in methods of analyses. This list should include 50.59 evaluations for the following:
              modifications include permanent: plant changes, design changes, set point
a. Changes that have been made under the pr
              changes, equivalency evaluations, suitability analyses, and commercial grade
ovisions of 10
              dedications.)
CFR 50.59 tha t have been updated in accordance with 10
              The list should contain the number of each document, the title, the revision (or date),
CFR 50.71(e)(4) since July 1 , 2007; b. Modifications that are field work complete; and
              and the affected system. In addition to the list, please provide a description of each
c. Changes to calculations (or initiation of new calculations) that have been
              modification and a list of associated calculations and affected procedures.
issued. The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of  
                                                  1                                        Enclosure
the affected document (i.e., the modification or procedure to which the evaluation applies). The list should NOT i
 
nclude any evaluations in which prior NRC approval was sought and obtained.
                MODIFICATION 50.59 BASELINE INSPECTION
(3) A list of all 10
                        INITIAL DOCUMENT REQUEST
CFR 50.59 changes that have been screened out as not requiring a full evaluation involving: (a)
(2) List of all 10 CFR 50.59 completed evaluations involving (a) calculations,
calculations; (b)
    (b) procedure revisions, (c) changes to the facility (modifications), (d) non-routine
procedure revisions; (c)
    operating configurations, or (e) departures in methods of analyses. This list should
changes to th
    include 50.59 evaluations for the following:
e facility (modifications); (d)
    a.       Changes that have been made under the provisions of 10 CFR 50.59
non-routine operating configurations; or (e)
              that have been updated in accordance with 10 CFR 50.71(e)(4) since
departures in methods of analyses.
              July 1, 2007;
The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies).
    b.       Modifications that are field work complete; and
(4) A list of any modifications, procedure revisions, or  
    c.       Changes to calculations (or initiation of new calculations) that have been
UFSAR changes where it was determined that 10
              issued. The list should contain the number and title of each document, a
CFR 50.59 did not apply.
              brief description of the change, and the corresponding number and type of
(5) A list of calculation changes that have been
              the affected document (i.e., the modification or procedure to which the
issued for use.
              evaluation applies). The list should NOT include any evaluations in
(6) A list of corrective action documents (open and closed) that address permanent plant modification
              which prior NRC approval was sought and obtained.
s or 10 CFR 50.59 issues, concerns, or processes. These documents should also include the corrective action documents associated with the modification and the 50.59 change implementation.
(3) A list of all 10 CFR 50.59 changes that have been screened out as not requiring a
The list should contain the number, title and revision (or date) of each document, the affected system and corresponding documentation (if applicable), and should be sorted in order of significance
    full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes to the
. (7) C opies of procedures addressing the following: modifications, design changes, set point changes, equivalency evaluations or suitability analyses, commercial grade dedications, post-modification testing, 10
    facility (modifications); (d) non-routine operating configurations; or (e) departures in
CFR 50.59 evaluation
    methods of analyses.
s and screenings, and UFSAR updates.
    The list should contain the number and title of each document, a brief description of
MODIFICATION 50.59 BASELINE INSPECTION
    the change, and the corresponding number and type of the affected document
INITIAL DOCUMENT REQUEST
    (i.e., the modification or procedure to which the evaluation applies).
Enclosure 3 (8) UFSAR updates submitted in accordance with 10
(4) A list of any modifications, procedure revisions, or UFSAR changes where it was
CFR 50.71(e)(4). Provide copies of the complete submittal.
    determined that 10 CFR 50.59 did not apply.
(9) Copy of the  
(5) A list of calculation changes that have been issued for use.
UFSAR change log or a synopsis of
(6) A list of corrective action documents (open and closed) that address permanent
the changes. This should include all of the changes made to the  
    plant modifications or 10 CFR 50.59 issues, concerns, or processes. These
UFSAR that were incorporated in the last  
    documents should also include the corrective action documents associated with the
10 CFR 50.71(e)(4) submittal.
    modification and the 50.59 change implementation.
(10) Electronic copy of the  
    The list should contain the number, title and revision (or date) of each document, the
UFSAR and technical specifications, if available.
    affected system and corresponding documentation (if applicable), and should be
(11) Name(s) and phone numbers for the regulatory and technical contacts.
    sorted in order of significance.
(12) Current management and engineering organizational chart. II. Information Requested to be Available Prior to Inspection (Request will be Made by September 30, 2011 , for Availability of Documents by October 14, 2011 , [Item 1]) or on First Day of Inspection  
(7) Copies of procedures addressing the following: modifications, design changes, set
(October 31, 2011) [Items 2, 3 and 4] (1) Copies of all selected items from Section
    point changes, equivalency evaluations or suitability analyses, commercial grade
I. This includes copies(2) Copies of these documents do not need to be solely available to the inspection team as long as the inspectors have easy and unrestrained access to them.
    dedications, post-modification testing, 10 CFR 50.59 evaluations and screenings,
  of associated documents such as calculations, post
    and UFSAR updates.
-modification test packages, 10
                                          2                                      Enclosure
CFR 50.59 evaluations or screenings, and any corrective action documents.
 
a. Updated Final Safety Analysis Report
                      MODIFICATION 50.59 BASELINE INSPECTION
, if not previously provided
                              INITIAL DOCUMENT REQUEST
; b. Original FSAR Volumes
    (8)   UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide copies
; c. Original SER and Supplements
          of the complete submittal.
; d. FSAR Question and Answers
    (9)   Copy of the UFSAR change log or a synopsis of the changes. This should include
; e. Quality Assurance Plan;
          all of the changes made to the UFSAR that were incorporated in the last
f. Technical Specifications
          10 CFR 50.71(e)(4) submittal.
, if not previously provided
    (10)   Electronic copy of the UFSAR and technical specifications, if available.
; g. Latest IPE/PRA Report;
    (11)   Name(s) and phone numbers for the regulatory and technical contacts.
h. Vendor Manuals; and
    (12)   Current management and engineering organizational chart.
i. The latest 10
II. Information Requested to be Available Prior to Inspection (Request will be Made by
CFR 50.59 UFSAR Update Submittal
    September 30, 2011, for Availability of Documents by October 14, 2011, [Item 1]) or
(3) Please ensure that other supporting documents for the selected items have been located and are readily retrievable as the inspection team will likely be requesting these documents during the inspection. Examples of supporting documents are:
    on First Day of Inspection (October 31, 2011) [Items 2, 3 and 4]
 
    (1)   Copies of all selected items from Section I. This includes copies of associated
MODIFICATION 50.59 BASELINE INSPECTION
          documents such as calculations, post-modification test packages, 10 CFR 50.59
INITIAL DOCUMENT REQUEST
          evaluations or screenings, and any corrective action documents.
Enclosure 4 a. Drawings supporting the modifications;
    (2)    Copies of these documents do not need to be solely available to the inspection team
b. Procedures affected by the modifications; and
          as long as the inspectors have easy and unrestrained access to them.
c. UFSAR change papers generated due to a 10
          a.       Updated Final Safety Analysis Report, if not previously provided;
CFR 50.59 evaluation.
          b.       Original FSAR Volumes;
(4) Assessment and  
          c.       Original SER and Supplements;
Corrective Actions:
          d.       FSAR Question and Answers;
a. The most recent MOD
          e.       Quality Assurance Plan;
/50.59 Quality Assurance (QA) audit and/or self-assessment; and
          f.       Technical Specifications, if not previously provided;
b. Corrective action documents (e.g., condition reports, including status of corrective actions) generate as a result of the most recent
          g.       Latest IPE/PRA Report;
MOD/50.59 QA audit and/or self
          h.       Vendor Manuals; and
-assessment.
          i.       The latest 10 CFR 50.59 UFSAR Update Submittal
III. Information Requested to be provided throughout the inspection
    (3)   Please ensure that other supporting documents for the selected items have been
(1) Copies of any corrective action documents generated as a result of the
          located and are readily retrievable as the inspection team will likely be requesting
inspection
          these documents during the inspection. Examples of supporting documents are:
team's questions or queries during this inspection.
                                                3                                      Enclosure
(2) Copies of the list of questions submitted by the inspection team members and the status/resolution of
 
the information requested (provide daily during the inspection to each inspection team member).
                      MODIFICATION 50.59 BASELINE INSPECTION
If you have any questions regarding the information requested, please contact the inspection team leader.  
                                INITIAL DOCUMENT REQUEST
  M. Schimmel
            a.     Drawings supporting the modifications;
    -2- The third group lists information necessary to aid the inspection team in tracking issues identified as a result of the inspection. The remaining documents in group three should be
            b.     Procedures affected by the modifications; and
available by the first day of the on
            c.     UFSAR change papers generated due to a 10 CFR 50.59 evaluation.
-site inspection, October 31, 2011. It is requested that
    (4)     Assessment and Corrective Actions:
this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the
            a.     The most recent MOD/50.59 Quality Assurance (QA) audit and/or self-
preparation and/or the on-site portions of the inspection.
                    assessment; and
The lead inspector for this inspection is Mr.
            b.     Corrective action documents (e.g., condition reports, including status of
George M. Hausman. We understand that our regulatory contact for this inspection is Mr.
                    corrective actions) generate as a result of the most recent MOD/50.59 QA
Sam J. DiPasquale of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at (630)
                    audit and/or self-assessment.
829-9743 or via e
III. Information Requested to be provided throughout the inspection
-mail at George.Hausman@nrc.gov
    (1)     Copies of any corrective action documents generated as a result of the inspection
. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44
            teams questions or queries during this inspection.
U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150
    (2)     Copies of the list of questions submitted by the inspection team members and the
-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection  
            status/resolution of the information requested (provide daily during the inspection to
requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
            each inspection team member).
In accordance with 10
    If you have any questions regarding the information requested, please contact the
CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
    inspection team leader.
-rm/adams.html
                                                4                                        Enclosure
(the Public Electronic Reading Room).
 
Sincerely, /RA by G. M. Hausman for/
M. Schimmel                                                               -2-
  Robert C. Daley, Chief
The third group lists information necessary to aid the inspection team in tracking issues identified as a result
Engineering Branch
of the inspection. The remaining documents in group three should be available by the first day of the on-site
3 Division of Reactor Safety  
inspection, October 31, 2011. It is requested that this information be provided to the lead inspector as the
Docket Nos.
information is generated during the inspection. It is important that all of these documents are up to date and
: 50-282; 50-306 License Nos.
complete in order to minimize the number of additional documents requested during the preparation and/or
: DPR-42; DPR-60 Enclosure:
the on-site portions of the inspection.
MODIFICATION 50.59 BASELINE INSPECTION INITIAL DOCUMENT REQUEST
The lead inspector for this inspection is Mr. George M. Hausman. We understand that our regulatory contact
  cc w/encl:
for this inspection is Mr. Sam J. DiPasquale of your organization. If there are any questions about the
Distribution via ListServ
inspection or the material requested, please contact the lead inspector at (630) 829-9743 or via e-mail at
  DISTRIBUTIONSee next page
George.Hausman@nrc.gov.
: DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress
This letter does not contain new or amended information collection requirements subject to the Paperwork
\Ltr. 83111 Prairie Island Request for Information GMH.docx
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved
  -Publicly Available
by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or
  -Sensitive To receive a copy of this document, indicate in the concurrence box
sponsor, and a person is not required to respond to, a request for information or an information collection
"C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
requirement unless the requesting document displays a currently valid Office of Management and Budget
  OFFICE RIII E RIII     NAME GHausman: ls
control number.
  RDaley  DATE 08/31/11 08/31/11   OFFICIAL RECORD COPY  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will
  Letter to Mr.
be available electronically for public inspection in the NRC Public Document Room or from the Publicly
Mark A. Schimmel from Mr. Robert C. Daley dated August
Available Records (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web
31, 2011. SUBJECT: PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 - INFORMATION REQUEST FOR THE TRIENNIAL PERMANENT PLANT
site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
MODIFICATIONS AND EVALUATIONS OF CHANGES, TESTS, OR
                                                                          Sincerely,
EXPERIMENTS (MOD/50.59) BASELINE INSPECTION 05000282/2011012(DRS); 05000306/2011012(DRS) DISTRIBUTION: Daniel Merzke
                                                                          /RA by G. M. Hausman for/
RidsNrrPMPrairieIsland Resource
                                                                          Robert C. Daley, Chief
RidsNrrDorlLpl3
                                                                          Engineering Branch 3
-1 Resource
                                                                          Division of Reactor Safety
RidsNrrDirsIrib Resource
Docket Nos.: 50-282; 50-306
Cynthia Pederson
License Nos.: DPR-42; DPR-60
Steven Orth
Enclosure:               MODIFICATION 50.59 BASELINE INSPECTION INITIAL DOCUMENT REQUEST
Jared Heck
cc w/encl:               Distribution via ListServ
Allan Barker
DISTRIBUTION:
Carole Ariano
See next page
Linda Linn
DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr. 83111 Prairie Island Request for Information GMH.docx
DRPIII DRSIII Patricia Buckley
Publicly Available                        Non-Publicly Available                   Sensitive              Non-Sensitive
Tammy Tomczak
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
ROPreports Resource
  OFFICE RIII                             E         RIII
NAME GHausman: ls                                 RDaley
  DATE           08/31/11                           08/31/11
                                                            OFFICIAL RECORD COPY
 
Letter to Mr. Mark A. Schimmel from Mr. Robert C. Daley dated August 31, 2011.
SUBJECT:       PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 -
              INFORMATION REQUEST FOR THE TRIENNIAL PERMANENT PLANT
              MODIFICATIONS AND EVALUATIONS OF CHANGES, TESTS, OR
              EXPERIMENTS (MOD/50.59) BASELINE INSPECTION
              05000282/2011012(DRS); 05000306/2011012(DRS)
DISTRIBUTION:
Daniel Merzke
RidsNrrPMPrairieIsland Resource
RidsNrrDorlLpl3-1 Resource
RidsNrrDirsIrib Resource
Cynthia Pederson
Steven Orth
Jared Heck
Allan Barker
Carole Ariano
Linda Linn
DRPIII
DRSIII
Patricia Buckley
Tammy Tomczak
ROPreports Resource
}}
}}

Latest revision as of 15:23, 12 November 2019

Information Request for the Triennial Permanent Plant Modifications and Evaluations of Changes, Tests, or Experiments (MOD/50.59) Baseline Inspection 05000282-11-012(DRS); 05000306-11-012(DRS)
ML11243A100
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 08/31/2011
From: Robert Daley
Engineering Branch 3
To: Schimmel M
Northern States Power Co
References
IR-11-012
Download: ML11243A100 (9)


See also: IR 05000282/2011012

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE ROAD, SUITE 210

LISLE, IL 60532-4352

August 31, 2011

Mr. Mark A. Schimmel

Site Vice President

Prairie Island Nuclear Generating Plant

Northern States Power Company, Minnesota

1717 Wakonade Drive East

Welch, MN 55089

SUBJECT: PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 -

INFORMATION REQUEST FOR THE TRIENNIAL PERMANENT PLANT

MODIFICATIONS AND EVALUATIONS OF CHANGES, TESTS, OR

EXPERIMENTS (MOD/50.59) BASELINE INSPECTION

05000282/2011012(DRS); 05000306/2011012(DRS)

Dear Mr. Schimmel:

On October 31, 2011, the U.S. Nuclear Regulatory Commission (NRC) will begin a MOD/50.59

baseline inspection at the Prairie Island Nuclear Generating Plant, Units 1 and 2. This inspection

will be performed in accordance with the NRC baseline Inspection Procedure (IP) 71111.17. The

on-site portion of the inspection will take place on October 31 - November 4, 2011, and

November 14 - 18, 2011.

Experience has shown that these baseline inspections are extremely resource intensive, both for

the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site

and to ensure a productive inspection for both parties, we have enclosed a request for documents

needed for the inspection. These documents have been divided into three groups.

The first group of information is necessary to ensure that the inspection team is adequately

prepared for the inspection. This information should be made available via compact disc and

delivered to the regional office no later than September 26, 2011. The inspection team will review

this information and, by September 30, 2011, will request specific items that should be provided for

review in the regional office by October 14, 2011.

The second group of requested documents contains additional items that the inspection team will

review, or need access to, during the inspection. Certain documents contained within this group,

i.e., Item (1), will be requested for review in the regional office prior to the inspection by

October 14, 2011, as identified above. The remaining documents should be available by the first

day of the on-site inspection, October 31, 2011.

M. Schimmel -2-

The third group lists information necessary to aid the inspection team in tracking issues identified

as a result of the inspection. The remaining documents in group three should be available by the

first day of the on-site inspection, October 31, 2011. It is requested that this information be

provided to the lead inspector as the information is generated during the inspection. It is important

that all of these documents are up to date and complete in order to minimize the number of

additional documents requested during the preparation and/or the on-site portions of the

inspection.

The lead inspector for this inspection is Mr. George M. Hausman. We understand that our

regulatory contact for this inspection is Mr. Sam J. DiPasquale of your organization. If there are

any questions about the inspection or the material requested, please contact the lead inspector at

(630) 829-9743 or via e-mail at George.Hausman@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-0011.

The NRC may not conduct or sponsor, and a person is not required to respond to, a request for

information or an information collection requirement unless the requesting document displays a

currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document Room

or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS),

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room).

Sincerely,

/RA by G. M. Hausman for/

Robert C. Daley, Chief

Engineering Branch 3

Division of Reactor Safety

Docket Nos.: 50-282; 50-306

License Nos.: DPR-42; DPR-60

Enclosure: MODIFICATION 50.59 BASELINE INSPECTION INITIAL DOCUMENT REQUEST

cc w/encl: Distribution via ListServ

MODIFICATION 50.59 BASELINE INSPECTION

INITIAL DOCUMENT REQUEST

Inspection Report: 05000282/2011012(DRS); 05000306/2011012(DRS)

Inspection Dates: October 31 - November 4, 2011, and November 14 - 18, 2011

Inspection Procedure: IP 71111.17, Evaluations of Changes, Tests, or Experiments and

Permanent Plant Modifications"

Inspection Team Leader: George M. Hausman

(630) 829-9743

George.Hausman@nrc.gov

I. Information Requested for In-Office Preparation Week

The following information is requested by September 26, 2011, or sooner, to facilitate the

selection of specific items that will be reviewed during the on-site inspection week. The

inspection team will select specific items from the information requested below and submit

a list to your staff by September 30, 2011. We will request that certain items be made

available to the regional office prior to the inspection by October 14, 2011. We request that

the remaining items selected from the lists be available and ready for review on the first day

of inspection (i.e., January 10, 2011). All requested information should identify the

associated system and cover the time frame from the receipt of information for the last

MOD/50.59 Inspection on December 5, 2008, to the present.

The required information identified below should be provided on compact disc (CD). Please

provide three copies of each CD submitted (i.e., one for each inspector). The preferred file

format is a searchable pdf file. The CDs should be indexed and hyper-linked to facilitate

ease of use, if possible. If you have any questions regarding this information, please call

the inspection team leader as soon as possible.

(1) List of permanent plant modifications to systems, structures, or components that

are field work complete. (For the purpose of this inspection, permanent plant

modifications include permanent: plant changes, design changes, set point

changes, equivalency evaluations, suitability analyses, and commercial grade

dedications.)

The list should contain the number of each document, the title, the revision (or date),

and the affected system. In addition to the list, please provide a description of each

modification and a list of associated calculations and affected procedures.

1 Enclosure

MODIFICATION 50.59 BASELINE INSPECTION

INITIAL DOCUMENT REQUEST

(2) List of all 10 CFR 50.59 completed evaluations involving (a) calculations,

(b) procedure revisions, (c) changes to the facility (modifications), (d) non-routine

operating configurations, or (e) departures in methods of analyses. This list should

include 50.59 evaluations for the following:

a. Changes that have been made under the provisions of 10 CFR 50.59

that have been updated in accordance with 10 CFR 50.71(e)(4) since

July 1, 2007;

b. Modifications that are field work complete; and

c. Changes to calculations (or initiation of new calculations) that have been

issued. The list should contain the number and title of each document, a

brief description of the change, and the corresponding number and type of

the affected document (i.e., the modification or procedure to which the

evaluation applies). The list should NOT include any evaluations in

which prior NRC approval was sought and obtained.

(3) A list of all 10 CFR 50.59 changes that have been screened out as not requiring a

full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes to the

facility (modifications); (d) non-routine operating configurations; or (e) departures in

methods of analyses.

The list should contain the number and title of each document, a brief description of

the change, and the corresponding number and type of the affected document

(i.e., the modification or procedure to which the evaluation applies).

(4) A list of any modifications, procedure revisions, or UFSAR changes where it was

determined that 10 CFR 50.59 did not apply.

(5) A list of calculation changes that have been issued for use.

(6) A list of corrective action documents (open and closed) that address permanent

plant modifications or 10 CFR 50.59 issues, concerns, or processes. These

documents should also include the corrective action documents associated with the

modification and the 50.59 change implementation.

The list should contain the number, title and revision (or date) of each document, the

affected system and corresponding documentation (if applicable), and should be

sorted in order of significance.

(7) Copies of procedures addressing the following: modifications, design changes, set

point changes, equivalency evaluations or suitability analyses, commercial grade

dedications, post-modification testing, 10 CFR 50.59 evaluations and screenings,

and UFSAR updates.

2 Enclosure

MODIFICATION 50.59 BASELINE INSPECTION

INITIAL DOCUMENT REQUEST

(8) UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide copies

of the complete submittal.

(9) Copy of the UFSAR change log or a synopsis of the changes. This should include

all of the changes made to the UFSAR that were incorporated in the last

10 CFR 50.71(e)(4) submittal.

(10) Electronic copy of the UFSAR and technical specifications, if available.

(11) Name(s) and phone numbers for the regulatory and technical contacts.

(12) Current management and engineering organizational chart.

II. Information Requested to be Available Prior to Inspection (Request will be Made by

September 30, 2011, for Availability of Documents by October 14, 2011, [Item 1]) or

on First Day of Inspection (October 31, 2011) [Items 2, 3 and 4]

(1) Copies of all selected items from Section I. This includes copies of associated

documents such as calculations, post-modification test packages, 10 CFR 50.59

evaluations or screenings, and any corrective action documents.

(2) Copies of these documents do not need to be solely available to the inspection team

as long as the inspectors have easy and unrestrained access to them.

a. Updated Final Safety Analysis Report, if not previously provided;

b. Original FSAR Volumes;

c. Original SER and Supplements;

d. FSAR Question and Answers;

e. Quality Assurance Plan;

f. Technical Specifications, if not previously provided;

g. Latest IPE/PRA Report;

h. Vendor Manuals; and

i. The latest 10 CFR 50.59 UFSAR Update Submittal

(3) Please ensure that other supporting documents for the selected items have been

located and are readily retrievable as the inspection team will likely be requesting

these documents during the inspection. Examples of supporting documents are:

3 Enclosure

MODIFICATION 50.59 BASELINE INSPECTION

INITIAL DOCUMENT REQUEST

a. Drawings supporting the modifications;

b. Procedures affected by the modifications; and

c. UFSAR change papers generated due to a 10 CFR 50.59 evaluation.

(4) Assessment and Corrective Actions:

a. The most recent MOD/50.59 Quality Assurance (QA) audit and/or self-

assessment; and

b. Corrective action documents (e.g., condition reports, including status of

corrective actions) generate as a result of the most recent MOD/50.59 QA

audit and/or self-assessment.

III. Information Requested to be provided throughout the inspection

(1) Copies of any corrective action documents generated as a result of the inspection

teams questions or queries during this inspection.

(2) Copies of the list of questions submitted by the inspection team members and the

status/resolution of the information requested (provide daily during the inspection to

each inspection team member).

If you have any questions regarding the information requested, please contact the

inspection team leader.

4 Enclosure

M. Schimmel -2-

The third group lists information necessary to aid the inspection team in tracking issues identified as a result

of the inspection. The remaining documents in group three should be available by the first day of the on-site

inspection, October 31, 2011. It is requested that this information be provided to the lead inspector as the

information is generated during the inspection. It is important that all of these documents are up to date and

complete in order to minimize the number of additional documents requested during the preparation and/or

the on-site portions of the inspection.

The lead inspector for this inspection is Mr. George M. Hausman. We understand that our regulatory contact

for this inspection is Mr. Sam J. DiPasquale of your organization. If there are any questions about the

inspection or the material requested, please contact the lead inspector at (630) 829-9743 or via e-mail at

George.Hausman@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the Paperwork

Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved

by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or

sponsor, and a person is not required to respond to, a request for information or an information collection

requirement unless the requesting document displays a currently valid Office of Management and Budget

control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will

be available electronically for public inspection in the NRC Public Document Room or from the Publicly

Available Records (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web

site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA by G. M. Hausman for/

Robert C. Daley, Chief

Engineering Branch 3

Division of Reactor Safety

Docket Nos.: 50-282; 50-306

License Nos.: DPR-42; DPR-60

Enclosure: MODIFICATION 50.59 BASELINE INSPECTION INITIAL DOCUMENT REQUEST

cc w/encl: Distribution via ListServ

DISTRIBUTION:

See next page

DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr. 83111 Prairie Island Request for Information GMH.docx

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE RIII E RIII

NAME GHausman: ls RDaley

DATE 08/31/11 08/31/11

OFFICIAL RECORD COPY

Letter to Mr. Mark A. Schimmel from Mr. Robert C. Daley dated August 31, 2011.

SUBJECT: PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 -

INFORMATION REQUEST FOR THE TRIENNIAL PERMANENT PLANT

MODIFICATIONS AND EVALUATIONS OF CHANGES, TESTS, OR

EXPERIMENTS (MOD/50.59) BASELINE INSPECTION

05000282/2011012(DRS); 05000306/2011012(DRS)

DISTRIBUTION:

Daniel Merzke

RidsNrrPMPrairieIsland Resource

RidsNrrDorlLpl3-1 Resource

RidsNrrDirsIrib Resource

Cynthia Pederson

Steven Orth

Jared Heck

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

Patricia Buckley

Tammy Tomczak

ROPreports Resource