ML11243A100: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES | {{#Wiki_filter:UNITED STATES | ||
NUCLEAR REGULATORY COMMISSION | |||
REGION III | |||
2443 WARRENVILLE ROAD, SUITE 210 | |||
LISLE, IL 60532-4352 | |||
-4352 | August 31, 2011 | ||
Mr. Mark A. Schimmel | |||
Site Vice President | |||
Prairie Island Nuclear Generating Plant | |||
Northern States Power Company, Minnesota | |||
1717 Wakonade Drive East | |||
Welch, MN 55089 | |||
SUBJECT: PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 - | |||
INFORMATION REQUEST FOR THE TRIENNIAL PERMANENT PLANT | |||
MODIFICATIONS AND EVALUATIONS OF CHANGES, TESTS, OR | |||
EXPERIMENTS (MOD/50.59) BASELINE INSPECTION | |||
05000282/2011012(DRS); 05000306/2011012(DRS) | |||
Dear Mr. Schimmel: | |||
will be performed in accordance with the NRC baseline Inspection Procedure | On October 31, 2011, the U.S. Nuclear Regulatory Commission (NRC) will begin a MOD/50.59 | ||
(IP) 71111.17. | baseline inspection at the Prairie Island Nuclear Generating Plant, Units 1 and 2. This inspection | ||
on- | will be performed in accordance with the NRC baseline Inspection Procedure (IP) 71111.17. The | ||
on-site portion of the inspection will take place on October 31 - November 4, 2011, and | |||
November 14 - 18, 2011. | |||
Experience has shown that these baseline inspections are extremely resource intensive, both for | |||
the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site | |||
and to ensure a productive inspection for both parties, we have enclosed a request for documents | |||
26, 2011. | needed for the inspection. These documents have been divided into three groups. | ||
The first group of information is necessary to ensure that the inspection team is adequately | |||
review, or need access to, during the inspection. | prepared for the inspection. This information should be made available via compact disc and | ||
-site inspection, October 31, 2011. | delivered to the regional office no later than September 26, 2011. The inspection team will review | ||
this information and, by September 30, 2011, will request specific items that should be provided for | |||
review in the regional office by October 14, 2011. | |||
The second group of requested documents contains additional items that the inspection team will | |||
review, or need access to, during the inspection. Certain documents contained within this group, | |||
-site inspection, October 31, 2011. | i.e., Item (1), will be requested for review in the regional office prior to the inspection by | ||
October 14, 2011, as identified above. The remaining documents should be available by the first | |||
day of the on-site inspection, October 31, 2011. | |||
M. Schimmel -2- | |||
The third group lists information necessary to aid the inspection team in tracking issues identified | |||
as a result of the inspection. The remaining documents in group three should be available by the | |||
If there are any questions about the inspection or the material requested, please contact the | first day of the on-site inspection, October 31, 2011. It is requested that this information be | ||
lead inspector at | provided to the lead inspector as the information is generated during the inspection. It is important | ||
that all of these documents are up to date and complete in order to minimize the number of | |||
additional documents requested during the preparation and/or the on-site portions of the | |||
Paperwork Reduction Act of 1995 (44 | inspection. | ||
The lead inspector for this inspection is Mr. George M. Hausman. We understand that our | |||
-0011. | regulatory contact for this inspection is Mr. Sam J. DiPasquale of your organization. If there are | ||
information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number. | any questions about the inspection or the material requested, please contact the lead inspector at | ||
(630) 829-9743 or via e-mail at George.Hausman@nrc.gov. | |||
This letter does not contain new or amended information collection requirements subject to the | |||
accessible from the NRC Web site at http://www.nrc.gov/reading | Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection | ||
-rm/adams.html | requirements were approved by the Office of Management and Budget, control number 3150-0011. | ||
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for | |||
information or an information collection requirement unless the requesting document displays a | |||
currently valid Office of Management and Budget control number. | |||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its | |||
enclosure will be available electronically for public inspection in the NRC Public Document Room | |||
: | or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS), | ||
: | accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public | ||
Electronic Reading Room). | |||
Sincerely, | |||
/RA by G. M. Hausman for/ | |||
Robert C. Daley, Chief | |||
MODIFICATION 50.59 BASELINE INSPECTION | Engineering Branch 3 | ||
Division of Reactor Safety | |||
Docket Nos.: 50-282; 50-306 | |||
: 05000282/2011012(DRS); 05000306/2011012(DRS) Inspection Dates | License Nos.: DPR-42; DPR-60 | ||
: October 31 - November 4, 2011, and November | Enclosure: MODIFICATION 50.59 BASELINE INSPECTION INITIAL DOCUMENT REQUEST | ||
cc w/encl: Distribution via ListServ | |||
MODIFICATION 50.59 BASELINE INSPECTION | |||
INITIAL DOCUMENT REQUEST | |||
Inspection Report: 05000282/2011012(DRS); 05000306/2011012(DRS) | |||
-site inspection week. | Inspection Dates: October 31 - November 4, 2011, and November 14 - 18, 2011 | ||
Inspection Procedure: IP 71111.17, Evaluations of Changes, Tests, or Experiments and | |||
Permanent Plant Modifications" | |||
Inspection Team Leader: George M. Hausman | |||
(630) 829-9743 | |||
George.Hausman@nrc.gov | |||
I. Information Requested for In-Office Preparation Week | |||
The following information is requested by September 26, 2011, or sooner, to facilitate the | |||
selection of specific items that will be reviewed during the on-site inspection week. The | |||
-linked to facilitate ease of use, if possible. | inspection team will select specific items from the information requested below and submit | ||
If you have any questions regarding this information, please call the inspection team leader as soon as possible. | a list to your staff by September 30, 2011. We will request that certain items be made | ||
available to the regional office prior to the inspection by October 14, 2011. We request that | |||
the remaining items selected from the lists be available and ready for review on the first day | |||
of inspection (i.e., January 10, 2011). All requested information should identify the | |||
associated system and cover the time frame from the receipt of information for the last | |||
MODIFICATION 50.59 BASELINE INSPECTION | MOD/50.59 Inspection on December 5, 2008, to the present. | ||
The required information identified below should be provided on compact disc (CD). Please | |||
provide three copies of each CD submitted (i.e., one for each inspector). The preferred file | |||
format is a searchable pdf file. The CDs should be indexed and hyper-linked to facilitate | |||
ease of use, if possible. If you have any questions regarding this information, please call | |||
the inspection team leader as soon as possible. | |||
, (c) changes to the facility (modifications) | (1) List of permanent plant modifications to systems, structures, or components that | ||
, (d) non-routine operating configurations | are field work complete. (For the purpose of this inspection, permanent plant | ||
, or (e) departures in methods of analyses. | modifications include permanent: plant changes, design changes, set point | ||
changes, equivalency evaluations, suitability analyses, and commercial grade | |||
dedications.) | |||
The list should contain the number of each document, the title, the revision (or date), | |||
and the affected system. In addition to the list, please provide a description of each | |||
modification and a list of associated calculations and affected procedures. | |||
1 Enclosure | |||
the affected document (i.e., the modification or procedure to which the evaluation applies). | |||
MODIFICATION 50.59 BASELINE INSPECTION | |||
INITIAL DOCUMENT REQUEST | |||
(2) List of all 10 CFR 50.59 completed evaluations involving (a) calculations, | |||
(b) procedure revisions, (c) changes to the facility (modifications), (d) non-routine | |||
operating configurations, or (e) departures in methods of analyses. This list should | |||
include 50.59 evaluations for the following: | |||
a. Changes that have been made under the provisions of 10 CFR 50.59 | |||
that have been updated in accordance with 10 CFR 50.71(e)(4) since | |||
July 1, 2007; | |||
b. Modifications that are field work complete; and | |||
c. Changes to calculations (or initiation of new calculations) that have been | |||
UFSAR changes where it was determined that 10 | issued. The list should contain the number and title of each document, a | ||
brief description of the change, and the corresponding number and type of | |||
the affected document (i.e., the modification or procedure to which the | |||
evaluation applies). The list should NOT include any evaluations in | |||
which prior NRC approval was sought and obtained. | |||
(3) A list of all 10 CFR 50.59 changes that have been screened out as not requiring a | |||
full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes to the | |||
facility (modifications); (d) non-routine operating configurations; or (e) departures in | |||
methods of analyses. | |||
The list should contain the number and title of each document, a brief description of | |||
MODIFICATION 50.59 BASELINE INSPECTION | the change, and the corresponding number and type of the affected document | ||
(i.e., the modification or procedure to which the evaluation applies). | |||
(4) A list of any modifications, procedure revisions, or UFSAR changes where it was | |||
determined that 10 CFR 50.59 did not apply. | |||
(5) A list of calculation changes that have been issued for use. | |||
UFSAR change log or a synopsis of | (6) A list of corrective action documents (open and closed) that address permanent | ||
plant modifications or 10 CFR 50.59 issues, concerns, or processes. These | |||
UFSAR that were incorporated in the last | documents should also include the corrective action documents associated with the | ||
10 CFR 50.71(e)(4) submittal. | modification and the 50.59 change implementation. | ||
The list should contain the number, title and revision (or date) of each document, the | |||
UFSAR and technical specifications, if available. | affected system and corresponding documentation (if applicable), and should be | ||
sorted in order of significance. | |||
(7) Copies of procedures addressing the following: modifications, design changes, set | |||
(October 31, 2011) [Items 2, 3 and 4] (1) Copies of all selected items from Section | point changes, equivalency evaluations or suitability analyses, commercial grade | ||
dedications, post-modification testing, 10 CFR 50.59 evaluations and screenings, | |||
and UFSAR updates. | |||
-modification test packages, 10 | 2 Enclosure | ||
MODIFICATION 50.59 BASELINE INSPECTION | |||
, if not previously provided | INITIAL DOCUMENT REQUEST | ||
(8) UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide copies | |||
of the complete submittal. | |||
(9) Copy of the UFSAR change log or a synopsis of the changes. This should include | |||
all of the changes made to the UFSAR that were incorporated in the last | |||
10 CFR 50.71(e)(4) submittal. | |||
, if not previously provided | (10) Electronic copy of the UFSAR and technical specifications, if available. | ||
(11) Name(s) and phone numbers for the regulatory and technical contacts. | |||
(12) Current management and engineering organizational chart. | |||
II. Information Requested to be Available Prior to Inspection (Request will be Made by | |||
September 30, 2011, for Availability of Documents by October 14, 2011, [Item 1]) or | |||
on First Day of Inspection (October 31, 2011) [Items 2, 3 and 4] | |||
(1) Copies of all selected items from Section I. This includes copies of associated | |||
MODIFICATION 50.59 BASELINE INSPECTION | documents such as calculations, post-modification test packages, 10 CFR 50.59 | ||
evaluations or screenings, and any corrective action documents. | |||
(2) Copies of these documents do not need to be solely available to the inspection team | |||
as long as the inspectors have easy and unrestrained access to them. | |||
a. Updated Final Safety Analysis Report, if not previously provided; | |||
b. Original FSAR Volumes; | |||
c. Original SER and Supplements; | |||
Corrective Actions: | d. FSAR Question and Answers; | ||
e. Quality Assurance Plan; | |||
/50.59 Quality Assurance (QA) audit and/or self-assessment; and | f. Technical Specifications, if not previously provided; | ||
g. Latest IPE/PRA Report; | |||
h. Vendor Manuals; and | |||
-assessment. | i. The latest 10 CFR 50.59 UFSAR Update Submittal | ||
(3) Please ensure that other supporting documents for the selected items have been | |||
located and are readily retrievable as the inspection team will likely be requesting | |||
these documents during the inspection. Examples of supporting documents are: | |||
3 Enclosure | |||
MODIFICATION 50.59 BASELINE INSPECTION | |||
INITIAL DOCUMENT REQUEST | |||
a. Drawings supporting the modifications; | |||
b. Procedures affected by the modifications; and | |||
c. UFSAR change papers generated due to a 10 CFR 50.59 evaluation. | |||
-site inspection, October 31, 2011. | (4) Assessment and Corrective Actions: | ||
a. The most recent MOD/50.59 Quality Assurance (QA) audit and/or self- | |||
assessment; and | |||
b. Corrective action documents (e.g., condition reports, including status of | |||
corrective actions) generate as a result of the most recent MOD/50.59 QA | |||
audit and/or self-assessment. | |||
III. Information Requested to be provided throughout the inspection | |||
-mail at George.Hausman@nrc.gov | (1) Copies of any corrective action documents generated as a result of the inspection | ||
teams questions or queries during this inspection. | |||
(2) Copies of the list of questions submitted by the inspection team members and the | |||
-0011. | status/resolution of the information requested (provide daily during the inspection to | ||
requirement unless the requesting document displays a currently valid Office of Management and Budget control number. | each inspection team member). | ||
If you have any questions regarding the information requested, please contact the | |||
inspection team leader. | |||
-rm/adams.html | 4 Enclosure | ||
M. Schimmel -2- | |||
The third group lists information necessary to aid the inspection team in tracking issues identified as a result | |||
of the inspection. The remaining documents in group three should be available by the first day of the on-site | |||
inspection, October 31, 2011. It is requested that this information be provided to the lead inspector as the | |||
information is generated during the inspection. It is important that all of these documents are up to date and | |||
: | complete in order to minimize the number of additional documents requested during the preparation and/or | ||
: | the on-site portions of the inspection. | ||
The lead inspector for this inspection is Mr. George M. Hausman. We understand that our regulatory contact | |||
for this inspection is Mr. Sam J. DiPasquale of your organization. If there are any questions about the | |||
inspection or the material requested, please contact the lead inspector at (630) 829-9743 or via e-mail at | |||
George.Hausman@nrc.gov. | |||
This letter does not contain new or amended information collection requirements subject to the Paperwork | |||
\Ltr. 83111 | Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved | ||
by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or | |||
sponsor, and a person is not required to respond to, a request for information or an information collection | |||
requirement unless the requesting document displays a currently valid Office of Management and Budget | |||
OFFICE RIII E RIII | control number. | ||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will | |||
be available electronically for public inspection in the NRC Public Document Room or from the Publicly | |||
Available Records (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web | |||
site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA by G. M. Hausman for/ | |||
Robert C. Daley, Chief | |||
Engineering Branch 3 | |||
-1 Resource | Division of Reactor Safety | ||
Docket Nos.: 50-282; 50-306 | |||
License Nos.: DPR-42; DPR-60 | |||
Enclosure: MODIFICATION 50.59 BASELINE INSPECTION INITIAL DOCUMENT REQUEST | |||
cc w/encl: Distribution via ListServ | |||
DISTRIBUTION: | |||
See next page | |||
DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr. 83111 Prairie Island Request for Information GMH.docx | |||
Publicly Available Non-Publicly Available Sensitive Non-Sensitive | |||
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy | |||
OFFICE RIII E RIII | |||
NAME GHausman: ls RDaley | |||
DATE 08/31/11 08/31/11 | |||
OFFICIAL RECORD COPY | |||
Letter to Mr. Mark A. Schimmel from Mr. Robert C. Daley dated August 31, 2011. | |||
SUBJECT: PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 - | |||
INFORMATION REQUEST FOR THE TRIENNIAL PERMANENT PLANT | |||
MODIFICATIONS AND EVALUATIONS OF CHANGES, TESTS, OR | |||
EXPERIMENTS (MOD/50.59) BASELINE INSPECTION | |||
05000282/2011012(DRS); 05000306/2011012(DRS) | |||
DISTRIBUTION: | |||
Daniel Merzke | |||
RidsNrrPMPrairieIsland Resource | |||
RidsNrrDorlLpl3-1 Resource | |||
RidsNrrDirsIrib Resource | |||
Cynthia Pederson | |||
Steven Orth | |||
Jared Heck | |||
Allan Barker | |||
Carole Ariano | |||
Linda Linn | |||
DRPIII | |||
DRSIII | |||
Patricia Buckley | |||
Tammy Tomczak | |||
ROPreports Resource | |||
}} | }} |
Latest revision as of 15:23, 12 November 2019
ML11243A100 | |
Person / Time | |
---|---|
Site: | Prairie Island |
Issue date: | 08/31/2011 |
From: | Robert Daley Engineering Branch 3 |
To: | Schimmel M Northern States Power Co |
References | |
IR-11-012 | |
Download: ML11243A100 (9) | |
See also: IR 05000282/2011012
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
2443 WARRENVILLE ROAD, SUITE 210
LISLE, IL 60532-4352
August 31, 2011
Mr. Mark A. Schimmel
Site Vice President
Prairie Island Nuclear Generating Plant
Northern States Power Company, Minnesota
1717 Wakonade Drive East
Welch, MN 55089
SUBJECT: PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 -
INFORMATION REQUEST FOR THE TRIENNIAL PERMANENT PLANT
MODIFICATIONS AND EVALUATIONS OF CHANGES, TESTS, OR
EXPERIMENTS (MOD/50.59) BASELINE INSPECTION
05000282/2011012(DRS); 05000306/2011012(DRS)
Dear Mr. Schimmel:
On October 31, 2011, the U.S. Nuclear Regulatory Commission (NRC) will begin a MOD/50.59
baseline inspection at the Prairie Island Nuclear Generating Plant, Units 1 and 2. This inspection
will be performed in accordance with the NRC baseline Inspection Procedure (IP) 71111.17. The
on-site portion of the inspection will take place on October 31 - November 4, 2011, and
November 14 - 18, 2011.
Experience has shown that these baseline inspections are extremely resource intensive, both for
the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site
and to ensure a productive inspection for both parties, we have enclosed a request for documents
needed for the inspection. These documents have been divided into three groups.
The first group of information is necessary to ensure that the inspection team is adequately
prepared for the inspection. This information should be made available via compact disc and
delivered to the regional office no later than September 26, 2011. The inspection team will review
this information and, by September 30, 2011, will request specific items that should be provided for
review in the regional office by October 14, 2011.
The second group of requested documents contains additional items that the inspection team will
review, or need access to, during the inspection. Certain documents contained within this group,
i.e., Item (1), will be requested for review in the regional office prior to the inspection by
October 14, 2011, as identified above. The remaining documents should be available by the first
day of the on-site inspection, October 31, 2011.
M. Schimmel -2-
The third group lists information necessary to aid the inspection team in tracking issues identified
as a result of the inspection. The remaining documents in group three should be available by the
first day of the on-site inspection, October 31, 2011. It is requested that this information be
provided to the lead inspector as the information is generated during the inspection. It is important
that all of these documents are up to date and complete in order to minimize the number of
additional documents requested during the preparation and/or the on-site portions of the
inspection.
The lead inspector for this inspection is Mr. George M. Hausman. We understand that our
regulatory contact for this inspection is Mr. Sam J. DiPasquale of your organization. If there are
any questions about the inspection or the material requested, please contact the lead inspector at
(630) 829-9743 or via e-mail at George.Hausman@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number 3150-0011.
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for
information or an information collection requirement unless the requesting document displays a
currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document Room
or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS),
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public
Electronic Reading Room).
Sincerely,
/RA by G. M. Hausman for/
Robert C. Daley, Chief
Engineering Branch 3
Division of Reactor Safety
Docket Nos.: 50-282; 50-306
Enclosure: MODIFICATION 50.59 BASELINE INSPECTION INITIAL DOCUMENT REQUEST
cc w/encl: Distribution via ListServ
MODIFICATION 50.59 BASELINE INSPECTION
INITIAL DOCUMENT REQUEST
Inspection Report: 05000282/2011012(DRS); 05000306/2011012(DRS)
Inspection Dates: October 31 - November 4, 2011, and November 14 - 18, 2011
Inspection Procedure: IP 71111.17, Evaluations of Changes, Tests, or Experiments and
Permanent Plant Modifications"
Inspection Team Leader: George M. Hausman
(630) 829-9743
George.Hausman@nrc.gov
I. Information Requested for In-Office Preparation Week
The following information is requested by September 26, 2011, or sooner, to facilitate the
selection of specific items that will be reviewed during the on-site inspection week. The
inspection team will select specific items from the information requested below and submit
a list to your staff by September 30, 2011. We will request that certain items be made
available to the regional office prior to the inspection by October 14, 2011. We request that
the remaining items selected from the lists be available and ready for review on the first day
of inspection (i.e., January 10, 2011). All requested information should identify the
associated system and cover the time frame from the receipt of information for the last
MOD/50.59 Inspection on December 5, 2008, to the present.
The required information identified below should be provided on compact disc (CD). Please
provide three copies of each CD submitted (i.e., one for each inspector). The preferred file
format is a searchable pdf file. The CDs should be indexed and hyper-linked to facilitate
ease of use, if possible. If you have any questions regarding this information, please call
the inspection team leader as soon as possible.
(1) List of permanent plant modifications to systems, structures, or components that
are field work complete. (For the purpose of this inspection, permanent plant
modifications include permanent: plant changes, design changes, set point
changes, equivalency evaluations, suitability analyses, and commercial grade
dedications.)
The list should contain the number of each document, the title, the revision (or date),
and the affected system. In addition to the list, please provide a description of each
modification and a list of associated calculations and affected procedures.
1 Enclosure
MODIFICATION 50.59 BASELINE INSPECTION
INITIAL DOCUMENT REQUEST
(2) List of all 10 CFR 50.59 completed evaluations involving (a) calculations,
(b) procedure revisions, (c) changes to the facility (modifications), (d) non-routine
operating configurations, or (e) departures in methods of analyses. This list should
include 50.59 evaluations for the following:
a. Changes that have been made under the provisions of 10 CFR 50.59
that have been updated in accordance with 10 CFR 50.71(e)(4) since
July 1, 2007;
b. Modifications that are field work complete; and
c. Changes to calculations (or initiation of new calculations) that have been
issued. The list should contain the number and title of each document, a
brief description of the change, and the corresponding number and type of
the affected document (i.e., the modification or procedure to which the
evaluation applies). The list should NOT include any evaluations in
which prior NRC approval was sought and obtained.
(3) A list of all 10 CFR 50.59 changes that have been screened out as not requiring a
full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes to the
facility (modifications); (d) non-routine operating configurations; or (e) departures in
methods of analyses.
The list should contain the number and title of each document, a brief description of
the change, and the corresponding number and type of the affected document
(i.e., the modification or procedure to which the evaluation applies).
(4) A list of any modifications, procedure revisions, or UFSAR changes where it was
determined that 10 CFR 50.59 did not apply.
(5) A list of calculation changes that have been issued for use.
(6) A list of corrective action documents (open and closed) that address permanent
plant modifications or 10 CFR 50.59 issues, concerns, or processes. These
documents should also include the corrective action documents associated with the
modification and the 50.59 change implementation.
The list should contain the number, title and revision (or date) of each document, the
affected system and corresponding documentation (if applicable), and should be
sorted in order of significance.
(7) Copies of procedures addressing the following: modifications, design changes, set
point changes, equivalency evaluations or suitability analyses, commercial grade
dedications, post-modification testing, 10 CFR 50.59 evaluations and screenings,
and UFSAR updates.
2 Enclosure
MODIFICATION 50.59 BASELINE INSPECTION
INITIAL DOCUMENT REQUEST
(8) UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide copies
of the complete submittal.
(9) Copy of the UFSAR change log or a synopsis of the changes. This should include
all of the changes made to the UFSAR that were incorporated in the last
10 CFR 50.71(e)(4) submittal.
(10) Electronic copy of the UFSAR and technical specifications, if available.
(11) Name(s) and phone numbers for the regulatory and technical contacts.
(12) Current management and engineering organizational chart.
II. Information Requested to be Available Prior to Inspection (Request will be Made by
September 30, 2011, for Availability of Documents by October 14, 2011, [Item 1]) or
on First Day of Inspection (October 31, 2011) [Items 2, 3 and 4]
(1) Copies of all selected items from Section I. This includes copies of associated
documents such as calculations, post-modification test packages, 10 CFR 50.59
evaluations or screenings, and any corrective action documents.
(2) Copies of these documents do not need to be solely available to the inspection team
as long as the inspectors have easy and unrestrained access to them.
a. Updated Final Safety Analysis Report, if not previously provided;
b. Original FSAR Volumes;
c. Original SER and Supplements;
d. FSAR Question and Answers;
e. Quality Assurance Plan;
f. Technical Specifications, if not previously provided;
g. Latest IPE/PRA Report;
h. Vendor Manuals; and
i. The latest 10 CFR 50.59 UFSAR Update Submittal
(3) Please ensure that other supporting documents for the selected items have been
located and are readily retrievable as the inspection team will likely be requesting
these documents during the inspection. Examples of supporting documents are:
3 Enclosure
MODIFICATION 50.59 BASELINE INSPECTION
INITIAL DOCUMENT REQUEST
a. Drawings supporting the modifications;
b. Procedures affected by the modifications; and
c. UFSAR change papers generated due to a 10 CFR 50.59 evaluation.
(4) Assessment and Corrective Actions:
a. The most recent MOD/50.59 Quality Assurance (QA) audit and/or self-
assessment; and
b. Corrective action documents (e.g., condition reports, including status of
corrective actions) generate as a result of the most recent MOD/50.59 QA
audit and/or self-assessment.
III. Information Requested to be provided throughout the inspection
(1) Copies of any corrective action documents generated as a result of the inspection
teams questions or queries during this inspection.
(2) Copies of the list of questions submitted by the inspection team members and the
status/resolution of the information requested (provide daily during the inspection to
each inspection team member).
If you have any questions regarding the information requested, please contact the
inspection team leader.
4 Enclosure
M. Schimmel -2-
The third group lists information necessary to aid the inspection team in tracking issues identified as a result
of the inspection. The remaining documents in group three should be available by the first day of the on-site
inspection, October 31, 2011. It is requested that this information be provided to the lead inspector as the
information is generated during the inspection. It is important that all of these documents are up to date and
complete in order to minimize the number of additional documents requested during the preparation and/or
the on-site portions of the inspection.
The lead inspector for this inspection is Mr. George M. Hausman. We understand that our regulatory contact
for this inspection is Mr. Sam J. DiPasquale of your organization. If there are any questions about the
inspection or the material requested, please contact the lead inspector at (630) 829-9743 or via e-mail at
George.Hausman@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the Paperwork
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved
by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or
sponsor, and a person is not required to respond to, a request for information or an information collection
requirement unless the requesting document displays a currently valid Office of Management and Budget
control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will
be available electronically for public inspection in the NRC Public Document Room or from the Publicly
Available Records (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web
site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA by G. M. Hausman for/
Robert C. Daley, Chief
Engineering Branch 3
Division of Reactor Safety
Docket Nos.: 50-282; 50-306
Enclosure: MODIFICATION 50.59 BASELINE INSPECTION INITIAL DOCUMENT REQUEST
cc w/encl: Distribution via ListServ
DISTRIBUTION:
See next page
DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr. 83111 Prairie Island Request for Information GMH.docx
Publicly Available Non-Publicly Available Sensitive Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE RIII E RIII
NAME GHausman: ls RDaley
DATE 08/31/11 08/31/11
OFFICIAL RECORD COPY
Letter to Mr. Mark A. Schimmel from Mr. Robert C. Daley dated August 31, 2011.
SUBJECT: PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 -
INFORMATION REQUEST FOR THE TRIENNIAL PERMANENT PLANT
MODIFICATIONS AND EVALUATIONS OF CHANGES, TESTS, OR
EXPERIMENTS (MOD/50.59) BASELINE INSPECTION
05000282/2011012(DRS); 05000306/2011012(DRS)
DISTRIBUTION:
RidsNrrPMPrairieIsland Resource
RidsNrrDorlLpl3-1 Resource
RidsNrrDirsIrib Resource
Cynthia Pederson
DRPIII
DRSIII
Patricia Buckley
ROPreports Resource