|
|
(One intermediate revision by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 02/06/2008 | | | issue date = 02/06/2008 |
| | title = Email from R. Guzman, NRR/DORL/LPL1-1 to R. Prato, Nro/Dcip/Cqva, Et. Al., Subject: Sequoyah Information | | | title = Email from R. Guzman, NRR/DORL/LPL1-1 to R. Prato, Nro/Dcip/Cqva, Et. Al., Subject: Sequoyah Information |
| | author name = Guzman R V | | | author name = Guzman R |
| | author affiliation = NRC/NRR/DORL/LPLI-1 | | | author affiliation = NRC/NRR/DORL/LPLI-1 |
| | addressee name = Prato R J | | | addressee name = Prato R |
| | addressee affiliation = NRC/NRO/DCIP/CQVB | | | addressee affiliation = NRC/NRO/DCIP/CQVB |
| | docket = 05000327, 05000328 | | | docket = 05000327, 05000328 |
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:I a From: Richard Guzmanr '-To: Robert Prato; ]imi Yerokun Cc: Tom Boyce; Alovsius Obodoako | | {{#Wiki_filter:I a From: Richard Guzmanr '- |
| | To: Robert Prato; ]imi Yerokun Cc: Tom Boyce; Alovsius Obodoako |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Re: Sequoyah Information Date: Wednesday, February 06, 2008 12:22:37 PM Jimi, Bob, We are confimed for 9am tomorrow (2/7) for our conference call with Sequoyah. | | Re: Sequoyah Information Date: Wednesday, February 06, 2008 12:22:37 PM Jimi, Bob, We are confimed for 9am tomorrow (2/7) for our conference call with Sequoyah. We will meet in your office, T-10 E61. |
| We will meet in your office, T-10 E61.Bridgeline is '1-888-395-3520. | | Bridgeline is '1-888-395-3520. Passcode - |
| Passcode -Thanks, Rich>>> Robert Prato 2/4/2008 5:37 PM >>>Rich My understanding is that Brendan has left until he arranges to get rehired as a retired annuitant and no one has been assigned as his replacement in the mean time. Therefore, can you please forward the following information to Sequoyah in reference to SOARCA. We would like to'arrange a telecom for Thursday morning.Thanks!Bob"The three sequences that will be used for the Sequoyah SOARCA analysis are as follows: 1. A LOOP (121-06-57) that leads to a LTSBO with TD AFW;2. ISL-RHR caused by inboard and outboard MOV isolation valves failing open resulting in RCS pressure being applied to low pressure piping, the operator diagnoses but fails to isolate the ISLOCA;3. A large seismic event that results in a STSBO without TD AFW In addition, attached are two information request. We are requesting that information for the immediate information request, be made available to us upon our arrival for the site-visit. | | Thanks, Rich |
| The second information request have specific questions that may take a little longer to gather and, therefore, we are requesting that you provide that information by 3/7/2008. | | >>> Robert Prato 2/4/2008 5:37 PM >>> |
| As we will explain in our telecom later this week, all the information we are asking for should be reasonably available and we do not expect you to perform any engineering analyses or to obtain information from your AE or NSSS vendor. During the telecom, we will also discuss the simplified process for forwarding the SOARCA-related information to the staff.momiztlon in this record w deleted m aocordance with the Freedom of InformatIto FOUAPA -ooI& 0L}} | | Rich My understanding is that Brendan has left until he arranges to get rehired as a retired annuitant and no one has been assigned as his replacement in the mean time. Therefore, can you please forward the following information to Sequoyah in reference to SOARCA. We would like to'arrange a telecom for Thursday morning. |
| | Thanks! |
| | Bob "The three sequences that will be used for the Sequoyah SOARCA analysis are as follows: |
| | : 1. A LOOP (121-06-57) that leads to a LTSBO with TD AFW; |
| | : 2. ISL-RHR caused by inboard and outboard MOV isolation valves failing open resulting in RCS pressure being applied to low pressure piping, the operator diagnoses but fails to isolate the ISLOCA; |
| | : 3. A large seismic event that results in a STSBO without TD AFW In addition, attached are two information request. We are requesting that information for the immediate information request, be made available to us upon our arrival for the site-visit. The second information request have specific questions that may take a little longer to gather and, therefore, we are requesting that you provide that information by 3/7/2008. As we will explain in our telecom later this week, all the information we are asking for should be reasonably available and we do not expect you to perform any engineering analyses or to obtain information from your AE or NSSS vendor. During the telecom, we will also discuss the simplified process for forwarding the SOARCA-related information to the staff. |
| | momiztlon in this record w deleted m aocordance with the Freedom of InformatIto A* |
| | FOUAPA 0L |
| | - ooI&}} |
|
---|
Category:E-Mail
MONTHYEARML24032A0202024-01-31031 January 2024 NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2023 ML23319A1662023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant, Exemption Request Related to 10 CFR 37.11(c)(2) ML23275A0272023-09-29029 September 2023 Submittal of Discharge Monitoring Report (DMR) Quality Assurance Study 43 Final Report 2023 ML23236A2562023-08-24024 August 2023 NRR E-mail Capture - Acceptance Review Results for the Sequoyah and Watts Bar License Amendment Request to Adopt TSTF-567 (L-2023-LLA-0106) ML23165A2862023-06-14014 June 2023 Tennessee Multi-Sector Permit (Tmsp), 2023 Annual Discharge Monitoring Report for Outfalls SW-1, SW-16, SW-17, SW-18, SW-19, and SW-21 ML23072A0722023-03-10010 March 2023 NRR E-mail Capture - (External_Sender) State Consultation - Sequoyah Nuclear Plant, Units 1 and 2; and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML23058A1312023-02-27027 February 2023 FW: TVA Intentions on EA-22-129 ML23062A5952023-02-27027 February 2023 Staff follow-up Questions to Tva'S 12/19/2022 Response of the Staff'S Rsi Regarding 08/04/2022 SQN Exemption Request ML23052A0792023-02-21021 February 2023 NRR E-mail Capture - Acceptance Review for Browns Ferry and Sequoyah License Amendment Request to Adopt TSTF-541 ML23046A3552023-02-15015 February 2023 Annual Water Withdrawal Report 2022 ML23019A3442023-01-19019 January 2023 Tennessee Multi-Sector Permit (Tmsp), 2022 Annual Discharge Monitoring Report for Outfalls SW-1, SW-16, and SW-19 ML23013A0382023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML23013A0362023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML23026A0282023-01-12012 January 2023 001 Radiation Safety Baseline Inspection Information Request ML22348A0972022-12-14014 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML22348A0442022-12-13013 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML22343A0692022-12-0808 December 2022 NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML22348A0432022-11-28028 November 2022 NRR E-mail Capture - State Consultation - Sequoyah Nuclear Plant, Units 1 and 2, License Amendment Request to Modify the Approved 10 CFR 50.69 Categorization Process (L-2022-LLA-0033) ML22227A0712022-08-15015 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 (EPID L-2022-LLA-0103) - Corrected ML22227A0262022-08-12012 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 ML22227A0272022-08-11011 August 2022 NRR E-mail Capture - Request for Additional Information Related to Alternative Requests RP-11 for Sequoyah Nuclear Plant, Units 1 and 2, and IST-RR-9 for Watts Bar Nuclear Plant, Units 1 and 2 ML22215A2752022-08-0303 August 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-554 ML22214A1582022-08-0202 August 2022 NRR E-mail Capture - Request for Additional Information for Sequoyah Units 1 and 2 License Amendment Request for Fire and Seismic PRA Modification to 10 CFR 50.69 (L-2022-LLA-0033) ML22196A0732022-07-15015 July 2022 NRR E-mail Capture - (External_Sender) State Notification for Sequoyah Units 1 and 2 Amendment Issuance - TSTF-505 RICT (L-2021-LLA-0145) ML22194A8762022-07-13013 July 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-529 ML22173A0332022-06-17017 June 2022 NRR E-mail Capture - (External_Sender) State Notification for Sequoyah Units 1 and 2 Amendment Issuance - Reactor Trip System Instrumentation (L-2021-LLA-0200) ML22166A4292022-06-0606 June 2022 NRR E-mail Capture - LAR to Adopt TSTF-577 ML22151A0102022-05-27027 May 2022 NRR E-mail Capture - Revised Request for Additional Information Re Sequoyah Nuclear Plant Alternative Request RV-02 ML22146A3322022-05-26026 May 2022 NRR E-mail Capture - Request for Additional Information Related to Sequoyah Nuclear Plant'S LAR to Adopt TSTF-505 ML22151A0092022-05-26026 May 2022 NRR E-mail Capture - Request for Additional Information Re Sequoyah Nuclear Plant Alternative Request RV-02 ML22146A3342022-05-25025 May 2022 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Units 1, 2, and 3, Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Relief Requests (EPID L-2022-LLR-0045 - 0047) ML22137A2692022-05-17017 May 2022 Notice of Termination, TNR192066, Gravel Lot Restoration Project ML22136A0182022-05-16016 May 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah Nuclear Plant, Units 1 and 2, Alternative Request RP-11 and Watts Bar Nuclear Plant, Units 1 and 2, Alternative Request IST-RR-9 ML22132A1762022-05-12012 May 2022 Tennessee Multi-Sector Permit (Tmsp), 2021 Annual Discharge Monitoring Report for Outfalls SW-2, SW-3, SW-4, SW-6, SW-8, SW-9, and SW-13 ML22144A1002022-05-12012 May 2022 NRR E-mail Capture - Request for Additional Information Related to Tva'S Request to Revised the TVA Plants' Radiological Emergency Plans ML22123A1812022-05-0303 May 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-577 ML22095A0182022-04-0404 April 2022 NRR E-mail Capture - Sequoyah Nuclear Plant - Acceptance of Request for Alternative - Pressure Isolation Valve Leakage ISTC-3630 (L-2022-LLR-0034) ML22125A1422022-03-22022 March 2022 1 and 2 - March 22, 2022 e-mail - Sequoyah TSTF-505 LAR Supplemental Information ML22075A0942022-03-16016 March 2022 NRR E-mail Capture - Acceptance Review for Sequoyah Units 1 and 2 - LAR to Use of Fire and Seismic PRAs to Modify Approved 10 CFR 50.69 Categorization Process ML22046A2742022-02-15015 February 2022 NRR E-mail Capture - Audit Question (Snsb 02) for Sequoyah Units 1 and 2 LAR to Adopt TSTF-505, Revision 2 (L-2021-LLA-0145) ML22047A0552022-02-15015 February 2022 Annual Water Withdrawal Report 2021 ML22038A1882022-02-0404 February 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Revise the TVA Radiological Emergency Plan ML22035A0182022-02-0303 February 2022 NRR E-mail Capture - Audit Questions (Eeb follow-up) for Sequoyah Units 1 and 2 LAR to Adopt TSTF-505, Revision 2 (L-2021-LLA-0145) ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21347A9022021-12-13013 December 2021 Discharge Monitoring Report (DMR) Quality Assurance Study 41 Follow-up Report 2021 ML21336A3942021-12-0101 December 2021 NRR E-mail Capture - Audit Questions for Sequoyah Units 1 and 2 - LAR to Adopt TSTF-505, Revision 2 (L-2021-LLA-0145) ML21323A0432021-11-18018 November 2021 NRR E-mail Capture - Acceptance Review for Sequoyah Units 1 and 2 - LAR to Eliminate the High Negative Flux Rate Trip Requirement ML21252A2152021-09-0909 September 2021 NRR E-mail Capture - Sequoyah Nuclear Plant, Unit 2 - Acceptance of Request for Alternative Inspection for Upper Head Injection J-groove Welds (L-2021-LLR-0059) ML21239A0712021-08-27027 August 2021 Acceptance of License Amendment Request to Adopt TSTF-505, Revision 2 ML21237A4952021-08-25025 August 2021 Document Request for Sequoyah Nuclear Plant - Radiation Protection Inspection - Inspection Report 2021-04 2024-01-31
[Table view] |
Text
I a From: Richard Guzmanr '-
To: Robert Prato; ]imi Yerokun Cc: Tom Boyce; Alovsius Obodoako
Subject:
Re: Sequoyah Information Date: Wednesday, February 06, 2008 12:22:37 PM Jimi, Bob, We are confimed for 9am tomorrow (2/7) for our conference call with Sequoyah. We will meet in your office, T-10 E61.
Bridgeline is '1-888-395-3520. Passcode -
Thanks, Rich
>>> Robert Prato 2/4/2008 5:37 PM >>>
Rich My understanding is that Brendan has left until he arranges to get rehired as a retired annuitant and no one has been assigned as his replacement in the mean time. Therefore, can you please forward the following information to Sequoyah in reference to SOARCA. We would like to'arrange a telecom for Thursday morning.
Thanks!
Bob "The three sequences that will be used for the Sequoyah SOARCA analysis are as follows:
- 1. A LOOP (121-06-57) that leads to a LTSBO with TD AFW;
- 2. ISL-RHR caused by inboard and outboard MOV isolation valves failing open resulting in RCS pressure being applied to low pressure piping, the operator diagnoses but fails to isolate the ISLOCA;
- 3. A large seismic event that results in a STSBO without TD AFW In addition, attached are two information request. We are requesting that information for the immediate information request, be made available to us upon our arrival for the site-visit. The second information request have specific questions that may take a little longer to gather and, therefore, we are requesting that you provide that information by 3/7/2008. As we will explain in our telecom later this week, all the information we are asking for should be reasonably available and we do not expect you to perform any engineering analyses or to obtain information from your AE or NSSS vendor. During the telecom, we will also discuss the simplified process for forwarding the SOARCA-related information to the staff.
momiztlon in this record w deleted m aocordance with the Freedom of InformatIto A*
FOUAPA 0L
- ooI&