| {{#Wiki_filter:From: Kalyanam, Kaly Sent: Thursday, January 12, 2012 3:07 PM To: STEELMAN, WILLIAM J | | {{#Wiki_filter:From: Kalyanam, Kaly Sent: Thursday, January 12, 2012 3:07 PM To: STEELMAN, WILLIAM J |
|
| |
|
| ==Subject:== | | ==Subject:== |
| FW: Request for Supplemetal Information to complete the Acceptance Review I am resending it because the "from"/"to" names were mixed up. | | FW: Request for Supplemetal Information to complete the Acceptance Review I am resending it because the from/to names were mixed up. |
| Sorry about it. | | Sorry about it. |
| Kaly To: W. Steelman From N Kalyanam | | Kaly To: W. Steelman From N Kalyanam |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| WATERFORD STEAM ELECTRIC STATION, UNIT 3 - SUPPLEMENTAL INFORMATION NEEDED FOR ACCEPTANCE OF REQUESTED LICENSING ACTION RE: LICENSE AMENDMENT REQUEST TO ADOPT NFPA 805 PERFORMANCE-BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR GENERATING PLANTS (2001 EDITION) (TAC NO. ME7602) | | WATERFORD STEAM ELECTRIC STATION, UNIT 3 - SUPPLEMENTAL INFORMATION NEEDED FOR ACCEPTANCE OF REQUESTED LICENSING ACTION RE: LICENSE AMENDMENT REQUEST TO ADOPT NFPA 805 PERFORMANCE-BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR GENERATING PLANTS (2001 EDITION) (TAC NO. ME7602) |
| By letter dated November 17, 2011, Entergy Operations Inc. (Entergy, the licensee), submitted a license amendment request (LAR) requesting U.S. Nuclear Regulatory Commission (NRC) review and approval to change the plant fire protection program to one based on the National Fire Protection Association (NFPA) standard NFPA 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants," 2001 Edition, as incorporated into Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Section 50.48(c), "Fire Protection." | | By letter dated November 17, 2011, Entergy Operations Inc. (Entergy, the licensee), submitted a license amendment request (LAR) requesting U.S. Nuclear Regulatory Commission (NRC) review and approval to change the plant fire protection program to one based on the National Fire Protection Association (NFPA) standard NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition, as incorporated into Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Section 50.48(c), Fire Protection. |
| | |
| Consistent with 10 CFR 50.90, an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. 10 CFR 50.34 addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. | | Consistent with 10 CFR 50.90, an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. 10 CFR 50.34 addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. |
| The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff | | The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff=s acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review was also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. |
| =s acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review was also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | |
| The information requested and associated time frame were discussed with you and Mr. S. | | The information requested and associated time frame were discussed with you and Mr. S. |
| Bennett, et.al., of your staff on January 12, 2012. | | Bennett, et.al., of your staff on January 12, 2012. |
| In order to make the application complete, the NRC staff requests that Entergy supplement the application to address the questions identified below. This will enable the NRC staff to begin its detailed technical review. In the January 12, 2012, conference call, the licensee had committed to provide, "within one to two working days," the date by when the supplement (response to these questions) will be communicated to the NRC staff. The NRC staff is providing the questions in this email and will confirm the committed supplement date through a later correspondence. | | In order to make the application complete, the NRC staff requests that Entergy supplement the application to address the questions identified below. This will enable the NRC staff to begin its detailed technical review. In the January 12, 2012, conference call, the licensee had committed |
| | |
| | to provide, within one to two working days, the date by when the supplement (response to these questions) will be communicated to the NRC staff. The NRC staff is providing the questions in this email and will confirm the committed supplement date through a later correspondence. |
| If you have any questions, please contact me at (301) 415-1480. | | If you have any questions, please contact me at (301) 415-1480. |
| N. Kalyanam, Project Manager Docket No. 50-382 | | N. Kalyanam, Project Manager Docket No. 50-382 SUPPLEMENTAL INFORMATION NEEDED RELIEF REQUEST FOR LICENSE AMENDMENT REQUEST ENTERGY OPERATIONS INC. |
| | |
| SUPPLEMENTAL INFORMATION NEEDED RELIEF REQUEST FOR LICENSE AMENDMENT REQUEST ENTERGY OPERATIONS INC. | |
| WATERFORD STEAM ELECTRIC STATION, UNIT 3 | | WATERFORD STEAM ELECTRIC STATION, UNIT 3 |
| : 1. A fire Probabilistic Risk Assessment (PRA), including the methods used in the base PRA, must have been peer reviewed to support an LAR. The NRC staff requests the LAR be supplemented confirming that the peer review was sufficient in that any enhancements subsequent to the peer review or ongoing enhancements to reduce Core Damage Frequency (CDF) and Large Early Release Frequency (LERF) involved the review of fire impacts on component failures for important fire scenarios and were performed within the methodology reviewed by the peer review team. | | : 1. A fire Probabilistic Risk Assessment (PRA), including the methods used in the base PRA, must have been peer reviewed to support an LAR. The NRC staff requests the LAR be supplemented confirming that the peer review was sufficient in that any enhancements subsequent to the peer review or ongoing enhancements to reduce Core Damage Frequency (CDF) and Large Early Release Frequency (LERF) involved the review of fire impacts on component failures for important fire scenarios and were performed within the methodology reviewed by the peer review team. |
| : 2. An acceptable LAR should include Table V-2: the "not-met" and CC-I SRs for fires. Please provide this Table. | | : 2. An acceptable LAR should include Table V-2: the not-met and CC-I SRs for fires. |
| | Please provide this Table. |
| : 3. The LAR identifies five deviations from currently reviewed methods such as those in NUREG/6850 and the Frequently Asked Question (FAQs). The NRC staff has agreed that unreviewed methods may be included in current submittals if accompanied by a sensitivity study. The LAR provides sensitivity studies on each of the five but the synergistic effects are not explored. Rather than try to identify relevant combinations, it would be simplest to provide an estimate of the changes in CDF and LERF where all five deviations are simultaneously replaced with currently reviewed methods. | | : 3. The LAR identifies five deviations from currently reviewed methods such as those in NUREG/6850 and the Frequently Asked Question (FAQs). The NRC staff has agreed that unreviewed methods may be included in current submittals if accompanied by a sensitivity study. The LAR provides sensitivity studies on each of the five but the synergistic effects are not explored. Rather than try to identify relevant combinations, it would be simplest to provide an estimate of the changes in CDF and LERF where all five deviations are simultaneously replaced with currently reviewed methods. |
| : 4. Waterford 3's increase in CDF is estimated to be greater than 10 | | : 4. Waterford 3s increase in CDF is estimated to be greater than 10-6/yr. According to Regulatory Guide (RG) 1.174, the NRC staff needs an estimate of the total risk from all hazards, e.g., seismic and external flooding to review the acceptability of this result. The licensees estimate of the total risk should be provided. |
| -6/yr. According to Regulatory Guide (RG) 1.174, the NRC staff needs an estimate of the total risk from all hazards, e.g., seismic and external flooding to review the acceptability of this result. The licensee's estimate of the total risk should be provided. | | : 5. Appendix M in the submittal states: |
| : 5. Appendix M in the submittal states: | |
|
| |
|
| "The licensee shall implement the following modifications to its facility to complete the transition to full compliance with 10 CFR 50.48(c) by _____________. [INSERT DATE. To be based on Attachment S]."
| | The licensee shall implement the following modifications to its facility to complete the transition to full compliance with 10 CFR 50.48(c) by _____________. [INSERT DATE. |
| There are no "following modifications" listed. The licensee should clarify what modifications are planned.}} | | To be based on Attachment S]. |
| | There are no following modifications listed. The licensee should clarify what modifications are planned.}} |
Letter Sequence Acceptance Review |
---|
|
|
MONTHYEARW3F1-2011-0061, Commitment to Provide 10 CFR 50.48(c) License Amendment Request and Request for Continued Enforcement Discretion2011-07-26026 July 2011 Commitment to Provide 10 CFR 50.48(c) License Amendment Request and Request for Continued Enforcement Discretion Project stage: Request W3F1-2011-0074, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)2011-11-17017 November 2011 License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: Request ML1200304302012-01-0303 January 2012 Email PRA Peer Review Report Project stage: Other ML1200304372012-01-0303 January 2012 Fpra Pr Position Paper Final Project stage: Other ML1201205332012-01-12012 January 2012 Email, Supplemental Information Needed for Acceptance of Requested Licensing Action, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants Project stage: Acceptance Review W3F1-2012-0005, Supplemental Information in Support of the NRC Acceptance Review of Waterford 3 License Amendment Request to Adopt NFPA 8052012-01-26026 January 2012 Supplemental Information in Support of the NRC Acceptance Review of Waterford 3 License Amendment Request to Adopt NFPA 805 Project stage: Supplement ML1203401282012-02-0303 February 2012 Acceptance Review Email, License Amendment Request to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition Project stage: Acceptance Review ML1203802572012-03-0909 March 2012 Request to Reinstate Enforcement Discretion License Amendment Request to Adopt NFPA Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition Project stage: Other ML1208704852012-04-0303 April 2012 Regulatory Audit Scheduled to Begin 5/7/2012 in Support of the License Amendment Request to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition Project stage: Other ML12185A2122012-07-18018 July 2012 Request for Additional Information, License Amendment Request to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition Project stage: RAI W3F1-2012-0064, Response to Request for Additional Information Regarding Adoption of National Fire Protection Association Standard NFPA 805 License Amendment Request2012-09-27027 September 2012 Response to Request for Additional Information Regarding Adoption of National Fire Protection Association Standard NFPA 805 License Amendment Request Project stage: Response to RAI W3F1-2012-0083, 90-Day Response to Request for Additional Information Regarding Adoption of National Fire Protection Association Standard NFPA 8052012-10-16016 October 2012 90-Day Response to Request for Additional Information Regarding Adoption of National Fire Protection Association Standard NFPA 805 Project stage: Response to RAI ML13072A0632013-03-22022 March 2013 Request for Additional Information, Round 2, License Amendment Request to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition Project stage: RAI ML13129A1502013-05-10010 May 2013 Request for Supplement of Review Schedule and Interim Milestones, License Amendment Request to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition Project stage: Other ML13157A0622013-06-26026 June 2013 Request for Additional Information, Round 3, License Amendment Request to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition Project stage: RAI W3F1-2013-0048, Supplement to NFPA 805 License Amendment Request (LAR)2013-12-18018 December 2013 Supplement to NFPA 805 License Amendment Request (LAR) Project stage: Supplement ML14023A2792014-01-23023 January 2014 Notice of Meeting with Entergy Operations, Inc., to Discuss Waterford Unit 3 License Amendment Request to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition Project stage: Meeting ML14024A2912014-01-24024 January 2014 Notice of Meeting with Entergy Operations, Inc., to Discuss Its National Fire Protection Association (NFPA) 805 License Amendment Request Supplement Changes for the Waterford Steam Electric Station, Unit 3 Project stage: Meeting W3F1-2014-0025, Updated Responses to Request for Additional Information Regarding Adoption of National Fire Protection Association Standard NFPA 805 License Amendment Request (LAR)2014-06-11011 June 2014 Updated Responses to Request for Additional Information Regarding Adoption of National Fire Protection Association Standard NFPA 805 License Amendment Request (LAR) Project stage: Response to RAI ML14232A0262014-09-15015 September 2014 Continuation of Enforcement Discretion, License Amendment Request to Adopt NFPA Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition Project stage: Other ML14350A2122014-12-22022 December 2014 Regulatory Audit Plan; January 12-14, 2015 Audit in Support of the Amendment Request to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition Project stage: Other ML15022A2392015-02-0606 February 2015 Request for Additional Information- National Fire Protection Association Standard NFPA 805 Project stage: RAI W3F1-2015-0015, Responses to Request for Additional Information Regarding Adoption of National Fire Protection Association Standard NFPA 805 License Amendment Request2015-03-12012 March 2015 Responses to Request for Additional Information Regarding Adoption of National Fire Protection Association Standard NFPA 805 License Amendment Request Project stage: Response to RAI W3F1-2015-0024, Responses to Request for Additional Information Regarding Adoption of National Fire Protection Association Standard NFPA 805 License Amendment Request (LAR)2015-04-10010 April 2015 Responses to Request for Additional Information Regarding Adoption of National Fire Protection Association Standard NFPA 805 License Amendment Request (LAR) Project stage: Response to RAI W3F1-2015-0025, Responses to Request for Additional Information Regarding Adoption of National Fire Protection Association Standard NFPA 805 License Amendment Request (LAR) Waterford Steam Electric Station, Unit 3 (Waterford 3)2015-05-14014 May 2015 Responses to Request for Additional Information Regarding Adoption of National Fire Protection Association Standard NFPA 805 License Amendment Request (LAR) Waterford Steam Electric Station, Unit 3 (Waterford 3) Project stage: Response to RAI ML15182A3462015-07-13013 July 2015 Request for Additional Information - National Fire Protection Association Standard NFPA 805 Project stage: RAI ML15197A2292015-07-21021 July 2015 Request for Additional Information Regarding National Fire Protection Association Standard 805 Project stage: RAI ML15239A7392015-08-31031 August 2015 Summary of Public Meeting with Entergy Operations, Inc. to Discuss Main Control Room Abandonment Regarding NFPA-805 License Amendment Request Project stage: Meeting W3F1-2015-0078, Revised Implementation Item Regarding Adoption of National Fire Protection Association Standard NFPA 805 License Amendment Request (LAR)2015-09-24024 September 2015 Revised Implementation Item Regarding Adoption of National Fire Protection Association Standard NFPA 805 License Amendment Request (LAR) Project stage: Request W3F1-2015-0081, Request for Additional Information (RAI) Clarification Regarding Adoption of National Fire Protection Association Standard NFPA 805 License Amendment Request (LAR)2015-10-13013 October 2015 Request for Additional Information (RAI) Clarification Regarding Adoption of National Fire Protection Association Standard NFPA 805 License Amendment Request (LAR) Project stage: Request W3F1-2015-0085, Transfer of License and Conforming Amendment2015-10-29029 October 2015 Transfer of License and Conforming Amendment Project stage: Other W3F1-2016-0003, Revised Licensing Actions and Implementation Items Regarding Adoption of National Fire Protection Association Standard NFPA 805 License Amendment Request (LAR)2016-01-18018 January 2016 Revised Licensing Actions and Implementation Items Regarding Adoption of National Fire Protection Association Standard NFPA 805 License Amendment Request (LAR) Project stage: Request 2014-01-23
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24241A1922024-08-27027 August 2024 October 2024 Emergency Preparedness Program Inspection - Request for Information ML24159A2672024-06-0707 June 2024 NRR E-mail Capture - NRC Notice of Acceptance: Waterford Steam Electric Station, Unit 3, Licensee Amendment Request (LAR) to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program ML24137A2702024-05-16016 May 2024 NRR E-mail Capture - Entergy Fleet - Acceptance Review of License Amendment Request to Remove Obsolete License Conditions from Operating Licenses for GGNS, RBS, and WF3 (L-2024-LLA-0062) ML24115A0862024-04-23023 April 2024 NRR E-mail Capture - NRC Notice of Acceptance: Waterford Steam Electric Station, Unit 3, Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds ML24115A0882024-04-23023 April 2024 NRR E-mail Capture - NRC Notice of Acceptance: Waterford Steam Electric Station, Unit 3, Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles ML24088A0092024-03-27027 March 2024 NRR E-mail Capture - Entergy Fleet - Final Request for Confirmation of Information (RCI) Re Alternative Request EN-RR-22-001 Concerning ASME Code Case N-752 (L-2022-LLR-0054) ML23348A1222023-12-14014 December 2023 NRR E-mail Capture - Grand Gulf, River Bend, and Waterford, Unit 3 - 2nd Round of Official RAIs for RR EN-RR-22-001, Use ASME Code Case N-752, Risk Informed Categorization for Class 2 and 3 Systems ML23097A0412023-04-0606 April 2023 June 2023 Emergency Preparedness Exercise Inspection - Request for Information ML23076A0552023-03-13013 March 2023 EP Program Inspection RFI Hjs 10132022 ML23072A3672023-03-0909 March 2023 NRR E-mail Capture - Entergy Fleet - Acceptance Review of Quality Assurance Program Manual Reduction in Commitment ML23052A0882023-02-17017 February 2023 Inspection Request for Information ML22336A0202022-12-0101 December 2022 NRR E-mail Capture - Acceptance Review for Waterford Unit 3 - License Amendment Request to Revise Technical Specification 3/4.3.2 ML22335A4802022-12-0101 December 2022 NRR E-mail Capture - NRC Update Completion Date for Waterford 3 LAR to Adopt TSTF-505 ML22329A0152022-11-0202 November 2022 NRR E-mail Capture - NRC Update Completion Date for Waterford 3 LAR to Adopt TSTF-505 ML22290A0442022-10-13013 October 2022 December 2022 Emergency Preparedness Program Inspection - Request for Information ML22215A1492022-08-0303 August 2022 NRR E-mail Capture - Waterford 3 - LAR to Permit the Use of Risk-Informed Completion Times in Accordance with Technical Specifications Task Force (TSTF) Traveler TSTF-505, Revision 2 ML22215A2062022-08-0303 August 2022 NRR E-mail Capture - Waterford 3 - LAR to Adopt Title 10 of the Code of Federal Regulations, Section 50.69: Loe and Completion Date Update ML22206A0172022-07-22022 July 2022 NRR E-mail Capture - Request for Additional Information: Waterford 3 - License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-505 ML22206A0152022-07-21021 July 2022 NRR E-mail Capture - Entergy (Grand Gulf, River Bend, and Waterford-3) - Acceptance Review of the RR EN-RR-22-001, Case N-752, Risk-informed Cat & Treatment for Repair/Replacement Activities in Class 2 & 3 Systems ML22209A1082022-07-15015 July 2022 NRR E-mail Capture - Draft RAIs to License Amendment Request for Application to Adopt 10 CFR 50.69 and Revise Technical Specifications to Adopt TSTF-505, Revision 2 ML22144A1662022-05-24024 May 2022 PI&R Request for Information and Transmittal e-mail ML22108A1792022-04-14014 April 2022 WF3 Cpcs Installation Inspection Plan Email ML22209A1062022-01-20020 January 2022 NRR E-mail Capture - (External_Sender) Options Moving Forward Regarding Waterford TSTF-505 and 50.69 ML22209A1052022-01-0606 January 2022 NRR E-mail Capture - Estimate for Completion of 50.69-TSTF-505 Peer Review ML22012A1592022-01-0505 January 2022 WF3 2022 EP Exercise Inspection RFI Sdh 010522 ML21356A5872021-12-22022 December 2021 NRR E-mail Capture - Acceptance for Review: Waterford 3 - Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule ML21349A2242021-12-14014 December 2021 NRR E-mail Capture - (External_Sender) Waterford 3 - Request for One-Time Exemption from 10 CFR 50, Appendix E Biennial EP Exercise ML21312A4792021-11-0505 November 2021 Email: NRC Staff Preliminary Questions Regarding X Energy LLC Xe-100 Topical Report: Risk-Informed Performance-Based Licensing Basis Development ML21308A5602021-11-0404 November 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, Grand Gulf, River Bend, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML21292A0112021-10-18018 October 2021 NRR E-mail Capture - ANO, 1 and 2, Grand Gulf, River Bend, Waterford, 3 - Acceptance Review of LAR to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21280A0812021-10-0505 October 2021 Email 10-5-21 - Request for Information_ Waterford EP Inspection (71114.04 & 71151) - Nov-Dec 2021 ML21285A0242021-10-0505 October 2021 Digital Instrumentation and Control Modification Inspection Request for Information ML22112A1512021-08-0606 August 2021 NRR E-mail Capture - for Review: Draft RAIs to LAR to Relocate Chemical Detection Systems Technical Specifications (TS) to Technical Requirements Manual (TRM) ML21216A4562021-08-0404 August 2021 WF3 2021 EP Exercise Inspection Request for Information (RFI) ML21218A0402021-07-26026 July 2021 NRR E-mail Capture - Final RAIs to Entergy Operations, Waterford Steam Electric Station, Unit 3 LAR to Adopt 10 CFR 50.69 ML21201A0062021-07-19019 July 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21173A1082021-06-22022 June 2021 NRR E-mail Capture - Acceptance Review for Waterford Unit 3 - License Amendment Request to Adopt TSTF-563 ML21174A0342021-06-22022 June 2021 NRR E-mail Capture - Entergy Fleet (ANO, Ggulf, Rbend, & Waterford) - Acceptance Review for Relief Request to Use a Provision of a Later Edition of the ASME Code, Section XI for Periodic System Pressure Tests Exemptions ML21160A0852021-06-0404 June 2021 NRR E-mail Capture - (External_Sender) NRC Notification to the State of Louisiana Regarding a Waterford Steam Electric Station, Unit 3 Amendment - Digital Upgrade I&C ML21145A0062021-05-24024 May 2021 NRR E-mail Capture - Supplement Received - Waterford Unit 3 - License Amendment Request for Boration Systems Tech Specs ML21120A1192021-04-30030 April 2021 NRR E-mail Capture - Acceptance Review for Waterford Unit 3 - LAR to Relocate Chemical Detection TSs to TRM ML21105A0512021-04-14014 April 2021 4-14-21 Email - RFI for In-Office Inspection of Recent WF3 Submission of EAL Procedure Revision ML21104A0382021-04-13013 April 2021 NRR E-mail Capture - Acceptance Review for Waterford Unit 3 - License Amendment Request for TSTF-505 ML21084A2552021-03-22022 March 2021 NRR E-mail Capture - Supplement to Audit Plan Dated October 1, 2020 (Waterford 3, L-2020-LLA-0164) ML21088A1512021-03-15015 March 2021 NRR E-mail Capture - Draft Waterford Acceptance Review Letter for TSTF-505 LAR ML21069A1842021-03-0202 March 2021 NRR E-mail Capture - Announcement of QA Inspection ML21040A3892021-02-0808 February 2021 NRR E-mail Capture - Announcement of QA Inspection ML21039A6412021-01-28028 January 2021 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Waterford 3 50.69 LAR ML21022A1692021-01-22022 January 2021 NRR E-mail Capture - Entergy Fleet (ANO, Grand Gulf, River Bend, and Waterford) - Acceptance Review for RR EN-20-RR-003, Proposed Alternative to Use ASME Code Case N-711-2 ML20329A1442020-11-20020 November 2020 Terrapower QAPD Preliminary Questions Email 2024-08-27
[Table view] |
Text
From: Kalyanam, Kaly Sent: Thursday, January 12, 2012 3:07 PM To: STEELMAN, WILLIAM J
Subject:
FW: Request for Supplemetal Information to complete the Acceptance Review I am resending it because the from/to names were mixed up.
Sorry about it.
Kaly To: W. Steelman From N Kalyanam
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - SUPPLEMENTAL INFORMATION NEEDED FOR ACCEPTANCE OF REQUESTED LICENSING ACTION RE: LICENSE AMENDMENT REQUEST TO ADOPT NFPA 805 PERFORMANCE-BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR GENERATING PLANTS (2001 EDITION) (TAC NO. ME7602)
By letter dated November 17, 2011, Entergy Operations Inc. (Entergy, the licensee), submitted a license amendment request (LAR) requesting U.S. Nuclear Regulatory Commission (NRC) review and approval to change the plant fire protection program to one based on the National Fire Protection Association (NFPA) standard NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition, as incorporated into Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Section 50.48(c), Fire Protection.
Consistent with 10 CFR 50.90, an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. 10 CFR 50.34 addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff=s acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review was also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The information requested and associated time frame were discussed with you and Mr. S.
Bennett, et.al., of your staff on January 12, 2012.
In order to make the application complete, the NRC staff requests that Entergy supplement the application to address the questions identified below. This will enable the NRC staff to begin its detailed technical review. In the January 12, 2012, conference call, the licensee had committed
to provide, within one to two working days, the date by when the supplement (response to these questions) will be communicated to the NRC staff. The NRC staff is providing the questions in this email and will confirm the committed supplement date through a later correspondence.
If you have any questions, please contact me at (301) 415-1480.
N. Kalyanam, Project Manager Docket No. 50-382 SUPPLEMENTAL INFORMATION NEEDED RELIEF REQUEST FOR LICENSE AMENDMENT REQUEST ENTERGY OPERATIONS INC.
WATERFORD STEAM ELECTRIC STATION, UNIT 3
- 1. A fire Probabilistic Risk Assessment (PRA), including the methods used in the base PRA, must have been peer reviewed to support an LAR. The NRC staff requests the LAR be supplemented confirming that the peer review was sufficient in that any enhancements subsequent to the peer review or ongoing enhancements to reduce Core Damage Frequency (CDF) and Large Early Release Frequency (LERF) involved the review of fire impacts on component failures for important fire scenarios and were performed within the methodology reviewed by the peer review team.
- 2. An acceptable LAR should include Table V-2: the not-met and CC-I SRs for fires.
Please provide this Table.
- 3. The LAR identifies five deviations from currently reviewed methods such as those in NUREG/6850 and the Frequently Asked Question (FAQs). The NRC staff has agreed that unreviewed methods may be included in current submittals if accompanied by a sensitivity study. The LAR provides sensitivity studies on each of the five but the synergistic effects are not explored. Rather than try to identify relevant combinations, it would be simplest to provide an estimate of the changes in CDF and LERF where all five deviations are simultaneously replaced with currently reviewed methods.
- 4. Waterford 3s increase in CDF is estimated to be greater than 10-6/yr. According to Regulatory Guide (RG) 1.174, the NRC staff needs an estimate of the total risk from all hazards, e.g., seismic and external flooding to review the acceptability of this result. The licensees estimate of the total risk should be provided.
- 5. Appendix M in the submittal states:
The licensee shall implement the following modifications to its facility to complete the transition to full compliance with 10 CFR 50.48(c) by _____________. [INSERT DATE.
To be based on Attachment S].
There are no following modifications listed. The licensee should clarify what modifications are planned.