ML12017A155: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML12017A155 | | number = ML12017A155 | ||
| issue date = 07/15/2011 | | issue date = 07/15/2011 | ||
| title = | | title = Licensee Comments on Draft NRC-Developed Exam (Operating)(Folder 2) | ||
| author name = Caruso J | | author name = Caruso J | ||
| author affiliation = NRC/RGN-I/DRS/OB | | author affiliation = NRC/RGN-I/DRS/OB | ||
| addressee name = Goff C | | addressee name = Goff C | ||
| addressee affiliation = PPL Susquehanna, LLC | | addressee affiliation = PPL Susquehanna, LLC | ||
| docket = 05000387, 05000388 | | docket = 05000387, 05000388 | ||
| license number = NPF-014, NPF-022 | | license number = NPF-014, NPF-022 | ||
| contact person = Jackson D | | contact person = Jackson D | ||
| case reference number = TAC U01842 | | case reference number = TAC U01842 | ||
| package number = ML110190451 | | package number = ML110190451 | ||
| document type = License-Operator, Part 55 Examination Related Material, Note | | document type = License-Operator, Part 55 Examination Related Material, Note | ||
| page count = 1 | | page count = 1 | ||
| project = TAC:U01842 | |||
| stage = Draft Other | |||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:Licensee Operating Test Comments Note to File -the op test was submitted to the licensee in segments as we completed it. The entire Op test had been submitted to the licensee for their review by 7/15/11. None of our original exam items were replaced. | {{#Wiki_filter:Licensee Operating Test Comments Note to File - the op test was submitted to the licensee in segments as we completed it. The entire Op test had been submitted to the licensee for their review by 7/15/11. None of our original exam items were replaced. Most of the comments made by the licensee were editorial or instructions for the booth operators. The most substantive technical changes were made to the SRO Admin JPM A-3 during exam pre-validation (the week of 10/24) and that was based on the CE's feedback to make this exam item more challenging.}} | ||
Most of the comments made by the licensee were editorial or instructions for the booth operators. | |||
The most substantive technical changes were made to the SRO Admin JPM A-3 during exam pre-validation (the week of 10/24) and that was based on the CE's feedback to make this exam item more challenging.}} |
Latest revision as of 09:40, 12 November 2019
ML12017A155 | |
Person / Time | |
---|---|
Site: | Susquehanna |
Issue date: | 07/15/2011 |
From: | Caruso J Operations Branch I |
To: | Goff C Susquehanna |
Jackson D | |
Shared Package | |
ML110190451 | List: |
References | |
TAC U01842 | |
Download: ML12017A155 (1) | |
Text
Licensee Operating Test Comments Note to File - the op test was submitted to the licensee in segments as we completed it. The entire Op test had been submitted to the licensee for their review by 7/15/11. None of our original exam items were replaced. Most of the comments made by the licensee were editorial or instructions for the booth operators. The most substantive technical changes were made to the SRO Admin JPM A-3 during exam pre-validation (the week of 10/24) and that was based on the CE's feedback to make this exam item more challenging.