ML12017A155

From kanterella
Jump to navigation Jump to search

Licensee Comments on Draft NRC-Developed Exam (Operating)(Folder 2)
ML12017A155
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 07/15/2011
From: Caruso J
Operations Branch I
To: Goff C
Susquehanna
Jackson D
Shared Package
ML110190451 List:
References
TAC U01842
Download: ML12017A155 (1)


Text

Licensee Operating Test Comments Note to File - the op test was submitted to the licensee in segments as we completed it. The entire Op test had been submitted to the licensee for their review by 7/15/11. None of our original exam items were replaced. Most of the comments made by the licensee were editorial or instructions for the booth operators. The most substantive technical changes were made to the SRO Admin JPM A-3 during exam pre-validation (the week of 10/24) and that was based on the CE's feedback to make this exam item more challenging.