ML12017A155: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 07/15/2011
| issue date = 07/15/2011
| title = Licensee Comments on Draft NRC-Developed Exam (Operating)(Folder 2)
| title = Licensee Comments on Draft NRC-Developed Exam (Operating)(Folder 2)
| author name = Caruso J G
| author name = Caruso J
| author affiliation = NRC/RGN-I/DRS/OB
| author affiliation = NRC/RGN-I/DRS/OB
| addressee name = Goff C B
| addressee name = Goff C
| addressee affiliation = PPL Susquehanna, LLC
| addressee affiliation = PPL Susquehanna, LLC
| docket = 05000387, 05000388
| docket = 05000387, 05000388
| license number = NPF-014, NPF-022
| license number = NPF-014, NPF-022
| contact person = Jackson D E
| contact person = Jackson D
| case reference number = TAC U01842
| case reference number = TAC U01842
| package number = ML110190451
| package number = ML110190451
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:Licensee Operating Test Comments Note to File -the op test was submitted to the licensee in segments as we completed it. The entire Op test had been submitted to the licensee for their review by 7/15/11. None of our original exam items were replaced.
{{#Wiki_filter:Licensee Operating Test Comments Note to File - the op test was submitted to the licensee in segments as we completed it. The entire Op test had been submitted to the licensee for their review by 7/15/11. None of our original exam items were replaced. Most of the comments made by the licensee were editorial or instructions for the booth operators. The most substantive technical changes were made to the SRO Admin JPM A-3 during exam pre-validation (the week of 10/24) and that was based on the CE's feedback to make this exam item more challenging.}}
Most of the comments made by the licensee were editorial or instructions for the booth operators.
The most substantive technical changes were made to the SRO Admin JPM A-3 during exam pre-validation (the week of 10/24) and that was based on the CE's feedback to make this exam item more challenging.}}

Latest revision as of 09:40, 12 November 2019

Licensee Comments on Draft NRC-Developed Exam (Operating)(Folder 2)
ML12017A155
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 07/15/2011
From: Caruso J
Operations Branch I
To: Goff C
Susquehanna
Jackson D
Shared Package
ML110190451 List:
References
TAC U01842
Download: ML12017A155 (1)


Text

Licensee Operating Test Comments Note to File - the op test was submitted to the licensee in segments as we completed it. The entire Op test had been submitted to the licensee for their review by 7/15/11. None of our original exam items were replaced. Most of the comments made by the licensee were editorial or instructions for the booth operators. The most substantive technical changes were made to the SRO Admin JPM A-3 during exam pre-validation (the week of 10/24) and that was based on the CE's feedback to make this exam item more challenging.