{{#Wiki_filter:2011 DAVIS-BESSE NUCLEAR POWER STATION INI1-IAL EXAMINATION PROPOSED EXAM FILES 5501 North State Route 2 e FirstEnergy Nuclear Operating Company | {{#Wiki_filter:2011 DAVIS-BESSE NUCLEAR POWER STATION INI1-IAL EXAMINATION PROPOSED EXAM FILES | ||
-WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS DOCUMENT AS UNRESTRICTED | FENOC 5501 North State Route 2 e FirstEnergy Nuclear Operating Company r --------------------------------------- | ||
Barry S. Allen | |||
- OPERATOR LICENSE EXAMINATION MATERIAL-Oak Harbor, Ohio 43449 419-321-7676 Fax. 419-321-7582 Vice President - Nuclear | |||
- WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS DOCUMENT AS UNRESTRICTED October 20, 2011 10 CFR 55 L-11-290 Mr. Dave Reeser Chief Examiner, Region III U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 | |||
==Subject:== | ==Subject:== | ||
Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Submittal of Written Operator License Examinations. | |||
Operating Tests, and | Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Submittal of Written Operator License Examinations. Operating Tests, and | ||
* Supporting Reference Material | * Supporting Reference Material | ||
==Dear Mr. Reeser:== | ==Dear Mr. Reeser:== | ||
Enclosed are the written examinations, operating tests, and supporting reference material prepared by the Davis-Besse Nuclear Power Station (DBNPS) staff for the licensed operator examinations to be administered during the weeks of December 5 and December 12, 2011. The enclosed items and supporting reference material, which are considered confidential, are being submitted to the NRC for review and approval in accordance with 10 CFR 55.40, "Written Examinations and Operating Implementation" and NUREG 1021, Operator Licensing Examination Standards for Power Reactors (Revision 9, Supplement 1). Modifications to the previous submitted outlines were made as a result of feedback received from the chief examiner and the validation process. These modifications to the scenario outlines are identified in bold italic print. -OPERATOR LICENSE EXAMINATION | |||
* -OPERATOR LICENSE EXAMINATION MATERIAL -WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS DOCUMENT AS UNRESTRICTED Davis-Besse Nuclear Power Station, Unit 1 L-11-290 Page 2of2 The materials enclosed shall be withheld from public disclosure until after the scheduled examinations are complete. | Enclosed are the written examinations, operating tests, and supporting reference material prepared by the Davis-Besse Nuclear Power Station (DBNPS) staff for the licensed operator examinations to be administered during the weeks of December 5 and December 12, 2011. | ||
There are no regulatory commitments included in the submittal. | The enclosed items and supporting reference material, which are considered confidential, are being submitted to the NRC for review and approval in accordance with 10 CFR 55.40, "Written Examinations and Operating Tests Implementation" and NUREG 1021, Operator Licensing Examination Standards for Power Reactors (Revision 9, Supplement 1). | ||
If there are any questions or if additional information is required, please contact Mr. Anthony Stallard, Superintendent | Modifications to the previous submitted outlines were made as a result of feedback received from the chief examiner and the validation process. These modifications to the scenario outlines are identified in bold italic print. | ||
-Nuclear Operations, at (419) 321-7161. | - OPERATOR LICENSE EXAMINATION MATERIAL | ||
Sincerely, Barry S. Allen vaw | - WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS | ||
* DOCUMENT AS UNRESTRICTED OCT J 1 2D11 | |||
* - OPERATOR LICENSE EXAMINATION MATERIAL | |||
- WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS DOCUMENT AS UNRESTRICTED Davis-Besse Nuclear Power Station, Unit 1 L-11-290 Page 2of2 The materials enclosed shall be withheld from public disclosure until after the scheduled examinations are complete. | |||
There are no regulatory commitments included in the submittal. If there are any questions or if additional information is required, please contact Mr. Anthony Stallard, Superintendent - Nuclear Operations, at (419) 321-7161. | |||
Sincerely, Barry S. Allen | |||
* vaw | |||
==Enclosure:== | ==Enclosure:== | ||
NUREG 1021 Forms and Operator License Examination Outline cc: Regional Administrator, NRC Region 11/ (w/o Enclosure) | |||
NUREG 1021 Forms and Operator License Examination Outline Regional Administrator, NRC Region 11/ (w/o Enclosure) | |||
Chief, Operations Branch, NRC Region III (w/o Enclosure) | Chief, Operations Branch, NRC Region III (w/o Enclosure) | ||
DB-1 NRC/NRR Senior Project Manager (w/o Enclosure) | DB-1 NRC/NRR Senior Project Manager (w/o Enclosure) | ||
DB-1 Senior Resident Inspector (w/o Enclosure) | DB-1 Senior Resident Inspector (w/o Enclosure) | ||
USNRC Document Control Desk (w/o Enclosure) | USNRC Document Control Desk (w/o Enclosure) | ||
Utility radiological Safety Board (w/o Enclosure) -OPERATOR LICENSE EXAMINATION MATERIAL -SHALL BE WITHHELD FROM PUBLIC DISCLOSURE UNTIL AFTER SCHEDULED EXAMINATIONS ARE COMPLETE | Utility radiological Safety Board (w/o Enclosure) | ||
* -OPERATOR LICENSE EXAMINATION -SHALL BE WITHHELD FROM PUBLIC DISCLOSURE UNTIL AFTER THE SCHEDULED EXAMINATIONS ARE COMPLETE NUREG 1021 Forms and Operator License Examination List of Enclosed NUREG Forms Form ES-201-3, Examination Security Agreement (Up-to-date Form ES-301-1, Administrative Topics Outline RO (Rev. Form ES-301-1, Administrative Topics Outline SRO (Rev. Form ES-301-2, Control Roomlln-Plant Systems Outline RO (Rev. Form ES-301-2, Control Roomlln-Plant Systems Outline SRO-I (Rev. Form ES-301-2, Control Roomlln-Plant Systems Outline SRO-U (Rev. Form ES-301-3, Operating Test Quality Checklist (Rev. Form ES-301-4, Simulator Scenario Quality Checklist (Rev. Form ES-301-5, Transient and Event Checklist (Rev. Form ES-301-6, Competencies Checklist (Rev. RO Written Form ES-401-2, PWR Examination Outline RO (Rev. Form ES-401-3, Generic Knowledge and Abilities Outline Tier 3 RO (Rev. SRO Written Form ES-401-2, PWR Examination Outline SRO (Rev. Form ES-401-3, Generic Knowledge and Abilities Outline Tier 3 SRO (Rev. Form ES-401-4, Record of Rejected KlAs (Rev. Form ES-401-6, Written Examination Quality Checklist (Rev. Form ES-D-1, Scenario Outline (Rev. List of Enclosed Exam Materials 6 Administrative Topics JPMs with applicable procedures 12 Control Roomlln-Plant Systems JPMs with applicable procedures 4 simulator Scenarios 100 Written Examination Questions, answers, and reference pages for each question's correct answer References provided to the candidates for the written examination ES-301 Operating Test Quality Checklist Form ES-301-3 ility: Davls*Besse Date of Exam 1215 thru 12115 2011 Operating Test No.: 2011 NRC exam 1. GENERAL CRITERIA a. The operating test conforms with the previously approved outline; changes are consistent with sampling requirements (e.g., 10 CFR 55.45, operational importance, safety function distribution). | - OPERATOR LICENSE EXAMINATION MATERIAL | ||
: b. There is no day-ta-day repetition between this and other operating tests to be administered during this examination. | * - SHALL BE WITHHELD FROM PUBLIC DISCLOSURE UNTIL AFTER THE SCHEDULED EXAMINATIONS ARE COMPLETE | ||
: c. The operating test shall not duplicate items from the applicants' audit test(s) (see Section O.1.a). d. Overlap with the written examination and between different parts of the operating test is within acceptable limits. e. It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated license level. 2. WALK*THROUGH CRITERIA a. Each JPM includes the following, as applicable: | |||
* - OPERATOR LICENSE EXAMINATION MATERIAL | |||
- SHALL BE WITHHELD FROM PUBLIC DISCLOSURE UNTIL AFTER THE SCHEDULED EXAMINATIONS ARE COMPLETE Enclosure L-11-290 NUREG 1021 Forms and Operator License Examination Outline List of Enclosed NUREG Forms Form ES-201-3, Examination Security Agreement (Up-to-date Copies) | |||
Form ES-301-1, Administrative Topics Outline RO (Rev. 1) | |||
Form ES-301-1, Administrative Topics Outline SRO (Rev. 1) | |||
Form ES-301-2, Control Roomlln-Plant Systems Outline RO (Rev. 1) | |||
Form ES-301-2, Control Roomlln-Plant Systems Outline SRO-I (Rev. 1) | |||
Form ES-301-2, Control Roomlln-Plant Systems Outline SRO-U (Rev. 1) | |||
Form ES-301-3, Operating Test Quality Checklist (Rev. 1) | |||
Form ES-301-4, Simulator Scenario Quality Checklist (Rev. 1) | |||
Form ES-301-5, Transient and Event Checklist (Rev. 1) | |||
* Form ES-301-6, Competencies Checklist (Rev. 1) | |||
RO Written Outline Form ES-401-2, PWR Examination Outline RO (Rev. 1) | |||
Form ES-401-3, Generic Knowledge and Abilities Outline Tier 3 RO (Rev. 1) | |||
SRO Written Outline Form ES-401-2, PWR Examination Outline SRO (Rev. 1) | |||
Form ES-401-3, Generic Knowledge and Abilities Outline Tier 3 SRO (Rev. 1) | |||
Form ES-401-4, Record of Rejected KlAs (Rev. 1) | |||
Form ES-401-6, Written Examination Quality Checklist (Rev. 1) | |||
Form ES-D-1, Scenario Outline (Rev. 1) | |||
List of Enclosed Exam Materials 6 Administrative Topics JPMs with applicable procedures 12 Control Roomlln-Plant Systems JPMs with applicable procedures 4 simulator Scenarios 100 Written Examination Questions, answers, and reference pages for each question's correct answer References provided to the candidates for the written examination | |||
* ES-301 Operating Test Quality Checklist Form ES-301-3 ility: Davls*Besse Date of Exam 1215 thru 12115 2011 Operating Test No.: 2011 NRC exam Initials | |||
: 1. GENERAL CRITERIA b* c# | |||
: a. The operating test conforms with the previously approved outline; changes are consistent with sampling requirements (e.g., 10 CFR 55.45, operational importance, safety function distribution). | |||
: b. There is no day-ta-day repetition between this and other operating tests to be administered during this examination. | |||
: c. The operating test shall not duplicate items from the applicants' audit test(s) (see Section O.1.a). | |||
: d. Overlap with the written examination and between different parts of the operating test is within acceptable limits. | |||
: e. It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated license level. | |||
: 2. WALK*THROUGH CRITERIA | |||
: a. Each JPM includes the following, as applicable: | |||
* initial conditions | * initial conditions | ||
* initiating cues | * initiating cues | ||
* references and tools, including associated procedures | * references and tools, including associated procedures | ||
* reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time critical by the facility licensee | * reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time critical by the facility licensee | ||
* specific performance criteria that include: -detailed expected actions with exact criteria and nomenclature | * specific performance criteria that include: | ||
-system response and other examiner cues -statements describing important observations to be made by the applicant | - detailed expected actions with exact criteria and nomenclature | ||
-criteria for successful completion of the task -identification of critical steps and their associated performance standards | - system response and other examiner cues | ||
-restrictions on the sequence of steps, if applicable | - statements describing important observations to be made by the applicant | ||
: b. Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2. | - criteria for successful completion of the task | ||
: 3. SIMULATOR CRITERIA a. The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301*4 and a copy is attached. | - identification of critical steps and their associated performance standards | ||
Printed Name f Signature Date | - restrictions on the sequence of steps, if applicable | ||
* The facility signature is not applicable for NRC-developed # Independent NRC reviewer initial items in Column "c"; chief examiner concurrence NUREG-1021, Revision 9 Supplement 1 FENOC Facsimile Final ES-301 Simulator Scenario Quality Checklist Form ES-301-4 Date of Exam 1215 thru 12115 2011 Operating Test No.: 2011 NRC §xam DIIAI 'TATIVE ATTRIBUTES Initials a b* C# 1. The initial conditions are realistic, in that some equipment andlor instrumentation | : b. Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2. | ||
: 3. SIMULATOR CRITERIA | |||
: a. The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301*4 and a copy is attached. | |||
Printed Name f Signature Date IIJ 23t" l~ | |||
M\ | |||
~I J1c120 \) | |||
NOTE: | |||
* The facility signature is not applicable for NRC-developed tests. | |||
# Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required. | |||
NUREG-1021, Revision 9 Supplement 1 FENOC Facsimile Final | |||
ES-301 Simulator Scenario Quality Checklist Form ES-301-4 I~ | |||
Date of Exam 1215 thru 12115 2011 Operating Test No.: 2011 NRC §xam | |||
* DIIAI 'TATIVE ATTRIBUTES Initials a b* C# | |||
: 1. The initial conditions are realistic, in that some equipment andlor instrumentation may be out of service, but it does not cue the operators into expected events. 1J; rf JZ | |||
: 2. The scenarios consist mostly of related events. .Ij;} Ir-I 5Z | |||
: 3. Each event description consists of | |||
* the point in the scenario when it is to be initiated | * the point in the scenario when it is to be initiated | ||
* the malfunction(s) that are entered to initiate the event r7 | * the malfunction(s) that are entered to initiate the event flj~ r7 fl | ||
* the symptoms/cues that will be visible to the crew | * the symptoms/cues that will be visible to the crew | ||
* the expected operator actions (by shift position) | * the expected operator actions (by shift position) | ||
* the event termination point (if applicable) | * the event termination point (if applicable) | ||
: 4. No more than one non-mechanistic failure (e.g., pipe break) is incorporated into the | : 4. No more than one non-mechanistic failure (e.g., pipe break) is incorporated into the scenario without a credible preceding incident such as a seismic event. I)'). r6 -S | ||
1;1' rt 5Z.. 6. Sequencing and timing of events is reasonable, and allows the examination team to | : 5. The events are valid with regard to physics and thermodynamics. | ||
: 7. If time compression techniques are used, the scenario summary clearly so indicates. | 1;1' rt 5Z.. | ||
Operators have sufficient time to carry out expected activities without undue time | : 6. Sequencing and timing of events is reasonable, and allows the examination team to obtain complete evaluation results commensurate with the scenario objectives. I'J) ~ 6Z | ||
Cues are given. 8. The simulator modeling is not altered. | : 7. If time compression techniques are used, the scenario summary clearly so indicates. | ||
Pursuant to 10 CFR 55.46(d), any open simulator performance deficiencies or deviations from the referenced plant have | Operators have sufficient time to carry out expected activities without undue time constraints. Cues are given. 1l:} ~ S2- | ||
$1; r-t ~ | |||
All other scenarios have been altered in accordance with Section 0.5 of ES-301. 11. All individual operator competencies can be evaluated, as verified using Form | * | ||
: 12. Each applicant will be significantly involved in the minimum number of transients and | : 8. The simulator modeling is not altered. | ||
: 13. The level of difficulty is appropriate to support licensing decisions for each crew position. | : 9. The scenarios have been validated. Pursuant to 10 CFR 55.46(d), any open simulator performance deficiencies or deviations from the referenced plant have been evaluated to ensure that functional fidelity is maintained while running the planned scenarios. | ||
'UFITATIVE ATTRIBUTES (PER .,,...,,., ,,"n , i:)C,", "v,," D.S.d) Actual 1. Total malfunctions (5-8) 7 8 8 6 /Y 2. Malfunctions after EOP entry (1-2) I 2 2 3 2 /!1J. /V'1 3. Abnormal events (2-4) 3 4 3 2 '{J:), r-I K 4. Major transients (1-2) 1 2 1 2 r-I 5. EOPs entered/requiring substantive actions (1-2) 1 2 1 1 JL .... 6. EOP contingencies requiring substantive actions 1 0 1 1 | I'j1J ro S2 | ||
Davis-Besse Date of Exam 12/5 thru 12/152011 Exam Level: RO [g) SRO [g) Item Descri 1. Questions and answers 'Hr:lfIlur:;.o accurate and 2. a. NRC KlAs referenced for all questions | : 10. Every operator will be evaluated using at least one new or significantly modified | ||
: b. lea referenced as available | ~ ;rI ~ | ||
: 3. SRO are Section D.2.d of ES-401 4. The sampling process was random and systematic (If more than 4 RO or 2 SRO questions are repeated from the last two NRC licensing exams, consult the NRR OL program office.) 5. Question the license screening/audit exam was as (check the item that applies) and appears appropriate: | scenario. All other scenarios have been altered in accordance with Section 0.5 of ES-301. | ||
X_ the audit exam was systematically and randomly developed; or X_ the audit exam was completed before the license exam was started; or _ the examinations were developed independently; or _ the licensee certifies that there is no duplication; or other 6. Bank use meets limits (no more than 75 percent from the bank, at least 10 percent new, and the rest new or modified); | I)J;} :;-ro SZ | ||
enter the actual RO / SRO-on distri 7. Between 50 and 60 percent ofthe questions on the RO exam are written at the comprehension/analysis level; the SRO exam may exceed 60 percent If the randomly selected KlAs support the higher cognitive levels; enter the actual | : 11. All individual operator competencies can be evaluated, as verified using Form ES 301-6 (submit the form along with the simulator scenarios). | ||
Iffi r-r | |||
: 8. References/handouts provided do not give away answers or aid in the elimination of distractors. | : 12. Each applicant will be significantly involved in the minimum number of transients and events specified on Form ES-301-5 (submit the form with the simulator scenarios). 'JZ | ||
: 9. Question content conforms with specific KIA statements in the previously approved examination outline and is appropriate for the Tier to which they are assigned; deviations are ustified 10. Question n<::"'l'hr'M".tril' and format meet the nlJll1AllinAS in ES An...",n,t"lIY B. 11. The exam contains the required number of one-point, multiple choice items; the total is correct and with value on cover sheet a. Author d. NRC Supervisor Note: | : 13. The level of difficulty is appropriate to support licensing decisions for each crew | ||
* The facility reviewer'S initials/signature are not applicable for NRC-developed examinations. | ~ | ||
# Independent NRC reviewer initial items in Column *c"; chief examiner concurrence required. | position. | ||
'UFITATIVE ATTRIBUTES (PER .,,...,,., ,,"n , i:)C,", "v,," D.S.d) Actual | |||
: 1. Total malfunctions (5-8) 7 8 8 6 I~d- /Y 02 | |||
: 2. Malfunctions after EOP entry (1-2) I 2 2 3 2 /!1J. /V'1 f(. | |||
: 3. Abnormal events (2-4) 3 4 3 2 '{J:), r-I K | |||
: 4. Major transients (1-2) 1 2 1 2 I~~ r-I JZ | |||
: 5. EOPs entered/requiring substantive actions (1-2) 1 2 1 1 ifJ~ I~ JL | |||
.... | |||
* | |||
: 6. EOP contingencies requiring substantive actions 1 0 1 1 (0-2) 1J'Ii r7 JC | |||
: 7. Critical tasks (2-3) 3 2 2 3 Ill]:; n- t.5L NUREG-1021, Revision 9 Supplement 1 FENoe Facsimile Final | |||
ES-401 Written Examination Qual Checklist Form ES-401-6 Facility: Davis-Besse Date of Exam 12/5 thru 12/152011 Exam Level: RO [g) SRO [g) | |||
Item Descri | |||
: 1. Questions and answers 'Hr:lfIlur:;.o accurate and | |||
: 2. a. NRC KlAs referenced for all questions | |||
: b. lea referenced as available | |||
: 3. SRO are Section D.2.d of ES-401 | |||
: 4. The sampling process was random and systematic (If more than 4 RO or 2 SRO questions are repeated from the last two NRC licensing exams, consult the NRR OL program office.) | |||
: 5. Question the license screening/audit exam was as below (check the item that applies) and appears appropriate: | |||
X_ the audit exam was systematically and randomly developed; or X_ the audit exam was completed before the license exam was started; or | |||
_ the examinations were developed independently; or | |||
_ the licensee certifies that there is no duplication; or other | |||
: 6. Bank use meets limits (no more than 75 percent Bank Modified New from the bank, at least 10 percent new, and the rest new or modified); enter the actual RO / SRO- 45/21 JZj) ~ (JZ on distri | |||
: 7. Between 50 and 60 percent ofthe questions on CIA the RO exam are written at the 30/6 45/19 comprehension/analysis level; the SRO exam may exceed 60 percent If the randomly selected KlAs support the higher cognitive levels; enter the actual (40%/(24%) (60%/(76%) ?;; | |||
RO I SRO question distribution(s) at right. | |||
: 8. References/handouts provided do not give away answers or aid in the elimination of distractors. | |||
: 9. Question content conforms with specific KIA statements in the previously approved examination outline and is appropriate for the Tier to which they are assigned; deviations are ustified | |||
: 10. Question n<::"'l'hr'M".tril' and format meet the nlJll1AllinAS in ES An ...",n,t"lIY B. | |||
: 11. The exam contains the required number of one-point, multiple choice items; the total is correct and with value on cover sheet Date | |||
: a. Author IIIZ'!,' " | |||
$-4t | |||
~I | |||
: d. NRC Supervisor '\[10[tc t \ | |||
Note: | |||
* The facility reviewer'S initials/signature are not applicable for NRC-developed examinations. | |||
# Independent NRC reviewer initial items in Column *c"; chief examiner concurrence required. | |||
NUREG-1021 , Revision 9 Supplement 1 FENOC Facsimile Final}} |
Revision as of 10:21, 12 November 2019
ML120250259 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 12/12/2011 |
From: | Progress Energy Florida |
To: | NRC/RGN-III |
Shared Package | |
ML11354A075 | List: |
References | |
Download: ML120250259 (7) | |
Text
2011 DAVIS-BESSE NUCLEAR POWER STATION INI1-IAL EXAMINATION PROPOSED EXAM FILES
FENOC 5501 North State Route 2 e FirstEnergy Nuclear Operating Company r ---------------------------------------
Barry S. Allen
- OPERATOR LICENSE EXAMINATION MATERIAL-Oak Harbor, Ohio 43449 419-321-7676 Fax. 419-321-7582 Vice President - Nuclear
- WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS DOCUMENT AS UNRESTRICTED October 20, 2011 10 CFR 55 L-11-290 Mr. Dave Reeser Chief Examiner, Region III U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352
Subject:
Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Submittal of Written Operator License Examinations. Operating Tests, and
- Supporting Reference Material
Dear Mr. Reeser:
Enclosed are the written examinations, operating tests, and supporting reference material prepared by the Davis-Besse Nuclear Power Station (DBNPS) staff for the licensed operator examinations to be administered during the weeks of December 5 and December 12, 2011.
The enclosed items and supporting reference material, which are considered confidential, are being submitted to the NRC for review and approval in accordance with 10 CFR 55.40, "Written Examinations and Operating Tests Implementation" and NUREG 1021, Operator Licensing Examination Standards for Power Reactors (Revision 9, Supplement 1).
Modifications to the previous submitted outlines were made as a result of feedback received from the chief examiner and the validation process. These modifications to the scenario outlines are identified in bold italic print.
- OPERATOR LICENSE EXAMINATION MATERIAL
- WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS
- DOCUMENT AS UNRESTRICTED OCT J 1 2D11
- - OPERATOR LICENSE EXAMINATION MATERIAL
- WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS DOCUMENT AS UNRESTRICTED Davis-Besse Nuclear Power Station, Unit 1 L-11-290 Page 2of2 The materials enclosed shall be withheld from public disclosure until after the scheduled examinations are complete.
There are no regulatory commitments included in the submittal. If there are any questions or if additional information is required, please contact Mr. Anthony Stallard, Superintendent - Nuclear Operations, at (419) 321-7161.
Sincerely, Barry S. Allen
- vaw
Enclosure:
NUREG 1021 Forms and Operator License Examination Outline cc: Regional Administrator, NRC Region 11/ (w/o Enclosure)
Chief, Operations Branch, NRC Region III (w/o Enclosure)
DB-1 NRC/NRR Senior Project Manager (w/o Enclosure)
DB-1 Senior Resident Inspector (w/o Enclosure)
USNRC Document Control Desk (w/o Enclosure)
Utility radiological Safety Board (w/o Enclosure)
- OPERATOR LICENSE EXAMINATION MATERIAL
- - SHALL BE WITHHELD FROM PUBLIC DISCLOSURE UNTIL AFTER THE SCHEDULED EXAMINATIONS ARE COMPLETE
- - OPERATOR LICENSE EXAMINATION MATERIAL
- SHALL BE WITHHELD FROM PUBLIC DISCLOSURE UNTIL AFTER THE SCHEDULED EXAMINATIONS ARE COMPLETE Enclosure L-11-290 NUREG 1021 Forms and Operator License Examination Outline List of Enclosed NUREG Forms Form ES-201-3, Examination Security Agreement (Up-to-date Copies)
Form ES-301-1, Administrative Topics Outline RO (Rev. 1)
Form ES-301-1, Administrative Topics Outline SRO (Rev. 1)
Form ES-301-2, Control Roomlln-Plant Systems Outline RO (Rev. 1)
Form ES-301-2, Control Roomlln-Plant Systems Outline SRO-I (Rev. 1)
Form ES-301-2, Control Roomlln-Plant Systems Outline SRO-U (Rev. 1)
Form ES-301-3, Operating Test Quality Checklist (Rev. 1)
Form ES-301-4, Simulator Scenario Quality Checklist (Rev. 1)
Form ES-301-5, Transient and Event Checklist (Rev. 1)
- Form ES-301-6, Competencies Checklist (Rev. 1)
RO Written Outline Form ES-401-2, PWR Examination Outline RO (Rev. 1)
Form ES-401-3, Generic Knowledge and Abilities Outline Tier 3 RO (Rev. 1)
SRO Written Outline Form ES-401-2, PWR Examination Outline SRO (Rev. 1)
Form ES-401-3, Generic Knowledge and Abilities Outline Tier 3 SRO (Rev. 1)
Form ES-401-4, Record of Rejected KlAs (Rev. 1)
Form ES-401-6, Written Examination Quality Checklist (Rev. 1)
Form ES-D-1, Scenario Outline (Rev. 1)
List of Enclosed Exam Materials 6 Administrative Topics JPMs with applicable procedures 12 Control Roomlln-Plant Systems JPMs with applicable procedures 4 simulator Scenarios 100 Written Examination Questions, answers, and reference pages for each question's correct answer References provided to the candidates for the written examination
- ES-301 Operating Test Quality Checklist Form ES-301-3 ility: Davls*Besse Date of Exam 1215 thru 12115 2011 Operating Test No.: 2011 NRC exam Initials
- 1. GENERAL CRITERIA b* c#
- a. The operating test conforms with the previously approved outline; changes are consistent with sampling requirements (e.g., 10 CFR 55.45, operational importance, safety function distribution).
- b. There is no day-ta-day repetition between this and other operating tests to be administered during this examination.
- c. The operating test shall not duplicate items from the applicants' audit test(s) (see Section O.1.a).
- d. Overlap with the written examination and between different parts of the operating test is within acceptable limits.
- e. It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated license level.
- 2. WALK*THROUGH CRITERIA
- a. Each JPM includes the following, as applicable:
- initial conditions
- initiating cues
- references and tools, including associated procedures
- reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time critical by the facility licensee
- specific performance criteria that include:
- detailed expected actions with exact criteria and nomenclature
- system response and other examiner cues
- statements describing important observations to be made by the applicant
- criteria for successful completion of the task
- identification of critical steps and their associated performance standards
- restrictions on the sequence of steps, if applicable
- b. Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2.
- 3. SIMULATOR CRITERIA
- a. The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301*4 and a copy is attached.
Printed Name f Signature Date IIJ 23t" l~
M\
~I J1c120 \)
NOTE:
- The facility signature is not applicable for NRC-developed tests.
- Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.
NUREG-1021, Revision 9 Supplement 1 FENOC Facsimile Final
ES-301 Simulator Scenario Quality Checklist Form ES-301-4 I~
Date of Exam 1215 thru 12115 2011 Operating Test No.: 2011 NRC §xam
- DIIAI 'TATIVE ATTRIBUTES Initials a b* C#
- 1. The initial conditions are realistic, in that some equipment andlor instrumentation may be out of service, but it does not cue the operators into expected events. 1J; rf JZ
- 2. The scenarios consist mostly of related events. .Ij;} Ir-I 5Z
- 3. Each event description consists of
- the point in the scenario when it is to be initiated
- the malfunction(s) that are entered to initiate the event flj~ r7 fl
- the symptoms/cues that will be visible to the crew
- the expected operator actions (by shift position)
- the event termination point (if applicable)
- 4. No more than one non-mechanistic failure (e.g., pipe break) is incorporated into the scenario without a credible preceding incident such as a seismic event. I)'). r6 -S
- 5. The events are valid with regard to physics and thermodynamics.
1;1' rt 5Z..
- 6. Sequencing and timing of events is reasonable, and allows the examination team to obtain complete evaluation results commensurate with the scenario objectives. I'J) ~ 6Z
- 7. If time compression techniques are used, the scenario summary clearly so indicates.
Operators have sufficient time to carry out expected activities without undue time constraints. Cues are given. 1l:} ~ S2-
$1; r-t ~
- 8. The simulator modeling is not altered.
- 9. The scenarios have been validated. Pursuant to 10 CFR 55.46(d), any open simulator performance deficiencies or deviations from the referenced plant have been evaluated to ensure that functional fidelity is maintained while running the planned scenarios.
I'j1J ro S2
- 10. Every operator will be evaluated using at least one new or significantly modified
~ ;rI ~
scenario. All other scenarios have been altered in accordance with Section 0.5 of ES-301.
I)J;} :;-ro SZ
- 11. All individual operator competencies can be evaluated, as verified using Form ES 301-6 (submit the form along with the simulator scenarios).
Iffi r-r
- 12. Each applicant will be significantly involved in the minimum number of transients and events specified on Form ES-301-5 (submit the form with the simulator scenarios). 'JZ
- 13. The level of difficulty is appropriate to support licensing decisions for each crew
~
position.
'UFITATIVE ATTRIBUTES (PER .,,...,,., ,,"n , i:)C,", "v,," D.S.d) Actual
- 1. Total malfunctions (5-8) 7 8 8 6 I~d- /Y 02
- 2. Malfunctions after EOP entry (1-2) I 2 2 3 2 /!1J. /V'1 f(.
- 3. Abnormal events (2-4) 3 4 3 2 '{J:), r-I K
- 4. Major transients (1-2) 1 2 1 2 I~~ r-I JZ
- 5. EOPs entered/requiring substantive actions (1-2) 1 2 1 1 ifJ~ I~ JL
....
- 6. EOP contingencies requiring substantive actions 1 0 1 1 (0-2) 1J'Ii r7 JC
- 7. Critical tasks (2-3) 3 2 2 3 Ill]:; n- t.5L NUREG-1021, Revision 9 Supplement 1 FENoe Facsimile Final
ES-401 Written Examination Qual Checklist Form ES-401-6 Facility: Davis-Besse Date of Exam 12/5 thru 12/152011 Exam Level: RO [g) SRO [g)
Item Descri
- 1. Questions and answers 'Hr:lfIlur:;.o accurate and
- 2. a. NRC KlAs referenced for all questions
- b. lea referenced as available
- 4. The sampling process was random and systematic (If more than 4 RO or 2 SRO questions are repeated from the last two NRC licensing exams, consult the NRR OL program office.)
- 5. Question the license screening/audit exam was as below (check the item that applies) and appears appropriate:
X_ the audit exam was systematically and randomly developed; or X_ the audit exam was completed before the license exam was started; or
_ the examinations were developed independently; or
_ the licensee certifies that there is no duplication; or other
- 6. Bank use meets limits (no more than 75 percent Bank Modified New from the bank, at least 10 percent new, and the rest new or modified); enter the actual RO / SRO- 45/21 JZj) ~ (JZ on distri
- 7. Between 50 and 60 percent ofthe questions on CIA the RO exam are written at the 30/6 45/19 comprehension/analysis level; the SRO exam may exceed 60 percent If the randomly selected KlAs support the higher cognitive levels; enter the actual (40%/(24%) (60%/(76%) ?;;
RO I SRO question distribution(s) at right.
- 8. References/handouts provided do not give away answers or aid in the elimination of distractors.
- 9. Question content conforms with specific KIA statements in the previously approved examination outline and is appropriate for the Tier to which they are assigned; deviations are ustified
- 10. Question n<::"'l'hr'M".tril' and format meet the nlJll1AllinAS in ES An ...",n,t"lIY B.
- 11. The exam contains the required number of one-point, multiple choice items; the total is correct and with value on cover sheet Date
- a. Author IIIZ'!,' "
$-4t
~I
- d. NRC Supervisor '\[10[tc t \
Note:
- The facility reviewer'S initials/signature are not applicable for NRC-developed examinations.
- Independent NRC reviewer initial items in Column *c"; chief examiner concurrence required.
NUREG-1021 , Revision 9 Supplement 1 FENOC Facsimile Final