ML121090475: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 04/18/2012
| issue date = 04/18/2012
| title = Acceptance Review of Proposed BVPS Emergency Preparedness Plan Using Nuclear Energy Institute 99-01, Revision 5
| title = Acceptance Review of Proposed BVPS Emergency Preparedness Plan Using Nuclear Energy Institute 99-01, Revision 5
| author name = Bamford P J
| author name = Bamford P
| author affiliation = NRC/NRR/DORL/LPLI-2
| author affiliation = NRC/NRR/DORL/LPLI-2
| addressee name = Lashley P H
| addressee name = Lashley P
| addressee affiliation = FirstEnergy Corp
| addressee affiliation = FirstEnergy Corp
| docket = 05000334, 05000412
| docket = 05000334, 05000412
Line 12: Line 12:
| document type = E-Mail, Acceptance Review Letter
| document type = E-Mail, Acceptance Review Letter
| page count = 1
| page count = 1
| project =
| stage = Acceptance Review
}}
}}


=Text=
=Text=
{{#Wiki_filter:From: Bamford, P eSent: Wednesday ,To: 'phlashley@
{{#Wiki_filter:From:                     Bamford, Peeter Sent:                     Wednesday,, April 18, 2012 3:19 PM To:                       'phlashley@firstenergycorp.com'


==Subject:==
==Subject:==
Acceptance Nuclear Ene
Acceptance Review of Proposed BVPS Emergency Preparedness P      Plan Using Nuclear Energy Institute 99-01, Revision 5 By letter dated December 21, 2011 (ADAMS Accession No. ML11362A317), FirstEnergy Nuclear Operating Company submittted a request for NRC approval of an emergencyy action level scheme change to a scheme based b        on Nuclear Energy Institute 99-01, Revision  n 5, for Beaver Valley Power Station, Units 1 and 2.
 
The purpose of this email is to provid  de the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of thist    request. The acceptance review was perform    med to determine if there is sufficient techniical information in scope and depth to allow the N NRC staff to complete its detailed technical review  w. The acceptance review is also intended to ide    entify whether the application has any read    dily apparent information insufficiencies in its characterization of the regulatory req quirements or the licensing basis of the plant.
By letter dated December 21, 2011 Nuclear Operating Company submi tlevel scheme change to a scheme bBeaver Valley Power Station, Units
The NRC staff has reviewed your re    equest, and concluded that it does provide techniccal information in sufficient detail to ena able the staff to proceed with its detailed technicaal review and make an independent assessment regarding the acceptability of the proposed su            ubmittal in terms of regulatory requirements and the protection of public health and safety and the environment. If additional informatio on is needed for the staff to complete its technica al review, you will be advised by separate corrrespondence.
 
In your submittal, you requested an expedited review of the proposed change by Julyy 2, 2012.
The purpose of this email is to provi d(NRC) staff's acceptance review of tdetermine if there is sufficient techn icomplete its detailed technical revie wwhether the application has any rea dcharacterization of the regulatory re q
Based on NRC staff resource availa    ability, this requested disposition date will not be ffeasible.
The NRC staff has reviewed your r einformation in sufficient detail to en aand make an independent assessmterms of regulatory requirements anenvironment. If additional informati oyou will be advised by separate cor r
The NRC staff anticipates that it will disposition the request by December 2012.
In your submittal, you requested an Based on NRC staff resource avail aThe NRC staff anticipates that it will Peter Bamford  NRR/DORL/LPL 1-2 Beaver Valley & TMI-1 Project Manage r301-415-2833 eter , April 18, 2012 3:19 PM firstenergycorp.com' Review of Proposed BVPS Emergency Preparedness Prgy Institute 99-01, Revision 5 (ADAMS Accession No. ML11362A317), FirstEn tted a request for NRC approval of an emergenc y based on Nuclear Energy Institute 99-01, Revisio n1 and 2.
Peter Bamford NRR/DORL/LPL 1-2 Beaver Valley & TMI-1 Project Managerr 301-415-2833}}
de the results of the U.S. Nuclear Regulatory Co this request. The acceptance review was perfor m ical information in scope and depth to allow the N w. The acceptance review is also intended to id e dily apparent information insufficiencies in its quirements or the licensing basis of the plant.
equest, and concluded that it does provide techni c able the staff to proceed with its detailed technicaent regarding the acceptability of the proposed s ud the protection of public health and safety and t on is needed for the staff to complete its technic a respondence. expedited review of the proposed change by Jul y ability, this requested disposition date will not be fdisposition the request by December 2012.
r    P lan Using ergy y action n 5, for mmission med to NRC staff to entify c al al review ubmittal in he al review, y 2, 2012.
feasible.}}

Latest revision as of 05:47, 12 November 2019

Acceptance Review of Proposed BVPS Emergency Preparedness Plan Using Nuclear Energy Institute 99-01, Revision 5
ML121090475
Person / Time
Site: Beaver Valley
Issue date: 04/18/2012
From: Peter Bamford
Plant Licensing Branch 1
To: Lashley P
FirstEnergy Corp
Bamford, Peter J., NRR/DORL 415-2833
References
Download: ML121090475 (1)


Text

From: Bamford, Peeter Sent: Wednesday,, April 18, 2012 3:19 PM To: 'phlashley@firstenergycorp.com'

Subject:

Acceptance Review of Proposed BVPS Emergency Preparedness P Plan Using Nuclear Energy Institute 99-01, Revision 5 By letter dated December 21, 2011 (ADAMS Accession No. ML11362A317), FirstEnergy Nuclear Operating Company submittted a request for NRC approval of an emergencyy action level scheme change to a scheme based b on Nuclear Energy Institute 99-01, Revision n 5, for Beaver Valley Power Station, Units 1 and 2.

The purpose of this email is to provid de the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of thist request. The acceptance review was perform med to determine if there is sufficient techniical information in scope and depth to allow the N NRC staff to complete its detailed technical review w. The acceptance review is also intended to ide entify whether the application has any read dily apparent information insufficiencies in its characterization of the regulatory req quirements or the licensing basis of the plant.

The NRC staff has reviewed your re equest, and concluded that it does provide techniccal information in sufficient detail to ena able the staff to proceed with its detailed technicaal review and make an independent assessment regarding the acceptability of the proposed su ubmittal in terms of regulatory requirements and the protection of public health and safety and the environment. If additional informatio on is needed for the staff to complete its technica al review, you will be advised by separate corrrespondence.

In your submittal, you requested an expedited review of the proposed change by Julyy 2, 2012.

Based on NRC staff resource availa ability, this requested disposition date will not be ffeasible.

The NRC staff anticipates that it will disposition the request by December 2012.

Peter Bamford NRR/DORL/LPL 1-2 Beaver Valley & TMI-1 Project Managerr 301-415-2833