ML12262A476: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 02/22/2012 | | issue date = 02/22/2012 | ||
| title = TMI Alert Portzline Presentation NUREG-0654 Public Mtg | | title = TMI Alert Portzline Presentation NUREG-0654 Public Mtg | ||
| author name = Portzline S | | author name = Portzline S | ||
| author affiliation = Exelon Generation Co, LLC | | author affiliation = Exelon Generation Co, LLC | ||
| addressee name = | | addressee name = | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Failures of the SOARCA Draft Report Peach Bottom, Delta PA 2/22/2012 | {{#Wiki_filter:Failures of the SOARCA Draft Report Peach Bottom, Delta PA 2/22/2012 ADAMS ML12062A076 or www.efmr.org/files/2012/SOARCA-2-22-2012.pdf (Original high quality file ) | ||
Scott D. Portzline Three Mile Island Alert Security Consultant | |||
Summary | |||
: 1. The SOARCA conclusions as represented by the NRC Office of Public Relations are misleading. | |||
2.The NRC has not clearly emphasized that SOARCA limited its simulations to a select group of scenarios. | : 2. The NRC has not clearly emphasized that SOARCA limited its simulations to a select group of scenarios. | ||
3.SOARCA does not include many aspects of nuclear accidents which would severely alter the outcomes and conclusions. | : 3. SOARCA does not include many aspects of nuclear accidents which would severely alter the outcomes and conclusions. | ||
Summary 4.The MELCOR software has numerous shortcomings and SOARCA should caution its readers that divergent results can easily be created. | Summary | ||
5.The NRC has not attempted to correct these misconceptions in the media. | : 4. The MELCOR software has numerous shortcomings and SOARCA should caution its readers that divergent results can easily be created. | ||
6.The NRC has a history of questionable or faulty probabilistic risk assessments. | : 5. The NRC has not attempted to correct these misconceptions in the media. | ||
7.There has never been a timely evacuation order at any of the | : 6. The NRC has a history of questionable or faulty probabilistic risk assessments. | ||
: 7. There has never been a timely evacuation order at any of the worlds nuclear accidents. | |||
No Timely Evacuations There has never been a timely evacuation or a timely evacuation order issued at any of the | No Timely Evacuations | ||
100% failure rate. | * There has never been a timely evacuation or a timely evacuation order issued at any of the worlds nuclear accidents. | ||
The evacuation projections are purely wishful | * 100% failure rate. | ||
Therefore: SOARCA is not based on reality. | * The evacuation projections are purely wishful thinkingignores known scientific data of real world nuclear evacuations. | ||
* Therefore: SOARCA is not based on reality. | |||
Three Mile Island - Windscale - Chernobyl - Fukushima | |||
Real-World None of these real-world nuclear accidents, prior to its occurrence, would have been predicted, or simulated by the MELCOR software utilized by SOARCA. | |||
Three Mile Island - Windscale - Chernobyl - Fukushima | |||
-world nuclear accidents, prior to its occurrence, would have been predicted, or simulated by the MELCOR software utilized by SOARCA. Three Mile Island | |||
- Windscale | |||
- Chernobyl | |||
- Fukushima | |||
Plume Projections Many Emergency Operations Centers employ plume projection software programs which cannot calculate for multiple source term accidents.}} | Plume Projections | ||
* Many Emergency Operations Centers employ plume projection software programs which cannot calculate for multiple source term accidents.}} |
Latest revision as of 22:26, 11 November 2019
ML12262A476 | |
Person / Time | |
---|---|
Site: | Peach Bottom, Three Mile Island |
Issue date: | 02/22/2012 |
From: | Portzline S Exelon Generation Co |
To: | Office of Nuclear Security and Incident Response |
Shannon King | |
Shared Package | |
ML12062A076 | List: |
References | |
Download: ML12262A476 (6) | |
Text
Failures of the SOARCA Draft Report Peach Bottom, Delta PA 2/22/2012 ADAMS ML12062A076 or www.efmr.org/files/2012/SOARCA-2-22-2012.pdf (Original high quality file )
Scott D. Portzline Three Mile Island Alert Security Consultant
Summary
- 1. The SOARCA conclusions as represented by the NRC Office of Public Relations are misleading.
- 2. The NRC has not clearly emphasized that SOARCA limited its simulations to a select group of scenarios.
- 3. SOARCA does not include many aspects of nuclear accidents which would severely alter the outcomes and conclusions.
Summary
- 4. The MELCOR software has numerous shortcomings and SOARCA should caution its readers that divergent results can easily be created.
- 5. The NRC has not attempted to correct these misconceptions in the media.
- 6. The NRC has a history of questionable or faulty probabilistic risk assessments.
- 7. There has never been a timely evacuation order at any of the worlds nuclear accidents.
No Timely Evacuations
- There has never been a timely evacuation or a timely evacuation order issued at any of the worlds nuclear accidents.
- 100% failure rate.
- The evacuation projections are purely wishful thinkingignores known scientific data of real world nuclear evacuations.
- Therefore: SOARCA is not based on reality.
Three Mile Island - Windscale - Chernobyl - Fukushima
Real-World None of these real-world nuclear accidents, prior to its occurrence, would have been predicted, or simulated by the MELCOR software utilized by SOARCA.
Three Mile Island - Windscale - Chernobyl - Fukushima
Plume Projections
- Many Emergency Operations Centers employ plume projection software programs which cannot calculate for multiple source term accidents.