ML13028A085: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
{{#Wiki_filter:ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         1 Group #                         1 K/A #                             007.EK2.02 Importance Rating             2.6 Proposed Question:               RO# 1, SEE ATTACHED Proposed Answer:                   A SEE ATTACHED Explanation (Optional):
-reference:
883D195 Sh. 4 Logic Diagram 4160V Bus Schemes; 883D195 Technical Reference(s):          Sh. 15 RC Trip Signal Logic Diagram; STPT 21.1 Sheet 16 (Attach if not previously provided)
Level RO SRO   Tier # 1     Group # 1     K/A # 007.EK2.02 Importance Rating 2.6     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           053.02.LP0273.007                             (As available)
RO# 1, SEE ATTACHED Proposed Answer:
Question Source:             Bank #                   INPO 27260 Modified Bank                               (Note changes or attach parent)
A   Explanation (Optional):
New Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTA CHED  Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-DR 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Knowledge of the interrelationship between a reactor trip and the following:
883D195 Sh. 4 Logic Diagram 4160V Bus Schemes; 883D195 Sh. 15 RC Trip Signal Logic Diagram; STPT 21.1 Sheet 16 (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
Breakers, relays and disconnects NUREG-1021, Revision 9
N/A Learning Objective:
053.02.LP0273.007 (As available)
Question Source:
Bank # INPO 27260 Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-DR   10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Knowledge of the interrelationship between a reactor trip and the following: Breakers, relays and disconnects NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         1 Group #                         1 K/A #                             008.AA1.06 Importance Rating             3.6 Proposed Question:               RO# 2, SEE ATTACHED Proposed Answer:                   C SEE ATTACHED Explanation (Optional):
-reference:
883D195 Sh. 18 Logic Diagram Pressurizer Pressure and Technical Reference(s):          Level Control (Attach if not previously provided)
Level RO SRO   Tier # 1     Group # 1     K/A # 008.AA1.06 Importance Rating 3.6     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           043.03.LP2463.010                             (As available)
RO# 2, SEE ATTACHED Proposed Answer:
Question Source:             Bank #
C   Explanation (Optional):
Modified Bank                               (Note changes or attach parent)
SEE ATTACHED Technical Reference(s):
New                         NEW Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
883D195 Sh. 18 Logic Diagram Pressurizer Pressure and Level Control (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-DR 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Ability to operate and/or monitor the following as they apply to the Pressurizer Vapor Space Accident: Control of PZR Level NUREG-1021, Revision 9
N/A Learning Objective: 043.03.LP2463.010 (As available)
Question Source:
Bank #   Modified Bank (Note changes or attach parent)
New NEW   Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-DR   10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Ability to operate and/or monitor the following as they apply to the Pressurizer Vapor Space Accident: Control of PZR Level NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         1 Group #                         1 K/A #                             026.AK3.03 Importance Rating             4.0 Proposed Question:               RO# 3, SEE ATTACHED Proposed Answer:                   C SEE ATTACHED Explanation (Optional):
-reference:
Technical Reference(s):           EOP-1.1, SI Termination Step 6, Background page 12 (Attach if not previously provided)
Level RO SRO   Tier # 1     Group # 1     K/A # 026.AK3.03 Importance Rating 4.0     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           031.02.LP0405.005                             (As available)
RO# 3, SEE ATTACHED Proposed Answer:
Question Source:             Bank #                   INPO 26807 Modified Bank                               (Note changes or attach parent)
C   Explanation (Optional):
New Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge                     1-P Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Knowledge of the reasons for the following responses as they apply to the Loss of Component Cooling Water: Guidance actions contained in EOP for Loss of CCW NUREG-1021, Revision 9
EOP-1.1, SI Termination Step 6, Background page 12 (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
031.02.LP0405.005 (As available)
Question Source:
Bank # INPO 2680 7  Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-P   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Knowledge of the reasons for the following responses as they apply to the Loss of Component Cooling Water: Guidance actions contained in EOP for Loss of CCW NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO                SRO Tier #                         1 Group #                         1 K/A #                             027.AA1.04 Importance Rating             3.9 Proposed Question:               RO# 4, SEE ATTACHED Proposed Answer:                   C SEE ATTACHED Explanation (Optional):
-reference:
AOP-18A Unit 1 Train "A" Equipment Operation; Logic Technical Reference(s):          883D195 Sheet 9 (Attach if not previously provided)
Level R O  SRO   Tier # 1     Group # 1     K/A # 027.AA1.04 Importance Rating 3.9     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           055.03.LP2440.002                             (As available)
RO# 4, SEE ATTACHED Proposed Answer:
Question Source:             Bank #                   PBNP 2003 Modified Bank                               (Note changes or attach parent)
C   Explanation (Optional):
New Question History:             Last NRC Exam             2003 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge                       1-I Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Ability to operate and/or monitor the following as they apply to the Pressurizer Pressure Control Malfunctions: Pressure Recovery, using emergency-only heaters NUREG-1021, Revision 9
AOP-18A Unit 1 Train "A" Equipment Operation; Logic 883D195 Sheet 9 (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
055.03.LP2440.002 (As available)
Question Source:
Bank # PBNP 2003 Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam 2003 (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-I   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Ability to operate and/or monitor the following as they apply to the Pressurizer Pressure Control Malfunctions: Pressure Recovery, using emergency
-only heaters NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         1 Group #                         1 K/A #                               029.EA2.01 Importance Rating             4.4 Proposed Question:               RO# 5, SEE ATTACHED Proposed Answer:                   C SEE ATTACHED Explanation (Optional):
-reference:
CSP-S.1, Response to Nuclear Power Generation/ATWS Step Technical Reference(s):          19 and CSP-S.1 Background Document (Attach if not previously provided)
Level RO SRO   Tier # 1     Group # 1     K/A # 029.EA2.01 Importance Rating 4.4     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           043.03.LP1996.012                             (As available)
RO# 5, SEE ATTACHED Proposed Answer:
Question Source:             Bank #                   INPO 24679 Modified Bank                               (Note changes or attach parent)
C   Explanation (Optional):
New Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge                       1-P Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Ability to determine or interpret the following as they apply to a ATWS: Reactor nuclear instrumentation NUREG-1021, Revision 9
CSP-S.1, Response to Nuclear Power Generation/ATWS Step 19 and CSP-S.1 Background Document (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
043.03.LP1996.012 (As available)
Question Source:
Bank # INPO 24679 Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-P   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Ability to determine or interpret the following as they apply to a ATWS: Reactor nuclear instrumentation NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         1 Group #                         1 K/A #                             038.02.02.38 Importance Rating             3.6 Proposed Question:               RO# 6, SEE ATTACHED Proposed Answer:                   A SEE ATTACHED Explanation (Optional):
-reference:
Technical Reference(s):           FSAR Chapter 14.2.4 (Attach if not previously         OM 4.3.8 Control of Time Critical Actions, step 4.8.2 provided)                        OM 4.3.2 Attachment E, Time Critical Actions, 4.1 Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           031.02.LP0441.004                             (As available)
Level RO SRO   Tier # 1     Group # 1     K/A # 038.02.02.38 Importance Rating 3.6     Proposed Question:
Question Source:             Bank #
RO# 6, SEE ATTACHED Proposed Answer:
Modified Bank                               (Note changes or attach parent)
A   Explanation (Optional):
New                         NEW Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge                     1-B Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43           X K/A Statement: Steam Generator Tube Rupture - Knowledge of conditions and limitations in the facility license NUREG-1021, Revision 9
FSAR Chapter 14.2.4 (Attach if not previously provided) OM 4.3.8 Control of Time Critical Actions, step 4.8.2 OM 4.3.2 Attachment E, Time Critical Actions, 4.1 Proposed references to be provided to applicants during examination:
N/A Learning Objective:
031.02.LP0441.004 (As available)
Question Source:
Bank #   Modified Bank (Note changes or attach parent)
New NEW   Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-B   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X   55.43 X   K/A Statement: Steam Generator Tube Rupture  
- Knowledge of conditions and limitations in the facility license NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         1 Group #                         1 K/A #                           WE012.EK1.01 Importance Rating             3.4 Proposed Question:               RO# 7, SEE ATTACHED Proposed Answer:                   D SEE ATTACHED Explanation (Optional):
-reference:
ECA-2.1, Uncontrolled Depressurization of Both Steam Technical Reference(s):          Generators Step 5; CSP-H.1 Loss of Heat Sink (Attach if not previously         LP0465 LOCA and Faulted Generator Contingencies provided)
Level RO SRO   Tier # 1     Group # 1     K/A # WE012.EK1.01 Importance Rating 3.4     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           031.02.LP0465.001                             (As available)
RO# 7, SEE ATTACHED Proposed Answer:
Question Source:             Bank #                   PBNP 2005 Modified Bank                               (Note changes or attach parent)
D   Explanation (Optional):
New Question History:             Last NRC Exam             2005 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-RI 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Knowledge of the operational implications of the following concepts as they apply to the Uncontrolled Depressurization of All Steam Generators: Components, capacity, and function of emergency systems.
ECA-2.1, Uncontrolled Depressurization of Both Steam Generators Step 5; CSP
-H.1 Loss of Heat Sink (Attach if not previously provided) LP0465 LOCA and Faulted Generator Contingencies Proposed references to be provided to applicants during examination:
N/A Learning Objective:
031.02.LP0465.001 (As available)
Question Source:
Bank # PBNP 2005 Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam 2005 (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-RI   10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Knowledge of the operational implications of the following concepts as they apply to the Uncontrolled Depressurization of All Steam Generators: Components, capacity, and function of emergency systems.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross-reference:
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         1 Group #                         1 K/A #                             054.AK3.02 Importance Rating             3.4 Proposed Question:               RO# 8, SEE ATTACHED Proposed Answer:                   A SEE ATTACHED Explanation (Optional):
Level RO SRO   Tier # 1     Group # 1     K/A # 054.AK3.02 Importance Rating 3.4     Proposed Question:
AOP-2B Feedwater System Malfunction; M-202-2 Feed Technical Reference(s):          P&ID; M-202-1 Condensate P&ID (Attach if not previously provided)
RO# 8, SEE ATTACHED Proposed Answer:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           055.03.LP2439.001                             (As available)
A   Explanation (Optional):
Question Source:             Bank #                   PBNP 2005 Modified Bank                               (Note changes or attach parent)
SEE ATTACHED Technical Reference(s):
New Question History:             Last NRC Exam             2005 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
AOP-2B Feedwater System Malfunction; M
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-RI 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Knowledge of the reasons for the following responses as they apply to a Loss of Main Feedwater: matching feedwater and steam flows.
-202-2 Feed P&ID; M-202-1 Condensate P&ID (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
055.03.LP2439.001 (As available)
Question Source: Bank # PBNP 2005 Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam 2005 (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-RI   10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Knowledge of the reasons for the following responses as they apply to a Loss of Main Feedwater: matching feedwater and steam flows.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         1 Group #                         1 K/A #                               055.EA1.07 Importance Rating             4.3 Proposed Question:               RO# 9, SEE ATTACHED Proposed Answer:                   C SEE ATTACHED Explanation (Optional):
-reference:
ECA 0.0 Unit 2 Loss of All AC Power; PBE-7033 Electrical Technical Reference(s):          Drawing (Attach if not previously provided)
Level RO SRO   Tier # 1     Group # 1     K/A # 055.EA1.07 Importance Rating 4.3     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           031.02.LP0462.007                             (As available)
RO# 9, SEE ATTACHED Proposed Answer:
Question Source:             Bank #                   AOP BANK Modified Bank                               (Note changes or attach parent)
C   Explanation (Optional):
New Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-RI 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Ability to operate and monitor the following as they apply to a Station Blackout:
ECA 0.0 Unit 2 Loss of All AC Power; P BE-7033 Electrical Drawing (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
Restoration of power from offsite.
N/A Learning Objective:
031.02.LP0462.007 (As available)
Question Source:
Bank # AOP BANK Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-RI   10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Ability to operate and monitor the following as they apply to a Station Blackout: Restoration of power from offsite.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         1 Group #                         1 K/A #                             056.AA2.05 Importance Rating             2.6 Proposed Question:               RO# 10, SEE ATTACHED Proposed Answer:                   C SEE ATTACHED Explanation (Optional):
-reference:
Technical Reference(s):           AOP-18A Unit 2 Train "A" Equipment Operation Att. A (Attach if not previously provided)
Level RO SRO   Tier # 1     Group # 1     K/A # 056.AA2.05 Importance Rating 2.6     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           052.07.LP0359.004                             (As available)
RO# 10, SEE ATTACHED Proposed Answer:
Question Source:             Bank #
C   Explanation (Optional):
Modified Bank                               (Note changes or attach parent)
SEE ATTACHED Technical Reference(s):
New                         NEW Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
AOP-18A Unit 2 Train "A" Equipment Operation Att. A (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-RI 10 CFR Part 55 Content:               55.41 55.43           X K/A Statement: Ability to determine and interpret the following as they apply to the Loss of Offsite Power: Operational status of HVAC chill water pump.
N/A Learning Objective:
NUREG-1021, Revision 9
052.07.LP0359.004 (As available)
Question Source:
Bank #   Modified Bank (Note changes or attach parent)
New NEW   Question History:
Last NRC Exa m  (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-RI   10 CFR Part 55 Content:
55.41   55.43 X   K/A Statement: Ability to determine and interpret the following as they apply to the Loss of Offsite Power: Operational status of HVAC chill water pum
: p. NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         1 Group #                         1 K/A #                             057.02.04.04 Importance Rating             4.5 Proposed Question:               RO# 11, SEE ATTACHED Proposed Answer:                   C SEE ATTACHED Explanation (Optional):
-reference:
AOP-0.2 Loss of Safety Related Instrument Buses and Technical Reference(s):          background (Attach if not previously provided)
Level RO SRO   Tier # 1     Group # 1     K/A # 057.02.04.04 Importance Rating 4.5     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           054.02.LP0123.011                             (As available)
RO# 11 , SEE ATTACHED Proposed Answer:
Question Source:             Bank #
C   Explanation (Optional):
Modified Bank                               (Note changes or attach parent)
SEE ATTACHED Technical Reference(s):
New                         NEW Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
AOP-0.2 Loss of Safety Related Instrument Buses and background (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
Question Cognitive Level:             Memory or Fundamental Knowledge                       1-I Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43           X K/A Statement: Loss of Vital AC Instrument Bus - Ability to recognize abnormal indications for system operating parameters that are entry-level conditions for emergency and abnormal operating procedures.
N/A Learning Objective:
NUREG-1021, Revision 9
054.02.LP0123.011 (As available)
Question Source:
Bank #   Modified Bank (Note changes or attach parent)
New NEW   Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-I   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X   55.43 X   K/A Statement: Loss of Vital AC Instrument Bus  
- Ability to recognize abnormal indications for system operating parameters that are entry
-level conditions for emergency and abnormal operating procedures. NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         1 Group #                         1 K/A #                             058.AK1.01 Importance Rating             2.8 Proposed Question:               RO# 12, SEE ATTACHED Proposed Answer:                   A SEE ATTACHED Explanation (Optional):
-reference:
0-SOP-DC-001 125VDC System, Bus D-01& Components; 0-Technical Reference(s):          SOP-Y-001 120 V Vital Instrument Inverters Att. A (Attach if not previously provided)
Level RO SRO   Tier # 1     Group # 1     K/A # 058.AK1.01 Importance Rating 2.8     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           054.03.LP0121.009                             (As available)
RO# 12, SEE ATTACHED Proposed Answer:
Question Source:             Bank #
A   Explanation (Optional):
Modified Bank                               (Note changes or attach parent)
SEE ATTACHED Technical Reference(s):
New                         NEW Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
0-SOP-DC-001 125VDC System, Bus D
Question Cognitive Level:             Memory or Fundamental Knowledge                       1-I Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Knowledge of the operational implications of the following concepts as they apply to a Loss of DC Power: Battery charger equipment and instrumentation.
-01& Components; 0
NUREG-1021, Revision 9
-SOP-Y-001 120 V Vital Instrument Inverters Att. A (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
054.03.LP0121.009 (As available)
Question Source:
Bank #   Modified Bank (Note changes or attach parent)
New NEW   Question History:
Last NRC Exa m  (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-I   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Knowledge of the operational implications of the following concepts as they apply to a Loss of DC Power: Battery charger equipment and instrumentation
. NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         1 Group #                         1 K/A #                             062.AK3.02 Importance Rating             3.6 Proposed Question:               RO# 13, SEE ATTACHED Proposed Answer:                     B SEE ATTACHED Explanation (Optional):
-reference:
Technical Reference(s):           883D195 Sh. 8 Logic Diagram Safeguard Sequence (Attach if not previously provided)
Level RO SRO   Tier # 1     Group # 1     K/A # 062.AK3.02 Importance Rating 3.6     Proposed Questio n: RO# 13, SEE ATTACHED Proposed Answer:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           051.06.LP0086.005                             (As available)
B   Explanation (Optional):
Question Source:             Bank #                   LOC BANK Modified Bank                               (Note changes or attach parent)
SEE ATTACHED Technical Reference(s):
New Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
883D195 Sh. 8 Logic Diagram Safeguard Sequence (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-RI 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Knowledge of the reasons for the following responses as they apply to the Loss of Nuclear Service Water: The automatic actions (alignments) within the nuclear service water resulting from the actuation of the ESFAS NUREG-1021, Revision 9
N/A Learning Objective:
051.06.LP0086.005 (As available)
Question Source:
Bank # LOC BANK Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-RI   10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Knowledge of the reasons for the following responses as they apply to the Loss of Nuclear Service Water: The automatic actions (alignments) within the nuclear service water resulting from the actuation of the ESFAS NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         1 Group #                         1 K/A #                             065.AA1.03 Importance Rating             2.9 Proposed Question:               RO# 14, SEE ATTACHED Proposed Answer:                   A SEE ATTACHED Explanation (Optional):
-reference:
EOP-1 Unit 1 Loss of Reactor or Secondary Coolant, Step 10c RNO; EOP-0 Reactor Trip or Safety Injection Attachment B; Technical Reference(s):          Logic 8893D195 Sheet 21 (Attach if not previously provided)
Level RO SRO   Tier # 1     Group # 1     K/A # 065.AA1.03 Importance Rating 2.9     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           052.06.LP0338.006                             (As available)
RO# 14, SEE ATTACHED Proposed Answer:
Question Source:             Bank #
A   Explanation (Optional):
Modified Bank                               (Note changes or attach parent)
SEE ATTACHED Technical Reference(s):
New                         NEW Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
EOP-1 Unit 1 Loss of Reactor or Secondary Coolant, Step 10c RNO; EOP-0 Reactor Trip or Safety Injection Attachment B; Logic 8893D195 Sheet 21 (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-RI 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Ability to operate and/or monitor the following as they apply to the Loss of Instrument Air: Restoration of systems served by instrument air when pressure is regained NUREG-1021, Revision 9
N/A Learning Objective:
052.06.LP0338.006 (As available)
Question Source:
Bank #   Modified Bank (Note changes or attach parent)
New NEW   Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-RI   10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Ability to operate and/or monitor the following as they apply to the Loss of Instrument Air: Restoration of systems served by instrument air when pressure is regained NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         1 Group #                         1 K/A #                             WE04.EA2.01 Importance Rating             3.4 Proposed Question:               RO# 15, SEE ATTACHED Proposed Answer:                   D SEE ATTACHED Explanation (Optional):
-reference:
EOP-0 Reactor Trip or Safety Injection, Step 25; EOP-1 Loss Technical Reference(s):          of Reactor or Secondary Coolant, Step 19 (Attach if not previously provided)
Level RO SRO   Tier # 1     Group # 1     K/A # WE04.EA2.01 Importance Rating 3.4     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           031.02.LP0465.001                             (As available)
RO# 15, SEE ATTACHED Proposed Answer:
Question Source:             Bank #                   INPO 29437 Modified Bank                               (Note changes or attach parent)
D   Explanation (Optional):
New Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-DR 10 CFR Part 55 Content:               55.41 55.43           X K/A Statement: Ability to determine and interpret the following as they apply to a LOCA Outside Containment: Facility conditions and selection of appropriate procedures during abnormal and emergency operations NUREG-1021, Revision 9
EOP-0 Reactor Trip or Safety Injection, Step 25; EOP
-1 Loss of Reactor or Secondary Coolant, Step 19 (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
031.02.LP0465.001 (As available)
Question Source:
Bank # INPO 29437 Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-DR   10 CFR Part 55 Content:
55.41   55.43 X   K/A Statement: Ability to determine and interpret the following as they apply to a LOCA Outside Containment: Facility conditions and selection of appropriate procedures during abnormal and emergency operations NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         1 Group #                         1 K/A #                           WE011.02.02.37 Importance Rating             3.6 Proposed Question:               RO# 16, SEE ATTACHED Proposed Answer:                     B SEE ATTACHED Explanation (Optional):
-reference:
Technical Reference(s):           STPT 8.1, Auxiliary Coolant System (Attach if not previously provided)
Level RO SRO   Tier # 1     Group # 1     K/A # WE011.02.02.37 Importance Rating 3.6     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           051.03.LP0064.004                             (As available)
RO# 16, SEE ATTACHED Proposed Answer:
Question Source:             Bank #                   PBNP 2005 Modified Bank                               (Note changes or attach parent)
B   Explanation (Optional):
New Question History:             Last NRC Exam             2005 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge                     1-F Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43           X K/A Statement: Loss of Emergency Coolant Recirculation - Ability to determine operability and/or availability of safety related equipment.
STPT 8.1, Auxiliary Coolant System (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
051.03.LP0064.004 (As available)
Question Source:
Bank # PBNP 2005 Modified Bank       (Note changes or attach parent)
New     Question History:
Last NRC Exam 2005 (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-F   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X   55.43 X   K/A Statement: Loss of Emergency Coolant Recirculation  
- Ability to determine operability and/or availability of safety related equipment.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         1 Group #                         1 K/A #                           WE005.EK1.01 Importance Rating             3.8 Proposed Question:               RO# 17, SEE ATTACHED Proposed Answer:                   A SEE ATTACHED Explanation (Optional):
-reference:
Technical Reference(s):           CSP-H.1 RCS Bleed and Feed Background Step 40 (Attach if not previously provided)
Level RO SRO   Tier # 1     Group # 1     K/A # WE005.EK1.01 Importance Rating 3.8     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           043.03.LP1998.004                             (As available)
RO# 17, SEE ATTACHED Proposed Answer:
Question Source:             Bank #                   INPO 25008 Modified Bank                               (Note changes or attach parent)
A   Explanation (Optional):
New Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-RI 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Knowledge of the operational implications of the following concepts as they apply to the Loss of Secondary Heat Sink: Components, capacity, and function of emergency systems NUREG-1021, Revision 9
CSP-H.1 RCS Bleed and Feed Background Step 40 (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
043.03.LP1998.004 (As available)
Question Source:
Bank # INPO 25008 Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-RI   10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Knowledge of the operational implications of the following concepts as they apply to the Loss of Secondary Heat Sink: Components, capacity, and function of emergency systems NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         1 Group #                         1 K/A #                             077.AK2.03 Importance Rating             3.0 Proposed Question:               RO# 18, SEE ATTACHED Proposed Answer:                     B SEE ATTACHED Explanation (Optional):
-reference:
AOP-0.1 Declining Frequency on the 345 KV Distribution System; LP0122 13.8 KV System; STPT 21 for 13.8 KV Technical Reference(s):          breaker (Attach if not previously provided)
Level RO SRO   Tier # 1     Group # 1     K/A # 077.AK2.03 Importance Rating 3.0     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           054.02.LP0122.001                             (As available)
RO# 18, SEE ATTACHED Proposed Answer:
Question Source:             Bank #
B   Explanation (Optional):
Modified Bank                               (Note changes or attach parent)
SEE ATTACHED Technical Reference(s):
New                         NEW Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
AOP-0.1 Declining Frequency on the 345 KV Distribution System; LP0122 13.8 KV System; STPT 21 for 13.8 KV breaker (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
Question Cognitive Level:             Memory or Fundamental Knowledge                       1-I Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Knowledge of the interrelationship between Generator Voltage and Electric Grid Disturbance and the following: Sensors, detectors, indicators NUREG-1021, Revision 9
N/A Learning Objective:
054.02.LP0122.001 (As available)
Question Source:
Bank #   Modified Bank (Note changes or attach parent)
New NEW   Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-I   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Knowledge of the interrelationship between Generator Voltage and Electric Grid Disturbance and the following: Sensors, detectors, indicators NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         1 Group #                         2 K/A #                             003.AK3.07 Importance Rating             3.8 Proposed Question:               RO# 19, SEE ATTACHED Proposed Answer:                     B SEE ATTACHED Explanation (Optional):
-reference:
LCO 3.4.2 Minimum Temperature for Criticality; AOP-6A Technical Reference(s):          Dropped Rod step 4 (Attach if not previously provided)
Level RO SRO   Tier # 1     Group # 2     K/A # 003.AK3.07   Importance Rating 3.8     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           055.03.LP2441.004                             (As available)
RO# 19, SEE ATTACHED Proposed Answer:
Question Source:             Bank #
B   Explanation (Optional):
Modified Bank                               (Note changes or attach parent)
SEE ATTACHED Technical Reference(s):
New                         NEW Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
LCO 3.4.2 Minimum Temperature for Criticality; AOP
Question Cognitive Level:             Memory or Fundamental Knowledge                     1-P Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Knowledge of the reason for the following as they apply to Dropped Control Rod:
-6A Dropped Rod step 4 (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
Tech-Spec limits for Tave NUREG-1021, Revision 9
N/A Learning Objective:
055.03.LP2441.004 (As available)
Question Source:
Bank #   Modified Bank (Note changes or attach parent)
New NEW   Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-P   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Knowledge of the reason for the following as they apply to Dropped Control Rod: Tech-Spec limits for Tave NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         1 Group #                         2 K/A #                             028.AA1.03 Importance Rating             2.9 Proposed Question:               RO# 20, SEE ATTACHED Proposed Answer:                   D SEE ATTACHED Explanation (Optional):
-reference:
883D195 Sh. 18 Logic Diagram Pressurizer Pressure and Technical Reference(s):          Level Control; 684J741 sh. 2 CVCS system P&ID (Attach if not previously provided)
Level RO SRO   Tier # 1     Group # 2     K/A # 028.AA1.03 Importance Rating 2.9     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           051.01.LP0078.004                             (As available)
RO# 20, SEE ATTACHED Proposed Answer:
Question Source:             Bank #
D   Explanation (Optional):
Modified Bank                               (Note changes or attach parent)
SEE ATTACHED Technical Reference(s):
New                         NEW Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
883D195 Sh. 18 Logic Diagram Pressurizer Pressure and Level Control; 684J741 sh. 2 CVCS system P&ID (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-RI 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Ability to operate and/or monitor the following as they apply to the Pressurizer Level Control Malfunction: RCP and seal water system NUREG-1021, Revision 9
N/A Learning Objective:
051.01.LP0078.004 (As available)
Question Source:
Bank #   Modified Bank (Note changes or attach parent)
New NEW   Question History:
Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge     Comprehension or Analysis 2-RI   10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Ability to operate and/or monitor the following as they apply to the Pressurizer Level Control Malfunction: RCP and seal water system NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         1 Group #                         2 K/A #                             032.AA2.05 Importance Rating             2.9 Proposed Question:               RO# 21, SEE ATTACHED Proposed Answer:                   C SEE ATTACHED Explanation (Optional):
-reference:
883D195 Sh. 11 Nuclear Instrumentation Trip Signals; 883D195 Sh. 12 Nuclear Instrumentation Premissives &
Level RO SRO   Tier # 1     Group # 2     K/A # 032.AA2.05 Importance Rating 2.9     Proposed Question:
Technical Reference(s):          Blocks; Master Data Book 3.2.7 PP-1 (Attach if not previously provided)
RO# 21, SEE ATTACHED Proposed Answer:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           053.03.LP2416.012                             (As available)
C   Explanation (Optional):
Question Source:             Bank #
SEE ATTACHED Technical Reference(s):
Modified Bank                               (Note changes or attach parent)
883D195 Sh. 11 Nuclear Instrumentation Trip Signals; 883D195 Sh. 12 Nuclear Instrumentation Premissives & Blocks; Master Data Book 3.2.7 PP
New                         NEW Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
-1 (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-RI 10 CFR Part 55 Content:               55.41 55.43           X K/A Statement: Ability to interpret the following as they apply to the Loss of Source Range Nuclear Instrumentation: Nature of abnormality, from rapid survey of control room data.
N/A Learning Objective:
053.03.LP2416.012 (As available)
Question Source:
Bank #   Modified Bank (Note changes or attach parent)
New NEW   Question History: Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-RI   10 CFR Part 55 Content:
55.41   55.43 X   K/A Statement: Ability to interpret the following as they apply to the Loss of Source Range Nuclear Instrumentation: Nature of abnormality, from rapid survey of control room data.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         1 Group #                         2 K/A #                             033.02.04.45 Importance Rating             4.1 Proposed Question:               RO# 22, SEE ATTACHED Proposed Answer:                   C SEE ATTACHED Explanation (Optional):
-reference:
Level RO SRO   Tier # 1     Group # 2     K/A # 033.0 2.04.45   Importance Rating 4.1     Proposed Question:
RO# 22, SEE ATTACHED Proposed Answer:
C   Explanation (Optional):
SEE ATTACHED Technical Reference(s):
883D195 Sh. 11 Nuclear Instrumentation Trip Signals; 883D195 Sh. 12 Nuclear Instrumentation Premissives &
883D195 Sh. 11 Nuclear Instrumentation Trip Signals; 883D195 Sh. 12 Nuclear Instrumentation Premissives &
Blocks; 0-SOP-IC-001-RED (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
Technical Reference(s):          Blocks; 0-SOP-IC-001-RED (Attach if not previously provided)
N/A Learning Objective:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           053.03.LP2416.011                             (As available)
053.03.LP2416.011 (As available)
Question Source:             Bank #                   KEWAUNEE 2011 Modified Bank                               (Note changes or attach parent)
Question Source:
New Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Bank # KEWAUNEE 2011 Modified Bank (Note changes or attach parent)
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-RI 10 CFR Part 55 Content:               55.41           X 55.43           X K/A Statement: Loss of Intermediate Range Nuclear Instrumentation - Ability to prioritize and interpret the significance of each annunciator or alarm.
New     Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-RI   10 CFR Part 55 Content:
55.41 X   55.43 X   K/A Statement: Loss of Intermediate Range Nuclear Instrumentation  
- Ability to prioritize and interpret the significance of each annunciator or alarm.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         1 Group #                         2 K/A #                               037.AK1.01 Importance Rating             2.9 Proposed Question:               RO# 23, SEE ATTACHED Proposed Answer:                     B SEE ATTACHED Explanation (Optional):
-reference:
Technical Reference(s):           Steam Table; AOP-3 Steam Generator Tube Leak (Attach if not previously provided)
Level RO SRO   Tier # 1     Group # 2     K/A # 037.AK1.01 Importance Rating 2.9     Proposed Question:
Proposed references to be provided to applicants during examination:                       Steam Table Learning Objective:           055.03.LP2438.001                             (As available)
RO# 23, SEE ATTACHED Proposed Answer:
Question Source:             Bank #
B   Explanation (Optional):
Modified Bank                               (Note changes or attach parent)
SEE ATTACHED Technical Reference(s):
New                         NEW Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Steam Table; AOP
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           3-SPR 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Knowledge of the operational implications of the following concepts as they apply to Steam Generator Tube Leak: Use of steam tables.
-3 Steam Generator Tube Leak (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
Steam Table Learning Objective:
055.03.LP2438.001 (As available)
Question Source:
Bank #   Modified Bank (Note changes or attach parent)
New NEW   Question History: Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 3-SPR   10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Knowledge of the operational implications of the following concepts as they apply to Steam Generator Tube Leak: Use of steam tables.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         1 Group #                         2 K/A #                             061.AK2.01 Importance Rating             2.5 Proposed Question:               RO# 24, SEE ATTACHED Proposed Answer:                   A SEE ATTACHED Explanation (Optional):
-reference:
RMSASRB CI RE-223B, RE-223 Background Monitor; RMSASRB CI RE-223, Waste Distillate Tank Overboard Technical Reference(s):          Monitor (Attach if not previously provided)
Level RO SRO   Tier # 1     Group # 2     K/A # 061.AK2.01 Importance Rating 2.5     Proposed Question: RO# 24, SEE ATTACHED Proposed Answer:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           051.07.LP0275.001                             (As available)
A   Explanation (Optional):
Question Source:             Bank #                   PBNP 2005 Modified Bank                               (Note changes or attach parent)
SEE ATTACHED Technical Reference(s):
New Question History:             Last NRC Exam             2005 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
RMSASRB CI RE
Question Cognitive Level:             Memory or Fundamental Knowledge                     1-F Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Knowledge of the interrelationships between the Area Radiation Monitor (ARM)
-223B, RE-223 Background Monitor; RMSASRB CI RE
System Alarms and the following: Detectors at each ARM system location.
-223, Waste Distillate Tank Overboard Monitor (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
051.07.LP0275.001 (As available)
Question Source:
Bank # PBNP 2005 Modified Bank (Note changes or attach parent)
New     Question History: Last NRC Exam 2005 (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-F   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Knowledge of the interrelationships between the Area Radiation Monitor (ARM) System Alarms and the following: Detectors at each ARM system location.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         1 Group #                         2 K/A #                           WE014.EK3.04 Importance Rating             3.3 Proposed Question:               RO# 25, SEE ATTACHED Proposed Answer:                   C SEE ATTACHED Explanation (Optional):
-reference:
Technical Reference(s):           CSP-Z.1 Response to High Containment Pressure (Attach if not previously provided)
Level RO SRO   Tier # 1     Group # 2     K/A # WE014.EK3.04 Importance Rating 3.3     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           043.03.LP2000.006                             (As available)
RO# 25, SEE ATTACHED Proposed Answer:
Question Source:             Bank #                   PBNP 2003 Modified Bank                               (Note changes or attach parent)
C   Explanation (Optional):
New Question History:             Last NRC Exam             2003 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge                     1-B Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Knowledge of the reasons for the following responses as they apply to the High Containment Pressure: RO or SRO function within the control room team as appropriate to the assigned position, in such a way that procedures are adhered to and the limitations in the facilities license and amendments are not violated.
CSP-Z.1 Response to High Containment Pressure (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
043.03.LP2000.006 (As available)
Question Source:
Bank # PBNP 2003 Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam 2003 (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-B   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Knowledge of the reasons for the following responses as they apply to the High Containment Pressure: RO or SRO function within the control room team as appropriate to the assigned position, in such a way that procedures are adhered to and the limitations in the facilities license and amendments are not violated.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         1 Group #                         2 K/A #                           WE015.EK1.01 Importance Rating             2.8 Proposed Question:               RO# 26, SEE ATTACHED Proposed Answer:                   A SEE ATTACHED Explanation (Optional):
-reference:
CSP-Z.2, 'Response to Containment Flooding and Technical Reference(s):          background (Attach if not previously provided)
Level RO SRO   Tier # 1     Group # 2     K/A # WE015.EK1.01 Importance Rating 2.8     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           043.03.LP2000.002                              (As available)
RO# 26, SEE ATTACHED Proposed Answer:
Question Source:             Bank #                   INPO 27286 Modified Bank                               (Note changes or attach parent)
A   Explanation (Optional):
New Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s): CSP-Z.2, 'Response to Containment Flooding and background (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
Question Cognitive Level:             Memory or Fundamental Knowledge                     1-P Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Knowledge of the operational implications of the following concepts as they apply to Containment Flooding: Components, capacity, and functions of emergency systems NUREG-1021, Revision 9
N/A Learning Objective:
043.03.LP2000.00 2 (As available)
Question Source
: Bank # INPO 27286 Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-P   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Knowledge of the operational implications of the following concepts as they apply to Containment Flooding: Components, capacity, and functions of emergency systems NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross-reference:
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         1 Group #                         2 K/A #                           WE016.EK2.02 Importance Rating             2.6 Proposed Question:               RO# 27, SEE ATTACHED Proposed Answer:                     B SEE ATTACHED Explanation (Optional):
Level RO SRO   Tier # 1     Group # 2     K/A # WE016.EK2.02 Importance Rating 2.6     Proposed Question:
EOP-0 Reactor Trip or Safety Injection foldout page and Technical Reference(s):          bases (Attach if not previously provided)
RO# 27, SEE ATTACHED Proposed Answer:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           031.02.LP1829.003                             (As available)
B   Explanation (Optional):
Question Source:             Bank #
SEE ATTACHED Technical Reference(s):
Modified Bank                               (Note changes or attach parent)
EOP-0 Reactor Trip or Safety Injection foldout page and bases (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
New                         NEW Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
N/A Learning Objective:
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-RI 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Knowledge of the interrelations between High Containment Radiation and the following: Facilities heat removal systems, including primary coolant, emergency coolant, the decay heat removal systems, and relations between proper operation of these systems to the operation of the facility.
031.02.LP1829.003 (As available)
NUREG-1021, Revision 9
Question Source:
Bank #   Modified Bank (Note changes or attach parent)
New NEW   Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-RI   10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Knowledge of the interrelations between High Containment Radiation and the following: Facilities heat removal systems, including primary coolant, emergency coolant, the decay heat removal systems, and relations between proper operation of these systems to the operation of the facility. NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         2 Group #                         1 K/A #                               003.K5.03 Importance Rating             3.1 Proposed Question:               RO# 28, SEE ATTACHED Proposed Answer:                     B SEE ATTACHED Explanation (Optional):
-reference:
Technical Reference(s):           EOP 0.1 Reactor Trip Response (Attach if not previously         LP0231 Reactor Coolant System provided)
Level RO SRO   Tier # 2     Group # 1     K/A # 003.K5.0 3  Importance Rating 3.1     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           051.01.LP0231.009                             (As available)
RO# 28, SEE ATTACHED Proposed Answer:
Question Source:             Bank #                   Primaries Modified Bank                               (Note changes or attach parent)
B   Explanation (Optional):
New Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge                     1-F Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Knowledge of the operational implications of the following concepts as they apply to the RCP's: Effects of RCP shutdown on Tave, including the reason for the unreliability of Tave in the shutdown loop.
EOP 0.1 Reactor Trip Response (Attach if not previously provided) LP0231 Reactor Coolant System Proposed references to be provided to applicants during examination: N/A Learning Objective:
051.01.LP0231.009 (As available)
Question Source:
Bank # Primaries Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-F   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Knowledge of the operational implications of the following concepts as they apply to the RCP's: Effects of RCP shutdown on Tave, including the reason for the unreliability of Tave in the shutdown loop.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         2 Group #                         1 K/A #                               004.K6.20 Importance Rating             2.5 Proposed Question:               RO# 29, SEE ATTACHED Proposed Answer:                   A SEE ATTACHED Explanation (Optional):
-reference:
684J741 Sh. 2, CVCS drawing; AOP-1D, CVCS Malfunction; Technical Reference(s):          AOP-5B Loss of Instrument Air Attachment H for CCW (Attach if not previously provided)
Level RO SRO   Tier # 2     Group # 1     K/A # 004.K6.20   Importance Rating 2.5     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           055.03.LP3718.001                             (As available)
RO# 29, SEE ATTACHED Proposed Answer:
Question Source:             Bank #                   PBNP 2005 Modified Bank                               (Note changes or attach parent)
A   Explanation (Optional):
New Question History:             Last NRC Exam             2005 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-RI 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Knowledge of the effect of a loss or malfunction on the following CVCS component:
684J741 Sh. 2, CVCS drawing; AOP
Function of demineralizer, including boron loading and temperature limits NUREG-1021, Revision 9
-1D, CVCS Malfunction; AOP-5B Loss of Instrument Air Attachment H for CCW (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
055.03.LP3718.001 (As available)
Question Source:
Bank # PBNP 2005 Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam 2005 (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-RI   10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Knowledge of the effect of a loss or malfunction on the following CVCS component: Function of demineralizer, including boron loading and temperature limits NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         2 Group #                         1 K/A #                               005.A1.02 Importance Rating             3.3 Proposed Question:               RO# 30, SEE ATTACHED Proposed Answer:                   C SEE ATTACHED Explanation (Optional):
-reference:
Technical Reference(s):           110E018 Sh. 1 RHR P&ID (Attach if not previously         LP0069 Residual Heat Removal System provided)
Level RO SRO   Tier # 2     Group # 1     K/A # 005.A1.02   Importance Rating 3.3     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           051.03.LP0069.010                             (As available)
RO# 30, SEE ATTACHED Proposed Answer:
Question Source:             Bank #                   PBNP 2007 Modified Bank                               (Note changes or attach parent)
C   Explanation (Optional):
New Question History:             Last NRC Exam             2007 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-RI 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the RHRS controls including: RHR flow rate.
110E018 Sh. 1 RHR P&ID (Attach if not previously provided) LP0069 Residual Heat Removal System Proposed references to be provided to applicants during examination:
N/A Learning Objective:
051.03.LP0069.010 (As available)
Question Source:
Bank # PBNP 2007 Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam 2007 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-RI   10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the RHRS controls including: RHR flow rate.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         2 Group #                         1 K/A #                               006.A2.08 Importance Rating             3.0 Proposed Question:               RO# 31, SEE ATTACHED Proposed Answer:                   D SEE ATTACHED Explanation (Optional):
-reference:
EOP-0 Reactor Trip or Safety Injection Attachment A; 499B466 Elementary drawing for 2P-15B Sh. 226; 883D195 Technical Reference(s):          Sh. 8 Logic Diagram Safeguard Sequence (Attach if not previously provided)
Level RO SRO   Tier # 2     Group # 1     K/A # 006.A2.08   Importance Rating 3.0     Proposed Questi on: RO# 31, SEE ATTACHED Proposed Answer:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           051.03.LP0066.003                             (As available)
D   Explanation (Optional):
Question Source:             Bank #
SEE ATTACHED Technical Reference(s):
Modified Bank                               (Note changes or attach parent)
EOP-0 Reactor Trip or Safety Injection Attachment A; 499B466 Elementary drawing for 2P
New                         NEW Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
-15B Sh. 226; 883D195 Sh. 8 Logic Diagram Safeguard Sequence (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-RI 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Ability to (a) predict the impacts of the following malfunctions or operations on the ECCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operation: Effect of electric power loss on valve position.
N/A Learning Objective:
051.03.LP0066.003 (As available)
Question Source:
Bank #   Modified Bank (Note changes or attach parent) New NEW   Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)     Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-RI   10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Ability to (a) predict the impacts of the following malfunctions or operations on the ECCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operation: Effect of electric power loss on valve position.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         2 Group #                         1 K/A #                               007.A3.01 Importance Rating             2.7 Proposed Question:               RO# 32, SEE ATTACHED Proposed Answer:                   D SEE ATTACHED Explanation (Optional):
-reference:
CVCS Drawings 684J741 Sh. 2 and 3; Waste Disposal Technical Reference(s):          Drawing 684J741 Sh. 1A; CCW Drawing 110E018 Sh. 2 (Attach if not previously provided)
Level RO SRO   Tier # 2     Group # 1     K/A # 007.A3.01   Importance Rating 2.7     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           051.02.LP0079.002                             (As available)
RO# 32, SEE ATTACHED Proposed Answer:
Question Source:             Bank #                   PBNP 2007 Modified Bank                               (Note changes or attach parent)
D   Explanation (Optional):
New Question History:             Last NRC Exam             2007 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED  Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge                     1-F Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Ability to monitor automatic operation of the PRTS, including: Components which discharge to the PRT.
CVCS Drawings 684J741 Sh. 2 and 3; Waste Disposal Drawing 684J741 Sh. 1A; CCW Drawing 110E018 Sh. 2 (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
051.02.LP0079.002 (As available)
Question Source:
Bank # PBNP 2007 Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam 2007 (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-F   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Ability to monitor automatic operation of the PRTS, including: Components which discharge to the PRT.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         2 Group #                         1 K/A #                               008.A4.02 Importance Rating             2.5 Proposed Question:               RO# 33, SEE ATTACHED Proposed Answer:                     B SEE ATTACHED Explanation (Optional):
-reference:
1-SOP-CC-002 section 5.12 page 96; CCW Drawing 110E018 Technical Reference(s):          Sh. 3 (Attach if not previously provided)
Level RO SRO   Tier # 2     Group # 1     K/A # 008.A4.02   Importance Rating 2.5     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           051.06.LP0084.001                             (As available)
RO# 33, SEE ATTACHED Proposed Answer:
Question Source:             Bank #
B   Explanation (Optional):
Modified Bank                               (Note changes or attach parent)
SEE ATTACHED Technical Reference(s):
New                         NEW Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
1-SOP-CC-002 section 5.12 page 96; CCW Drawing 110E018 Sh. 3 (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-RI 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Ability to manually operate and/or monitor in the control room: Filling and draining operations of the CCW System including proper venting of the components NUREG-1021, Revision 9
N/A Learning Objective:
051.06.LP0084.001 (As available)
Question Source:
Ba nk #  Modified Bank (Note changes or attach parent)
New NEW   Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-RI   10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Ability to manually operate and/or monitor in the control room: Filling and draining operations of the CCW System including proper venting of the components NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         2 Group #                         1 K/A #                             010.02.01.23 Importance Rating             4.3 Proposed Question:               RO# 34, SEE ATTACHED Proposed Answer:                     B SEE ATTACHED Explanation (Optional):
-reference:
OP 3C Hot Standby to Cold Shutdown Unit 1/2; 883D195 Sh.
Level RO SRO   Tier # 2     Group # 1     K/A # 010.02.01.23 Importance Rating 4.3     Proposed Question:
Technical Reference(s):          18 Pressurizer Pressure and Level Control (Attach if not previously provided)
RO# 34, SEE ATTACHED Proposed Answer:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           055.01.LP0272.008                             (As available)
B   Explanation (Optional):
Question Source:             Bank #                   BANK OPS Modified Bank                               (Note changes or attach parent)
SEE ATTACHED Technical Reference(s):
New Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
OP 3C Hot Standby to Cold Shutdown Unit 1/2; 883D195 Sh. 18 Pressurizer Pressure and Level Control (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-DR 10 CFR Part 55 Content:               55.41           X 55.43           X K/A Statement: Pressurizer Pressure Control - Ability to perform specific system and integrated plant procedures during all modes of plant operation.
N/A Learning Objective:
055.01.LP0272.008 (As available)
Question Source: Bank # BANK OPS Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-DR   10 CFR Part 55 Content:
55.41 X   55.43 X   K/A Statement: Pressurizer Pressure Control  
- Ability to perform specific system and integrated plant procedures during all modes of plant operation.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                          RO               SRO Tier #                         2 Group #                         1 K/A #                               012.K1.08 Importance Rating             2.9 Proposed Question:               RO# 35, SEE ATTACHED Proposed Answer:                     B SEE ATTACHED Explanation (Optional):
-reference:
883D195 Sh.7 SI Logic Sheet; 883D195 Sh. 10 Feed Control Technical Reference(s):          Logic sheet (Attach if not previously provided)
Leve l RO SRO   Tier # 2     Group # 1     K/A # 012.K1.08   Importance Rating 2.9     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           053.06.LP0486.001                             (As available)
RO# 35, SEE ATTACHED Proposed Answer:
Question Source:             Bank #
B   Explanation (Optional):
Modified Bank                               (Note changes or attach parent)
SEE ATTACHED Technical Reference(s):
New                         NEW Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
883D195 Sh.7 SI Logic Sheet; 883D195 Sh. 10 Feed Control Logic sheet (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-RI 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Knowledge of the physical connections and/or cause effect relationships between the RPS and the following: MFW NUREG-1021, Revision 9
N/A Learning Objective:
053.06.LP0486.001 (As available)
Question Source:
Bank #   Modified Bank (Note changes or attach parent)
New NEW   Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-RI   10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Knowledge of the physical connections and/or cause effect relationships between the RPS and the following: MFW NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         2 Group #                         1 K/A #                               013.K2.01 Importance Rating             3.6 Proposed Question:               RO# 36, SEE ATTACHED Proposed Answer:                   C SEE ATTACHED Explanation (Optional):
-reference:
EOP-0, Reactor Trip or Safety Injection, Attachment A, SI panel Checks, Step A11; Safety Injection System Drawing
Level RO SRO   Tier # 2     Group # 1     K/A # 013.K2.01   Importance Rating 3.6     Proposed Question:
                                  #110E035, Sh. 1; 889D195 Sh 9 SI Logic; Master Data Book Technical Reference(s):          3.2.6 2B-32 MCC; Master Data Book 3.2.6 2B-42 MCC (Attach if not previously provided)
RO# 36, SEE ATTACHED Proposed Answer:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           051.03.LP0066.003                             (As available)
C   Explanation (Optional):
Question Source:             Bank #
SEE ATTACHED Technical Reference(s):
Modified Bank                               (Note changes or attach parent)
EOP-0, Reactor Trip or Safety Injection, Attachment A, SI panel Checks, Step A11; Safety Injection System Drawing #110E0 35, Sh. 1; 889D195 Sh 9 SI Logic; Master Data Book 3.2.6 2B-32 MCC; Master Data Book 3.2.6 2B
New                         NEW Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
-42 MCC (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-RI 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Knowledge of bus power supplies to the following: ESFAS/safeguards equipment control.
N/A Learning Objectiv e: 051.03.LP0066.003 (As available)
NUREG-1021, Revision 9
Question Source:
Bank #   Modified Bank (Note changes or attach parent)
New NEW   Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-RI   10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Knowledge of bus power supplies to the following: ESFAS/safeguards equipment control. NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         2 Group #                         1 K/A #                               022.K3.02 Importance Rating             3.0 Proposed Question:               RO# 37, SEE ATTACHED Proposed Answer:                   A SEE ATTACHED Explanation (Optional):
-reference:
Technical Reference(s):           KFI04L, Level Sensors and Detectors (Attach if not previously provided)
Level RO SRO   Tier # 2     Group # 1     K/A # 022.K3.02   Importance Rating 3.0     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           KFI04L.04C                                     (As available)
RO# 37, SEE ATTACHED Proposed Answer:
Question Source:             Bank #                   PBNP 2007 Modified Bank                               (Note changes or attach parent)
A   Explanation (Optional):
New Question History:             Last NRC Exam             2007 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-RI 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Knowledge of the effect that a loss or malfunction of the CCS (Containment Cooling System) will have on the following: Contanment instrumentation readings.
KFI04L, Level Sensors and Detectors (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
KFI04L.04C (As available)
Question Source:
Bank # PBNP 2007 Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam 2007 (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-RI   10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Knowledge of the effect that a loss or malfunction of the CCS (Containment Cooling System) will have on the following: Contanment instrumentation readings.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         2 Group #                         1 K/A #                               026.K4.01 Importance Rating             4.2 Proposed Question:               RO# 38, SEE ATTACHED Proposed Answer:                     B SEE ATTACHED Explanation (Optional):
-reference:
EOP-1.3 Transfer to Containment Sump Recirculation - Low Technical Reference(s):          Head Injection and background (Attach if not previously provided)
Level RO SRO   Tier # 2     Group # 1     K/A # 026.K4.01   Importance Rating 4.2     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           031.02.LP0435.010                             (As available)
RO# 38, SEE ATTACHED Proposed Answer:
Question Source:             Bank #                   INPO 27574 Modified Bank                               (Note changes or attach parent)
B   Explanation (Optional):
New Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge                     1-P Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Knowledge of the CSS (Containment Spray System) design feature(s) and/or interlock(s) which provide for the following: Sources of water for CSS, including recirculation phase after LOCA NUREG-1021, Revision 9
EOP-1.3 Transfer to Containment Sump Recirculation  
- Low Head Injection and background (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
031.02.LP0435.010 (As available)
Question Source:
Bank # INPO 27574 Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-P   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Knowledge of the CSS (Containment Spray System) design feature(s) and/or interlock(s) which provide for the following: Sources of water for CSS, including recirculation phase after LOCA NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         2 Group #                         1 K/A #                               039.K1.01 Importance Rating             3.1 Proposed Question:               RO# 39, SEE ATTACHED Proposed Answer:                     B SEE ATTACHED Explanation (Optional):
-reference:
STPT 2.2, Steam Line Isolation Setpoint document; 883D195 Technical Reference(s):          Sh. 7 MSIV logic (Attach if not previously provided)
Level RO SRO   Tier # 2     Grou p # 1     K/A # 039.K1.01   Importance Rating 3.1     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           031.02.LP0441.003                             (As available)
RO# 39, SEE ATTACHED Proposed Answer:
Question Source:             Bank #                   PBNP 2005 Modified Bank                               (Note changes or attach parent)
B   Explanation (Optional):
New Question History:             Last NRC Exam             2005 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-DR 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Knowledge of the physical connections and/or cause-effect relationships between the MRSS (Main and Reheat Steam) and the following systems: S/G NUREG-1021, Revision 9
STPT 2.2, Steam Line Isolation Setpoint document; 883D195 Sh. 7 MSIV logic (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
031.02.LP0441.003 (As available)
Question Source:
Bank # PBNP 2005 Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam 2005 (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-DR   10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Knowledge of the physical connections and/or cause
-effect relationships between the MRSS (Main and Reheat Steam) and the following systems: S/G NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         2 Group #                         1 K/A #                               039.K5.05 Importance Rating             2.7 Proposed Question:               RO# 40, SEE ATTACHED Proposed Answer:                   D SEE ATTACHED Explanation (Optional):
-reference:
Technical Reference(s):           LP0448 Heatup and Cooldown Limitations (Attach if not previously provided)
Level RO SRO   Tier # 2     Group # 1     K/A # 039.K5.05   Importance Rating 2.7     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           043.02.LP0448.004                             (As available)
RO# 40, SEE ATTACHED Proposed Answer:
Question Source:             Bank #                   TECH SPEC BANK Modified Bank                               (Note changes or attach parent)
D   Explanation (Optional):
New Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge                     1-B Comprehension or Analysis 10 CFR Part 55 Content:               55.41 55.43 K/A Statement: Knowledge of the operations implications of the following concepts as they apply to the MRSS (Main and Reheat Steam): Bases for RCS cooldown limits NUREG-1021, Revision 9
LP0448 Heatup and Cooldown Limitations (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
043.02.LP0448.004 (As available)
Question Source:
Bank # TECH SPEC BANK Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-B   Comprehension or Analysis 10 CFR Part 55 Content:
55.41   55.43   K/A Statement: Knowledge of the operations implications of the following concepts as they apply to the MRSS (Main and Reheat Steam): Bases for RCS cooldown limits NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         2 Group #                         1 K/A #                               059.K3.04 Importance Rating             3.6 Proposed Question:               RO# 41, SEE ATTACHED Proposed Answer:                     B SEE ATTACHED Explanation (Optional):
-reference:
AOP-5B Loss of Instrument or Service Air Attachment T; 1C03 1E2 1-4 ARB; 883D195 Sh.10 Main Feed Reg Valve Technical Reference(s):          logic; LP2462 FSAR Secondary Transient Analysis (Attach if not previously provided)
Level RO SRO   Tier # 2     Group # 1     K/A # 059.K3.04   Importance Rating 3.6     Proposed Question: RO# 41, SEE ATTACHED Proposed Answer:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           043.02.LP2462.004                             (As available)
B   Explanation (Optional):
Question Source:             Bank #                   INPO 26113 Modified Bank                               (Note changes or attach parent)
SEE ATTACHED Technical Reference(s):
New Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
AOP-5B Loss of Instrument or Service Air Attachment T; 1C03 1E2 1
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-RI 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Knowledge of the effect that a loss or malfunction of the MFW will have on the following: RCS NUREG-1021, Revision 9
-4 ARB; 883D195 Sh.10 Main Feed Reg Valve logic; LP2462 FSAR Secondary Transient Analysis (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
043.02.LP2462.004 (As available)
Question Source:
Bank # INPO 26113 Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-RI   10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Knowledge of the effect that a loss or malfunction of the MFW will have on the following: RCS NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         2 Group #                         1 K/A #                               059.A1.03 Importance Rating             2.7 Proposed Question:               RO# 42, SEE ATTACHED Proposed Answer:                   C SEE ATTACHED Explanation (Optional):
-reference:
Technical Reference(s):           AOP-2B Feedwater System Malfunction Step 8a (Attach if not previously provided)
Level RO SRO   Tier # 2     Group # 1     K/A # 059.A1.03   Importance Rating 2.7     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           055.03.LP2439.004                             (As available)
RO# 42, SEE ATTACHED Proposed Answer:
Question Source:             Bank #                   PBNP 2007 Modified Bank                               (Note changes or attach parent)
C   Explanation (Optional):
New Question History:             Last NRC Exam             2007 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge                     1-P Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the MFW controls including: Power level restrictions for operation of MFW pumps and valves NUREG-1021, Revision 9
AOP-2B Feedwater System Malfunction Step 8a (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
055.03.LP2439.004 (As available)
Question Source:
Bank # PBNP 2007 Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam 2007 (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-P   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the MFW controls including: Power level restrictions for operation of MFW pumps and valves NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         2 Group #                         1 K/A #                               061.K4.09 Importance Rating             3.7 Proposed Question:               RO# 43, SEE ATTACHED Proposed Answer:                   D SEE ATTACHED Explanation (Optional):
-reference:
CSP-H.1, Loss of Heat Sink; Master Data Book 3.2.1(1A-06),
Level RO SRO   Tier # 2     Group # 1     K/A # 061.K4.09   Importance Rating 3.7     Proposed Question:
3.2.2(2A-05), 3.2.4(2B-04); M-217 Sh. 1 Aux Feedwater System; M-217 Sh. 2 Aux Feedwater System; M-2217 Aux Technical Reference(s):          Feedwater System (Attach if not previously provided)
RO# 43, SEE ATTACHED Proposed Answer:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           052.05.LP0169.003                             (As available)
D   Explanation (Optional):
Question Source:             Bank #
SEE ATTACHED Technical Reference(s):
Modified Bank                               (Note changes or attach parent)
CSP-H.1, Loss of Heat Sink; Master Data Book 3.2.1(1A
New                         NEW Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
-06), 3.2.2(2A-05), 3.2.4(2B
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-RI 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Knowledge of AFW design feature(s) and/or interlock(s) which provide for the following: Crossties between multi-unit station NUREG-1021, Revision 9
-04); M-217 Sh. 1 Aux Feedwater System; M-217 Sh. 2 Aux Feedwater System; M
-2217 Aux Feedwater System (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
052.05.LP0169.003 (As available)
Question Source: Bank #   Modified Bank (Note changes or attach parent)
New NEW   Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-RI   10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Knowledge of AFW design feature(s) and/or interlock(s) which provide for the following: Crossties between multi
-unit station NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         2 Group #                         1 K/A #                               061.A2.07 Importance Rating             3.4 Proposed Question:               RO# 44, SEE ATTACHED Proposed Answer:                   D SEE ATTACHED Explanation (Optional):
-reference:
ARP 1C03 1D 1-8 1P-53 AFP Low Suction Pressure Trip; West. 833D195 Sh. 27; OM 3.7, AOP and EOP Procedure Usage for Response to Plant Transients; STPT 14.11 Aux Technical Reference(s):          Feedwater (Attach if not previously provided)
Level RO SRO   Tier # 2     Group # 1     K/A # 061.A2.07   Importance Rating 3.4     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           052.05.LP0169.006                             (As available)
RO# 44, SEE ATTACHED Proposed Answer:
Question Source:             Bank #
D   Explanation (Optional):
Modified Bank                               (Note changes or attach parent)
SEE ATTACHED Technical Reference(s):
New                         NEW Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
ARP 1C03 1D 1
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-RI 10 CFR Part 55 Content:               55.41           X 55.43           X K/A Statement: Ability to (a) predict the impacts of the following malfunctions or operations on the AFW; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operation: Air or MOV failure NUREG-1021, Revision 9
-8 1P-53 AFP Low Suction Pressure Trip; West. 833D195 Sh. 27; OM 3.7, AOP and EOP Procedure Usage for Response to Plant Transients; STPT 14.11 Aux Feedwater (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective
: 052.05.LP0169.006 (As available)
Question Source:
Bank #   Modified Bank (Note changes or attach parent)
New NEW   Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-RI   10 CFR Part 55 Content:
55.41 X   55.43 X   K/A Statement: Ability to (a) predict the impacts of the following malfunctions or operations on the AFW; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operation: Air or MOV failure NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         2 Group #                         1 K/A #                               062.A1.01 Importance Rating             3.4 Proposed Question:               RO# 45, SEE ATTACHED Proposed Answer:                   C SEE ATTACHED Explanation (Optional):
-reference:
Technical Reference(s):           TS-81 Emergency Diesel Generator G-01 Monthly test (Attach if not previously provided)
Level RO SRO   Tier # 2     Group # 1     K/A # 062.A1.01   Importance Rating 3.4     Proposed Question: RO# 45, SEE ATTACHED Proposed Answer:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           054.02.LP0133.006                             (As available)
C   Explanation (Optional):
Question Source:             Bank #
SEE ATTACHED Technical Reference(s):
Modified Bank                               (Note changes or attach parent)
TS-81 Emergency Diesel Generator G
New                         NEW Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
-01 Monthly test (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
Question Cognitive Level:             Memory or Fundamental Knowledge                     1-P Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the AC Distibution System controls including: Significance of D/G load limits NUREG-1021, Revision 9
N/A Learning Objective:
054.02.LP0133.006 (As available)
Question Source:
Bank #   Modified Bank (Note changes or attach parent)
New NEW   Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-P   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the AC Distibution System controls including: Significance of D/G load limits NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         2 Group #                         1 K/A #                               062.A3.05 Importance Rating             3.5 Proposed Question:               RO# 46, SEE ATTACHED Proposed Answer:                     B SEE ATTACHED Explanation (Optional):
-reference:
PBF-7033, PBNP Electrical Drawing; LP0007 4160 VAC Technical Reference(s):          Distribution; LP0133 Emergency Diesel Generators (Attach if not previously provided)
Level RO SRO   Tier # 2     Group # 1     K/A # 062.A3.05   Importance Rating 3.5     Proposed Questi on: RO# 46, SEE ATTACHED Proposed Answer:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           054.01.LP0007.004                             (As available)
B   Explanation (Optional):
Question Source:             Bank #
SEE ATTACHED Technical Reference(s):
Modified Bank                               (Note changes or attach parent)
PBF-7033, PBNP Electrical Drawing; LP0007 4160 VAC Distribution; LP0133 Emergency Diesel Generators (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
New                         NEW Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
N/A Learning Objective:
Question Cognitive Level:             Memory or Fundamental Knowledge                     1-F Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Ability to monitor automatic operation of the AC Distribution system, including:
054.01.LP0007.004 (As available)
Safety-related indicators and controls.
Question Source:
Bank #   Modified Bank (Note changes or attach parent)
New NEW   Question History:
Last NRC Exam   (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-F   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Ability to monitor automatic operation of the AC Distribution system, including: Safety-related indicators and controls.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         2 Group #                         1 K/A #                               063.K2.01 Importance Rating             2.9 Proposed Question:               RO# 47, SEE ATTACHED Proposed Answer:                   A SEE ATTACHED Explanation (Optional):
-reference:
AOP 0.0, Vital DC System Malfunction; LP0121 DC Technical Reference(s):          Distribution System (Attach if not previously provided)
Level RO SRO   Tier # 2     Group # 1     K/A # 063.K2.01   Importance Rating 2.9     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           055.03.LP3456.001                             (As available)
RO# 47, SEE ATTACHED Proposed Answer:
Question Source:             Bank #                   PBNP 2002 Modified Bank                               (Note changes or attach parent)
A   Explanation (Optional):
New Question History:             Last NRC Exam             2002 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge                     1-F Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Knowledge of bus power supplies to the following: Major DC loads.
AOP 0.0, Vital DC System Malfunction; LP0121 DC Distribution System (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
055.03.LP3456.001 (As available)
Question Source:
Bank # PBNP 2002 Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam 2002 (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-F   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Knowledge of bus power supplies to the following: Major DC loads.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cros s-reference:
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         2 Group #                         1 K/A #                               063.A4.03 Importance Rating             3.0 Proposed Question:               RO# 48, SEE ATTACHED Proposed Answer:                   D SEE ATTACHED Explanation (Optional):
Level RO SRO   Tier # 2     Group # 1     K/A # 063.A4.03   Importance Rating 3.0     Proposed Question:
ARP 2C20 A 2-2 D-01/D-03 125V DC Bus Under/Over Technical Reference(s):          Voltage; ARP 2C20 A 1-1 D07 Battery Charger Trouble (Attach if not previously provided)
RO# 48, SEE ATTACHED Proposed Answer:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           054.01.LP0121.006                             (As available)
D   Explanation (Optional):
Question Source:             Bank #                   PBNP 2007 Modified Bank                               (Note changes or attach parent)
SEE ATTACHED Technical Reference(s):
New Question History:             Last NRC Exam             2007 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
ARP 2C20 A 2
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-RI 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Ability to manually operate and/or monitor in the control room: Battery discharge rate NUREG-1021, Revision 9
-2 D-01/D-03 125V DC Bus Under/Over Voltage; ARP 2C20 A 1
-1 D07 Battery Charger Trouble (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
054.01.LP0121.006 (As available)
Question Source:
Bank # PBNP 2007 Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam 2007 (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-RI   10 CFR Part 55 Content:
55.41 X   55.43   K/A Statemen t: Ability to manually operate and/or monitor in the control room: Battery discharge rate NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         2 Group #                         1 K/A #                               064.K6.08 Importance Rating             3.2 Proposed Question:               RO# 49, SEE ATTACHED Proposed Answer:                   A SEE ATTACHED Explanation (Optional):
-reference:
Master Data Book 3.2.5 1B40 MCC; Master Data Book 3.2.6 Technical Reference(s):          2B40 MCC; M-219 Sh. 3 Fuel Oil P&ID (Attach if not previously provided)
Level RO SRO   Tier # 2     Group # 1     K/A # 064.K6.08   Importance Rating 3.2     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           054.02.LP0133.004                             (As available)
RO# 49, SEE ATTACHED Proposed Answer:
Question Source:             Bank #                   PBNP 2002 Modified Bank                               (Note changes or attach parent)
A   Explanation (Optional):
New Question History:             Last NRC Exam             2002 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-RI 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Knowledge of the effect of a loss or malfunction of the following will have on the ED/G system: Fuel oil storage tanks NUREG-1021, Revision 9
Master Data Book 3.2.5 1B40 MCC; Master Data Book 3.2.6 2B40 MCC; M
-219 Sh. 3 Fuel Oil P&ID (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
054.02.LP0133.004 (As available)
Question Source:
Bank # PBNP 2002 Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam 2002 (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-RI   10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Knowledge of the effect of a loss or malfunction of the following will have on the ED/G system: Fuel oil storage tanks NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         2 Group #                         1 K/A #                             064.02.04.30 Importance Rating             2.7 Proposed Question:               RO# 50, SEE ATTACHED Proposed Answer:                   D SEE ATTACHED Explanation (Optional):
-reference:
TS-84 Emergency Diesel Generator Monthly; NP 2.1.5 Electrical Communications, Switchyard Access and Work Technical Reference(s):          Planning (Attach if not previously provided)
Level RO SRO   Tier # 2     Group # 1     K/A # 064.02.04.30 Importance Rating 2.7     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           054.02.LP0133.006                             (As available)
RO# 50, SEE ATTACHED Proposed Answer:
Question Source:             Bank #
D   Explanation (Optional):
Modified Bank                               (Note changes or attach parent)
SEE ATTACHED Technical Reference(s):
New                         NEW Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
TS-84 Emergency Diesel Generator Monthly; NP 2.1.5 Electrical Communications, Switchyard Access and Work Planning (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
Question Cognitive Level:             Memory or Fundamental Knowledge                     1-P Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43           X K/A Statement: Emergency Diesel Generator - Knowledge of events related to system operation/status that must be reported to internal organizations or external agencies, such as the State, the NRC, or the transmission system operator.
N/A Learning Objective:
NUREG-1021, Revision 9
054.02.LP0133.006 (As available)
Question Source:
Bank #   Modified Bank (Note changes or attach parent)
New NEW   Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-P   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X   55.43 X   K/A Statement: Emergency Diesel Generator  
- Knowledge of events related to system operation/status that must be reported to internal organizations or external agencies, such as the State, the NRC, or the transmission system operator
. NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         2 Group #                         1 K/A #                               073.K1.01 Importance Rating             3.6 Proposed Question:               RO# 51, SEE ATTACHED Proposed Answer:                   C SEE ATTACHED Explanation (Optional):
-reference:
RMSASRB CI 2RE-219 SGBD Liquid Sample Line Monitor Unit 2; RMSASRB CI 2RE-222 SGBD Tank Area Monitor Technical Reference(s):          Unit 2 (Attach if not previously provided)
Level RO SRO   Tier # 2     Group # 1     K/A # 073.K1.01   Importance Rating 3.6     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           052.02.LP0037.004                             (As available)
RO# 51, SEE ATTACHED Proposed Answer:
Question Source:             Bank #                   PBNP 2005 Modified Bank                               (Note changes or attach parent)
C   Explanation (Optional):
New Question History:             Last NRC Exam             2005 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge                       1-I Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Knowledge of the physical connections and/or cause effect relationships between the PRM (Process Radiation Monitoring) system and the following systems: Those systems served by PRMs.
RMSASRB CI 2RE-219 SGBD Liquid Sample Line Monitor Unit 2; RMSASRB CI 2RE
NUREG-1021, Revision 9
-222 SGBD Tank Area Monitor Unit 2 (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
052.02.LP0037.
004 (As available)
Question Source:
Bank # PBNP 2005 Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam 2005 (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-I   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Knowledge of the physical connections and/or cause effect relationships between the PRM (Process Radiation Monitoring) system and the following systems: Those systems served by PRMs. NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         2 Group #                         1 K/A #                               073.A2.02 Importance Rating             2.7 Proposed Question:               RO# 52, SEE ATTACHED Proposed Answer:                   D SEE ATTACHED Explanation (Optional):
-reference:
RMSASRB CI RE-214 Aux Building Vent Exhaust; Technical Reference(s):          RMSASRB 1.0 Generic RMS Alarm Response Guidelines (Attach if not previously provided)
Level RO SRO   Tier # 2     Group # 1     K/A # 073.A2.02   Importance Rating 2.7     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           053.05.LP0286.004                             (As available)
RO# 52, SEE ATTACHED Proposed Answer:
Question Source:             Bank #
D   Explanation (Optional): SEE ATTACHED Technical Reference(s):
Modified Bank                               (Note changes or attach parent)
RMSASRB CI RE
New                         NEW Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
-214 Aux Building Vent Exhaust; RMSASRB 1.0 Generic RMS Alarm Response Guidelines (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           1-P 10 CFR Part 55 Content:               55.41           X 55.43           X K/A Statement: Ability to (a) predict the impacts of the following malfunctions or operations on the PRM (Process Radiation Monitoring) system; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Detector failure.
N/A Learning Objective:
053.05.LP0286.004 (As available)
Question Source:
Bank #   Modified Bank (Note changes or attach parent)
New NEW   Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 1-P   10 CFR Part 55 Content:
55.41 X   55.43 X   K/A Statement: Ability to (a) predict the impacts of the following malfunctions or operations on the PRM (Process Radiation Monitoring) system; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Detector failure.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         2 Group #                         1 K/A #                               076.K2.04 Importance Rating             2.5 Proposed Question:               RO# 53, SEE ATTACHED Proposed Answer:                   C SEE ATTACHED Explanation (Optional):
-reference:
Master Data Book 3.2.6 2B32; Master Data Book 3.2.6 2B42; Technical Reference(s):          883D195 Sh. SI logic (Attach if not previously provided)
Level RO SRO   Tier # 2     Group # 1     K/A # 076.K2.04   Importance Rating 2.5     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           051.06.LP0086.004                             (As available)
RO# 53, SEE ATTACHED Proposed Answer:
Question Source:             Bank #
C   Explanation (Optional):
Modified Bank                               (Note changes or attach parent)
SEE ATTACHED Technical Reference(s):
New                         NEW Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Master Data Book 3.2.6 2B32; Master Data Book 3.2.6 2B42; 883D195 Sh. SI logic (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-RI 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Knowledge of bus power supplies to the following: Reactor building closed cooling water (Service Water)
N/A Learning Objective:
051.06.LP0086.004 (As available)
Question Source:
Bank #   Modified Bank (Note changes or attach parent)
New NEW   Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-RI   10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Knowledge of bus power supplies to the following: Reactor building closed cooling water (Service Water)
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         2 Group #                         1 K/A #                               078.K3.02 Importance Rating             3.4 Proposed Question:               RO# 54, SEE ATTACHED Proposed Answer:                   D SEE ATTACHED Explanation (Optional):
-reference:
Technical Reference(s):           AOP-5B Loss of Instrument or Service Air (Attach if not previously provided)
Level RO SRO   Tier # 2     Group # 1     K/A # 078.K3.02   Importance Rating 3.4     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           052.06.LP0338.007                             (As available)
RO# 54, SEE ATTACHED Proposed Answer:
Question Source:             Bank #                   PBNP 2007 Modified Bank                               (Note changes or attach parent)
D   Explanation (Optional):
New Question History:             Last NRC Exam             2007 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-RI 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Knowledge of the effect that a loss or malfunction of the Instrument Air System will have on the following: Systems having pneumatic valves and controls NUREG-1021, Revision 9
AOP-5B Loss of Instrument or Service Air (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
052.06.LP0338.007 (As available)
Question Source:
Bank # PBNP 2007 Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam 2007 (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-RI   10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Knowledge of the effect that a loss or malfunction of the Instrument Air System will have on the following: Systems having pneumatic valves and controls NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         2 Group #                         1 K/A #                               103.K4.06 Importance Rating             3.1 Proposed Question:               RO# 55, SEE ATTACHED Proposed Answer:                   A SEE ATTACHED Explanation (Optional):
-reference:
Technical Reference(s):           Logic Drawing 883D195 Sh. 7, Containment Isolation (Attach if not previously provided)
Level RO SRO   Tier # 2     Group # 1     K/A # 103.K4.06   Importance Rating 3.1     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           053.06.LP0486.14                               (As available)
RO# 55, SEE ATTACHED Proposed Answer:
Question Source:             Bank #                   PBNP 2007 Modified Bank                               (Note changes or attach parent)
A   Explanation (Optional):
New Question History:             Last NRC Exam             2007 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge                     1-F Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Knowledge of containment system design feature(s) and/or interlock(s) which provide for the following: Containment isolation system.
Logic Drawing 883D195 Sh. 7, Containment Isolation (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective: 053.06.LP0486.14 (As available)
Question Source:
Bank # PBNP 2007 Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam 2007 (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-F   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Knowledge of containment system design feature(s) and/or interlock(s) which provide for the following: Containment isolation system.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         2 Group #                         2 K/A #                               001.K2.01 Importance Rating             3.5 Proposed Question:               RO# 56, SEE ATTACHED Proposed Answer:                     B SEE ATTACHED Explanation (Optional):
-reference:
OI-31 Rod Drive Motor Generator Set; LP0131 Rod Drive Technical Reference(s):          MG Sets (Attach if not previously provided)
Level RO SRO   Tier # 2     Group # 2     K/A # 001.K2.01   Importance Rating 3.5     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           054.04.LP0213.002                             (As available)
RO# 56, SEE ATTACHED Proposed Answer:
Question Source:             Bank #
B   Explanation (Optional):
Modified Bank                               (Note changes or attach parent)
SEE ATTACHED Technical Reference(s):
New                         NEW Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
OI-31 Rod Drive Motor Generator Set; LP0131 Rod Drive MG Sets (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
Question Cognitive Level:             Memory or Fundamental Knowledge                       1-I Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Knowledge of bus power supplies to the following: One-line diagram of power supply to M/G sets.
N/A Learning Objective:
054.04.LP0213.002 (As available)
Question Source:
Bank #   Modified Bank (Note changes or attach parent)
New NEW   Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-I   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Knowledge of bus power supplies to the following: One
-line diagram of power supply to M/G sets.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         2 Group #                         2 K/A #                               014.K1.02 Importance Rating             3.0 Proposed Question:               RO# 57, SEE ATTACHED Proposed Answer:                     B SEE ATTACHED Explanation (Optional):
-reference:
Technical Reference(s):           OP-1B Reactor Startup (Attach if not previously provided)
Level RO SRO   Tier # 2     Group # 2     K/A # 014.K1.02   Importance Rating 3.0     Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           055.03.LP2441.003                             (As available)
RO# 57, SEE ATTACHED Proposed Answer:
Question Source:             Bank #                   INPO 27672 Modified Bank                               (Note changes or attach parent)
B   Explanation (Optional):
New Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-DR 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Knowledge of the physical connections and/or cause effect relationships between the RPIS and the following systems: NIS NUREG-1021, Revision 9
OP-1B Reactor Startup (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
055.03.LP2441.003 (As available)
Question Source:
Bank # INPO 27672 Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-DR   10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Knowledge of the physical connections and/or cause effect relationships between the RPIS and the following systems: NIS NUREG-1021, Revisio n 9 ES-401  Written Examination Question Worksheet Form-401-5    Examination Outline Cross
-reference:
Level RO  SRO  Tier # 2    Group # 2    K/A # 016.K4.03  Importance Rating 2.8      Proposed Question:
RO# 58, SEE ATTACHED Proposed Answer: A    Explanation (Optional):
SEE ATTACHED Technical Reference(s):
Logic Drawing Sh. 23, LOFWTT; STPT 15.1, Turbine Trips, Alarms and AMSAC (Attach if not previously provided)    Proposed references to be provided to applicants during examination: N/A  Learning Objective:
053.02.LP1828.002 (As available)
Question Source:
Bank # PBNP 2007  Modified Bank (Note changes or attach parent)
New    Question History:
Last NRC Exam 2007  (Optional
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analys is 2-DR  10 CFR Part 55 Content:
55.41 X  55.43    K/A Statement: Knowledge of NNIS (Non
-Nuclear Instrumentation System) design feature(s) and/or interlock(s) which provide for the following: Input to control systems NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         2 Group #                         2 K/A #                               016.K4.03 Importance Rating             2.8 Proposed Question:               RO# 58, SEE ATTACHED Proposed Answer:                   A SEE ATTACHED Explanation (Optional):
-reference:
Logic Drawing Sh. 23, LOFWTT; STPT 15.1, Turbine Trips, Technical Reference(s):           Alarms and AMSAC (Attach if not previously provided)
Level RO SRO   Tier # 2     Group # 2     K/A # 029.A1.03   Importance Rating 3.0      Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           053.02.LP1828.002                             (As available)
RO# 59, SEE ATTACHED Proposed Answer:
Question Source:             Bank #                   PBNP 2007 Modified Bank                               (Note changes or attach parent)
C    Explanation (Optional):
New Question History:             Last NRC Exam             2007 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-DR 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Knowledge of NNIS (Non-Nuclear Instrumentation System) design feature(s) and/or interlock(s) which provide for the following: Input to control systems NUREG-1021, Revision 9
LCO 3.6.4 Containment Pressure; LCO 3.6.5 Containment Temperature; PBF
-2061 Control Room Shift Turnover Checklist  (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
057.02.LP3342.002 (As available)
Question Source:
Bank # INPO 26746 Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-P    Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the Containment Purge System controls including: Containment pressure, temperature, and humidity NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         2 Group #                         2 K/A #                               029.A1.03 Importance Rating             3.0 Proposed Question:               RO# 59, SEE ATTACHED Proposed Answer:                   C SEE ATTACHED Explanation (Optional):
-reference:
LCO 3.6.4 Containment Pressure; LCO 3.6.5 Containment Temperature; PBF-2061 Control Room Shift Turnover Technical Reference(s):           Checklist (Attach if not previously provided)
Level RO SRO   Tier # 2     Group # 2     K/A # 035.K5.03   Importance Rating 2.8      Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           057.02.LP3342.002                              (As available)
RO# 60, SEE ATTACHED Proposed Answer:
Question Source:             Bank #                   INPO 26746 Modified Bank                               (Note changes or attach parent)
B    Explanation (Optional):
New Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge                     1-P Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the Containment Purge System controls including: Containment pressure, temperature, and humidity NUREG-1021, Revision 9
LP0446 S/G Transient Response (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
043.01.LP0446.003 (As available)
Question Source:
Bank # INPO 24696 Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-F    Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Knowledge of operational implications of the following concepts as the apply to the S/Gs: Shrink and swell concept NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         2 Group #                         2 K/A #                               035.K5.03 Importance Rating             2.8 Proposed Question:               RO# 60, SEE ATTACHED Proposed Answer:                     B SEE ATTACHED Explanation (Optional):
-reference:
Technical Reference(s):           LP0446 S/G Transient Response (Attach if not previously provided)
Level RO SRO   Tier # 2     Group # 2     K/A # 055.K3.01  Importance Rating 2.5      Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           043.01.LP0446.003                              (As available)
RO# 61, SEE ATTACHED Proposed Answer:
Question Source:             Bank #                   INPO 24696 Modified Bank                               (Note changes or attach parent)
D    Explanation (Optional):
New Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge                     1-F Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Knowledge of operational implications of the following concepts as the apply to the S/Gs: Shrink and swell concept NUREG-1021, Revision 9
LP2439 Secondary Coolant Malfunctions (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
055.03.LP2439.004 (As available)
Question Source:
Bank # INPO 23359 Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-DR  10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Knowledge of the effect that a loss or malfunction of the CARS (Condenser Air Removal system) will have on the following: Main condenser NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross-reference:
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         2 Group #                         2 K/A #                               055.K3.01 Importance Rating             2.5 Proposed Question:               RO# 61, SEE ATTACHED Proposed Answer:                   D SEE ATTACHED Explanation (Optional):
Level RO SRO   Tier # 2     Group # 2     K/A # 068.A2.02  Importance Rating 2.7      Proposed Question:
Technical Reference(s):           LP2439 Secondary Coolant Malfunctions (Attach if not previously provided)
RO# 62, SEE ATTACHED Proposed Answer:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           055.03.LP2439.004                             (As available)
D   Explanation (Optional):
Question Source:             Bank #                   INPO 23359 Modified Bank                               (Note changes or attach parent)
SEE ATTACHED Technical Reference(s):
New Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
OI-140B Standard Radioactive Batch Liquid Release
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-DR 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Knowledge of the effect that a loss or malfunction of the CARS (Condenser Air Removal system) will have on the following: Main condenser NUREG-1021, Revision 9
-Waste Distillate Tanks; RAM 3.1.1 Restarting a Liquid Batch Release  (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
051.04.LP0063.004 (As available)
Question Source:
Bank # INPO 24086 Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-P    Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X   55.43 K/A Statement: Ability to (a) predict the impacts of the following malfunctions or operations on the Liquid Radwaste System ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Lack of tank recirculation prior to release. NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         2 Group #                         2 K/A #                               068.A2.02 Importance Rating             2.7 Proposed Question:               RO# 62, SEE ATTACHED Proposed Answer:                   D SEE ATTACHED Explanation (Optional):
-reference:
OI-140B Standard Radioactive Batch Liquid Release-Waste Distillate Tanks; RAM 3.1.1 Restarting a Liquid Batch Technical Reference(s):           Release (Attach if not previously provided)
Level RO SRO   Tier # 2     Group # 2     K/A # 072.A3.01  Importance Rating 2.9      Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           051.04.LP0063.004                             (As available)
RO# 63, SEE ATTACHED Proposed Answer:
Question Source:             Bank #                   INPO 24086 Modified Bank                               (Note changes or attach parent)
A    Explanation (Optional):
New Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge                     1-P Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43           X K/A Statement: Ability to (a) predict the impacts of the following malfunctions or operations on the Liquid Radwaste System ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Lack of tank recirculation prior to release.
Logic Drawing 883D195 Sh. 21 Containment Isolation/Containment Ventilation Isolation; Logic Drawing 883D195 Sh. 7 Safeguards Actuation Signals; RMSARB 1RE
-305, Containment Purge Exhaust Low Range Gas Monitor; Drawing M-215 Sh. 1, Containment Ventilation D (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
051.05.LP0057.004 (As available)
Question Source:
Bank # PBNP 2007  Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam 2007  (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-I    Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Ability to monitor automatic operation of the ARM (Area Radiation Monitoring) system, including: Changes in ventilation alignment.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         2 Group #                         2 K/A #                               072.A3.01 Importance Rating             2.9 Proposed Question:               RO# 63, SEE ATTACHED Proposed Answer:                   A SEE ATTACHED Explanation (Optional):
-reference:
Logic Drawing 883D195 Sh. 21 Containment Isolation/Containment Ventilation Isolation; Logic Drawing 883D195 Sh. 7 Safeguards Actuation Signals; RMSARB 1RE-305, Containment Purge Exhaust Low Range Gas Monitor; Technical Reference(s):           Drawing M-215 Sh. 1, Containment Ventilation D (Attach if not previously provided)
Level RO SRO   Tier # 2     Group # 2     K/A # 079.A4.01   Importance Rating 2.7      Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           051.05.LP0057.004                             (As available)
RO# 64, SEE ATTACHED Proposed Answer:
Question Source:             Bank #                   PBNP 2007 Modified Bank                               (Note changes or attach parent)
B    Explanation (Optional):
New Question History:             Last NRC Exam             2007 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge                       1-I Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Ability to monitor automatic operation of the ARM (Area Radiation Monitoring) system, including: Changes in ventilation alignment.
STPT 14.7 Instrument and Service Air (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
NUREG-1021, Revision 9
N/A Learning Objective:
052.06.LP0338.004 (As available) Question Source:
Bank #   Modified Bank (Note changes or attach parent)
New NEW    Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-RI  10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement:
Ability to manually operate and/or monitor in the control room: Cross
-tie valves with Instrument Air System NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                  Level                          RO                SRO Tier #                          2 Group #                        2 K/A #                                079.A4.01 Importance Rating              2.7 Proposed Question:                RO# 64, SEE ATTACHED Proposed Answer:                    B SEE ATTACHED Explanation (Optional):
-reference:
Technical Reference(s):          STPT 14.7 Instrument and Service Air (Attach if not previously provided)
Level RO SRO   Tie r # 2     Group # 2     K/A # 086.02.04.35 Importance Rating 3.8     Proposed Question:
Proposed references to be provided to applicants during examination:                      N/A Learning Objective:          052.06.LP0338.004                              (As available)
RO# 65, SEE ATTACHED Proposed Answer:
Question Source:              Bank #
B   Explanation (Optional):
Modified Bank                                (Note changes or attach parent)
SEE ATTACHED Technical Reference(s):
New                        NEW Question History:            Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
PC76 Part 7, Inspection of Fixed Automatic Dry Chemical Fire Extinguishing Systems; LP0003 Fire Protection System lesson plan (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
Question Cognitive Level:            Memory or Fundamental Knowledge Comprehension or Analysis                            2-RI 10 CFR Part 55 Content:              55.41          X 55.43 K/A Statement: Ability to manually operate and/or monitor in the control room: Cross-tie valves with Instrument Air System NUREG-1021, Revision 9
N/A Learning Objective:
 
052.01.LP0003.007 (As available)
ES-401                Written Examination Question Worksheet                                  Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         2 Group #                         2 K/A #                             086.02.04.35 Importance Rating             3.8 Proposed Question:               RO# 65, SEE ATTACHED Proposed Answer:                     B SEE ATTACHED Explanation (Optional):
Question Source:
PC76 Part 7, Inspection of Fixed Automatic Dry Chemical Fire Extinguishing Systems; LP0003 Fire Protection System Technical Reference(s):          lesson plan (Attach if not previously provided)
Bank #   Modified Bank (Note changes or attach parent)
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           052.01.LP0003.007                             (As available)
New NEW   Question History:
Question Source:             Bank #
Last NRC Exam (Optional  
Modified Bank                               (Note changes or attach parent)
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
New                         NEW Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Question Cognitive Level:             Memory or Fundamental Knowledge                     1-P Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43           X K/A Statement: Fire Protection - Knowledge of local auxiliary operator tasks during an emergency and the resultant operational effects.
Memory or Fundamental Knowledge 1-P   Comprehension or Analysis 10 CFR Part 55 Content:
NUREG-1021, Revision 9
55.41 X   55.43 X   K/A Statement: Fire Protection - Knowledge of local auxiliary operator tasks during an emergency and the resultant operational effects.
 
ES-401                Written Examination Question Worksheet                                  Form-401-5 Examination Outline Cross-reference:                  Level                          RO                SRO Tier #                          3 Group #
K/A #                                02.01.06 Importance Rating              3.8 Proposed Question:                RO# 66, SEE ATTACHED Proposed Answer:                    B SEE ATTACHED Explanation (Optional):
OM 3.7, AOP and EOP Procedure Usage for Response to Technical Reference(s):          Plant Transients (Attach if not previously provided)
Proposed references to be provided to applicants during examination:                      N/A Learning Objective:          02.01.06                                      (As available)
Question Source:              Bank #
Modified Bank                                (Note changes or attach parent)
New                        NEW Question History:            Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:            Memory or Fundamental Knowledge                      1-P Comprehension or Analysis 10 CFR Part 55 Content:              55.41          X 55.43          X K/A Statement: Ability to manage the control room crew during plant transients.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         3 Group #
-reference:
K/A #                               02.01.26 Importance Rating             3.4 Proposed Question:               RO# 67, SEE ATTACHED Proposed Answer:                   D SEE ATTACHED Explanation (Optional):
Level RO SRO   Tier # 3     Group #     K/A # 02.01.06  Importance Rating 3.8      Proposed Question:
OP-AA-101-1000 Fleet Clearance and Tagging Section 2.0 Terms and Definitions for Hazardous Energy and High Technical Reference(s):          Energy System (Attach if not previously provided)
RO# 66, SEE ATTACHED Proposed Answer:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           02.01.26                                       (As available)
B    Explanation (Optional):
Question Source:             Bank #                   ADMIN BANK Modified Bank                               (Note changes or attach parent)
SEE ATTACHED Technical Reference(s):
New Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
OM 3.7, AOP and EOP Procedure Usage for Response to Plant Transients (Attach if not previously provided)    Proposed references to be provided to applicants during examination:
Question Cognitive Level:             Memory or Fundamental Knowledge                     1-P Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Knowledge of industrial safety procedures (such as rotating equipment, electrical, high temperature, high pressure, caustic, chlorine, oxygen and hydrogen)
N/A  Learning Objective:
NUREG-1021, Revision 9
02.01.06 (As available)
Question Source:
Bank #  Modified Bank (Note changes or attach parent)  New NEW    Question History:
Last NRC Exam (Optional
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)    Question Cognitive Level:
Memory or Fundamental Knowledge 1-P    Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X  55.43 X  K/A Statement: Ability to manage the control room crew during plant transients.
NUREG-1021, Revision 9 ES-401  Written Examination Question Worksheet Form-401-5    Examination Outline Cross
-reference:
Level RO  SRO  Tier # 3    Group #      K/A # 02.01.26   Importance Rating 3.4     Proposed Question:
RO# 67, SEE ATTACHED Proposed Answer: D   Explanation (Optional):
SEE ATTACHED Technical Reference(s):
OP-AA-101-1000 Fleet Clearance and Tagging Section 2.0 Terms and Definitions for Hazardous Energy and High Energy System (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
02.01.26 (As available)
Question Source:
Bank # ADMIN BANK Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-P   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Knowledge of industrial safety procedures (such as rotating equipment, electrical, high temperature, high pressure, caustic, chlorine, oxygen and hydrogen) NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         3 Group #
-reference:
K/A #                               02.02.17 Importance Rating             2.6 Proposed Question:               RO# 68, SEE ATTACHED Proposed Answer:                   D SEE ATTACHED Explanation (Optional):
Level RO SRO   Tier # 3     Group #     K/A # 02.02.17   Importance Rating 2.6     Proposed Question:
Technical Reference(s):           NP 2.1.8 Guarded Equipment (Attach if not previously provided)
RO# 68 , SEE ATTACHED Proposed Answer:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           02.02.17                                       (As available)
D   Explanation (Optional):
Question Source:             Bank #                   LOC BANK Modified Bank                               (Note changes or attach parent)
SEE ATTACHED Technical Reference(s):
New Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
NP 2.1.8 Guarded Equipment (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
Question Cognitive Level:             Memory or Fundamental Knowledge                     1-P Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43           X K/A Statement: Knowledge of the process for managing maintenance activities during power operations, such as risk assessments, work prioritization, and coordination with the transmission system operator NUREG-1021, Revision 9
N/A Learning Objective:
02.02.17 (As available)
Question Source:
Bank # LOC BANK Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-P   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X   55.43 X   K/A Statement: Knowledge of the process for managing maintenance activities during power operations, such as risk assessments, work prioritization, and coordination with the transmission system operator NUREG-1021, Revision 9


ES-4 01  Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401                Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         3 Group #
-reference:
K/A #                               02.02.21 Importance Rating             2.9 Proposed Question:               RO# 69, SEE ATTACHED Proposed Answer:                     B SEE ATTACHED Explanation (Optional):
Level RO SRO   Tier # 3     Group #     K/A # 02.02.21   Importance Rating 2.9     Proposed Question:
PC97 Part 1 Service Water Flush 'A' Accidnet Fan; IT 08A Cold Start 1P-29 TDAFW Pump; IT 07G Service Water Valves Quarterly; IT 01 Train A High Head SI Pumps and Technical Reference(s):          Valves Train A (Attach if not previously provided)
RO# 69, SEE ATTACHED Proposed Answer:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           02.02.21                                       (As available)
B   Explanation (Optional):
Question Source:             Bank #
SEE ATTACHED Technical Reference(s):
Modified Bank                               (Note changes or attach parent)
PC97 Part 1 Service Water Flush 'A' Accidnet Fan; IT 08A Cold Start 1P
New                         NEW Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
-29 TDAFW Pump; IT 07G Service Water Valves Quarterly; IT 01 Train A High Head SI Pumps and Valves Train A (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
Question Cognitive Level:             Memory or Fundamental Knowledge                     1-P Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43           X K/A Statement: Knowledge of pre- and post-maintenance operability requirements NUREG-1021, Revision 9
N/A Learning Objective:
02.02.21 (As available)
Question Source:
Bank #   Modified Bank (Note changes or attach parent)
New NEW   Question History: Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-P   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X   55.43 X   K/A Statement: Knowledge of pre
- and post-maintenance operability requirements NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         3 Group #
-reference:
K/A #                               02.02.41 Importance Rating             3.5 Proposed Question:               RO# 70, SEE ATTACHED Proposed Answer:                   C SEE ATTACHED Explanation (Optional):
Level RO SRO   Tier # 3     Group #     K/A # 02.02.41   Importance Rating 3.5     Proposed Question:
Technical Reference(s):           883D195 Logic Sheet 20 & 26; LP0169 Auxiliary Feedwater (Attach if not previously provided)
RO# 70, SEE ATTACHED Proposed Answer:
Proposed references to be provided to applicants during examination:                       883D195 SHEET 20 Learning Objective:           052.05.LP0169.004                             (As available)
C   Explanation (Optional): SEE ATTACHED Technical Reference(s):
Question Source:             Bank #                   BANK LOC Modified Bank                               (Note changes or attach parent)
883D195 Logic Sheet 20 & 26; LP0169 Auxiliary Feedwater (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
New Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
883D195 SHEET 20 Learning Objective:
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           3-SPR 10 CFR Part 55 Content:               55.41          X 55.43 K/A Statement: Ability to obtain and interpret station electrical and mechanical drawings.
052.05.LP0169.004 (As available)
Question Source:
Bank # BANK LOC Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 3-SPR   10 CFR Part 55 Content:
55.4 1 X   55.43   K/A Statement: Ability to obtain and interpret station electrical and mechanical drawings.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         3 Group #
-reference:
K/A #                               02.03.12 Importance Rating             3.2 Proposed Question:               RO# 71, SEE ATTACHED Proposed Answer:                     B SEE ATTACHED Explanation (Optional):
Level RO SRO   Tier # 3     Group #     K/A # 02.03.12   Importance Rating 3.2     Proposed Question:
0-SOP-FH-001 Fuel/Insert/Component Movement in the SFP Technical Reference(s):          or New Fuel vault P&L 3.4.1 (Attach if not previously provided)
RO# 71, SEE ATTACHED Proposed Answer:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           112.01.LP0260.001                             (As available)
B   Explanation (Optional):
Question Source:             Bank #                   PBNP 2009 Modified Bank                               (Note changes or attach parent)
SEE ATTACHED Technical Reference(s):
New Question History:             Last NRC Exam             2009 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
0-SOP-FH-001 Fuel/Insert/Component Movement in the SF P or New Fuel vault P&L 3.4.1 (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
Question Cognitive Level:             Memory or Fundamental Knowledge                     1-B Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43 K/A Statement: Knowledge of radiological safety principles pertaining to licensed operator duties, such as containment entry requirements, fuel handling responsibilities, access to locked high-radiation areas, aligning filters, etc NUREG-1021, Revision 9
N/A Learning Objective:
112.01.LP0260.001 (As available)
Question Source:
Bank # PBNP 2009 Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam 2009 (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-B   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X   55.43   K/A Statement: Knowledge of radiological safety principles pertaining to licensed operator duties, such as containment entry requirements, fuel handling responsibilities, access to locked high
-radiation areas, aligning filters, etc NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         3 Group #
-reference:
K/A #                               02.03.13 Importance Rating             3.4 Proposed Question:               RO# 72, SEE ATTACHED Proposed Answer:                     B SEE ATTACHED Explanation (Optional):
Level RO SRO   Tier # 3     Group #     K/A # 02.03.13   Importance Rating 3.4     Proposed Question:
Technical Reference(s):           RP-1C, Refueling P&L 3.3.5 (Attach if not previously provided)
RO# 72, SEE ATTACHED Proposed Answer:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           055.02.LP2186.001                             (As available)
B   Explanation (Optional):
Question Source:             Bank #                   PBNP 2005 Modified Bank                               (Note changes or attach parent)
SEE ATTACHED Technical Reference(s): RP-1C, Refueling P&L 3.3.5 (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
New Question History:             Last NRC Exam             2005 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
N/A Learning Objective:
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-DR 10 CFR Part 55 Content:               55.41           X 55.43           X K/A Statement: Knowledge of radiological safety procedures pertaining to licensed operator duties, such as response to radiation monitor alarms, containment entry requirements, fuel handling responsibilities, access to locked high-radiation areas, aligning filters, etc NUREG-1021, Revision 9
055.02.LP2186.001 (As available)
Question Source:
Bank # PBNP 2005 Modified Bank       (Note changes or attach parent)
New     Question History:
Last NRC Exam 2005 (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-DR   10 CFR Part 55 Content:
55.41 X   55.43 X   K/A Statement: Knowledge of radiological safety procedures pertaining to licensed operator duties, such as response to radiation monitor alarms, containment entry requirements, fuel handling responsibilities, access to locked high
-radiation areas, aligning filters, etc NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         3 Group #
-reference:
K/A #                               02.03.14 Importance Rating             3.4 Proposed Question:               RO# 73, SEE ATTACHED Proposed Answer:                   A SEE ATTACHED Explanation (Optional):
Level RO SRO   Tier # 3     Group #     K/A # 02.03.14   Importance Rating 3.4     Proposed Question:
Technical Reference(s):           EOP-3, Steam Generator Tube Rupture Background Step 11 (Attach if not previously provided)
RO# 73, SEE ATTACHED Proposed Answer:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           031.02.LP0441.002                             (As available)
A   Explanation (Optional): SEE ATTACHED Technical Reference(s):
Question Source:             Bank #                   INPO 19590 Modified Bank                               (Note changes or attach parent)
EOP-3, Steam Generator Tube Rupture Background Step 11 (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
New Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
N/A Learning Objective:
Question Cognitive Level:             Memory or Fundamental Knowledge                     1-B Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43          X K/A Statement: Knowledge of radiation or contamination hazards that may arise during normal, abnormal, or emergency conditions or activities NUREG-1021, Revision 9
031.02.LP0 441.002 (As available)
Question Source:
Bank # INPO 19590 Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-B   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X   55.4 3 X   K/A Statement: Knowledge of radiation or contamination hazards that may arise during normal, abnormal, or emergency conditions or activities NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross-reference:
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         3 Group #
Level RO SRO   Tier # 3     Group #     K/A # 02.04.34   Importance Rating 4.2     Proposed Question:
K/A #                               02.04.34 Importance Rating             4.2 Proposed Question:               RO# 74, SEE ATTACHED Proposed Answer:                     B SEE ATTACHED Explanation (Optional):
RO# 74, SEE ATTACHED Proposed Answer:
AOP-10A, Safe Shutdown - Local Control; Master Data Book 3.2.1 1A05; Master Data Book 3.2.1 1A06; Master Data Book Technical Reference(s):          3.2.2 2A05; Master Data Book 3.2.2 2A06 (Attach if not previously provided)
B   Explanation (Optional):
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           055.03.LP1275.001                             (As available)
SEE ATTACHED Technical Reference(s):
Question Source:             Bank #                   PBNP 2007 Modified Bank                               (Note changes or attach parent)
AOP-10A, Safe Shutdown - Local Control; Master Data Book 3.2.1 1A05; Master Data Book 3.2.1 1A06; Master Data Book 3.2.2 2A05; Master Data Book 3.2.2 2A06 (Attach if not previously provided)     Proposed references to be provided to applicants during examination
New Question History:             Last NRC Exam             2007 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
: N/A Learning Objective:
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-DS 10 CFR Part 55 Content:               55.41           X 55.43           X K/A Statement: Knowledge of RO tasks performed outside the main control room during an emergency and the resultant operational effects.
055.03.LP1275.001 (As available)
Question Source:
Bank # PBNP 2007 Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam 2007 (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-DS   10 CFR Part 55 Content:
55.41 X   55.43 X   K/A Statement: Knowledge of RO tasks performed outside the main control room during an emergency and the resultant operational effects.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Workshe et  Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                  Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                         3 Group #
-reference:
K/A #                               02.04.41 Importance Rating             2.9 Proposed Question:               RO# 75, SEE ATTACHED Proposed Answer:                   C SEE ATTACHED Explanation (Optional):
Level RO SRO   Tier # 3     Group #     K/A # 02.04.41   Importance Rating 2.9     Proposed Question:
Technical Reference(s):           EPIP 1.2.1 Emergency Action Level Technical Basis (Attach if not previously provided)
RO# 75, SEE ATTACHED Proposed Answer:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           PBN BEP.061.005L.005                           (As available)
C   Explanation (Optional):
Question Source:             Bank #                   LOC BANK Modified Bank                               (Note changes or attach parent)
SEE ATTACHED Technical Reference(s):
New Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
EPIP 1.2.1 Emergency Action Level Technical Basis (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-DR 10 CFR Part 55 Content:               55.41           X 55.43           X K/A Statement: Knowledge of the emergency action level thresholds and classifications NUREG-1021, Revision 9
N/A Learning Objective:
PBN BEP.061.005L.005 (As available)
Question Source:
Bank # LOC BANK Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-DR   10 CFR Part 55 Content:
55.41 X   55.43 X   K/A Statement: Knowledge of the emergency action level thresholds and classifications NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                                             1 Group #                                           1 K/A #                             026.AA2.02 Importance Rating                                 3.6 Proposed Question:               SRO# 1, SEE ATTACHED Proposed Answer:                   D Explanation (Optional):           SEE ATTACHED Technical Reference(s):           AOP-1A, Reactor Coolant Leak; AOP-9B, Attachment B, B3 (Attach if not previously provided)
-reference:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           055.03.LP2444.008                             (As available)
Level RO SRO   Tier #   1   Group #   1   K/A # 026.AA2.02 Importance Rating 3.6   Proposed Question:
Question Source:             Bank #
SRO# 1, SEE ATTACHED Proposed Answer
Modified Bank                               (Note changes or attach parent)
: D   Explanation (Optional):
New                         NEW Question History:             Last NRC Exam             NEW (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                         3-SPK 10 CFR Part 55 Content:               55.41 55.43           X KA Statement: Ability to determine and interpret the following as they apply to the Loss of Component Cooling Water: The cause of possible CCW loss.
AOP-1A, Reactor Coolant Leak; AOP
-9B, Attachment B, B3 (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
055.03.LP2444.008 (As available)
Question Source:
Bank #   Modified Bank (Note changes or attach parent)
New NEW   Question History:
Last NRC Exam NEW (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 3-SPK   10 CFR Part 55 Content: 55.41   55.43 X   KA Statement: Ability to determine and interpret the following as they apply to the Loss of Component Cooling Water: The cause of possible CCW loss.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                                             1 Group #                                           1 K/A #                             029.02.04.09 Importance Rating                                 4.2 Proposed Question:               SRO# 2, SEE ATTACHED Proposed Answer:                   C Explanation (Optional):           SEE ATTACHED Technical Reference(s):           CSP-S.1 Response to Nuclear Generation/ATWS, Step 20 (Attach if not previously provided)
-reference:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           043.03.LP1996.011                             (As available)
Level RO SRO   Tier #   1   Group #   1   K/A # 02 9.02.04.09   Importance Rating 4.2   Proposed Question:
Question Source:             Bank #
SRO# 2, SEE ATTACHED Proposed Answer:
Modified Bank                               (Note changes or attach parent)
C   Explanation (Optional):
New                         NEW Question History:             Last NRC Exam             NEW (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                         3-SPK 10 CFR Part 55 Content:               55.41           X 55.43           X KA Statement: ATWS - Knowledge of low power/shutdown implications in accident (e.g., loss of coolant accident or loss of residual heat removal) mitigation strategies.
CSP-S.1 Response to Nuclear Generation/ATWS, Step 20 (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
043.03.LP1996.011 (As available)
Question Source:
Bank #   Modified Bank (Note changes or attach parent)
New NEW   Question History:
Last NRC Exam NEW (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 3-SPK   10 CFR Part 55 Content:
55.41 X   55.43 X   KA Statement: ATWS - Knowledge of low power/shutdown implications in accident (e.g., loss of coolant accident or loss of residual heat removal) mitigation strategies.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cros s-reference:
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                                             1 Group #                                           1 K/A #                               038.EA2.07 Importance Rating                                 4.8 Proposed Question:               SRO# 3, SEE ATTACHED Proposed Answer:                   C Explanation (Optional):           SEE ATTACHED Technical Reference(s):           EOP-3 Steam Generator Tube Rupture, Step 37 and bases (Attach if not previously provided)
Level RO SRO   Tier #   1   Group #   1   K/A # 038.EA2.07 Importance Rating 4.8   Proposed Question:
Proposed references to be provided to applicants during examination:                       EOP-3 Step 37 Learning Objective:           031.02.LP0441.013                             (As available)
SRO# 3, SEE ATTACHED Proposed Answer:
Question Source:             Bank #                   LOC BANK Modified Bank                               (Note changes or attach parent)
C   Explanation (Optional):
New Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-RI 10 CFR Part 55 Content:               55.41 55.43           X KA Statement: Ability to determine or interpret the following as they apply to a SGTR: Plant conditions, from survey of control room indications.
EOP-3 Steam Generator Tube Rupture, Step 37 and bases (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
EOP-3 Step 37 Learning Objective:
031.02.LP0441.013 (As available)
Question Source:
Bank # LOC BANK Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-RI   10 CFR Part 55 Content:
55.41   55.43 X   KA Statement: Ability to determine or interpret the following as they apply to a SGTR: Plant conditions, from survey of control room indications.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                                             1 Group #                                           1 K/A #                             054.02.02.40 Importance Rating                                 4.7 Proposed Question:               SRO# 4, SEE ATTACHED Proposed Answer:                   D Explanation (Optional):           SEE ATTACHED LCO 3.7.3 MFIV, MFRV, and MFRV Bypass's with Technical Reference(s):          associated bases (Attach if not previously provided)
-reference:
Proposed references to be provided to applicants during examination:                       LCO 3.7.3 Learning Objective:           057.03.LP3343.002                             (As available)
Level RO SRO   Tier #   1   Gr oup #   1   K/A # 054.02.02.40 Importance Rating 4.7   Proposed Question:
Question Source:             Bank #
SRO# 4, SEE ATTACHED Proposed Answer:
Modified Bank                               (Note changes or attach parent)
D   Explanation (Optional):
New                         NEW Question History:             Last NRC Exam             NEW (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           3-SPR 10 CFR Part 55 Content:               55.41           X 55.43           X KA Statement: Loss of Main Feedwater - Ability to apply technical specifications for a system.
LCO 3.7.3 MFIV, MFRV, and MFRV Bypass's with associated bases (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
NUREG-1021, Revision 9
LCO 3.7.3 Learning Objective:
057.03.LP3343.002 (As available)
Question Source:
Bank #   Modified Bank (Note changes or attach parent) New NEW   Question History:
Last NRC Exam NEW (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)     Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 3-SPR   10 CFR Part 55 Content:
55.41 X   55.43 X   KA Statement: Loss of Main Feedwater  
- Ability to apply technical specifications for a system
. NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                                             1 Group #                                           1 K/A #                             056.AA2.21 Importance Rating                                 3.8 Proposed Question:               SRO# 5, SEE ATTACHED Proposed Answer:                     B Explanation (Optional):           SEE ATTACHED Technical Reference(s):           ECA-0.0 Loss of All AC, Step 9 and Bases (Attach if not previously provided)
-reference:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           031.02.LP0462.007                             (As available)
Level RO SRO   Tier #   1   Group #   1   K/A # 056.AA2.21 Importance Rating 3.8   Proposed Question:
Question Source:             Bank #
SRO# 5, SEE ATTACHED Proposed Answer:
Modified Bank                               (Note changes or attach parent)
B   Explanation (Optional):
New                         NEW Question History:             Last NRC Exam             NEW (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                         3-SPK 10 CFR Part 55 Content:               55.41 55.43           X KA Statement: Ability to determine and interpret the following as they apply to the Loss of Offsite Power: ED/G frequency and voltage indicators.
ECA-0.0 Loss of All AC, Step 9 and Bases (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
031.02.LP0462.007 (As available)
Question Source:
Bank #   Modified Bank (Note changes or attach parent)
New NEW   Question History:
Last NRC Exam NEW (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 3-SPK   10 CFR Part 55 Content:
55.41   55.43 X   KA Statement: Ability to determine and interpret the following as they apply to the Loss of Offsite Power: ED/G frequency and voltage indicators.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                                             1 Group #                                           1 K/A #                             058.02.01.32 Importance Rating                                 4.0 Proposed Question:               SRO# 6, SEE ATTACHED Proposed Answer:                   A Explanation (Optional):           SEE ATTACHED LCO 3.8.4 DC Sources - Operating and bases; 0-SOP-DC-003 125 VDC System Bus D03 and Components; AOP-0.0 Vital Technical Reference(s):          DC Malfunctions (Attach if not previously provided)
-reference:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           057.02.LP3344.002                             (As available)
Level RO SRO   Tier #   1   Group #   1   K/A # 058.02.01.32 Importance Rating 4.0   Proposed Question:
Question Source:             Bank #
SRO# 6, SEE ATTACHED Proposed Answer:
Modified Bank                               (Note changes or attach parent)
A   Explanation (Optional):
New                         NEW Question History:             Last NRC Exam             NEW (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                          3-SPK 10 CFR Part 55 Content:               55.41           X 55.43           X KA Statement: Loss of DC Power - Ability to explain and apply system limits and precautions.
LCO 3.8.4 DC Sources  
- Operating and bases; 0
-SOP-DC-003 125 VDC System Bus D03 and Components; AOP
-0.0 Vital DC Malfunctions (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
057.02.LP3344.002 (As available)
Question Source:
Bank #   Modified Bank (Note changes or attach parent)
New NEW   Question History:
Last NRC Exam NEW (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analys is 3-SPK   10 CFR Part 55 Content:
55.41 X   55.43 X   KA Statement: Loss of DC Power  
- Ability to explain and apply system limits and precautions.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                                             1 Group #                                           2 K/A #                               005.AA2.03 Importance Rating                                 4.4 Proposed Question:               SRO# 7, SEE ATTACHED Proposed Answer:                   C Explanation (Optional):           SEE ATTACHED Technical Reference(s):           LCO 3.1.4 Rod Group Alignment Limits and bases (Attach if not previously provided)
-reference:
Proposed references to be provided to applicants during examination:                       LCO 3.1.4 Learning Objective:           057.02.LP3338.003                             (As available)
Level RO SRO   Tier #   1   Group #   2   K/A # 005.AA2.03 Importance Rating 4.4   Proposed Question:
Question Source:             Bank #                   TS BANK Modified Bank                               (Note changes or attach parent)
SRO# 7, SEE ATTACHED Proposed Answer:
New Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
C   Explanation (Optional):
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           3-SPR 10 CFR Part 55 Content:               55.41 55.43           X KA Statement: Ability to determine and interpret the following as they apply to the Inoperable /
SEE ATTACHED Technical Reference(s):
Stuck Control Rod: Required actions if more than one rod is stuck or inoperable.
LCO 3.1.4 Rod Group Alignment Limits and bases (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
LCO 3.1.4 Learning Objective:
057.02.LP3338.003 (As available)
Question Source:
Bank # TS BANK Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 3-SPR   10 CFR Part 55 Content:
55.41   55.43 X   KA Statement: Ability to determine and interpret the following as they apply to the Inoperable / Stuck Control Rod: Required actions if more than one rod is stuck or inoperable.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                                             1 Group #                                           2 K/A #                             060.02.04.18 Importance Rating                                 4.0 Proposed Question:               SRO# 8, SEE ATTACHED Proposed Answer:                     B Explanation (Optional):           SEE ATTACHED EOP-1.3 Transfer to Containment Sump Recirculation - Low Head Injection, Step 30 background; LCO 3.7.14 Primary Technical Reference(s):          Auxiliary Ventilation and associated Bases (Attach if not previously provided)
-reference:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           057.02.LP3343.002                             (As available)
Level RO SRO   Tier #   1   Group #   2   K/A # 060.02.04.18 Importance Rating 4.0   Proposed Question:
Question Source:             Bank #
SRO# 8, SEE ATTACHED Proposed Answer:
Modified Bank                               (Note changes or attach parent)
B   Explanation (Optional):
New                         NEW Question History:             Last NRC Exam             NEW (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-RI 10 CFR Part 55 Content:               55.41           X 55.43           X KA Statement: Accidental Gaseous Radwaste Release - Knowledge of the specific bases for EOPs.
EOP-1.3 Transfer to Containment Sump Recirculation  
- Low Head Injection, Step 30 background; LCO 3.7.14 Primary Auxiliary Ventilation and associated Bases (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective: 057.02.LP3343.002 (As available)
Question Source:
Bank #   Modified Bank (Note changes or attach parent)
New NEW   Question History:
Last NRC Exam NEW (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-RI   10 CFR Part 55 Content
: 55.41 X   55.43 X   KA Statement: Accidental Gaseous Radwaste Release  
- Knowledge of the specific bases for EOPs.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                                             1 Group #                                           2 K/A #                             067.AA2.13 Importance Rating                                 4.4 Proposed Question:               SRO# 9, SEE ATTACHED Proposed Answer:                   A Explanation (Optional):           SEE ATTACHED Technical Reference(s):           AOP-10A Safe Shutdown - Local Control and bases (Attach if not previously provided)
-reference:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           055.03.LP1275.001                             (As available)
Level RO SRO   Tier #   1   Group #   2   K/A # 067.AA2.13 Importance Rating 4.4   Proposed Question:
Question Source:             Bank #
SRO# 9, SEE ATTACHED Proposed Answer:
Modified Bank                               (Note changes or attach parent)
A   Explanation (Optional):
New                         NEW Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge                     1-P Comprehension or Analysis 10 CFR Part 55 Content:               55.41 55.43           X KA Statement: Ability to determine and interpret the following as they apply to the Plant Fire on Site: Need for emergency shutdown.
AOP-10A Safe Shutdown  
- Local Control and bases (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
055.03.LP1275.001 (As available)
Question Source:
Bank #   Modified Bank (Note changes or attach parent) New N EW    Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)     Question Cognitive Level:
Memory or Fundamental Knowledge 1-P   Comprehension or Analysis 10 CFR Part 55 Content:
55.41   55.43 X   KA Statement: Ability to determine and interpret the following as they apply to the Plant Fire on Site: Need for emergency shutdown.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                                             1 Group #                                           2 K/A #                           WE13.02.04.47 Importance Rating                                 4.2 Proposed Question:               SRO# 10, SEE ATTACHED Proposed Answer:                   A Explanation (Optional):           SEE ATTACHED CSP-ST.0 Critical Safety Function Trees; OM 3.7 AOP and Technical Reference(s):          EOP Procedure Use and Adherence (Attach if not previously provided)
-reference:
Proposed references to be provided to applicants during examination:                     CSP-ST.0 Figs. 1 - 3 Learning Objective:           043.03.LP1995.011                             (As available)
Level RO SRO   Tier #   1   Group #   2   K/A # WE13.02.04.47 Importance Rating 4.2   Proposed Question:
Question Source:             Bank #
SRO# 10, SEE ATTACHED Proposed Answer:
Modified Bank                               (Note changes or attach parent)
A   Explanation (Optional):
New                         NEW Question History:             Last NRC Exam             NEW (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           3-SPR 10 CFR Part 55 Content:               55.41           X 55.43           X KA Statement: Steam Generator Over-Pressure - Ability to diagnose and recognize trends in an accurate and timely manner utilizing the appropriate control room reference material.
CSP-ST.0 Critical Safety Function Trees; OM 3.7 AOP and EOP Procedure Use and Adherence (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
CSP-ST.0 Fig s. 1 - 3 Learning Objective:
043.03.LP1995.011 (As available)
Question Source:
Bank #   Modified Bank (Note changes or attach parent)
New NEW   Question History:
Last NRC Exam NEW (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 3-SPR   10 CFR Part 55 Content:
55.41 X   55.43 X   KA Statement: Steam Generator Over
-Pressure - Ability to diagnose and recognize trends in an accurate and timely manner utilizing the appropriate control room reference material.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                                             2 Group #                                           2 K/A #                               013.A2.01 Importance Rating                                 4.8 Proposed Question:               SRO# 11, SEE ATTACHED Proposed Answer:                   D Explanation (Optional):           SEE ATTACHED EOP-1 Loss of Reactor or Secondary Coolant; EOP-1.3 Transfer to Containment Sump Recirculation - Low Head Technical Reference(s):          Injection and associated bases (Attach if not previously provided)
-reference:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           031.02.LP0435.010                             (As available)
Level RO SRO   Tier #   2   Group #   2   K/A # 013.A2.0 1  Importance Rating 4.8   Proposed Question:
Question Source:             Bank #
SRO# 11, SEE ATTACHED Proposed Answer:
Modified Bank                               (Note changes or attach parent)
D   Explanation (Optional):
New                         NEW Question History:             Last NRC Exam             NEW (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                         3-SPK 10 CFR Part 55 Content:               55.41           X 55.43           X KA Statement: Ability to (a) predict the impacts of the following malfunctions or operations on the ESFAS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: LOCA NUREG-1021, Revision 9
EOP-1 Loss of Reactor or Secondary Coolant; EOP
-1.3 Transfer to Containment Sump Recirculation - Low Head Injection and associated bases (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
031.02.LP0435.010 (As available)
Question Source:
Bank #   Modified Bank       (Note changes or attach parent)
New NEW   Question History:
Last NRC Exam NEW (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 3-SPK   10 CFR Part 55 Content:
55.41 X   55.43 X   KA Statement: Ability to (a) predict the impacts of the following malfunctions or operations on the ESFAS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: LOCA NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                                             2 Group #                                           2 K/A #                             039.02.02.44 Importance Rating                                 4.4 Proposed Question:               SRO# 12, SEE ATTACHED Proposed Answer:                     B Explanation (Optional):           SEE ATTACHED AOP-24 Response to Instrument Malfunctions; ARP 1C03 1E2 1-2 Steam Generator 'A' Level Setpoint Deviation/Trouble; ARP 1C03 1E2 3-2 Steam Generator 'A' Technical Reference(s):          Feedwater Flow Channel Alert (Attach if not previously provided)
-reference:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           055.03.LP3455.002                             (As available)
Level RO SRO   Tier #   2   Group #   2   K/A # 039.02.02.44 Importance Rating 4.4   Proposed Question:
Question Source:             Bank #                   INPO 29497 Modified Bank                               (Note changes or attach parent)
SRO# 12, SEE ATTACHED Proposed Answer:
New Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
B   Explanation (Optional
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-RI 10 CFR Part 55 Content:               55.41           X 55.43           X KA Statement: Main and Reheat Steam - Ability to interpret control room indications to verify the status and operation of a system, and understand how operator actions and directives affect plant and system conditions.
): SEE ATTACHED Technical Reference(s):
AOP-24 Response to Instrument Malfunctions; ARP 1C03 1E2 1-2 Steam Generator 'A' Level Setpoint Deviation/Trouble; ARP 1C03 1E2 3
-2 Steam Generator 'A' Feedwater Flow Channel Alert (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
055.03.LP3455.002 (As available)
Question Source:
Bank # INPO 29497 Modified Bank (Note changes or attach parent)
New     Question History: Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-RI   10 CFR Part 55 Content:
55.41 X   55.43 X   KA Statement: Main and Reheat Steam  
- Ability to interpret control room indications to verify the status and operation of a system, and understand how operator actions and directives affect plant and system conditions.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                                             2 Group #                                           2 K/A #                               007.A2.03 Importance Rating                                 3.9 Proposed Question:               SRO# 13, SEE ATTACHED Proposed Answer:                   D Explanation (Optional):           SEE ATTACHED EOP-0 Reactor Trip or Safety Injection Step 9 RNO; ARB Technical Reference(s):          1C04 1C 1-1 "1T-2 PRT Press High Temp Hi Level Hi or Lo" (Attach if not previously provided)
-reference:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           043.03.LP1998.006                             (As available)
Level RO SRO   Tier #   2   Group #   2   K/A # 007.A2.03   Importance Rating 3.9   Proposed Question:
Question Source:             Bank #
SRO# 13, SEE ATTACHED Proposed Answer:
Modified Bank                               (Note changes or attach parent)
D   Explanation (Optional):
New                         NEW Question History:             Last NRC Exam             NEW (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-RI 10 CFR Part 55 Content:               55.41           X 55.43           X KA Statement: Ability to (a) predict the impacts of the following malfunctions or operations on the PRT; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Overpressurization of the PZR.
EOP-0 Reactor Trip or Safety Injection Step 9 RNO; ARB 1C04 1C 1-1 " 1T-2 PRT Press High Temp Hi Level Hi or Lo" (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
NUREG-1021, Revision 9
N/A Learning Objective:
043.03.LP1998.006 (As available)
Question Source:
Bank #   Modified Bank       (Note changes or attach parent)
New NEW   Question History:
Last NRC Exam NEW (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-RI   10 CFR Part 55 Content:
55.41 X   55.43 X   KA Statement: Ability to (a) predict the impacts of the following malfunctions or operations on the PRT; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Overpressurization of the PZR. NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                                             2 Group #                                           2 K/A #                             076.02.01.20 Importance Rating                                 4.6 Proposed Question:               SRO# 14, SEE ATTACHED Proposed Answer:                   D Explanation (Optional):           SEE ATTACHED Technical Reference(s):           OI-70 Service Water System Operation (Attach if not previously provided)
-reference:
OI-70 Att D and Proposed references to be provided to applicants during examination:                       Figure 1 Learning Objective:           051.06.LP0086.006                             (As available)
Level RO SRO   Tier #   2   Group #   2   K/A # 076.02.0 1.20   Importance Rating 4.6   Proposed Question:
Question Source:             Bank #                   LOC Modified Bank                               (Note changes or attach parent)
SRO# 14, SEE ATTACHED Proposed Answer:
New Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
D   Explanation (Optional):
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           3-SPR 10 CFR Part 55 Content:               55.41           X 55.43           X KA Statement: Service Water - Ability to interpret and execute procedure steps.
SEE ATTACHED Technical Reference(s):
NUREG-1021, Revision 9
OI-70 Service Water System Operation (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
OI-70 Att D and Figure 1 Learning Objective: 051.06.LP0086.006 (As available)
Question Source:
Bank # LOC Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 3-SPR   10 CFR Part 55 Content:
55.41 X   55.43 X   KA Statement: Service Water  
- Ability to interpret and execute procedur e steps. NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                                             2 Group #                                           2 K/A #                             103.02.04.06 Importance Rating                                 4.7 Proposed Question:               SRO# 15, SEE ATTACHED Proposed Answer:                     B Explanation (Optional):           SEE ATTACHED EOP-1.3 Transfer to Containment Sump Recirculation - Low Technical Reference(s):          Head Injection; ECA-1.3 Containment Sump Blockage (Attach if not previously provided)
-reference:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           031.02.LP0465.001                             (As available)
Level RO SRO   Tier #   2   Group #   2   K/A # 103.02.04.06 Importance Rating 4.7   Proposed Question:
Question Source:             Bank #                   INPO 27517 Modified Bank                               (Note changes or attach parent)
SRO# 15, SEE ATTACHED Proposed Answer:
New Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
B   Explanation (Optional):
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                         3-SPK 10 CFR Part 55 Content:               55.41           X 55.43           X KA Statement: Containment - Knowledge of EOP mitigation strategies.
SEE ATTACHED Technical Reference(s):
EOP-1.3 Transfer to Containment Sump Recirculation  
- Low Head Injection; ECA
-1.3 Containment Sump Blockage (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
031.02.LP0465.001 (As available)
Question Source:
Bank # INPO 27517 Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 3-SPK   10 CFR Part 55 Content:
55.41 X   55.43 X   KA Statement: Containment  
- Knowledge of EOP mitigation strategies.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                                             2 Group #                                           2 K/A #                               001.A2.14 Importance Rating                                 3.9 Proposed Question:               SRO# 16, SEE ATTACHED Proposed Answer:                   C Explanation (Optional):           SEE ATTACHED AOP-6A Dropped Rod; ARB 2C04 2A 1-6 Rod Control Technical Reference(s):          System Urgent Failure (Attach if not previously provided)
-reference:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           055.03.LP2441.002                             (As available)
Level RO SRO   Tier #   2   Group #   2   K/A # 001.A2.14   Importance Rating 3.9   Proposed Question: SRO# 16, SEE ATTACHED Proposed Answer:
Question Source:             Bank #
C   Explanation (Optional):
Modified Bank                               (Note changes or attach parent)
SEE ATTACHED Technical Reference(s):
New                         NEW Question History:             Last NRC Exam             NEW (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
AOP-6A Dropped Rod; ARB 2C04 2A 1
Question Cognitive Level:             Memory or Fundamental Knowledge                     1-P Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43           X KA Statement: Ability to (a) predict the impacts of the following malfunction or operations on the CRDS- and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Urgent failure alarm, including rod-out-of-sequence and motion-inhibit alarms.
-6 Rod Control System Urgent Failure (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
055.03.LP2441.002 (As available)
Question Source:
Bank #   Modified Bank (Note changes or attach parent)
New NEW   Question History:
Last NRC Exam NEW (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-P   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X   55.43 X   KA Statement: Ability to (a) predict the impacts of the following malfunction or operations on the CRDS- and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Urgent failure alarm , including rod
-out-of-sequence and motion
-inhibit alarms.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                                             2 Group #                                           2 K/A #                             027.02.02.25 Importance Rating                                 4.2 Proposed Question:               SRO# 17, SEE ATTACHED Proposed Answer:                   C Explanation (Optional):           SEE ATTACHED Technical Reference(s):           LCO 3.6.7 Spray Additive System Bases (Attach if not previously provided)
-reference:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           057.01.LP3336.017                             (As available)
Level RO SRO   Tier #   2   Group #   2   K/A # 02 7.02.02.25   Importance Rating 4.2   Proposed Question:
Question Source:             Bank #
SRO# 17, SEE ATTACHED Proposed Answer:
Modified Bank                                (Note changes or attach parent)
C   Explanation (Optional):
New                         NEW Question History:             Last NRC Exam             NEW (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           1-B 10 CFR Part 55 Content:               55.41           X 55.43           X KA Statement: Containment Iodine Removal - Knowledge of the bases in Technical Specifications for limiting conditions for operations and safety limits.
): LCO 3.6.7 Spray Additive System Bases (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
057.01.LP3336.017 (As available)
Question Source:
Bank #   Modified Ba nk      (Note changes or attach parent)
New NEW   Question History:
Last NRC Exam NEW (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 1-B   10 CFR Part 55 Content:
55.41 X   55.43 X   KA Statement: Containment Iodine Removal  
- Knowledge of the bases in Technical Specifications for limiting conditions for operations and safety limits.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                                             2 Group #                                           2 K/A #                             056.02.01.07 Importance Rating                                 4.7 Proposed Question:               SRO# 18, SEE ATTACHED Proposed Answer:                   D Explanation (Optional):           SEE ATTACHED Technical Reference(s):           AOP-2B Feedwater System Malfunction (Attach if not previously provided)
-reference:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           055.03.LP2439.005                             (As available)
Level RO SRO   Tier #   2   Grou p #   2   K/A # 056.02.01.07 Importance Rating 4.7   Proposed Question:
Question Source:             Bank #
SRO# 18, SEE ATTACHED Proposed Answer:
Modified Bank                               (Note changes or attach parent)
D   Explanation (Optional):
New                         NEW Question History:             Last NRC Exam             NEW (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-RI 10 CFR Part 55 Content:               55.41           X 55.43           X KA Statement: Condensate - Ability to evaluate plant performance and make operational judgements based on operating characteristics, reactor behavior, and instrument interpretation.
AOP-2B Feedwater System Malfunction (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
055.03.LP2439.005 (As available)
Question Source:
Bank #   Modified Bank (Note changes or attach parent)
New NEW   Question History: Last NRC Exam NEW (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-RI   10 CFR Part 55 Content:
55.41 X   55.43 X   KA Statement: Condensate  
- Ability to evaluate plant performance and make operational judgements based on operating characteristics, reactor behavior, and instrument interpretation.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                                             3 Group #
-reference:
K/A #                               02.01.35 Importance Rating                                 3.9 Proposed Question:               SRO# 19, SEE ATTACHED Proposed Answer:                   C Explanation (Optional):           SEE ATTACHED Technical Reference(s):           RP-1C Refueling Precaution and Limitation 3.2.11 (Attach if not previously provided)
Level RO SRO   Tier #   3   Group #     K/A # 02.01.35   Importance Rating   3.9   Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           112.01.LP0285.002                             (As available)
SRO# 19, SEE ATTACHED Proposed Answer:
Question Source:             Bank #
C   Explanation (Optional):
Modified Bank                               (Note changes or attach parent)
SEE ATTACHED Technical Reference(s):
New                         NEW Question History:             Last NRC Exam             NEW (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
RP-1C Refueling Precaution and Limitation 3.2.11 (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
Question Cognitive Level:             Memory or Fundamental Knowledge                     1-P Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43           X KA Statement: Knowledge of the fuel-handling responsibilities of SROs.
N/A Learning Objective:
112.01.LP0285.002 (As available)
Question Source:
Bank #   Modified Bank (Note changes or attach parent)
New NEW   Question History:
Last NRC Exam NEW (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-P   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X   55.43 X   KA Statement: Knowledge of the fuel
-handling responsibilities of SROs.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                                             3 Group #
-reference:
K/A #                               02.02.07 Importance Rating                                 3.6 Proposed Question:               SRO# 20, SEE ATTACHED Proposed Answer:                   C Explanation (Optional):           SEE ATTACHED FP-E-SE-03, 10CFR50.59 Applicability, Screening and Technical Reference(s):          Evaluation (Attach if not previously provided)
Level RO SRO   Tier #   3   Group #     K/A # 02.02.07   Importance Rating 3.6   Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           SD 86.02.07                                    (As available)
SRO# 20, SEE ATTACHED Proposed Answer:
Question Source:             Bank #                   PBNP 2005 SRO Modified Bank                               (Note changes or attach parent)
C   Explanation (Optional):
New Question History:             Last NRC Exam             2005 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s): FP-E-SE-03, 10CFR50.59 Applicability, Screening and Evaluation (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
Question Cognitive Level:             Memory or Fundamental Knowledge                     1-P Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43           X KA Statement: Knowledge of the process for conducting special or infrequent tests.
N/A Learning Objective:
SD 86.02.0 7 (As available)
Question Source: Bank # PBNP 2005 SRO Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam 2005 (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-P   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X   55.43 X   KA Statement: Knowledge of the process for conducting special or infrequent tests.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                                             3 Group #
-reference:
K/A #                               02.02.35 Importance Rating                                 4.5 Proposed Question:               SRO# 21, SEE ATTACHED Proposed Answer:                   D Explanation (Optional):           SEE ATTACHED Technical Reference(s):           TS 1.1 Definitions (Modes)
Level RO SRO   Tier #   3   Group #     K/A # 02.02.35   Importance Rating 4.5   Proposed Question:
(Attach if not previously provided)
SRO# 21, SEE ATTACHED Proposed Answer:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           057.01.LP3336.009                             (As available)
D   Explanation (Optional):
Question Source:             Bank #                   PBNP 2007 SRO Modified Bank                               (Note changes or attach parent)
SEE ATTACHED Technical Reference(s):
New Question History:             Last NRC Exam             2007 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
TS 1.1 Definitions (Modes)
Question Cognitive Level:             Memory or Fundamental Knowledge                     1-P Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43           X KA Statement: Ability to determine Technical Specification Mode of Operation.
(Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
057.01.LP3336.009 (As available)
Question Source:
Bank # PBNP 2007 SRO Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam 2007 (Optiona l - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-P   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X   55.43 X   KA Statement: Ability to determine Technical Specification Mode of Operation.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                                             3 Group #
-reference:
K/A #                               02.03.04 Importance Rating                                 3.7 Proposed Question:               SRO# 22, SEE ATTACHED Proposed Answer:                   A Explanation (Optional):           SEE ATTACHED Technical Reference(s):           EPIP 5.1, Personnel Emergency Dose Authorization (Attach if not previously provided)
Level RO SRO   Tier #   3   Group #     K/A # 02.03.04   Importance Rating 3.7   Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           SD 86.03.04                                   (As available)
SRO# 22, SEE ATTACHED Proposed Answer:
Question Source:             Bank #                   PBNP 2007 SRO Modified Bank                               (Note changes or attach parent)
A   Explanation (Optional):
New Question History:             Last NRC Exam             2007 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-DS 10 CFR Part 55 Content:               55.41           X 55.43           X KA Statement: Knowledge of radiation exposure limits under normal or emergency conditions.
EPIP 5.1, Personnel Emergency Dose Authorization (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
SD 86.03.04 (As available)
Question Source:
Bank # PBNP 2007 SRO Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam 2007 (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-DS   10 CFR Part 55 Content:
55.41 X   55.43 X   KA Statement: Knowledge of radiation exposure limits under normal or emergency conditions.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                                             3 Group #
-reference:
K/A #                               02.03.11 Importance Rating                                 4.3 Proposed Question:               SRO# 23, SEE ATTACHED Proposed Answer:                   D Explanation (Optional):           SEE ATTACHED RMSASRB CI 2RE-229 Unit 2 SW Overboard monitor; RMSASRB CI RE-223 Waste Distillate Tank Overboard monitor; OI-140, Standard Batch Release; AOP-4A High Effluent Activity; RAM 3.1.1 Restarting a Liquid Batch Technical Reference(s):          Release (Attach if not previously provided)
Level RO SRO   Tier #   3   Group #     K/A # 02.03.11   Importance Rating   4.3   Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           051.04.LP0063.004                             (As available)
SRO# 23, SEE ATTACHED Proposed Answer:
Question Source:             Bank #                   PBNP 2005 SRO Modified Bank                               (Note changes or attach parent)
D   Explanation (Optional):
New Question History:             Last NRC Exam             2005 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                         3-SPK 10 CFR Part 55 Content:               55.41           X 55.43           X KA Statement: Ability to control radiation releases.
RMSASRB CI 2RE
-229 Unit 2 SW Overboard monitor; RMSASRB CI RE
-223 Waste Distillate Tank Overboard monitor; OI-140, Standard Batch Release; AOP
-4A High Effluent Activity; RAM 3.1.1 Restarting a Liquid Batch Release (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
051.04.LP0063.004 (As available)
Question Source:
Bank # PBNP 2005 SRO Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam 2005 (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 3-SPK   10 CFR Part 55 Content:
55.41 X   55.43 X   KA Statement: Ability to control radiation releases.
NUREG-1021, Revision 9
NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                                             3 Group #
-reference:
K/A #                               02.04.08 Importance Rating                                 4.5 Proposed Question:               SRO# 24, SEE ATTACHED Proposed Answer:                   A Explanation (Optional):           SEE ATTACHED OM 3.7 AOP and EOP Procedure Use and Adherence Step Technical Reference(s):          6.16.3 (Attach if not previously provided)
Level RO SRO   Tier #   3   Group #     K/A # 0 2.04.08   Importance Rating 4.5   Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           LP3959.001                                     (As available)
SRO# 24, SEE ATTACHED Proposed Answer:
Question Source:             Bank #                   PBNP 2003 SRO Modified Bank                               (Note changes or attach parent)
A   Explanation (Optional):
New Question History:             Last NRC Exam             2003 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge                     1-P Comprehension or Analysis 10 CFR Part 55 Content:               55.41           X 55.43           X KA Statement: Knowledge of how abnormal operating procedures are used in conjunction with EOPs.
OM 3.7 AOP and EOP Procedure Use and Adherence Step 6.16.3 (Attach if not previousl y provided)     Proposed references to be provided to applicants during examination:
NUREG-1021, Revision 9
N/A Learning Objective:
LP3959.001 (As available)
Question Source:
Bank # PBNP 2003 SRO Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam 2003 (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge 1-P   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 X   55.43 X   KA Statement: Knowledge of how abnormal operating procedures are used in conjunction with EOPs. NUREG-1021, Revision 9


ES-401 Written Examination Question Worksheet Form-401-5   Examination Outline Cross
ES-401               Written Examination Question Worksheet                                 Form-401-5 Examination Outline Cross-reference:                   Level                         RO               SRO Tier #                                             3 Group #
-reference:
K/A #                               02.04.22 Importance Rating                                 4.4 Proposed Question:               SRO# 25, SEE ATTACHED Proposed Answer:                     B Explanation (Optional):           SEE ATTACHED CSP-ST.0 Critical Safety Function Status Trees, Step 6; OM Technical Reference(s):          3.7 AOP and EOP Procedure Use and Adherence (Attach if not previously provided)
Level RO SRO   Tier #   3   Group #     K/A # 02.04.22   Importance Rating 4.4   Proposed Question:
Proposed references to be provided to applicants during examination:                       N/A Learning Objective:           043.03.LP1995.013                             (As available)
SRO# 25, SEE ATTACHED Proposed Answer:
Question Source:             Bank #                   INPO 19175 Modified Bank                               (Note changes or attach parent)
B   Explanation (Optional):
New Question History:             Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
SEE ATTACHED Technical Reference(s):
Question Cognitive Level:             Memory or Fundamental Knowledge Comprehension or Analysis                           2-DS 10 CFR Part 55 Content:               55.41           X 55.43           X KA Statement: Knowledge of the bases for prioritizing safety functions during abnormal/emergency operations.
CSP-ST.0 Critical Safety Function Status Trees, Step 6; OM 3.7 AOP and EOP Procedure Use and Adherence (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
N/A Learning Objective:
043.03.LP1995.013 (As available)
Question Source:
Bank # INPO 19175 Modified Bank (Note changes or attach parent)
New     Question History:
Last NRC Exam (Optional  
- Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)
Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 2-DS   10 CFR Part 55 Content:
55.41 X   55.43 X   KA Statement: Knowledge of the bases for prioritizing safety functions during abnormal/emergency operations.
NUREG-1021, Revision 9}}
NUREG-1021, Revision 9}}

Latest revision as of 23:07, 4 November 2019

2012 Point Beach Nuclear Plant Initial License Examination Administered Written Exam Es 401-5 Forms
ML13028A085
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 12/17/2012
From:
NRC/RGN-III
To:
Zoia, Charles
Shared Package
ML11354A210 List:
References
Download: ML13028A085 (100)


Text

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 007.EK2.02 Importance Rating 2.6 Proposed Question: RO# 1, SEE ATTACHED Proposed Answer: A SEE ATTACHED Explanation (Optional):

883D195 Sh. 4 Logic Diagram 4160V Bus Schemes; 883D195 Technical Reference(s): Sh. 15 RC Trip Signal Logic Diagram; STPT 21.1 Sheet 16 (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 053.02.LP0273.007 (As available)

Question Source: Bank # INPO 27260 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-DR 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Knowledge of the interrelationship between a reactor trip and the following:

Breakers, relays and disconnects NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 008.AA1.06 Importance Rating 3.6 Proposed Question: RO# 2, SEE ATTACHED Proposed Answer: C SEE ATTACHED Explanation (Optional):

883D195 Sh. 18 Logic Diagram Pressurizer Pressure and Technical Reference(s): Level Control (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 043.03.LP2463.010 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-DR 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Ability to operate and/or monitor the following as they apply to the Pressurizer Vapor Space Accident: Control of PZR Level NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 026.AK3.03 Importance Rating 4.0 Proposed Question: RO# 3, SEE ATTACHED Proposed Answer: C SEE ATTACHED Explanation (Optional):

Technical Reference(s): EOP-1.1, SI Termination Step 6, Background page 12 (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 031.02.LP0405.005 (As available)

Question Source: Bank # INPO 26807 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-P Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Knowledge of the reasons for the following responses as they apply to the Loss of Component Cooling Water: Guidance actions contained in EOP for Loss of CCW NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 027.AA1.04 Importance Rating 3.9 Proposed Question: RO# 4, SEE ATTACHED Proposed Answer: C SEE ATTACHED Explanation (Optional):

AOP-18A Unit 1 Train "A" Equipment Operation; Logic Technical Reference(s): 883D195 Sheet 9 (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 055.03.LP2440.002 (As available)

Question Source: Bank # PBNP 2003 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam 2003 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-I Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Ability to operate and/or monitor the following as they apply to the Pressurizer Pressure Control Malfunctions: Pressure Recovery, using emergency-only heaters NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 029.EA2.01 Importance Rating 4.4 Proposed Question: RO# 5, SEE ATTACHED Proposed Answer: C SEE ATTACHED Explanation (Optional):

CSP-S.1, Response to Nuclear Power Generation/ATWS Step Technical Reference(s): 19 and CSP-S.1 Background Document (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 043.03.LP1996.012 (As available)

Question Source: Bank # INPO 24679 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-P Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Ability to determine or interpret the following as they apply to a ATWS: Reactor nuclear instrumentation NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 038.02.02.38 Importance Rating 3.6 Proposed Question: RO# 6, SEE ATTACHED Proposed Answer: A SEE ATTACHED Explanation (Optional):

Technical Reference(s): FSAR Chapter 14.2.4 (Attach if not previously OM 4.3.8 Control of Time Critical Actions, step 4.8.2 provided) OM 4.3.2 Attachment E, Time Critical Actions, 4.1 Proposed references to be provided to applicants during examination: N/A Learning Objective: 031.02.LP0441.004 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-B Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 X K/A Statement: Steam Generator Tube Rupture - Knowledge of conditions and limitations in the facility license NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # WE012.EK1.01 Importance Rating 3.4 Proposed Question: RO# 7, SEE ATTACHED Proposed Answer: D SEE ATTACHED Explanation (Optional):

ECA-2.1, Uncontrolled Depressurization of Both Steam Technical Reference(s): Generators Step 5; CSP-H.1 Loss of Heat Sink (Attach if not previously LP0465 LOCA and Faulted Generator Contingencies provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 031.02.LP0465.001 (As available)

Question Source: Bank # PBNP 2005 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam 2005 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-RI 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Knowledge of the operational implications of the following concepts as they apply to the Uncontrolled Depressurization of All Steam Generators: Components, capacity, and function of emergency systems.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 054.AK3.02 Importance Rating 3.4 Proposed Question: RO# 8, SEE ATTACHED Proposed Answer: A SEE ATTACHED Explanation (Optional):

AOP-2B Feedwater System Malfunction; M-202-2 Feed Technical Reference(s): P&ID; M-202-1 Condensate P&ID (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 055.03.LP2439.001 (As available)

Question Source: Bank # PBNP 2005 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam 2005 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-RI 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Knowledge of the reasons for the following responses as they apply to a Loss of Main Feedwater: matching feedwater and steam flows.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 055.EA1.07 Importance Rating 4.3 Proposed Question: RO# 9, SEE ATTACHED Proposed Answer: C SEE ATTACHED Explanation (Optional):

ECA 0.0 Unit 2 Loss of All AC Power; PBE-7033 Electrical Technical Reference(s): Drawing (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 031.02.LP0462.007 (As available)

Question Source: Bank # AOP BANK Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-RI 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Ability to operate and monitor the following as they apply to a Station Blackout:

Restoration of power from offsite.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 056.AA2.05 Importance Rating 2.6 Proposed Question: RO# 10, SEE ATTACHED Proposed Answer: C SEE ATTACHED Explanation (Optional):

Technical Reference(s): AOP-18A Unit 2 Train "A" Equipment Operation Att. A (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 052.07.LP0359.004 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-RI 10 CFR Part 55 Content: 55.41 55.43 X K/A Statement: Ability to determine and interpret the following as they apply to the Loss of Offsite Power: Operational status of HVAC chill water pump.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 057.02.04.04 Importance Rating 4.5 Proposed Question: RO# 11, SEE ATTACHED Proposed Answer: C SEE ATTACHED Explanation (Optional):

AOP-0.2 Loss of Safety Related Instrument Buses and Technical Reference(s): background (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 054.02.LP0123.011 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-I Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 X K/A Statement: Loss of Vital AC Instrument Bus - Ability to recognize abnormal indications for system operating parameters that are entry-level conditions for emergency and abnormal operating procedures.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 058.AK1.01 Importance Rating 2.8 Proposed Question: RO# 12, SEE ATTACHED Proposed Answer: A SEE ATTACHED Explanation (Optional):

0-SOP-DC-001 125VDC System, Bus D-01& Components; 0-Technical Reference(s): SOP-Y-001 120 V Vital Instrument Inverters Att. A (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 054.03.LP0121.009 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-I Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Knowledge of the operational implications of the following concepts as they apply to a Loss of DC Power: Battery charger equipment and instrumentation.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 062.AK3.02 Importance Rating 3.6 Proposed Question: RO# 13, SEE ATTACHED Proposed Answer: B SEE ATTACHED Explanation (Optional):

Technical Reference(s): 883D195 Sh. 8 Logic Diagram Safeguard Sequence (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 051.06.LP0086.005 (As available)

Question Source: Bank # LOC BANK Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-RI 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Knowledge of the reasons for the following responses as they apply to the Loss of Nuclear Service Water: The automatic actions (alignments) within the nuclear service water resulting from the actuation of the ESFAS NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 065.AA1.03 Importance Rating 2.9 Proposed Question: RO# 14, SEE ATTACHED Proposed Answer: A SEE ATTACHED Explanation (Optional):

EOP-1 Unit 1 Loss of Reactor or Secondary Coolant, Step 10c RNO; EOP-0 Reactor Trip or Safety Injection Attachment B; Technical Reference(s): Logic 8893D195 Sheet 21 (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 052.06.LP0338.006 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-RI 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Ability to operate and/or monitor the following as they apply to the Loss of Instrument Air: Restoration of systems served by instrument air when pressure is regained NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # WE04.EA2.01 Importance Rating 3.4 Proposed Question: RO# 15, SEE ATTACHED Proposed Answer: D SEE ATTACHED Explanation (Optional):

EOP-0 Reactor Trip or Safety Injection, Step 25; EOP-1 Loss Technical Reference(s): of Reactor or Secondary Coolant, Step 19 (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 031.02.LP0465.001 (As available)

Question Source: Bank # INPO 29437 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-DR 10 CFR Part 55 Content: 55.41 55.43 X K/A Statement: Ability to determine and interpret the following as they apply to a LOCA Outside Containment: Facility conditions and selection of appropriate procedures during abnormal and emergency operations NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # WE011.02.02.37 Importance Rating 3.6 Proposed Question: RO# 16, SEE ATTACHED Proposed Answer: B SEE ATTACHED Explanation (Optional):

Technical Reference(s): STPT 8.1, Auxiliary Coolant System (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 051.03.LP0064.004 (As available)

Question Source: Bank # PBNP 2005 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam 2005 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-F Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 X K/A Statement: Loss of Emergency Coolant Recirculation - Ability to determine operability and/or availability of safety related equipment.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # WE005.EK1.01 Importance Rating 3.8 Proposed Question: RO# 17, SEE ATTACHED Proposed Answer: A SEE ATTACHED Explanation (Optional):

Technical Reference(s): CSP-H.1 RCS Bleed and Feed Background Step 40 (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 043.03.LP1998.004 (As available)

Question Source: Bank # INPO 25008 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-RI 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Knowledge of the operational implications of the following concepts as they apply to the Loss of Secondary Heat Sink: Components, capacity, and function of emergency systems NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 077.AK2.03 Importance Rating 3.0 Proposed Question: RO# 18, SEE ATTACHED Proposed Answer: B SEE ATTACHED Explanation (Optional):

AOP-0.1 Declining Frequency on the 345 KV Distribution System; LP0122 13.8 KV System; STPT 21 for 13.8 KV Technical Reference(s): breaker (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 054.02.LP0122.001 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-I Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Knowledge of the interrelationship between Generator Voltage and Electric Grid Disturbance and the following: Sensors, detectors, indicators NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 2 K/A # 003.AK3.07 Importance Rating 3.8 Proposed Question: RO# 19, SEE ATTACHED Proposed Answer: B SEE ATTACHED Explanation (Optional):

LCO 3.4.2 Minimum Temperature for Criticality; AOP-6A Technical Reference(s): Dropped Rod step 4 (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 055.03.LP2441.004 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-P Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Knowledge of the reason for the following as they apply to Dropped Control Rod:

Tech-Spec limits for Tave NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 2 K/A # 028.AA1.03 Importance Rating 2.9 Proposed Question: RO# 20, SEE ATTACHED Proposed Answer: D SEE ATTACHED Explanation (Optional):

883D195 Sh. 18 Logic Diagram Pressurizer Pressure and Technical Reference(s): Level Control; 684J741 sh. 2 CVCS system P&ID (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 051.01.LP0078.004 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-RI 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Ability to operate and/or monitor the following as they apply to the Pressurizer Level Control Malfunction: RCP and seal water system NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 2 K/A # 032.AA2.05 Importance Rating 2.9 Proposed Question: RO# 21, SEE ATTACHED Proposed Answer: C SEE ATTACHED Explanation (Optional):

883D195 Sh. 11 Nuclear Instrumentation Trip Signals; 883D195 Sh. 12 Nuclear Instrumentation Premissives &

Technical Reference(s): Blocks; Master Data Book 3.2.7 PP-1 (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 053.03.LP2416.012 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-RI 10 CFR Part 55 Content: 55.41 55.43 X K/A Statement: Ability to interpret the following as they apply to the Loss of Source Range Nuclear Instrumentation: Nature of abnormality, from rapid survey of control room data.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 2 K/A # 033.02.04.45 Importance Rating 4.1 Proposed Question: RO# 22, SEE ATTACHED Proposed Answer: C SEE ATTACHED Explanation (Optional):

883D195 Sh. 11 Nuclear Instrumentation Trip Signals; 883D195 Sh. 12 Nuclear Instrumentation Premissives &

Technical Reference(s): Blocks; 0-SOP-IC-001-RED (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 053.03.LP2416.011 (As available)

Question Source: Bank # KEWAUNEE 2011 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-RI 10 CFR Part 55 Content: 55.41 X 55.43 X K/A Statement: Loss of Intermediate Range Nuclear Instrumentation - Ability to prioritize and interpret the significance of each annunciator or alarm.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 2 K/A # 037.AK1.01 Importance Rating 2.9 Proposed Question: RO# 23, SEE ATTACHED Proposed Answer: B SEE ATTACHED Explanation (Optional):

Technical Reference(s): Steam Table; AOP-3 Steam Generator Tube Leak (Attach if not previously provided)

Proposed references to be provided to applicants during examination: Steam Table Learning Objective: 055.03.LP2438.001 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 3-SPR 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Knowledge of the operational implications of the following concepts as they apply to Steam Generator Tube Leak: Use of steam tables.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 2 K/A # 061.AK2.01 Importance Rating 2.5 Proposed Question: RO# 24, SEE ATTACHED Proposed Answer: A SEE ATTACHED Explanation (Optional):

RMSASRB CI RE-223B, RE-223 Background Monitor; RMSASRB CI RE-223, Waste Distillate Tank Overboard Technical Reference(s): Monitor (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 051.07.LP0275.001 (As available)

Question Source: Bank # PBNP 2005 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam 2005 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-F Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Knowledge of the interrelationships between the Area Radiation Monitor (ARM)

System Alarms and the following: Detectors at each ARM system location.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 2 K/A # WE014.EK3.04 Importance Rating 3.3 Proposed Question: RO# 25, SEE ATTACHED Proposed Answer: C SEE ATTACHED Explanation (Optional):

Technical Reference(s): CSP-Z.1 Response to High Containment Pressure (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 043.03.LP2000.006 (As available)

Question Source: Bank # PBNP 2003 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam 2003 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-B Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Knowledge of the reasons for the following responses as they apply to the High Containment Pressure: RO or SRO function within the control room team as appropriate to the assigned position, in such a way that procedures are adhered to and the limitations in the facilities license and amendments are not violated.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 2 K/A # WE015.EK1.01 Importance Rating 2.8 Proposed Question: RO# 26, SEE ATTACHED Proposed Answer: A SEE ATTACHED Explanation (Optional):

CSP-Z.2, 'Response to Containment Flooding and Technical Reference(s): background (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 043.03.LP2000.002 (As available)

Question Source: Bank # INPO 27286 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-P Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Knowledge of the operational implications of the following concepts as they apply to Containment Flooding: Components, capacity, and functions of emergency systems NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 2 K/A # WE016.EK2.02 Importance Rating 2.6 Proposed Question: RO# 27, SEE ATTACHED Proposed Answer: B SEE ATTACHED Explanation (Optional):

EOP-0 Reactor Trip or Safety Injection foldout page and Technical Reference(s): bases (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 031.02.LP1829.003 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-RI 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Knowledge of the interrelations between High Containment Radiation and the following: Facilities heat removal systems, including primary coolant, emergency coolant, the decay heat removal systems, and relations between proper operation of these systems to the operation of the facility.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 003.K5.03 Importance Rating 3.1 Proposed Question: RO# 28, SEE ATTACHED Proposed Answer: B SEE ATTACHED Explanation (Optional):

Technical Reference(s): EOP 0.1 Reactor Trip Response (Attach if not previously LP0231 Reactor Coolant System provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 051.01.LP0231.009 (As available)

Question Source: Bank # Primaries Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-F Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Knowledge of the operational implications of the following concepts as they apply to the RCP's: Effects of RCP shutdown on Tave, including the reason for the unreliability of Tave in the shutdown loop.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 004.K6.20 Importance Rating 2.5 Proposed Question: RO# 29, SEE ATTACHED Proposed Answer: A SEE ATTACHED Explanation (Optional):

684J741 Sh. 2, CVCS drawing; AOP-1D, CVCS Malfunction; Technical Reference(s): AOP-5B Loss of Instrument Air Attachment H for CCW (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 055.03.LP3718.001 (As available)

Question Source: Bank # PBNP 2005 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam 2005 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-RI 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Knowledge of the effect of a loss or malfunction on the following CVCS component:

Function of demineralizer, including boron loading and temperature limits NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 005.A1.02 Importance Rating 3.3 Proposed Question: RO# 30, SEE ATTACHED Proposed Answer: C SEE ATTACHED Explanation (Optional):

Technical Reference(s): 110E018 Sh. 1 RHR P&ID (Attach if not previously LP0069 Residual Heat Removal System provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 051.03.LP0069.010 (As available)

Question Source: Bank # PBNP 2007 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam 2007 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-RI 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the RHRS controls including: RHR flow rate.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 006.A2.08 Importance Rating 3.0 Proposed Question: RO# 31, SEE ATTACHED Proposed Answer: D SEE ATTACHED Explanation (Optional):

EOP-0 Reactor Trip or Safety Injection Attachment A; 499B466 Elementary drawing for 2P-15B Sh. 226; 883D195 Technical Reference(s): Sh. 8 Logic Diagram Safeguard Sequence (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 051.03.LP0066.003 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-RI 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Ability to (a) predict the impacts of the following malfunctions or operations on the ECCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operation: Effect of electric power loss on valve position.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 007.A3.01 Importance Rating 2.7 Proposed Question: RO# 32, SEE ATTACHED Proposed Answer: D SEE ATTACHED Explanation (Optional):

CVCS Drawings 684J741 Sh. 2 and 3; Waste Disposal Technical Reference(s): Drawing 684J741 Sh. 1A; CCW Drawing 110E018 Sh. 2 (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 051.02.LP0079.002 (As available)

Question Source: Bank # PBNP 2007 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam 2007 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-F Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Ability to monitor automatic operation of the PRTS, including: Components which discharge to the PRT.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 008.A4.02 Importance Rating 2.5 Proposed Question: RO# 33, SEE ATTACHED Proposed Answer: B SEE ATTACHED Explanation (Optional):

1-SOP-CC-002 section 5.12 page 96; CCW Drawing 110E018 Technical Reference(s): Sh. 3 (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 051.06.LP0084.001 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-RI 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Ability to manually operate and/or monitor in the control room: Filling and draining operations of the CCW System including proper venting of the components NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 010.02.01.23 Importance Rating 4.3 Proposed Question: RO# 34, SEE ATTACHED Proposed Answer: B SEE ATTACHED Explanation (Optional):

OP 3C Hot Standby to Cold Shutdown Unit 1/2; 883D195 Sh.

Technical Reference(s): 18 Pressurizer Pressure and Level Control (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 055.01.LP0272.008 (As available)

Question Source: Bank # BANK OPS Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-DR 10 CFR Part 55 Content: 55.41 X 55.43 X K/A Statement: Pressurizer Pressure Control - Ability to perform specific system and integrated plant procedures during all modes of plant operation.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 012.K1.08 Importance Rating 2.9 Proposed Question: RO# 35, SEE ATTACHED Proposed Answer: B SEE ATTACHED Explanation (Optional):

883D195 Sh.7 SI Logic Sheet; 883D195 Sh. 10 Feed Control Technical Reference(s): Logic sheet (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 053.06.LP0486.001 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-RI 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Knowledge of the physical connections and/or cause effect relationships between the RPS and the following: MFW NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 013.K2.01 Importance Rating 3.6 Proposed Question: RO# 36, SEE ATTACHED Proposed Answer: C SEE ATTACHED Explanation (Optional):

EOP-0, Reactor Trip or Safety Injection, Attachment A, SI panel Checks, Step A11; Safety Injection System Drawing

  1. 110E035, Sh. 1; 889D195 Sh 9 SI Logic; Master Data Book Technical Reference(s): 3.2.6 2B-32 MCC; Master Data Book 3.2.6 2B-42 MCC (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 051.03.LP0066.003 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-RI 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Knowledge of bus power supplies to the following: ESFAS/safeguards equipment control.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 022.K3.02 Importance Rating 3.0 Proposed Question: RO# 37, SEE ATTACHED Proposed Answer: A SEE ATTACHED Explanation (Optional):

Technical Reference(s): KFI04L, Level Sensors and Detectors (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: KFI04L.04C (As available)

Question Source: Bank # PBNP 2007 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam 2007 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-RI 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Knowledge of the effect that a loss or malfunction of the CCS (Containment Cooling System) will have on the following: Contanment instrumentation readings.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 026.K4.01 Importance Rating 4.2 Proposed Question: RO# 38, SEE ATTACHED Proposed Answer: B SEE ATTACHED Explanation (Optional):

EOP-1.3 Transfer to Containment Sump Recirculation - Low Technical Reference(s): Head Injection and background (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 031.02.LP0435.010 (As available)

Question Source: Bank # INPO 27574 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-P Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Knowledge of the CSS (Containment Spray System) design feature(s) and/or interlock(s) which provide for the following: Sources of water for CSS, including recirculation phase after LOCA NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 039.K1.01 Importance Rating 3.1 Proposed Question: RO# 39, SEE ATTACHED Proposed Answer: B SEE ATTACHED Explanation (Optional):

STPT 2.2, Steam Line Isolation Setpoint document; 883D195 Technical Reference(s): Sh. 7 MSIV logic (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 031.02.LP0441.003 (As available)

Question Source: Bank # PBNP 2005 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam 2005 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-DR 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Knowledge of the physical connections and/or cause-effect relationships between the MRSS (Main and Reheat Steam) and the following systems: S/G NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 039.K5.05 Importance Rating 2.7 Proposed Question: RO# 40, SEE ATTACHED Proposed Answer: D SEE ATTACHED Explanation (Optional):

Technical Reference(s): LP0448 Heatup and Cooldown Limitations (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 043.02.LP0448.004 (As available)

Question Source: Bank # TECH SPEC BANK Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-B Comprehension or Analysis 10 CFR Part 55 Content: 55.41 55.43 K/A Statement: Knowledge of the operations implications of the following concepts as they apply to the MRSS (Main and Reheat Steam): Bases for RCS cooldown limits NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 059.K3.04 Importance Rating 3.6 Proposed Question: RO# 41, SEE ATTACHED Proposed Answer: B SEE ATTACHED Explanation (Optional):

AOP-5B Loss of Instrument or Service Air Attachment T; 1C03 1E2 1-4 ARB; 883D195 Sh.10 Main Feed Reg Valve Technical Reference(s): logic; LP2462 FSAR Secondary Transient Analysis (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 043.02.LP2462.004 (As available)

Question Source: Bank # INPO 26113 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-RI 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Knowledge of the effect that a loss or malfunction of the MFW will have on the following: RCS NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 059.A1.03 Importance Rating 2.7 Proposed Question: RO# 42, SEE ATTACHED Proposed Answer: C SEE ATTACHED Explanation (Optional):

Technical Reference(s): AOP-2B Feedwater System Malfunction Step 8a (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 055.03.LP2439.004 (As available)

Question Source: Bank # PBNP 2007 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam 2007 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-P Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the MFW controls including: Power level restrictions for operation of MFW pumps and valves NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 061.K4.09 Importance Rating 3.7 Proposed Question: RO# 43, SEE ATTACHED Proposed Answer: D SEE ATTACHED Explanation (Optional):

CSP-H.1, Loss of Heat Sink; Master Data Book 3.2.1(1A-06),

3.2.2(2A-05), 3.2.4(2B-04); M-217 Sh. 1 Aux Feedwater System; M-217 Sh. 2 Aux Feedwater System; M-2217 Aux Technical Reference(s): Feedwater System (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 052.05.LP0169.003 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-RI 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Knowledge of AFW design feature(s) and/or interlock(s) which provide for the following: Crossties between multi-unit station NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 061.A2.07 Importance Rating 3.4 Proposed Question: RO# 44, SEE ATTACHED Proposed Answer: D SEE ATTACHED Explanation (Optional):

ARP 1C03 1D 1-8 1P-53 AFP Low Suction Pressure Trip; West. 833D195 Sh. 27; OM 3.7, AOP and EOP Procedure Usage for Response to Plant Transients; STPT 14.11 Aux Technical Reference(s): Feedwater (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 052.05.LP0169.006 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-RI 10 CFR Part 55 Content: 55.41 X 55.43 X K/A Statement: Ability to (a) predict the impacts of the following malfunctions or operations on the AFW; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operation: Air or MOV failure NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 062.A1.01 Importance Rating 3.4 Proposed Question: RO# 45, SEE ATTACHED Proposed Answer: C SEE ATTACHED Explanation (Optional):

Technical Reference(s): TS-81 Emergency Diesel Generator G-01 Monthly test (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 054.02.LP0133.006 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-P Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the AC Distibution System controls including: Significance of D/G load limits NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 062.A3.05 Importance Rating 3.5 Proposed Question: RO# 46, SEE ATTACHED Proposed Answer: B SEE ATTACHED Explanation (Optional):

PBF-7033, PBNP Electrical Drawing; LP0007 4160 VAC Technical Reference(s): Distribution; LP0133 Emergency Diesel Generators (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 054.01.LP0007.004 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-F Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Ability to monitor automatic operation of the AC Distribution system, including:

Safety-related indicators and controls.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 063.K2.01 Importance Rating 2.9 Proposed Question: RO# 47, SEE ATTACHED Proposed Answer: A SEE ATTACHED Explanation (Optional):

AOP 0.0, Vital DC System Malfunction; LP0121 DC Technical Reference(s): Distribution System (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 055.03.LP3456.001 (As available)

Question Source: Bank # PBNP 2002 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam 2002 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-F Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Knowledge of bus power supplies to the following: Major DC loads.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 063.A4.03 Importance Rating 3.0 Proposed Question: RO# 48, SEE ATTACHED Proposed Answer: D SEE ATTACHED Explanation (Optional):

ARP 2C20 A 2-2 D-01/D-03 125V DC Bus Under/Over Technical Reference(s): Voltage; ARP 2C20 A 1-1 D07 Battery Charger Trouble (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 054.01.LP0121.006 (As available)

Question Source: Bank # PBNP 2007 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam 2007 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-RI 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Ability to manually operate and/or monitor in the control room: Battery discharge rate NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 064.K6.08 Importance Rating 3.2 Proposed Question: RO# 49, SEE ATTACHED Proposed Answer: A SEE ATTACHED Explanation (Optional):

Master Data Book 3.2.5 1B40 MCC; Master Data Book 3.2.6 Technical Reference(s): 2B40 MCC; M-219 Sh. 3 Fuel Oil P&ID (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 054.02.LP0133.004 (As available)

Question Source: Bank # PBNP 2002 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam 2002 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-RI 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Knowledge of the effect of a loss or malfunction of the following will have on the ED/G system: Fuel oil storage tanks NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 064.02.04.30 Importance Rating 2.7 Proposed Question: RO# 50, SEE ATTACHED Proposed Answer: D SEE ATTACHED Explanation (Optional):

TS-84 Emergency Diesel Generator Monthly; NP 2.1.5 Electrical Communications, Switchyard Access and Work Technical Reference(s): Planning (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 054.02.LP0133.006 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-P Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 X K/A Statement: Emergency Diesel Generator - Knowledge of events related to system operation/status that must be reported to internal organizations or external agencies, such as the State, the NRC, or the transmission system operator.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 073.K1.01 Importance Rating 3.6 Proposed Question: RO# 51, SEE ATTACHED Proposed Answer: C SEE ATTACHED Explanation (Optional):

RMSASRB CI 2RE-219 SGBD Liquid Sample Line Monitor Unit 2; RMSASRB CI 2RE-222 SGBD Tank Area Monitor Technical Reference(s): Unit 2 (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 052.02.LP0037.004 (As available)

Question Source: Bank # PBNP 2005 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam 2005 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-I Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Knowledge of the physical connections and/or cause effect relationships between the PRM (Process Radiation Monitoring) system and the following systems: Those systems served by PRMs.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 073.A2.02 Importance Rating 2.7 Proposed Question: RO# 52, SEE ATTACHED Proposed Answer: D SEE ATTACHED Explanation (Optional):

RMSASRB CI RE-214 Aux Building Vent Exhaust; Technical Reference(s): RMSASRB 1.0 Generic RMS Alarm Response Guidelines (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 053.05.LP0286.004 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 1-P 10 CFR Part 55 Content: 55.41 X 55.43 X K/A Statement: Ability to (a) predict the impacts of the following malfunctions or operations on the PRM (Process Radiation Monitoring) system; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Detector failure.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 076.K2.04 Importance Rating 2.5 Proposed Question: RO# 53, SEE ATTACHED Proposed Answer: C SEE ATTACHED Explanation (Optional):

Master Data Book 3.2.6 2B32; Master Data Book 3.2.6 2B42; Technical Reference(s): 883D195 Sh. SI logic (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 051.06.LP0086.004 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-RI 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Knowledge of bus power supplies to the following: Reactor building closed cooling water (Service Water)

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 078.K3.02 Importance Rating 3.4 Proposed Question: RO# 54, SEE ATTACHED Proposed Answer: D SEE ATTACHED Explanation (Optional):

Technical Reference(s): AOP-5B Loss of Instrument or Service Air (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 052.06.LP0338.007 (As available)

Question Source: Bank # PBNP 2007 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam 2007 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-RI 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Knowledge of the effect that a loss or malfunction of the Instrument Air System will have on the following: Systems having pneumatic valves and controls NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 103.K4.06 Importance Rating 3.1 Proposed Question: RO# 55, SEE ATTACHED Proposed Answer: A SEE ATTACHED Explanation (Optional):

Technical Reference(s): Logic Drawing 883D195 Sh. 7, Containment Isolation (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 053.06.LP0486.14 (As available)

Question Source: Bank # PBNP 2007 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam 2007 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-F Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Knowledge of containment system design feature(s) and/or interlock(s) which provide for the following: Containment isolation system.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 001.K2.01 Importance Rating 3.5 Proposed Question: RO# 56, SEE ATTACHED Proposed Answer: B SEE ATTACHED Explanation (Optional):

OI-31 Rod Drive Motor Generator Set; LP0131 Rod Drive Technical Reference(s): MG Sets (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 054.04.LP0213.002 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-I Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Knowledge of bus power supplies to the following: One-line diagram of power supply to M/G sets.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 014.K1.02 Importance Rating 3.0 Proposed Question: RO# 57, SEE ATTACHED Proposed Answer: B SEE ATTACHED Explanation (Optional):

Technical Reference(s): OP-1B Reactor Startup (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 055.03.LP2441.003 (As available)

Question Source: Bank # INPO 27672 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-DR 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Knowledge of the physical connections and/or cause effect relationships between the RPIS and the following systems: NIS NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 016.K4.03 Importance Rating 2.8 Proposed Question: RO# 58, SEE ATTACHED Proposed Answer: A SEE ATTACHED Explanation (Optional):

Logic Drawing Sh. 23, LOFWTT; STPT 15.1, Turbine Trips, Technical Reference(s): Alarms and AMSAC (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 053.02.LP1828.002 (As available)

Question Source: Bank # PBNP 2007 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam 2007 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-DR 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Knowledge of NNIS (Non-Nuclear Instrumentation System) design feature(s) and/or interlock(s) which provide for the following: Input to control systems NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 029.A1.03 Importance Rating 3.0 Proposed Question: RO# 59, SEE ATTACHED Proposed Answer: C SEE ATTACHED Explanation (Optional):

LCO 3.6.4 Containment Pressure; LCO 3.6.5 Containment Temperature; PBF-2061 Control Room Shift Turnover Technical Reference(s): Checklist (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 057.02.LP3342.002 (As available)

Question Source: Bank # INPO 26746 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-P Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the Containment Purge System controls including: Containment pressure, temperature, and humidity NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 035.K5.03 Importance Rating 2.8 Proposed Question: RO# 60, SEE ATTACHED Proposed Answer: B SEE ATTACHED Explanation (Optional):

Technical Reference(s): LP0446 S/G Transient Response (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 043.01.LP0446.003 (As available)

Question Source: Bank # INPO 24696 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-F Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Knowledge of operational implications of the following concepts as the apply to the S/Gs: Shrink and swell concept NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 055.K3.01 Importance Rating 2.5 Proposed Question: RO# 61, SEE ATTACHED Proposed Answer: D SEE ATTACHED Explanation (Optional):

Technical Reference(s): LP2439 Secondary Coolant Malfunctions (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 055.03.LP2439.004 (As available)

Question Source: Bank # INPO 23359 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-DR 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Knowledge of the effect that a loss or malfunction of the CARS (Condenser Air Removal system) will have on the following: Main condenser NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 068.A2.02 Importance Rating 2.7 Proposed Question: RO# 62, SEE ATTACHED Proposed Answer: D SEE ATTACHED Explanation (Optional):

OI-140B Standard Radioactive Batch Liquid Release-Waste Distillate Tanks; RAM 3.1.1 Restarting a Liquid Batch Technical Reference(s): Release (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 051.04.LP0063.004 (As available)

Question Source: Bank # INPO 24086 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-P Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 X K/A Statement: Ability to (a) predict the impacts of the following malfunctions or operations on the Liquid Radwaste System ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Lack of tank recirculation prior to release.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 072.A3.01 Importance Rating 2.9 Proposed Question: RO# 63, SEE ATTACHED Proposed Answer: A SEE ATTACHED Explanation (Optional):

Logic Drawing 883D195 Sh. 21 Containment Isolation/Containment Ventilation Isolation; Logic Drawing 883D195 Sh. 7 Safeguards Actuation Signals; RMSARB 1RE-305, Containment Purge Exhaust Low Range Gas Monitor; Technical Reference(s): Drawing M-215 Sh. 1, Containment Ventilation D (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 051.05.LP0057.004 (As available)

Question Source: Bank # PBNP 2007 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam 2007 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-I Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Ability to monitor automatic operation of the ARM (Area Radiation Monitoring) system, including: Changes in ventilation alignment.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 079.A4.01 Importance Rating 2.7 Proposed Question: RO# 64, SEE ATTACHED Proposed Answer: B SEE ATTACHED Explanation (Optional):

Technical Reference(s): STPT 14.7 Instrument and Service Air (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 052.06.LP0338.004 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-RI 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Ability to manually operate and/or monitor in the control room: Cross-tie valves with Instrument Air System NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 086.02.04.35 Importance Rating 3.8 Proposed Question: RO# 65, SEE ATTACHED Proposed Answer: B SEE ATTACHED Explanation (Optional):

PC76 Part 7, Inspection of Fixed Automatic Dry Chemical Fire Extinguishing Systems; LP0003 Fire Protection System Technical Reference(s): lesson plan (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 052.01.LP0003.007 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-P Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 X K/A Statement: Fire Protection - Knowledge of local auxiliary operator tasks during an emergency and the resultant operational effects.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 3 Group #

K/A # 02.01.06 Importance Rating 3.8 Proposed Question: RO# 66, SEE ATTACHED Proposed Answer: B SEE ATTACHED Explanation (Optional):

OM 3.7, AOP and EOP Procedure Usage for Response to Technical Reference(s): Plant Transients (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 02.01.06 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-P Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 X K/A Statement: Ability to manage the control room crew during plant transients.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 3 Group #

K/A # 02.01.26 Importance Rating 3.4 Proposed Question: RO# 67, SEE ATTACHED Proposed Answer: D SEE ATTACHED Explanation (Optional):

OP-AA-101-1000 Fleet Clearance and Tagging Section 2.0 Terms and Definitions for Hazardous Energy and High Technical Reference(s): Energy System (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 02.01.26 (As available)

Question Source: Bank # ADMIN BANK Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-P Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Knowledge of industrial safety procedures (such as rotating equipment, electrical, high temperature, high pressure, caustic, chlorine, oxygen and hydrogen)

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 3 Group #

K/A # 02.02.17 Importance Rating 2.6 Proposed Question: RO# 68, SEE ATTACHED Proposed Answer: D SEE ATTACHED Explanation (Optional):

Technical Reference(s): NP 2.1.8 Guarded Equipment (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 02.02.17 (As available)

Question Source: Bank # LOC BANK Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-P Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 X K/A Statement: Knowledge of the process for managing maintenance activities during power operations, such as risk assessments, work prioritization, and coordination with the transmission system operator NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 3 Group #

K/A # 02.02.21 Importance Rating 2.9 Proposed Question: RO# 69, SEE ATTACHED Proposed Answer: B SEE ATTACHED Explanation (Optional):

PC97 Part 1 Service Water Flush 'A' Accidnet Fan; IT 08A Cold Start 1P-29 TDAFW Pump; IT 07G Service Water Valves Quarterly; IT 01 Train A High Head SI Pumps and Technical Reference(s): Valves Train A (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 02.02.21 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-P Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 X K/A Statement: Knowledge of pre- and post-maintenance operability requirements NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 3 Group #

K/A # 02.02.41 Importance Rating 3.5 Proposed Question: RO# 70, SEE ATTACHED Proposed Answer: C SEE ATTACHED Explanation (Optional):

Technical Reference(s): 883D195 Logic Sheet 20 & 26; LP0169 Auxiliary Feedwater (Attach if not previously provided)

Proposed references to be provided to applicants during examination: 883D195 SHEET 20 Learning Objective: 052.05.LP0169.004 (As available)

Question Source: Bank # BANK LOC Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 3-SPR 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Ability to obtain and interpret station electrical and mechanical drawings.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 3 Group #

K/A # 02.03.12 Importance Rating 3.2 Proposed Question: RO# 71, SEE ATTACHED Proposed Answer: B SEE ATTACHED Explanation (Optional):

0-SOP-FH-001 Fuel/Insert/Component Movement in the SFP Technical Reference(s): or New Fuel vault P&L 3.4.1 (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 112.01.LP0260.001 (As available)

Question Source: Bank # PBNP 2009 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam 2009 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-B Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 K/A Statement: Knowledge of radiological safety principles pertaining to licensed operator duties, such as containment entry requirements, fuel handling responsibilities, access to locked high-radiation areas, aligning filters, etc NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 3 Group #

K/A # 02.03.13 Importance Rating 3.4 Proposed Question: RO# 72, SEE ATTACHED Proposed Answer: B SEE ATTACHED Explanation (Optional):

Technical Reference(s): RP-1C, Refueling P&L 3.3.5 (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 055.02.LP2186.001 (As available)

Question Source: Bank # PBNP 2005 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam 2005 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-DR 10 CFR Part 55 Content: 55.41 X 55.43 X K/A Statement: Knowledge of radiological safety procedures pertaining to licensed operator duties, such as response to radiation monitor alarms, containment entry requirements, fuel handling responsibilities, access to locked high-radiation areas, aligning filters, etc NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 3 Group #

K/A # 02.03.14 Importance Rating 3.4 Proposed Question: RO# 73, SEE ATTACHED Proposed Answer: A SEE ATTACHED Explanation (Optional):

Technical Reference(s): EOP-3, Steam Generator Tube Rupture Background Step 11 (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 031.02.LP0441.002 (As available)

Question Source: Bank # INPO 19590 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-B Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 X K/A Statement: Knowledge of radiation or contamination hazards that may arise during normal, abnormal, or emergency conditions or activities NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 3 Group #

K/A # 02.04.34 Importance Rating 4.2 Proposed Question: RO# 74, SEE ATTACHED Proposed Answer: B SEE ATTACHED Explanation (Optional):

AOP-10A, Safe Shutdown - Local Control; Master Data Book 3.2.1 1A05; Master Data Book 3.2.1 1A06; Master Data Book Technical Reference(s): 3.2.2 2A05; Master Data Book 3.2.2 2A06 (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 055.03.LP1275.001 (As available)

Question Source: Bank # PBNP 2007 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam 2007 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-DS 10 CFR Part 55 Content: 55.41 X 55.43 X K/A Statement: Knowledge of RO tasks performed outside the main control room during an emergency and the resultant operational effects.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 3 Group #

K/A # 02.04.41 Importance Rating 2.9 Proposed Question: RO# 75, SEE ATTACHED Proposed Answer: C SEE ATTACHED Explanation (Optional):

Technical Reference(s): EPIP 1.2.1 Emergency Action Level Technical Basis (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: PBN BEP.061.005L.005 (As available)

Question Source: Bank # LOC BANK Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-DR 10 CFR Part 55 Content: 55.41 X 55.43 X K/A Statement: Knowledge of the emergency action level thresholds and classifications NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 026.AA2.02 Importance Rating 3.6 Proposed Question: SRO# 1, SEE ATTACHED Proposed Answer: D Explanation (Optional): SEE ATTACHED Technical Reference(s): AOP-1A, Reactor Coolant Leak; AOP-9B, Attachment B, B3 (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 055.03.LP2444.008 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam NEW (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 3-SPK 10 CFR Part 55 Content: 55.41 55.43 X KA Statement: Ability to determine and interpret the following as they apply to the Loss of Component Cooling Water: The cause of possible CCW loss.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 029.02.04.09 Importance Rating 4.2 Proposed Question: SRO# 2, SEE ATTACHED Proposed Answer: C Explanation (Optional): SEE ATTACHED Technical Reference(s): CSP-S.1 Response to Nuclear Generation/ATWS, Step 20 (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 043.03.LP1996.011 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam NEW (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 3-SPK 10 CFR Part 55 Content: 55.41 X 55.43 X KA Statement: ATWS - Knowledge of low power/shutdown implications in accident (e.g., loss of coolant accident or loss of residual heat removal) mitigation strategies.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 038.EA2.07 Importance Rating 4.8 Proposed Question: SRO# 3, SEE ATTACHED Proposed Answer: C Explanation (Optional): SEE ATTACHED Technical Reference(s): EOP-3 Steam Generator Tube Rupture, Step 37 and bases (Attach if not previously provided)

Proposed references to be provided to applicants during examination: EOP-3 Step 37 Learning Objective: 031.02.LP0441.013 (As available)

Question Source: Bank # LOC BANK Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-RI 10 CFR Part 55 Content: 55.41 55.43 X KA Statement: Ability to determine or interpret the following as they apply to a SGTR: Plant conditions, from survey of control room indications.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 054.02.02.40 Importance Rating 4.7 Proposed Question: SRO# 4, SEE ATTACHED Proposed Answer: D Explanation (Optional): SEE ATTACHED LCO 3.7.3 MFIV, MFRV, and MFRV Bypass's with Technical Reference(s): associated bases (Attach if not previously provided)

Proposed references to be provided to applicants during examination: LCO 3.7.3 Learning Objective: 057.03.LP3343.002 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam NEW (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 3-SPR 10 CFR Part 55 Content: 55.41 X 55.43 X KA Statement: Loss of Main Feedwater - Ability to apply technical specifications for a system.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 056.AA2.21 Importance Rating 3.8 Proposed Question: SRO# 5, SEE ATTACHED Proposed Answer: B Explanation (Optional): SEE ATTACHED Technical Reference(s): ECA-0.0 Loss of All AC, Step 9 and Bases (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 031.02.LP0462.007 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam NEW (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 3-SPK 10 CFR Part 55 Content: 55.41 55.43 X KA Statement: Ability to determine and interpret the following as they apply to the Loss of Offsite Power: ED/G frequency and voltage indicators.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 058.02.01.32 Importance Rating 4.0 Proposed Question: SRO# 6, SEE ATTACHED Proposed Answer: A Explanation (Optional): SEE ATTACHED LCO 3.8.4 DC Sources - Operating and bases; 0-SOP-DC-003 125 VDC System Bus D03 and Components; AOP-0.0 Vital Technical Reference(s): DC Malfunctions (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 057.02.LP3344.002 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam NEW (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 3-SPK 10 CFR Part 55 Content: 55.41 X 55.43 X KA Statement: Loss of DC Power - Ability to explain and apply system limits and precautions.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 2 K/A # 005.AA2.03 Importance Rating 4.4 Proposed Question: SRO# 7, SEE ATTACHED Proposed Answer: C Explanation (Optional): SEE ATTACHED Technical Reference(s): LCO 3.1.4 Rod Group Alignment Limits and bases (Attach if not previously provided)

Proposed references to be provided to applicants during examination: LCO 3.1.4 Learning Objective: 057.02.LP3338.003 (As available)

Question Source: Bank # TS BANK Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 3-SPR 10 CFR Part 55 Content: 55.41 55.43 X KA Statement: Ability to determine and interpret the following as they apply to the Inoperable /

Stuck Control Rod: Required actions if more than one rod is stuck or inoperable.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 2 K/A # 060.02.04.18 Importance Rating 4.0 Proposed Question: SRO# 8, SEE ATTACHED Proposed Answer: B Explanation (Optional): SEE ATTACHED EOP-1.3 Transfer to Containment Sump Recirculation - Low Head Injection, Step 30 background; LCO 3.7.14 Primary Technical Reference(s): Auxiliary Ventilation and associated Bases (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 057.02.LP3343.002 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam NEW (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-RI 10 CFR Part 55 Content: 55.41 X 55.43 X KA Statement: Accidental Gaseous Radwaste Release - Knowledge of the specific bases for EOPs.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 2 K/A # 067.AA2.13 Importance Rating 4.4 Proposed Question: SRO# 9, SEE ATTACHED Proposed Answer: A Explanation (Optional): SEE ATTACHED Technical Reference(s): AOP-10A Safe Shutdown - Local Control and bases (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 055.03.LP1275.001 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-P Comprehension or Analysis 10 CFR Part 55 Content: 55.41 55.43 X KA Statement: Ability to determine and interpret the following as they apply to the Plant Fire on Site: Need for emergency shutdown.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 2 K/A # WE13.02.04.47 Importance Rating 4.2 Proposed Question: SRO# 10, SEE ATTACHED Proposed Answer: A Explanation (Optional): SEE ATTACHED CSP-ST.0 Critical Safety Function Trees; OM 3.7 AOP and Technical Reference(s): EOP Procedure Use and Adherence (Attach if not previously provided)

Proposed references to be provided to applicants during examination: CSP-ST.0 Figs. 1 - 3 Learning Objective: 043.03.LP1995.011 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam NEW (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 3-SPR 10 CFR Part 55 Content: 55.41 X 55.43 X KA Statement: Steam Generator Over-Pressure - Ability to diagnose and recognize trends in an accurate and timely manner utilizing the appropriate control room reference material.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 013.A2.01 Importance Rating 4.8 Proposed Question: SRO# 11, SEE ATTACHED Proposed Answer: D Explanation (Optional): SEE ATTACHED EOP-1 Loss of Reactor or Secondary Coolant; EOP-1.3 Transfer to Containment Sump Recirculation - Low Head Technical Reference(s): Injection and associated bases (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 031.02.LP0435.010 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam NEW (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 3-SPK 10 CFR Part 55 Content: 55.41 X 55.43 X KA Statement: Ability to (a) predict the impacts of the following malfunctions or operations on the ESFAS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: LOCA NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 039.02.02.44 Importance Rating 4.4 Proposed Question: SRO# 12, SEE ATTACHED Proposed Answer: B Explanation (Optional): SEE ATTACHED AOP-24 Response to Instrument Malfunctions; ARP 1C03 1E2 1-2 Steam Generator 'A' Level Setpoint Deviation/Trouble; ARP 1C03 1E2 3-2 Steam Generator 'A' Technical Reference(s): Feedwater Flow Channel Alert (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 055.03.LP3455.002 (As available)

Question Source: Bank # INPO 29497 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-RI 10 CFR Part 55 Content: 55.41 X 55.43 X KA Statement: Main and Reheat Steam - Ability to interpret control room indications to verify the status and operation of a system, and understand how operator actions and directives affect plant and system conditions.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 007.A2.03 Importance Rating 3.9 Proposed Question: SRO# 13, SEE ATTACHED Proposed Answer: D Explanation (Optional): SEE ATTACHED EOP-0 Reactor Trip or Safety Injection Step 9 RNO; ARB Technical Reference(s): 1C04 1C 1-1 "1T-2 PRT Press High Temp Hi Level Hi or Lo" (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 043.03.LP1998.006 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam NEW (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-RI 10 CFR Part 55 Content: 55.41 X 55.43 X KA Statement: Ability to (a) predict the impacts of the following malfunctions or operations on the PRT; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Overpressurization of the PZR.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 076.02.01.20 Importance Rating 4.6 Proposed Question: SRO# 14, SEE ATTACHED Proposed Answer: D Explanation (Optional): SEE ATTACHED Technical Reference(s): OI-70 Service Water System Operation (Attach if not previously provided)

OI-70 Att D and Proposed references to be provided to applicants during examination: Figure 1 Learning Objective: 051.06.LP0086.006 (As available)

Question Source: Bank # LOC Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 3-SPR 10 CFR Part 55 Content: 55.41 X 55.43 X KA Statement: Service Water - Ability to interpret and execute procedure steps.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 103.02.04.06 Importance Rating 4.7 Proposed Question: SRO# 15, SEE ATTACHED Proposed Answer: B Explanation (Optional): SEE ATTACHED EOP-1.3 Transfer to Containment Sump Recirculation - Low Technical Reference(s): Head Injection; ECA-1.3 Containment Sump Blockage (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 031.02.LP0465.001 (As available)

Question Source: Bank # INPO 27517 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 3-SPK 10 CFR Part 55 Content: 55.41 X 55.43 X KA Statement: Containment - Knowledge of EOP mitigation strategies.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 001.A2.14 Importance Rating 3.9 Proposed Question: SRO# 16, SEE ATTACHED Proposed Answer: C Explanation (Optional): SEE ATTACHED AOP-6A Dropped Rod; ARB 2C04 2A 1-6 Rod Control Technical Reference(s): System Urgent Failure (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 055.03.LP2441.002 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam NEW (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-P Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 X KA Statement: Ability to (a) predict the impacts of the following malfunction or operations on the CRDS- and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Urgent failure alarm, including rod-out-of-sequence and motion-inhibit alarms.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 027.02.02.25 Importance Rating 4.2 Proposed Question: SRO# 17, SEE ATTACHED Proposed Answer: C Explanation (Optional): SEE ATTACHED Technical Reference(s): LCO 3.6.7 Spray Additive System Bases (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 057.01.LP3336.017 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam NEW (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 1-B 10 CFR Part 55 Content: 55.41 X 55.43 X KA Statement: Containment Iodine Removal - Knowledge of the bases in Technical Specifications for limiting conditions for operations and safety limits.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 056.02.01.07 Importance Rating 4.7 Proposed Question: SRO# 18, SEE ATTACHED Proposed Answer: D Explanation (Optional): SEE ATTACHED Technical Reference(s): AOP-2B Feedwater System Malfunction (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 055.03.LP2439.005 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam NEW (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-RI 10 CFR Part 55 Content: 55.41 X 55.43 X KA Statement: Condensate - Ability to evaluate plant performance and make operational judgements based on operating characteristics, reactor behavior, and instrument interpretation.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 3 Group #

K/A # 02.01.35 Importance Rating 3.9 Proposed Question: SRO# 19, SEE ATTACHED Proposed Answer: C Explanation (Optional): SEE ATTACHED Technical Reference(s): RP-1C Refueling Precaution and Limitation 3.2.11 (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 112.01.LP0285.002 (As available)

Question Source: Bank #

Modified Bank (Note changes or attach parent)

New NEW Question History: Last NRC Exam NEW (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-P Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 X KA Statement: Knowledge of the fuel-handling responsibilities of SROs.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 3 Group #

K/A # 02.02.07 Importance Rating 3.6 Proposed Question: SRO# 20, SEE ATTACHED Proposed Answer: C Explanation (Optional): SEE ATTACHED FP-E-SE-03, 10CFR50.59 Applicability, Screening and Technical Reference(s): Evaluation (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: SD 86.02.07 (As available)

Question Source: Bank # PBNP 2005 SRO Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam 2005 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-P Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 X KA Statement: Knowledge of the process for conducting special or infrequent tests.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 3 Group #

K/A # 02.02.35 Importance Rating 4.5 Proposed Question: SRO# 21, SEE ATTACHED Proposed Answer: D Explanation (Optional): SEE ATTACHED Technical Reference(s): TS 1.1 Definitions (Modes)

(Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 057.01.LP3336.009 (As available)

Question Source: Bank # PBNP 2007 SRO Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam 2007 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-P Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 X KA Statement: Ability to determine Technical Specification Mode of Operation.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 3 Group #

K/A # 02.03.04 Importance Rating 3.7 Proposed Question: SRO# 22, SEE ATTACHED Proposed Answer: A Explanation (Optional): SEE ATTACHED Technical Reference(s): EPIP 5.1, Personnel Emergency Dose Authorization (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: SD 86.03.04 (As available)

Question Source: Bank # PBNP 2007 SRO Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam 2007 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-DS 10 CFR Part 55 Content: 55.41 X 55.43 X KA Statement: Knowledge of radiation exposure limits under normal or emergency conditions.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 3 Group #

K/A # 02.03.11 Importance Rating 4.3 Proposed Question: SRO# 23, SEE ATTACHED Proposed Answer: D Explanation (Optional): SEE ATTACHED RMSASRB CI 2RE-229 Unit 2 SW Overboard monitor; RMSASRB CI RE-223 Waste Distillate Tank Overboard monitor; OI-140, Standard Batch Release; AOP-4A High Effluent Activity; RAM 3.1.1 Restarting a Liquid Batch Technical Reference(s): Release (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 051.04.LP0063.004 (As available)

Question Source: Bank # PBNP 2005 SRO Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam 2005 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 3-SPK 10 CFR Part 55 Content: 55.41 X 55.43 X KA Statement: Ability to control radiation releases.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 3 Group #

K/A # 02.04.08 Importance Rating 4.5 Proposed Question: SRO# 24, SEE ATTACHED Proposed Answer: A Explanation (Optional): SEE ATTACHED OM 3.7 AOP and EOP Procedure Use and Adherence Step Technical Reference(s): 6.16.3 (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: LP3959.001 (As available)

Question Source: Bank # PBNP 2003 SRO Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam 2003 (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge 1-P Comprehension or Analysis 10 CFR Part 55 Content: 55.41 X 55.43 X KA Statement: Knowledge of how abnormal operating procedures are used in conjunction with EOPs.

NUREG-1021, Revision 9

ES-401 Written Examination Question Worksheet Form-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 3 Group #

K/A # 02.04.22 Importance Rating 4.4 Proposed Question: SRO# 25, SEE ATTACHED Proposed Answer: B Explanation (Optional): SEE ATTACHED CSP-ST.0 Critical Safety Function Status Trees, Step 6; OM Technical Reference(s): 3.7 AOP and EOP Procedure Use and Adherence (Attach if not previously provided)

Proposed references to be provided to applicants during examination: N/A Learning Objective: 043.03.LP1995.013 (As available)

Question Source: Bank # INPO 19175 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam (Optional - Questions validated at the facility since 10/95 will generally undergo less rigorous review by the NRC; failure to provide the information will necessitate a detailed review of every question)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 2-DS 10 CFR Part 55 Content: 55.41 X 55.43 X KA Statement: Knowledge of the bases for prioritizing safety functions during abnormal/emergency operations.

NUREG-1021, Revision 9